AMENDMENT 1 IDAHO FALLS POWER CONTRACTOR MAP.PDF
PDF 3 MB Posted
- Solicitation number
- 697DCK-18-R-00436
About this file
AMENDMENT 1 IDAHO FALLS POWER CONTRACTOR MAP (PDF)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1413.pdf | ||
| DAVIS BACON WAGES.docx | DOCX document | |
| AMENDMENT 1.pdf | ||
| SOLICITATION.pdf | ||
| AMENDMENT 1 UPDATED DRAWING C-001.pdf | ||
| DRAWINGS.pdf | ||
| SPECIFICATIONS.pdf | ||
| SOLICITATION.pdf | ||
| DAVIS BACON WAGES.docx | DOCX document | |
| SPECIFICATIONS.pdf | ||
| DRAWINGS.pdf | ||
| SF-1413.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
M
P
IDAHO FALLS POWER MUST INSPECT
ALL TRENCHES PRIOR TO BACKFILL.
CONTACT IDAHO FALLS POWER,
GRANT CAMPBELL 220-0486
GENERAL CONSTRUCTION AND ELECTRICAL NOTES:
1. CENTERLINE OF POWER TRENCH AS NOTED ON PLAN.
2. MINIMUM DEPTH OF ALL PRIMARY POWER TRENCHES SHALL BE 54" BELOW FINISHED
GRADE W/ 6" OF SAND BEDDING BELOW AND ABOVE TOP OF CONDUIT. MINIMUM DEPTH OF
ALL SECONDARY AND FIBER OPTIC TRENCHES SHALL BE 30" BELOW FINISHED GRADE.
PRIMARY, SECONDARY, AND FIBER OPTIC CONDUIT DEPTHS CAN BE REDUCED TO 18" OF
COVER BELOW FINISHED GRADE, BUT RIGID GALVANIZED STEEL CONDUIT AND ELBOWS
MUST BE PROVIDED AND INSTALLED BY THE DEVELOPER/CONTRACTOR WHERE THE
TRENCH DEPTH IS LESS THAN 48" DEEP.
3. TRENCH WIDTH SHALL BE 5.0' UNLESS OTHERWISE NOTED. BOTTOM OF TRENCHES
MUST BE LEVEL FOR CONDUIT INSTALLATION.
4. BACK-FILL AND COMPACT ALL TRENCHES TO A MINIMUM OF 95% OF MAXIMUM DENSITY.
5. ALL PRIMARY, SECONDARY, STREET LIGHT, AND FIBER OPTIC CONDUITS INCLUDING
ELBOWS AND FITTINGS SHALL BE SUPPLIED AND INSTALLED BY THE
DEVELOPER/CONTRACTOR UNLESS OTHERWISE NOTED. ALL ELECTRICAL AND FIBER
CONDUIT SHALL BE SCHEDULE 40 PVC. ALL ELBOWS SHALL BE 36" RADIUS SCHEDULE 40
PVC UNLESS OTHERWISE NOTED.
6. THE DEVELOPER/ENGINEER SHALL PROVIDE STAKING AND LAYOUT OF NEW ELECTRICAL
AND FIBER OPTIC FACILITIES.
7. ALL LOT CORNERS ADJACENT TO ALL POWER TRENCHES MUST BE CLEARLY MARKED
FOR INSTALLATION OF ELECTRICAL FACILITIES.
8. THE CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING ELECTRICAL AND FIBER
OPTIC FACILITIES DURING CONSTRUCTION. ALSO, REPAIR/REPLACE ALL CONCRETE,
ASPHALT, AND LANDSCAPING THAT IS DISTURBED DURING CONSTRUCTION.
9. ALL NEW ELECTRICAL FACILITIES AND FIBER OPTICS FACILITIES SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE CURRENT IDAHO FALLS POWER SERVICE
POLICY. COORDINATE WITH IDAHO FALLS POWER.
10. ELECTRICAL SECTIONALIZING CABINETS, SECONDARY BOXES, FIBER BOXES
TRANSFORMER BASES, ETC.(WHEN REQUIRED) WILL BE PROVIDED BY IDAHO FALLS
POWER BUT SHALL BE INSTALLED BY THE DEVELOPER/CONTRACTOR.
11. OWNER SHALL BEAR ALL COSTS TO RELOCATE OR REMOVE EXISTING POWER POLES,
LIGHT POLES, ANCHOR GUYS, AND MISCELLANEOUS ELECTRICAL FACILITIES UNLESS
OTHERWISE NOTED.
12. ALL TRENCHES AND CONDUITS (INCLUDING ROAD CROSSINGS) MUST BE INSPECTED BY
IDAHO FALLS POWER PRIOR TO BACK -FILLING. IDAHO FALLS POWER WILL PROVIDE
GROUND RODS AND CONTRACTOR WILL INSTALL GROUND RODS PRIOR TO INSTALLATION
OF CONDUIT.
13. CONTRACTOR/DEVELOPER TO INSTALL A PULL STRING THROUGH EACH RUN OF FIBER
OPTIC CONDUIT.
14. ALL PRIMARY CONDUIT MUST HAVE A MINIMUM OF ONE (1) FOOT SEPARATION
BETWEEN OTHER CONDUITS IN TRENCH.
15. OWNER/DEVELOPER SHALL PROVIDE ALL TRENCHING, CONDUIT AND CONCRETE LIGHT
POLE FOUNDATIONS FOR STREET ILLUMINATION ALONG ALL PUBLIC RIGHT OF WAYS AS
PER IDAHO FALLS POWER SERVICE POLICY. ADDITION TO, OWNER/DEVLEOPER SHALL
PURCHASE STREET LIGHT ASSEMBLY PROVIDED AND INSTALLED BY IDAHO FALLS POWER.
CITY OF IDAHO FALLS, IDAHO
Date:
Designed By:
CadFile:
140 South Capital Ave.
PO Box 50220
Idaho Falls, ID 83405-0220
Telephone: 208-612-8430
Scale:
Reviewed By:
Work Request No.
Sheet:
REVISION:
REVISION:
REVISION:
REVISION:
GENERAL LAYOUT AND CONSTRUCTION MAP
IDAHO FALLS AIRPORT - ADDITIONAL LIGHTING 2018
T, 2 N., R 37 E., B.M., SECTION 15, Plate 1
1"=50'
6/22/2018
G.C.
Electrical Design - Airport New Lighting 2018
CONTRACTOR'S MAP
J.R./J.M.
30934 1 of 1
N
1 " = 50'
25 10050
LEGEND (NEW CONSTRUCTION)
EXISTING 2" SCHEDULE 40 PVC CONDUIT (FIBER)
INSTALL 2" SCHEDULE 40 PVC CONDUIT (FIBER)
EXISTING 2" SCHEDULE 40 PVC CONDUIT
INSTALL 2" SCHEDULE 40 PVC CONDUIT
EXISTING 2-1/2" SCHEDULE 40 PVC CONDUIT
INSTALL 2-1/2" SCHEDULE 40 PVC CONDUIT
EXISTING 3" SCHEDULE 40 PVC CONDUIT
INSTALL 3" SCHEDULE 40 PVC CONDUIT
EXISTING 4" SCHEDULE 40 PVC CONDUIT
INSTALL 4" SCHEDULE 40 PVC CONDUIT
INSTALL SINGLE PHASE A PRIMARY OVER-HEAD CONDUCTOR
EXISTING SINGLE PHASE A PRIMARY OVER-HEAD CONDUCTOR
INSTALL SINGLE PHASE A PRIMARY UNDERGROUND CONDUCTOR IN 2-1/2" SCHEDULE 40 PVC CONDUIT
EXISTING SINGLE PHASE A PRIMARY UNDERGROUND CONDUCTOR
INSTALL SINGLE PHASE B PRIMARY OVER-HEAD CONDUCTOR
EXISTING SINGLE PHASE B PRIMARY OVER-HEAD CONDUCTOR
INSTALL SINGLE PHASE B PRIMARY UNDERGROUND CONDUCTOR IN 2-1/2" SCHEDULE 40 PVC CONDUIT
EXISTING SINGLE PHASE B PRIMARY UNDERGROUND CONDUCTOR
INSTALL SINGLE PHASE C PRIMARY OVER-HEAD CONDUCTOR
EXISTING SINGLE PHASE C PRIMARY OVER-HEAD CONDUCTOR
INSTALL SINGLE PHASE C PRIMARY UNDERGROUND CONDUCTOR IN 2-1/2" SCHEDULE 40 PVC CONDUIT
EXISTING SINGLE PHASE C PRIMARY UNDERGROUND CONDUCTOR
EXISTING IDAHO FALLS FIBER OPTIC LINE
INSTALL IDAHO FALLS FIBER OPTIC LINE IN 2" SCHEDULE 40 PVC CONDUIT
INSTALL THREE PHASE PRIMARY OVER-HEAD CONDUCTOR
INSTALL THREE PHASE PRIMARY UNDERGROUND CONDUCTOR IN 4" SCHEDULE 40 PVC CONDUIT
EXISTING THREE PHASE PRIMARY OVER-HEAD CONDUCTOR
EXISTING THREE PHASE PRIMARY UNDERGROUND CONDUCTOR
INSTALL SECONDARY OVER-HEAD CONDUCTOR
EXISTING SECONDARY OVER-HEAD CONDUCTOR
INSTALL SECONDARY UNDERGROUND CONDUCTOR
EXISTING SECONDARY UNDERGROUND CONDUCTOR
EXISTING PARCEL LINE
EXISTING EASEMENT LINE
INSTALL THREE PHASE TRANSFORMER PAD (6'X 7' - SMALL OR 7'X8') (BY CONTRACTOR)
INSTALL THREE PHASE TRANSFORMER (BY IDAHO FALLS POWER)
EXISTING THREE PHASE TRANSFORMER (7'X 8')
(PROVIDED BY IDAHO FALLS POWER-INSTALLED BY CONTRACTOR)
INSTALL SINGLE / THREE PHASE SECTIONALIZING CABINET (BY IDAHO FALLS POWER)
EXISTING SINGLE / THREE PHASE SECTIONALIZING CABINET
INSTALL SINGLE PHASE TRANSFORMER BASE (PROVIDED BY IDAHO FALLS POWER-INSTALLED BY CONTRACTOR). INSTALL
ONE -10' LENGTH OF 2-1/2" PVC SECONDARY SERVICE CONDUIT FROM THE CENTER OF EACH TRANSFORMER IN BOTH
DIRECTIONS AT 45° ANGLE INTO EACH LOT. UNLESS OTHERWISE NOTED. CAP END OF CONDUITS AND MARK WITH 2X4).
EXISTING SINGLE PHASE TRANSFORMER
INSTALL POWER POLE / INSTALL POWER POLE WITH ANCHOR GUY
EXISTING POWER POLE / EXISTING POWER POLE WITH ANCHOR GUY
INSTALL POWER POLE WITH OVER-HEAD TRANSFORMER (PHASE NOTED BY COLOR)
EXISTING POWER POLE WITH OVER-HEAD TRANSFORMER TO BE MOVED OR REMOVED
INSTALL CITY OF IDAHO FALLS STANDARD STREET LIGHT
EXISTING CITY OF IDAHO FALLS STANDARD STREET LIGHT
INSTALL SMALL/LARGE FIBER OPTIC JUNCTION BOX
EXISTING SMALL/LARGE FIBER OPTIC JUNCTION BOX
INSTALL SECONDARY PEDESTAL(PROVIDED BY IDAHO FALLS POWER-INSTALLED BY CONTRACTOR). INSTALL ONE -10'
LENGTH OF 2-1/2" PVC SECONDARY SERVICE CONDUIT FROM THE CENTER OF EACH SECONDARY PEDISTAL IN BOTH
DIRECTIONS AT 45° ANGLE INTO EACH LOT. UNLESS OTHERWISE NOTED. CAP END OF CONDUITS AND MARK WITH 2X4).
EXISTING SECONDARY PEDESTAL
EXISTING METER
INSTALL JUNCTION BOX
EXISTING JUNCTION BOX
JB
JB
M
P
P
INSTALL SINGLE / THREE PHASE SECTIONALIZING CABINET BASE
Z P
U B
L I C
W
O R
K S P
A R
K S
P
R O
J E C
T S I d a h o
F a l l s
A i r p o r t n e w l i g h t i n g
D e s i g n M a p s
I F P
E l e c t r i c a l
D e s i g n
A i r p o r t
N e w
L i g h t i n g d w g
A
M g c a m p b e
File details come from the government source that posted it.