About this file

SOW LOGANDALE (doc)

View the file

Other files

File Type Posted
6973GH-19-R-00294-0001.pdf PDF
DRAWINGS-LGD-NV.pdf PDF
QUESTIONS AND ANSWERS.pdf PDF
EXPERIENCE INFO FORM.pdf PDF
WD-NV20190001 (WAGE DETERMINATION).WAGE DETERMINATION —
6973GH-19-R-00294.pdf PDF
Fence.jpg JPG image
SOW UPDATE.doc DOC document
CONTRACTOR'S RELEASE FORM.doc DOC document
WD-NV20190001 (WAGE DETERMINATION).WAGE DETERMINATION —
DRAWINGS-LGD-NV.pdf PDF
6973GH-19-R-00294.pdf PDF
QUESTIONS AND ANSWERS.pdf PDF
EXPERIENCE INFO FORM.pdf PDF
SOW LOGANDALE.doc DOC document
Fence.jpg JPG image
CONTRACTOR'S RELEASE FORM.doc DOC document
CONTRACTOR'S RELEASE FORM.doc DOC document
6973GH-19-R-00294.pdf PDF
SOW LOGANDALE.doc DOC document
WD-NV20190001 (WAGE DETERMINATION).WAGE DETERMINATION —
EXPERIENCE INFO FORM.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For

COTHEN LOGANDALE

1.0 Scope of Work

The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to Logandale, Nevada to replace an existing fence system installed around an existing tower and guy anchors. The removed fence and all other construction generated debris will be the responsibility of the contractor for disposal. The replacement fence will be made of wooden material pressure treated and coated. All wooden material will be coated with colorless sealer or waterproofing. Fence installation will be provide around tower structure and all guy anchors. Final constructed fence will stand four feet tall along the perimeter dimensions specified below with post set in concrete foundations.

Tower Structure Dimensions are 10 feet long by 10 feet wide. Fencing will be centered on the tower structure with equally spaced separation between the fence and tower structure on all sides.

Guy Anchor Dimensions are 16 feet long and 6 feet wide. Fencing will not be centered on the guy anchor. The perimeter will be established with the long dimension parallel to the guy wire and wide dimension transverse to the guy wire. Guy anchor will be equally spaced along the wide dimension between guy anchor and fencing. Guy anchor will be spaced 3 feet from end of fencing in long dimension. Guy Anchor Dimensions may need to be field adjusted to provide a minimum of 18 inches of separation between the top rail and guy wire. Changes in rail height may be permissible but must be approved in advance.

The fence construction will be composed of post centered on 6 feet to 8 feet distances and three rails. Top rail will be 2 inches below the top of the posts, bottom rail will be 8 inches above ground level and mid rail will be equally spaced between top rail and bottom rail. Corner posts for all guy anchoring fence will be made of 4 in x 4 in wooden posts.

Completion of the work will include other items as noted in this Statement of Work (SOW) and Section 4.0 for more details. All work items denoted in Section 3.0 may require additional effort for items not specifically detailed and/or described in the SOW and information such materials will be required to meet standard industry requirements and specifications for acceptance and installation. Installation detail to be in conformance with the specifications and applicable industry standards. All materials and craftsmanship shall be in conformance with the identified specification.

1.1 Objectives

This SOW shall achieve the following specific objectives:

· Remove existing fencing for tower structure and guy anchors.

· Install new wooden fence to replace existing fence

1.2 References

All applicable documents referenced in this SOW are listed below.

1) Applicable Standard Industry Quality and Safety Requirements

2.0 Requirements

Contractor will:

· Provide all necessary labor (or sub-contract labor) of appropriate skill to accomplish all tasks with this SOW

· Submit Construction Red Lines as Described in Section 3.0

· Travel as necessary to accomplish all tasks in the SOW.

· Provide specialized services to accomplish all tasks specified in the SOW.

· Provide procurement services as required for materials and equipment.

· Must submit and clear a law enforcement clearance through the local CBP sector office for all personnel including sub-contractor personnel

· Complete all tasks as required in Section 3.0

· Provide deliverables as required in Section 3.1

· Schedule and coordinate as required by Section 4.0

· Provide progress/compliance as required in section 4.0.

3.0 Tasks

The tasks to be performed under this SOW are described below in several categories. Where conflicts arise between this document shall supercede.

1) Phase I: Security Clearance

a) All contractor personnel shall submit personal information to the Government for the purposes of submitting to security clearance check. Security clearance check will be performed by DHS-CBP. All personal and private information (PPI) will be submitted on Attachment A and submitted directly to DHS-CBP. Point of contact for receipt of PPI will be provided upon submission of project schedule after award. Security clearance must be completed 3 weeks prior to construction start date.

2) Phase II: Construction Planning

a) Contractor will provide a start date for removal and replacement of existing fence.

3) Phase II: Construction/Installation

a. Contractor will remove existing fence and install new fence.

4) Phase III: Project Close Out

a) None

3.1 End Results/Deliverables

The deliverables to be completed and submitted under this SOW are removed and replaced fence.

3.2 List of Deliverables by Task

The deliverables to be completed and submitted for each task under this SOW are described below. Acceptance of the work will be based on conformance with construction drawings and other government furnished information provided by FAALC/AML-2000.

1) Security Clearance

a) Site Access Forms

2) Construction Planning

a) Construction Schedule or Construction Start Date

3) Construction/Installation

a) Existing fenced removed and replaced as required.

4) Project Close Out Package

a) None

4.0 Schedules/Milestones

Project scheduling and milestones for the site are not required but should a schedule be provided it should include no less than the following milestones:

· Security Clearance,

· Prework Meeting,

· Mobilization,

· Installation

· Final Inspection and Acceptance

· Demobilization

5.0 Other Considerations

All personnel shall be required to submit and clear a law enforcement clearance through the local CBP sector office.

6.0 Progress/Compliance

The following will be coordinated with FAA-AML-2070 in order to monitor progress and ensure compliance (identify action):

· Prework Meeting

· Final Inspection and Acceptance

· Submission Documents in Sections 3.1 & 4.1

7.0 Period of performance

The period of performance is 60 days after notice to proceed.

8.0 Place of performance

The place of performance is at the site coordinates 3950 Mills St in Logandale Nevada 89021.

Appendix A:

Procedure No:

Date:

Field Site Request Form

Request For: Site Access Request From:

Proposed Site Visit Location (include region, area, and facility):

Mohawk Mountain

Dates of Visit:

POC for Visit:

Purpose of Visit (include specific types of information to be collected):

List of Attendees (attach additional page if more attendees requested)

Name
Title
Company

Approval Signature:

****************************FOR CLASSIFIED USE ONLY****************************

Attendee Information (attach additional page if more attendees requested)

Name
Title
Company
SSN
DoB
Clearance Level

Security Officer Signature:

Local POC Approval:

The Information System Security Branch requires a mandatory submission of visitor pre-clearance forms no later than 48 hours before arrival of visitor(s) in order for any visitor to be considered for approval

CBP offices prefer submission of Field Site Request Form three (3) weeks prior to Field Site Visit. Please e-mail/fax form to the POC listed in the Site Visit Coordination Request Procedure.