Synopsis.pdf
PDF 40 KB Posted
- Solicitation number
- 697DCK-18-R-00046
About this file
Synopsis (pdf)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project for Denver Air Route Traffic Control Center (ARTCC ) Motor Control Center Replacement
The Federal Aviation Administration (FAA) is seeking competent and qualified contractors interested in providing offers for a project at the Denver Air Route Traffic Control Center to replace the power distribution and motor control centers (MCCs) on the Essential Bus. This is not a Screening Information Request (SIR) or Request for Proposal (RFP). See Section III for documentation required to be submitted and evaluated to determine which vendors receive the solicitation.
SECTION I REQUIREMENT SCOPE
This project for the Motor Control Center replacement is located at FAA’s Denver Air Route Traffic Control Center, 2211 17th Ave., Longmont, CO. Contractor must furnish the equipment, labor, material and tools required to complete the project. The work includes but is not limited to the following:
1. Motor Control Centers
a. Provide, install and remove temporary power distribution equipment
b. Provide, install and remove temporary cooling equipment, as needed to maintain facility operations during MCC replacement.
c. Demolition of existing motor control center units with minimal damage to existing conductors and conduit
d. Installation and startup of motor control center equipment, including circuit breakers and motor starters
e. Installation of concrete housekeeping pads for motor control center equipment
f. Termination, splicing, and testing of electrical conductors by industry approved methods.
g. Integration of electrical controls for motor starters into existing Building Automation
System.
2. General
a. Perform Risk Management
b. Construction Management, including coordination of work with FAA and other contractors that may be performing other work simultaneously.
c. Safety Management, including proper use of tools, work at height, use of PPE, Lock-out
/Tag out, etc.
All work shall be in accordance with the plans and specifications provided at a later date.
The total estimated price of the proposed construction project is between $200,000.00 and $350,000.00.
PAYMENT AND PERFORMANCE BONDS WILL BE REQUIRED AS PART OF THE
SOLICITATION.
SECTION II- CONTRACT TYPE AND EVALUATION CRITERIA
Award will be made to the responsive and responsible offeror whose offer results in the best value to the government.
The North American Industry Classification System (NAICS) is 238210 – Electrical Contractors & Other Wiring Installation Contractors. The small business size standard is $15 Million. The solicitation will be competed as 100% small business set-aside.
SECTION III- GO/NO GO CRITERIA
The initial information submitted will be evaluated on a Go/No-Go basis. Offerors must receive a “Go” on all of the following criteria to be considered a viable offeror and receive the solicitation. The Government reserves the right to perform clarifications/discussions with any offerors. To receive a “Go” rating the offeror must have 5 years of experience performing industrial electrical distribution replacement work, be able to provide the necessary bonding for a projects of this size (construction estimate of $200,000.00 to $350,000.00), and complete the following documents:
1. Sensitive Security Information Form
2. Past Experience History*
*To receive a “Go” rating for past experience, the offeror must provide three (3) industrial electrical distribution projects, performed at FAA facilities, government agency (federal, state or local) or other life-critical facility (ie hospital, 911 call center), with project values over $150,000.00 per project, completed in the past five years.
The information provided will also be used as part of the responsibility determination. Responses must be emailed to mary.higgins@faa.gov, no later than 12:00 Noon (Central Time) on Thursday, 12/07/2017.
Please place “Denver ARTCC Motor Control Center Replacement project” in the subject line of your email. Requests received after this date and time will not be honored. Failure to submit all required information will deem the request for solicitation as non-responsive.
NOTE: Contractors must have active registration in System for Award Management (SAM) before award can be made. Contractors can register at www.sam.gov. There is no cost to register.
11/20/2017 http://www.sam.gov/
File details come from the government source that posted it.