Memo Transmittal 1 JCN# 1005750

Special Provisions for Replacement of LOC shelter and Distance Measuring Equipment (DME) on Runway 35 at Watertown Municipal Airport (ATY) in Watertown, SD.

The following Special Provisions shall modify, supersede, or supplement the FAA-GL-918D - Specification for Construction of Terminal Navigational Aid Facilities.

SP-1: Scope of Work This scope of work provides instructions for the replacement of the LOC shelter and Distance Measuring Equipment (DME) on Runway 35 at Watertown Municipal Airport (ATY) in Watertown, SD.

The work includes but is not limited to:

The contractor shall coordinate the exact sequence of work with the airport authority through the Contracting Officer’s Representative (COR) prior to construction and shall provide updated construction schedules at the preconstruction conference and upon request. Contractor shall hold a tailgate safety meeting prior to commencement of work each day, in the presence of the COR, to discuss possible safety hazards and mitigation.

1. Coordinate with airport operations and local SSC to locate existing underground utilities and cabling near the Runway 35 Localizer shelter.

2. Construct a new equipment shelter foundation for a Government Furnished DuPont shelter, parking area, site work, power and signal cabling. Install lightning protection for the shelter and perimeter counterpoise system per plan and spec.

3. Relocate the existing REIL (with air to ground receiver). FAA installation will remove and reinstall LOC and DME electronics equipment including DME antenna.

4. Remove existing LOC shelter and foundation. Dispose of debris at approved waste site. Backfill and compact top 6” with crushed rock flush with surrounding grade.

5. Locate existing REIL power and control cables and splice in hand holes to reroute to the new shelter.

6. Furnish and Install underground power and control cables for LOC.

7. Contractor shall coordinate with Power Company for electrical service.

8. All cables shall be tested per specifications after installation in the presence of the Contracting Officer’s Representative (COR). A written record of the test results for all of the cables shall be delivered to the COR.

Memo Transmittal 2 JCN# 1005750

9. Cleanup site on daily basis. Gravel or grass areas disturbed by construction activity or vehicles shall be restored to their pre-construction condition to meet the surrounding grade.

Participate in Contractor’s Acceptance Inspection (CAI) with COR and FAA SSC representative(s).

Address punch list items generated at the inspection.

NOTE TO COR: We will need to have two JAI’s for each project (one for the shelter replacement and another for the entire project). Ralph Bustamante is to provide fund to purchase the new shelter and a separate JAI’s is required for the shelter replacement.

Memo Transmittal 3 JCN# 1005750

SP-2: Schedule Requirements

Contract Performance Time: 20 Working Days

Proposed Construction Notice-to-Proceed (NTP): TBD

After the award of the contract and prior to starting work, the contractor must submit to the Resident Engineer (RE) a satisfactory progress schedule which must show the proposed sequence of work, and how the contractor proposes to complete the various items of work within the number of working days set up in the contract or on or before the completion date specified in the contract. The contractor must confer with the RE at regular intervals in regard to the prosecution of the work according to the progress schedule.

A working day is defined as any calendar day, except Saturdays and Sundays. The length of a working day will be determined by the RE from the number of working hours established by actual job practice by the Contractor, except not less than eight hours will be considered in the determination. Work cannot exceed 40 hours per week without permission of the RE. Work on Saturdays will only be allowed with the permission of the RE and shall count as a working day.

The RE will determine which days constitute as working days.

A partial working day of one-half will be charged under the following conditions:

(1) When weather conditions do not permit the completion of a full day’s work.

(2) When job conditions due to recent weather do not permit full efficiency of the men or equipment.

(3) A shortage of help which is beyond the contractor’s control prevents reasonable progress.

(4) When any condition over which the contractor has no control prevents completing a full day’s production.

No working day will be charged under the following conditions:

(1) When adverse weather prevents work.

(2) When job conditions due to recent weather prevent work.

(3) When work has been suspended by an act or an omission of the FAA.

(4) When any condition over which the contractor has no control causes suspension of work.

Construction Schedule Phasing

The Runway 35 Localizer will require an outage when work is occurring in the Localizer critical area.

Memo Transmittal 4 JCN# 1005750

Localizer shall remain in service until it needs to be removed.

SP-3: Additional Information

1. Utility Agreement: N/A

2. Utility coordination and contact information: Coordinate with local FAA

Watertown Municipal Utilities Phone: 1-605-886-6233

3. Construction Preparation Contact: Contact the Airport Authority for badging, bonding, and insurance requirements at:

Watertown Municipal Airport

2416 BOEING AVENUE

WATERTOWN, SD 57201

Todd Syhre, Manager Phone: 605-882-6209

Note: Airport badging procedures may take up to 4 weeks to complete. Begin badging procedures as soon as contract is awarded.

4. Long lead items: The contractor shall be aware that some materials that require submittals are "long lead items!" These submittals must be submitted (any time after award) for approval as soon as possible.

5. INSULATED POWER CABLES, 600 V: The following specifications in bold italics replace Specification FAA GL- 918D.

16G.3 INSULATED POWER CABLES, 600 V. Insulation–resistance measurements must be made with both ends of the insulated conductors disconnected from source and load terminals, arresters, and large surge protectors. Apply a 500-volt dc voltage to the conductors being tested with an insulation-resistance test instrument and read the insulation directly on the instrument meter scale. Apply the test voltage for at least 1 minute after the meter reading has stabilized, to allow even distribution of the test voltage throughout the insulation. Apply the test voltage between each insulated conductor and all other conductors, and between each insulated conductor and ground. Record the measured resistance. It shall be a minimum of 50 megaohms.

6. CONTROL CABLE TESTING: The following specifications in bold italics replace Specification FAA

GL- 918D.

16G.6 CONTROL CABLE TESTING. For continuity, shorts, crosses, and grounds testing, make these tests with both ends of each conductor

Memo Transmittal 5 JCN# 1005750 disconnected from terminal strip jumper wires, surge protectors, and equipment. The tests should be as follows:

a. Continuity Tests. Make continuity tests with an ohmmeter at the near end of the cable. Temporarily short each conductor to its paired conductor, common connector, or to a shield or armor, at the far end of the cable. Record the meter readings. Remove the temporary short at the far end of the cable after each conductor or conductor pair is tested for continuity.

b. Shorts, Crosses, and Grounds Tests. Make the tests with an ohmmeter connected at either end of a cable. Test between all paired or unpaired conductors within a shielded or unshielded conductor group. Test between each conductor and its nearer designated grounding conductor, pair shield, group shield, cable shield, or armor.

For insulation–resistance measurements, apply cable rated dc test voltage to the conductors being tested with an insulation-resistance test instrument, and read the insulation resistance directly on the instrument meter scale. Apply the test voltage for at least 1 minute after the meter has stabilized. Apply the test voltage between paired conductors, between conductors of a conductor group, and between conductors of an ungrouped cable. Apply the test voltage between each conductor and its designated common grounded conductor, pair-shield, group shield, and overall cable shield or armor. The resistance shall be a minimum of 50 megaohms.

7. WORKPLACE SAFETY REQUIREMENTS AND ENVIRONMENTAL CONTROL

a. In addition to the detailed requirements included in other provisions of this contract, the Contractor shall comply with all federal, state, and local laws, ordinances, criteria, rules and regulations regarding safety in the work area, human health and environmental protection. The Contractor is responsible for obtaining all permits, filing any required notifications, and ensuring that employees are properly trained and certified to perform work required under this contract.

b. The FAA considers the Prime Contractor responsible for overall worksite safety and environmental compliance. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent hazardous working conditions from occurring and inspecting operations to ensure that workplace safety and accident prevention requirements are followed.

c. In the event of an accident or incident, the Contractor shall immediately notify the Contracting Officer and Contracting Officer’s Representative. The Contractor shall complete and submit a

Memo Transmittal 6 JCN# 1005750 written Accident report. In the event of a spill or discharge, the Contractor shall take immediate action to control or contain the release.

d. Throughout this project, the Contractor will ensure that work environments are properly maintained through good housekeeping practices. The Contractor will keep walking areas free of electrical cords and wires and ensure that form and scrap lumber with protruding nails, and all other debris is cleared from work areas and is not stored in an around buildings or other structures. Walkways shall be kept clear of obstructions. Containers equipped with covers shall be provided for the collection and separation of waste, trash, oily and used rags and other refuse.

Combustible scrap and debris, garbage and other waste shall be removed and disposed of at frequent and regular intervals. Sufficient lighting will be provided.

e. This project includes the demolition of the ATY LOC Shelter. The shelter has been inspected by a certified asbestos inspector and the 9” x 9” gray floor tile was found to contain 6% chrysotile asbestos. The FAA will provide a copy of the survey report. The contractor is responsible for compliance with the South Dakota Department of Environment and Natural Resources requirements for building demolition notification and for handling the building materials, including the asbestos containing material, in accordance with all state and local requirements.

Wastes must be properly disposed of and documentation provided to the FAA. Additional information and links to the Notification Form for Demolition and Renovation Projects can be found on the internet at: http://denr.sd.gov/des/wm/asb/asbdemolition.aspx

f. When employees are working at heights, working with electrical systems over 50v, are at risk of electrocution or where medical emergency response is not readily available, a two person rule will be implemented and employees must be trained in first aid and CPR. The second person must also be trained in first aid and CPR.

g. Compressed gases may be utilized during welding. The Contractor shall ensure that any workmen in charge of oxygen or fuel-gas supply equipment, including generators and oxygen or fuel-gas distributions, are instructed and judged as being competent for this work. Rules and regulations covering the operation and maintenance of oxygen or fuel-gas supply equipment shall be readily available.

h. All electrical work will be conducted in accordance with current Occupational Safety and Health Administration (OSHA) standards and NFPA 70E: Standard for Electrical Safety in the Workplace.

Where possible, equipment will be de-energized and site specific lockout/tagout procedures followed before work is conducted. Connections to operational FAA equipment or to power sources that support operational FAA equipment must be made by qualified FAA Technicians. A site specific lockout/tagout plan will be required for new equipment and new facilities. This plan will be based on manufacturers recommended procedures and site specific switch locations and conditions. The plan will follow the standard FAA lockout/tagout format, sample templates are available at loto.faa.gov.

http://denr.sd.gov/des/wm/asb/asbdemolition.aspx

Memo Transmittal 7 JCN# 1005750

SP-4: Government Furnished Material List

Government-Furnished Equipment: All government-furnished property will be made available to the contractor at the preconstruction conference. The contractor shall make arrangements to pick-up all of the items from FAA and deliver them to the job site or the "on airport" staging area at his expense.

[Insert GFM list here]

Item NSN Description Qty Unit Source

1 DME 1 each FAA

2 12’x16’ shelter 1 each FAA