About this file

AMENDMENT00002 (pdf)

View the file

Other files

File Type Posted
E404 Drawing Redlines.pdf PDF
Concrete Topping - 2.jpg JPG image
amendment0003.pdf PDF
amendment0001.pdf PDF
697DCK18R00378.pdf PDF
Mod4 Area - 16.pdf PDF
Water Containment Pit - Mod 4.pdf PDF
Mod 4 Section Detail 7-10R.pdf PDF
WAGERATE.pdf PDF
Concrete Topping - 3.jpg JPG image
Amendment00004.pdf PDF
North Wall opening.pdf PDF
E401 Drawing Redlines.pdf PDF
ZMA - 1200961 - Control Wing Mod 4 Area Modernization - Project Specifications.pdf PDF
SSI.doc DOC document
BusinessDeclaration.pdf PDF
E703 Drawing Redlines.pdf PDF
Work De-scope K-Line Fire wall - Drawings.pdf PDF
Concrete Topping - 1.jpg JPG image
Concrete Topping - 1.jpg JPG image
Mod 4 Section Detail 7-10R.pdf PDF
ZMA - 1200961 - Control Wing Mod 4 Area Modernization - Project Specifications.pdf PDF
E703 Drawing Redlines.pdf PDF
E401 Drawing Redlines.pdf PDF
Concrete Topping - 2.jpg JPG image
amendment0001.pdf PDF
AMENDMENT00002.pdf PDF
697DCK18R00378.pdf PDF
WAGERATE.pdf PDF
amendment0003.pdf PDF
SSI.doc DOC document
Concrete Topping - 3.jpg JPG image
Work De-scope K-Line Fire wall - Drawings.pdf PDF
E404 Drawing Redlines.pdf PDF
BusinessDeclaration.pdf PDF
Mod4 Area - 16.pdf PDF
Concrete Topping - 1.jpg JPG image
WAGERATE.pdf PDF
SSI.doc DOC document
Concrete Topping - 3.jpg JPG image
ZMA - 1200961 - Control Wing Mod 4 Area Modernization - Project Specifications.pdf PDF
Mod 4 Section Detail 7-10R.pdf PDF
Work De-scope K-Line Fire wall - Drawings.pdf PDF
BusinessDeclaration.pdf PDF
Concrete Topping - 2.jpg JPG image
Mod4 Area - 16.pdf PDF
E404 Drawing Redlines.pdf PDF
AMENDMENT00002.pdf PDF
E703 Drawing Redlines.pdf PDF
E401 Drawing Redlines.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 9

0002 05/18/2018

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1200 DISTRICT AVENUE

BURLINGTON MA 01803

AAQ510BOS-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-18-R-00378

copies to the issuing office.

05/18/2018

(x)

Amendment #00002 is issued for the attached questions and answers:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan Newcomb

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ZMA Control Wing Mod 4 Area Modernization: Combined RFI Questions and Responses

1. Drawing A301, A302, A601: What is the scope change, if any, relating to the 2-hour fire rated barrier on the K-Line wall?

The design intent was to complete the horizontal shaft wall from the attic floor level, without removing any existing work associated with the CBI Lab Room 1051A. After a more detailed inspection of the configuration of the existing wall, it was determined, by the Fire Protection Engineers, that the design approach stated on the drawings would not suffice the requirements of a complete 2hr rated assembly.

The FAA is looking for a different solution to this matter to avoid affecting the existing work in the CBI Lab and delaying the current construction project for the Mod 4 Area modernization. For these reasons, the FAA has decided to de-scope the construction of the 2hr horizontal shaft wall at the K-Line wall. Existing wall construction is to remain. For reference, see redlines on drawing sheets A301, A302, and A601, attached to this email.

2. Drawing A101 Note 6: Does the FAA wish to receive alternate proposals aside from the approach listed for mitigating dust?

The Contractor can proposed an alternate method as part of the bid (aside from the approach listed for mitigating dust), if it presents an advantage to the Government. This Bid alternate shall be submitted in writing with the proper justification and must be correlated to the specific section of the work indicated on drawing A101 and project specifications, for FAA review and approval.

3. Is the FAA responsible for moving and storing furniture from areas of work?

The FAA will remove existing furniture stored inside the Mod 4 space prior to work.

4. Is there an extension to the bid due date pending scope changes and RFI answers?

Bid closing date have been extended until July 17, 2018 at 5:00 p.m.

5. Are there as-built drawings available showing the existing concrete topping slab on the first floor? If so, please provide.

Old documentations indicates the installation of 1 inch concrete toping on top of the waffle slab. There is no as-built drawings showing specific details of the topping. See drawing attached (Mod 4 Section Detail 7-10R).

6. Are there photos of the existing concrete topping slab on the first flooring being installed?

If so, please provide?

This construction is dated back to the 1960’s. No pictures are available.

7. What is the thickness of the existing concrete topping slab?

According to original construction drawings, a 1” topping was installed. To confirm this information, a piece of the existing topping was removed and measured 1.5 inches thick (See picture attached).

8. Per Keyed Demolition Note #2 on sheet A101, the existing exterior door at Existing Stair

3 (Door No. 001) is to be removed. Per the Door and Frame Schedule on sheet A611, Door No. 001 is shown as existing. Clarify whether this door is to remain or be replaced. If it is to be replaced, please provide information on the new door to be installed.

Existing Door 001 is existing to remain. Door will receive new hardware compatible with Security Access Control System, as indicated on drawings.

9. Please provide a plumbing isometric for the new plumbing work.

Isometric for drain and vent is not available. Field coordination is required. See contract drawings and specs for additional requirements. See response to Question #10, for additional information.

10. Per Keyed Note #1, there is a new VTR to be installed. Please verify that this VTR is necessary and must be installed.

The VTR will be vented through the wall. Penetration must include approved flashing, sealant, and screen cover. The vent must penetrate the wall at least 18’ above the floor of the mechanical room.

11. Please advise what the existing flooring to be removed in the existing admin area is.

The existing flooring to be removed is a combination of VCT and Carpet.

12. Please clarify what the size of the existing exterior opening at the north wall is. Will further concrete cutting and removal be required to achieve desired opening size?

See Dimensions indicated on drawings. No additional cutting will be required for the North Wall temporary opening.

13. Please confirm that the installation of the 2-hour rated shaft wall on the first floor is to be removed from the scope of work.

See response for question #1.

14. It is stated in the specifications that the contractor is to provide a fire watch. Is the contractor responsible for provide fire watch personnel?

Provide fire watch as indicated on Drawings and Specs. Fire watch is required during any open flame activity.

15. Please advise if there are any cracks in the existing basement ceiling (slab above) that have already been identified?

No cracks have been identified on the waffle slab floor. All existing sleeve penetrations have been sealed but not necessarily watertight. Please clarify what is the intention of this question?

16. Please confirm that any loose furniture will be moved or stored by the owner prior to the contractor starting work. If this is not the case, please indicate what will be in the contractor’s scope for moving and/or protecting existing furniture.

FAA will remove all furniture and stored material outside the Mod 4 Area prior to the work.

17. In the case that the existing concrete topping slab is well-adhered to the slab below and troublesome to remove, can the topping slab remain or must the topping slab be removed in full?

Topping shall be removed as indicated on drawings.

18. Please advise where the temporary water and temporary power hook up locations are.

Contractor to coordinate with Power Company for temporary hook-up. Contractor is responsible for water.

19. Per General Demolition Note #3, no water shall be used during cutting of concrete walls, however, it was stated during the site visit that water could be used for dust control. Can water be used when saw cutting the concrete wall?

The intent is to cut the wall without the use of water. If water must be used, contractor must provide reason and a mitigation plan to contain water and keep it from affecting critical equipment in the basement.

20. Per General Demolition Note C on sheet A101, a jackhammer can be used for the topping slab removal. Per Note 4 on sheet S100 regarding the interior concrete wall removal, use of jackhammers is not permitted. Does this mean that a jackhammer can be used for the topping slab removal but not for the wall removal? Please clarify.

A jackhammer may be used on the wall for selective demo as needed. The intent is for the wall to be chain/saw cut.

21. Will the contractor be allowed to use existing electrical outlets for small tools?

Building Service power can be used for construction tools. An existing Building Service panel in Room 1051A (CBI Lab) is available to power construction tools. Contractor shall coordinated with the COR in advance.

22. Detail 3 on sheet A651 shows cement board in mechanical room where epoxy flooring is to be installed. Is cement board to be installed floor to ceiling in this room?

The cement board will be eliminated. Gyp (No. 5/8 drywall type X) will cover the entire wall. Refer to drawings A111 and A601 for wall partition types.

23. Light fixture A1 is not shown on the Luminaire Schedule on sheet E302. Please add to Luminaire Schedule.

Refer to lighting fixture schedule on Sheet E602.

24. Please provide an isometric or more information on the drain line up to attic described in Keyed Note #7 on sheet F112.

No isometric is available. See picture attached for reference. Mod4 Area -16.jpg

25. Is the existing fire alarm system currently being services by a contractor? If so, please provide the name of the contractor.

Alemany Building Solutions 786-350-6909.

26. Can the Superintendent, if appropriately qualified, also fulfill the duties of Quality Control Manager?

No. QC personnel shall be dedicated to that task.

27. Specification 01 14 00 paragraph 1.1.N states that Powder driven fasteners, tools, and devices are not allowed on facility property. Can this limitation be waived?

Powder actuated fasteners, tools, or devices are not allowed on FAA Property.

28. Specification 05 12 00 paragraph 1.7.A and B state the structural steel needs to be fabricated at an AISC certified fabricator and that the erection is performed by an AISC certified erector. The scope of the structural steel for this project is limited to the work associated with overhead door entrance, and there are very few AISC certified erectors and fabricators in the south half of Florida. Can the AISC certified fabricator and erector requirement be removed?

The certified fabricator and erector requirements shall be removed, but the shop drawings, welder certifications, and quality control requirements will not be removed.

29. The threshold detail 3/A611 and the details on sheet A651, suggest that an epoxy floor be placed in room 106 with the pitch from 2” to the drain completely in epoxy materials.

Will it be acceptable to extend the concrete topping slab with slope into room 106 and place an 1/8” minimum epoxy coating over the topping slab?

The floor in room 106 will be sloped with a topping that is separate from the self-levelling topping used for the rest of the space. The sloped floor will be installed after the self-leveling floor, equipment pad, and pipes have been installed. The edges of the sloped floor will be finished to match the self levelling toping around the room. The epoxy coatings will be installed on the sloped surface of the topping. Detail 3/A611 will be changed to indicate that the floor coatings extend to the center of the door and the joint will be covered by the threshold.

30. In concealed locations can the communications and controls cabling be run using plenum rated cable or is EMT required?

All wiring and/or cables shall be installed in conduit as per contract drawings and specifications.

31. No bid form or bid format was provided for the pricing response to the solicitation. Is there a required format for the price proposal?

Pricing shall be listed per Division and Specification Section corresponding to the type of work.

32. Detail 1/A601 is called out to be installed along column line K. A review of the documentation from the site visit suggests that there is already a Gypsum Wall board soffit installed at this location, and it is not shown to be removed on the demolition plans.

In addition, access to this area will need be done from room 1051A which was not accessed on the site visit. How is detail 1/A601 to be correlated to actual conditions in the field, or has it already been installed? If detail 1/A601 or some variation is to be installed, what is required for access to room 1051A?

See response to question #1.

33. Fire Alarm System: Sheet Y201 in general sheet note 3 states ‘otherwise provide new circuits and panels’, while note 6 on sheet Y001 states ‘connect to existing fire alarm control panel.’ Is a new panel to be assumed as required or not required for this proposal?

New panel for fire alarm is not required. All new devices will be added to existing system.

Additional NAC power supply’s may be required.

34. Rated Walls and Storage Rooms 1040A/1042A: Sheet L101 shows that storage 1040A and 1042A are to be enclosed by a 1 hour rated wall. This is not reflected on the walls shown on sheet A111 for this location nor for doors 131 and 132 on the door schedule on sheet A601. Are these walls and doors to be rated is the rating line shown on sheet L101 to be removed?

The 1 Hour Rating is not required for the storage rooms.

35. Storage Rooms 1040A/1042A: Sheet A101 shows the location of storage rooms 1040A and 1042A to have existing exterior windows. No work is shown on sheet A111 on the exterior wall. What is required at the exterior wall for new work at the location of storage rooms 1040A and 1042A?

A new furred out wall will be needed at the north curtain wall to close the storage rooms.

No window is required inside the storage space.

36. In lieu of removing the concrete topping slab and placing a new concrete slab, would placement of an epoxy surface to fill cracks and provide for levelling of the existing surface be acceptable?

Concrete topping shall be removed and new topping installed as indicated on Drawings.

37. Sheet M104 has keyed note 4 for new containment drip pan. There are no specifications on this pan. What materials are acceptable for the containment drip pan?

The pan will be 18ga galvenized sheet metal. The pan is to have minimum of 2” side walls with 3/4" wide flanges. The width of the pan must extend 2” beyond each side of the pipe insulation and supports. Pans are to be supported from slotted channel and threaded rod supports.

QUESTIONS/ISSUES RAISED BY SSDI CONTRACTOR: VERSAR SECURITY SYSTEMS:

• Section 01 14 00, 1.2, H. (page 5) calls for SSDI contractor to temporarily relocate or remove existing security components required to complete the work. There is existing security conduit/wiring running through the ceiling space above existing rooms 1042, 1042A and 1040 that doesn’t look like it will be affected. Confirm?

Work related to rooms 1042, 1042A, and 1040 will not affect any existing security system conduit running above ceiling.

• Section 08 71 00 (Door Hardware), 3.06, A., A. (Door 100) – The lockset for this door needs to be electrified. It also needs to be equipped with a latch bolt monitor. The part number shown does not indicate either of these options.

Provide electrified lockset with latch bolt monitor for Door 100, and rough-in installation as indicated on drawing E703. Sargent Locks are indicated on the Door Hardware schedule to establish a manufacturer basis of design and to maintain consistency with the rest of the Facility doors. Coordinate hardware with SSDI contractor for compatibility with security/access control devices and accessories. Intent is for Door 100 to have access control from both Sides of door.

• Section 08 71 00 (Door Hardware), 3.06, A., B. (Door EX1) – The exit device for this door needs to be electrified. It also needs to be equipped with a latch bolt monitor. The part number shown does not indicate either of these options. There also needs to be a power supply shown for the exit device. The power supply should be equipped with battery backup.

Provide electrified Exit Device with latch bolt monitor for Door EX1, and rough-in installation as indicated on drawing E703. Von Duprin 98/99 Series Exit Devices are indicated on the Door Hardware schedule to establish a manufacturer basis of design and to maintain consistency with the rest of the Facility doors. Coordinate hardware with SSDI contractor for compatibility with security/access control devices and accessories. Provide power supply equipped with battery backup at door location, from the same manufacturer of the Exit Device to ensure compatibility.

Provide new 120V circuit from new Panel B1051B. Door will also require a PIR.

• Section 08 71 00 (Door Hardware), 3.06, A., D. (Door 001) – The exit device for this door needs to be electrified. It also needs to be equipped with a latch bolt monitor. The part number shown does not indicate either of these options. There also needs to be a power supply shown for the exit device. The power supply should be equipped with battery backup.

Provide electrified Exit Device with latch bolt monitor for Door 001, and rough-in installation as indicated on drawing E703. Von Duprin 98/99 Series Exit Devices are indicated on the Door Hardware schedule to establish a manufacturer basis of design and to maintain consistency with the rest of the Facility doors. Coordinate hardware with SSDI contractor for compatibility with security/access control devices and accessories. Provide power supply equipped with battery backup at door location, from the same manufacturer of the Exit Device to ensure compatibility.

Provide new 120V circuit from new Panel B1051B. Door will also require a PIR.

• Section 08 71 00 (Door Hardware), 3.06, A., F. (Door 102) – The lockset for this door needs to be electrified. It also needs to be equipped with a latch bolt monitor. The part number shown does not indicate either of these options.

Provide electrified lockset with latch bolt monitor for Door 102, and rough-in installation as indicated on drawing E703. Sargent Locks are indicated on the Door Hardware schedule to establish a manufacturer basis of design and to maintain consistency with the rest of the Facility doors. Coordinate hardware with SSDI contractor for compatibility with security/access control devices and accessories.

• Drawing E402, Keyed Note 2 at Door EX1 (grid T/11) and Door 001 (grid S/11.5) should be removed. These doors are to be equipped with electric panic hardware devices which draw too much power for the security system panel to provide. They should be provided with dedicated local power supplies powered by a 120V circuit.

Drawing E402 - Keyed Note 2 is not applicable for doors EX1 and 001. Provide power supply equipped with battery backup at door EX1 and 001 locations. Power supply shall be from the same manufacturer of the Exit Device installed on door to ensure proper operation and compatibility. New 120V circuit shall be provided from new Panel B1051B to the power supplies.

Door EX1 and 001 require PIR.

• Drawing E402, Keyed Note 11 should read “SECURITY SYSTEM ACCESS CONTROL PANEL AND POWER SUPPLY PANEL. PROVIDE…”. Please verify there will be enough space for both panels.

Sizes are 24”W x 30”H x 6.62D” and 15”W x 18”H x 6”D, and can be mounted side-by-side or up and down.

Wall space is available inside the TELECOM room to accommodate the installation of both panels, the Security System Access Control Panel and the Power Supply Panel. Installation will be field coordinated to ensure proper clearances with other equipment inside the room.

• Drawing E404, Keyed Note 4 – One of the 1” conduits should extend to the new security system access control panel in Telecom 104, the other 1” conduit should extend to the security junction box located at grid S/11.

Information is confirmed. 1-1" Conduit shall be installed from the Network Switch at the Basemet to the new ACP inside the TELECOM room, and the other 1-1"Conduit shall be installed from the Network Switch to the security camera junction box located at Door 001 lobby (See attached redlines on Drawings E401 and E404 for clarification).

• Drawing E404 – The junction box with Keyed Note 6 at Door 001 (grid S/11.5) should be on the exterior wall. Another junction box with Keyed Note 8 should be on the interior side of the door.

Conduit with Keyed note 7 should be shown between the two junction boxes. This door should be similar to Door EX1 (grid T/11).

A 4”x 4” box shall be provided at the exterior wall connected to a 8”x 8”x 6” box on the secured side with a 1” conduit run back to the new ACP inside the TELECOM room (See attached redlines on Drawing E404).

• Drawing E703, details 1 and 3 should have a PIR similar to that shown on detail 2.

Provide PIR option for both doors EX1 and 001 (See attached redlines on Drawing E703).

• Drawing E703, detail 7 – There should be another 1” conduit shown from the wireway (2) going to the existing security system network switch in Local Telco Area B141.

As indicated above, 1-1”conduit shall be installed from the network switch in the basement floor to the new ACP inside the TELECOM room (See attached redlines on drawing E703 for clarification).

697DCK-18-R-00378amendment2
ZMA Mod 4 - RFI Responses - July 2018