SECTION B (PRICING).PRICING
28 KB Posted
- Solicitation number
- 6973GH-19-R-00289
About this file
SECTION B (PRICING) (docx)
Text of this file
ATTACHMENT 1
PART I – SECTION B
SUPPLIES OR SERVICES AND PRICES/ COSTS
PRICING SCHEDULE
BASE YEAR
PERIOD OF PERFORMANCE: 04/05/2020 – 04/04/2021
ESTIMATED FIXED ESTIMATED
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 Canadair CRJ-700 Initial 2 Student $___________ $_____________ Pilot Qualification Training (Course FAA28503) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% initial test) [minimum Level “C” Simulator]
0002 Canadair CRJ-700/900 2 Student $___________ $_____________ Recurrent/Differences Pilot Qualification Training (Course FAA28504) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% proficiency check) [minimum Level “C” Simulator]
0003 Canadair CRJ-700/900 Supplementary Training Hours
a. Ground School – Cost Per hour $____________
b. FTD – Cost Per Hour $____________
c. Simulator – Cost Per hour $____________
d. Additional Instructor – Cost Per hour $____________
0004 Embraer ERJ-145 Initial 2 Student $___________ $_____________
(Course FAA28009) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% initial test) [minimum Level “C” Simulator]
0005 Embraer ERJ-145 Recurrent 2 Student $___________ $_____________ Pilot Qualification Training (Course FAA28015) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% proficiency check) [minimum Level “C” Simulator]
0006 Embraer ERJ-145 Supplementary Training Hours
a. Ground School – Cost Per hour $____________
b. FTD – Cost Per Hour $____________
Estimated Base Year Total Price $______________
Note: This is an Indefinite Delivery Requirements type contract. The precise quantities of products, services, and support required is estimated and will be ordered on an as-needed basis with the issuance of Delivery/Task Orders. Delivery/Task Orders will be issued with Not-to-Exceed line item(s). Prices are pre-established with Section B Unit Prices. Estimated requirements are not a representation to an offeror or contractor that the estimated quantity will be ordered, or that conditions affecting requirements will be stable or normal.
(The remainder of this page has been intentionally left blank)
SUPPLIES OR SERVICES AND PRICES/ COSTS
PRICING SCHEDULE
OPTION YEAR I
PERIOD OF PERFORMANCE: 04/05/2021 – 04/04/2022
0007 Canadair CRJ-700 2 Student $___________ $_____________
(Course FAA28503) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% initial test) [minimum Level “C” Simulator]
0008 Canadair CRJ-700/900 2 Student $___________ $_____________ Recurrent/Differences Pilot Qualification Training (Course FAA28504) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% proficiency check) [minimum Level “C” Simulator]
0009 Canadair CRJ-700/900 Supplementary Training Hours
a. Ground School – Cost Per hour $____________
b. FTD – Cost Per Hour $____________
c. Simulator – Cost Per hour $____________
d. Additional Instructor – Cost Per hour $____________
0010 Embraer ERJ-145 Initial 2 Student $___________ $_____________ Pilot Qualification Training (Course FAA28009) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed c.. Flight Simulator Training _________ hrs.
(including 100% initial test) [minimum Level “C” Simulator]
0011 Embraer ERJ-145 Recurrent 2 Student $___________ $_____________ Pilot Qualification Training (Course FAA28015) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% proficiency check) [minimum Level “C” Simulator]
0012 Embraer ERJ-145 Supplementary Training Hours
a. Ground School – Cost Per hour $____________
b. FTD – Cost Per Hour $____________
c. Simulator – Cost Per hour $____________
d. Additional Instructor – Cost Per hour $____________
Estimated Option Year 1 Total Price $__________
Note: This is an Indefinite Delivery Requirements type contract. The precise quantities of products, services, and support required is estimated and will be ordered on an as-needed basis with the issuance of Delivery/Task Orders. Delivery/Task Orders will be issued with Not-to-Exceed line item(s). Prices are pre-established with Section B Unit Prices. Estimated requirements are not a representation to an offeror or contractor that the estimated quantity will be ordered, or that conditions affecting requirements will be stable or normal.
SUPPLIES OR SERVICES AND PRICES/ COSTS
PRICING SCHEDULE
OPTION YEAR II
PERIOD OF PERFORMANCE: 04/05/2022 – 04/04/2023
0013 Canadair CRJ-700 Initial 2 Student $___________ $_____________
(Course FAA28503) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% initial test) [minimum Level “C” Simulator]
0014 Canadair CRJ-700/900 2 Student $___________ $_____________ Recurrent/Differences Pilot Qualification Training (Course FAA28504) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% proficiency check) [minimum Level “C” Simulator]
0015 Canadair CRJ-700/900 Supplementary Training Hours
a. Ground School – Cost Per hour $____________
b. FTD – Cost Per Hour $____________
0016 Embraer ERJ-145 Initial 2 Student $___________ $_____________
(Course FAA28009) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% initial test) [minimum Level “C” Simulator]
0017 Embraer ERJ-145 Recurrent 2 Student $___________ $_____________ Pilot Qualification Training (Course FAA28015) Contractor Proposed
a. Ground School _________ hrs.
Contractor Proposed
b. Flight Training Device _________ hrs.
(minimum Level 5 FTD) Contractor Proposed
c. Flight Simulator Training _________ hrs.
(including 100% proficiency check) [minimum Level “C” Simulator]
0018 Embraer ERJ-145 Supplementary Training Hours
a. Ground School – Cost Per hour $____________
b. FTD – Cost Per Hour $____________
Estimated Option Year 2 Total Price $__________
Total Estimated Price (Base and all Options) $__________
Note: This is an Indefinite Delivery Requirements type contract. The precise quantities of products, services, and support required is estimated and will be ordered on an as-needed basis with the issuance of Delivery/Task Orders. Delivery/Task Orders will be issued with Not-to-Exceed line item(s). Prices are pre-established with Section B Unit Prices. Estimated requirements are not a representation to an offeror or contractor that the estimated quantity will be ordered, or that conditions affecting requirements will be stable or normal.
(The remainder of this page has been intentionally left blank)
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX A.pdf | ||
| SIR 6973GH-19-R-00289.pdf | ||
| PERFORMANCE WORK STATEMENT (PWS).PWS | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.