QWI RCAG Roof & Door Replacement

QWI RCAG

Waterford, PA

QWI RCAG Roof & Door Replacement

Waterford, Pennsylvania Provide all labor, tools, equipment, materials, and supervision required to: replace the existing roof system covering the 17’ x 37’ roof, including soffit and fascia replacement, service entrance replacement and replacing the two exterior doors and frames. The QWI RCAG facility is located off Conneauttree Road near Waterford, Pennsylvania.

· QWI RCAG

Waterford, PA 41.88075 -80.02063 Part I – Section B

Statement of Work

The work items listed below serve as a Statement of Work (SOW) to be performed under this contract for roofing replacement/installation at the QWI RCAG facility.

The work to be performed under this contract shall include, but is not limited to, the following:

1. The removal and proper disposal of the existing built up or membrane roofing material, ballast, insulation or backer board, flashing, and roof edge. Remove existing soffit and fascia. Remove existing service entrance support equipment.

2. Furnish and install new aluminum soffit and fascia.

3. Replace electric service entrance by removing existing meter socket and conduit and installing a new meter socket with continuous rigid galvanized steel conduit (RGS) through the concrete decking and extending three (3) feet above the roof surface. Provide a service entrance cap and extend existing wires to comply with FAA and local electric company regulations. Repair siding after the new meter box is installed.

4. Temporary covering of exposed roof area during inclement weather or if the roof is left exposed over night. The contractor shall also cover interior equipment prior to removal of the roofing system.

5. The installation of new polyisocyanurate insulation, Dens-Deck (DD) roofboard and modified bitumen roof system. The roof system shall be installed in accordance with the manufacturer’s specifications and directives.

6. The removal of the two existing doors, frames, thresholds, door hardware, and appurtenances.

7. The installation of new insulated fire doors, frames, thresholds, door hardware, and appurtenances and the selected replacement of door hardware, security devices, and other appurtenances. The existing locksets and devices shall be turned over to the Contracting Officer’s Representative (COR)

8. Painting new doors, frames and any surfaces or materials damaged during construction. The exterior vinyl siding shall be restored.

9. The contractor is responsible for the removal and proper disposal of materials removed from the existing roof system and building along with site cleanup and restoration of all damaged areas.

10. Upon completion of work the contractor shall notify the COR so that the work may be inspected for completion. Upon acceptance, the contractor shall submit a warranty for the complete roofing system of not less than fifteen (15) or twenty (20) years (based on roofing systems specified). The warranty will be a no dollar limit (NDL) guarantee. The contractor will determine if the manufacturer must inspect the roof to issue the required warranty and bear all costs associated with the inspection.

PART 1 - SECTION C

DESCRIPTION/SPECIFICATION

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

1-1

Summary of Work

1-2

Construction Limits and Use of Facilities

1-3

Submittals

DIVISION 2 - 6 (NOT USED)

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

7-1 Modified Bitumen Membrane Roofing

7-2 Flashing

7-3 Temporary Roof

7-4 Sealant

DIVISION 8 – DOORS AND WINDOWS

8-1 Hollow Metal Doors & Frames

8-2 Not Used

8-3 Finish Hardware

8-4 Not Used

8-5 Weatherstripping & Seals

DIVISION 9 - PAINTING

9-3

Painting

DIVISION 10 - 15(NOT USED)

DIVISION 16 - ELECTRICAL

16-1 Electrical Material and Installation

16-2 Applicable Documents

16-3 Service Entrance

ATTACHMENTS

1.

Photographs

2. Sketch

DIVISION 1 - GENERAL REQUIREMENTS

1-1

SUMMARY OF WORK

1-1.1

General These specifications, together with the referenced specifications, standards and drawings specified in the Contract Documents, cover the requirements of the Federal Aviation Administration, hereinafter referred to as the Government or FAA, for all work associated with the replacement of roofing, soffit, fascia, doors, and electrical service entrance at the QWI RCAG facility located off Conneauttree Road near Waterford, Pennsylvania.

1-1.2

Intent of Specifications This specification identifies the basic labor, materials and equipment necessary to perform the required work. All work will be performed in accordance with current roofing practices, door installation practices and manufacturer’s specifications. The roof system must meet the 15-year or 20-year, no dollar limit guarantee of the manufacturer.

1-1.3.2 Site Visit It is strongly recommended that the Contractor make a site visit prior to submitting a quote. Arrangements for a site visit shall be made through the facility point of contact. For access to QWI RCAG contact Mr. Jeff Jones or Eric Marendt (ERI SSC Supervisor) at (814) 838-3131. The contractor is required to give 48-hour notification for scheduling the site visit to the RCLR facility.

1-2

CONSTRUCTION LIMITS AND USE OF FACILITES

1-2.1 Construction Limits

The Contractor shall confine operations, activities, storage of materials, and employee parking within the areas designated by the COR. Space is limited at the site; therefore, the Contractor shall coordinate all work activities with the Facility Contact. Any additional space the Contractor deems necessary shall be obtained off site, at no additional cost to the Government.

1-2.2 Damage to Site

Damage to existing pavement, landscaping, structures or underground facilities caused by the Contractor's activities shall be repaired. All costs of such repairs shall be borne by the Contractor. After issuance of the Notice to Proceed (NTP) and prior to commencement of construction, the Contractor and COR shall conduct a joint inspection of the existing area, which will be affected by the construction. Existing damage or defects shall be noted and will be used as the basis for determination of damages caused by the Contractor's operations.

1-2.3 Contractors' Use of Premises

The Contractor shall have use of the premises within the construction area limits for the execution of his work and shall assume full responsibility for the protection and safekeeping of products and materials stored on the site.

The Contractor and subcontractors shall maintain the job site in a neat and orderly condition. This includes the daily removal of rubbish, waste, tools, equipment, and materials not required for the work in progress. All metal shall be removed from the site and the area left in a neat and orderly condition.

1-2.4 Work Schedule

Normal work hours will be from 8 am to 4:30 pm, Monday through Friday. All work outside of the normal time frame will be coordinated with the COR. The contractor shall give a minimum of 48 hours notice prior to commencing with work outside of normal work hours.

The Contractor will have 45 calendar days to complete the project.

Work will not be permitted during periods of rain, snow or other inclement weather. The Contractor will provide necessary covering for exposed areas in the event of inclement weather.

1-3 SUBMITTALS

1-3.1 Procedure

Two (2) complete sets of all shop drawings and/or product data sheets shall be submitted to the COR. The COR will review the submittal documentation and mark them with one of the following designations: Approved as Submitted; Approved as Noted; Approved as Noted – Resubmission required; or Not Approved. Two sets of marked-up submittal documentation will be returned to the contractor for his/her further action as described below.

1-3.2 Submittal Approval Approval of said submittals will not relieve the Contractor of the responsibility for any error, which may exist. The Contractor shall be responsible for the dimensions and design of adequate connections, details, and satisfactory construction of all work.

Approved as Submitted – Indicates that the COR has received the shop drawings or product data and has reviewed and approved their use during construction. Once the submittal has been approved, the COR will not permit substitution without prior written approval.

Approved as Noted – Indicates that the COR has reviewed the submittal and has approved the subject shop drawings or product data contingent upon the Contractor’s acceptance of the corrections, notations, or both and, if accepted, does not require resubmittal.

Approved as Noted – Resubmission Required - Indicates that the COR has reviewed the submittal and has approved the subject shop drawings or product data contingent upon the Contractor’s acceptance of the corrections, notations, or both and, if accepted, resubmittal is required. The Contractor shall resubmit the corrected material, in the same quantity as specified for the original submittal. Upon receipt of the corrected documentation the COR will re-evaluate the submittal prior to approval being given to the Contractor to proceed.

Not Approved - Indicates that the COR has reviewed the submittal and has not approved the subject shop drawings or product data. Reasons for shop drawings or product data not being approved are that they do not meet the specifications or general practice. If disapproved, the Contractor shall resubmit the corrected material, in the same quantity as specified for the original submittal.

END OF DIVISION 1

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

7-1

MODIFIED BITUMEN MEMBRANE ROOFING

7-1.1 General

Work Included A. Furnish and install a self-adhering modified bitumen membrane roof system including roof edge and flashing. The roof shall meet the 20-year, No Dollar Limit (NDL), warranty requirements of the manufacturer.

B. Remove existing roof membrane, insulation or backer board, roof edge, and flashing covering the existing roof and clean the substrate.

C. Remove existing service entrance support equipment.

D. Install new treated wood nailers at roof edge, if required.

E. Install new 1-½ polyisocyanurate Insulation and new Dens-Deck (DD) roofboard in accordance with manufacturer’s requirements.

F. Install new self-adhering modified bitumen membrane roofing system. Minimum three-ply APP modified bitumen roof membrane consisting of two modified bitumen base sheets and a cap sheet. The roof membrane shall be a Firestone, APP180, modified bitumen membrane roofing system or equivalent including a fully adhered modified base sheet and a fully adhered APP granule cap sheet.

G. Install roof edge.

H. Submit 20-year total roofing system warranty.

References A.

ASTM D41 – Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing.

B.

ASTM D312 – Standard Specification for Asphalt Used in Roofing.

C.

ASTM D1668 – Glass Fabrics (Woven and Treated) for Roofing and Waterproofing.

D.

ASTM D2170 – Kinetic Viscosity of Asphalts (Bitumens).

E. ASTM D4402 – Viscosity Determination of Asphalt at Elevated Temperatures Using a Rotational Viscometer.

F. ASTM D4601 – Asphalt-Coated Glass Fiber Base Sheet Used in Roofing.

G. ASTM D4897/4897M - Asphalt-Coated Glass-Fiber Venting Base Sheet Used in Roofing.

H. ASTM D5147 - Standard Test Methods for Sampling and Testing Modified Bituminous Sheet Material.

I. ASTM D6162 – Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements.

J. ASTM D6163 - Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements.

K. ASTM D6164 – Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Polyester Reinforcements.

L. AAMA 1402.86 – Standard Specifications for Aluminum Siding, Soffit, and Fascia. (American Architectural Manufacturers Association)

M. FM – Factory Mutual Research Corporation, Current Edition Approval Guide, Roof Coatings.

N. UL – Underwriters Laboratories, Roofing Materials and Systems Directory, Fire Resistance Directory, Current Edition.

O. FAA-STD-019e Lightning Protection, Grounding Bonding and Shielding Requirements for Facilities

Qualifications of Contractors

Contractors shall be required to show evidence of a minimum of 5 years experience in actual installation of similar products, on projects of similar scope, in the geographic area of this project. The roofing applicator shall be a manufacturer's authorized applicator.

The contactor has the responsibility to provide all required safety measures and supervision. The Contractor shall develop and maintain a safety program to ensure compliance with the provisions of the Occupational Health and Safety Administration (OSHA) standards. This program shall also include education and training of employees who work on site.

Quality Assurance

The roofing system shall be installed in compliance with the manufacturer’s requirements, project specifications, and approved submittals. No deviations shall be made without prior written approval of the manufacturer.

The Contractor shall identify and appoint a roofing quality control inspector who shall monitor work and ensure compliance with the applicable contract documents, specifications, drawings, and manufacturer’s requirements. The quality control inspector shall have a minimum of five years experience inspecting similar roofing work and shall not be a principal or officer in the Contractor’s company or be affiliated with the roofing product manufacturer.

Product Data

Submit for approval: manufacturer’s installation instructions: product data indicating insulation, fasteners, membrane, cement materials, sealant materials, base flashing materials, and metal edgings; and manufacturer’s certification that products are physically and chemically compatible with each other and meet ASTM or Federal Specifications.

Submittals

All submittals shall be in accordance with Division 1, Subpart 1-3, of this specification. Manufacture must supply approval of the final shop drawings to assure issuance of the required warranty.

Delivery, Storage and Handling

Deliver materials to the job site in original, unopened containers labeled with the manufacturer's name, brand name and installation instructions.

Materials are not to be stored exposed for prolonged periods. Store products in weather-protected environment, clear of ground and moisture. Manufacturers packaging is not sufficient for outdoor storage.

Adhesive containers shall not be stored with opened lids.

Any damaged or wet materials and any materials that are improperly delivered, stored, or handled shall be removed from the site.

Environmental Requirements

A.

Do not apply sheet roofing during inclement weather. The manufacturer’s requirements shall be met with regard to weather conditions.

B.

Do not apply sheet roofing to damp, frozen, dirty or dusty roof surfaces unacceptable to the manufacturer.

C.

It should be noted that there is a possibility that lead based paint may be exposed underneath the roof decking, or roof edge being replaced. The contractor shall minimize their disturbing these areas and ensure personnel safety.

Warranty

A.

Roofing Contractor shall provide a written warranty for a minimum of 20 years for the total roofing system covering the following:

1.

Roofing and flashing shall be waterproof and weather-tight for a period of 20 years after date of final acceptance.

B. Leaks or defects, such as seam lifting, blisters, cracks, tears, etc., which may occur during term of warranty shall be corrected within 48 hours after notification by the Government of their existence, at no cost to the Government.

Standards

A.

Roofing materials, insulation, and related components necessary to complete roof and deck system shall be as recommended by:

1. Underwriters' Laboratories, Inc. (UL): Class A Fire Hazard Classification.

2. Factory Mutual Research Corporation System (FM): Roof Assembly Test Standard 4470, FM 1A-90.

Factory Mutual Systems (FM): Roof assembly Classification I-90.

B.

Basis of design is:

1.

Self-adhering modified bitumen roof system.

7-1.2 Products

Acceptable Manufacturers A. Duro-Last Roofing, Inc.

B. Johns Manville

C. Carlisle Tire & Rubber Company

D. GAF Materials Corporation

E. Firestone

F. Or approved equal (manufacturer’s technical specifications must be submitted for approval)

Materials A. APP Base Sheet: ASTM D 6222, Type I or II; or ASTM D 6223; Grade G, minimum 3.5 mm (140 mils) thick at the selvage edge.

B. APP Cap Sheet: ASTM D 6222, Type II; or ASTM D 6223; Grade G, minimum 4.0 mm (160 mils) thick at selvage edge.

C. Flashing: Membrane manufacturer's standard, minimum two-ply modified bitumen membrane flashing system compatible with the roof membrane specified and as recommended in membrane manufacturer's published literature. Flashing membranes must meet or exceed the properties of the material standards specified for the modified bitumen base and cap sheet, except that flashing membrane thickness must be as recommended by the membrane manufacturer.

D. Membrane Surfacing: Provide modified bitumen roof membrane cap sheet with factory-applied granule surfacing of white color.

E. Primer: ASTM D 41, or other primer compatible with the application and as approved in writing by the modified bitumen membrane manufacturer.

F. Modified Bitumen Roof Cement: ASTM D 4586, Type II for vertical surfaces, Type I for horizontal surfaces, compatible with the modified bitumen roof membrane and as recommended by the modified bitumen membrane manufacturer.

G. Fasteners: Fasteners shall be as recommended by the membrane manufacturer for each type of substrate and shall be FM approved. In general, all fasteners, anchors, nails, and straps shall be of zinc or cadmium plated steel, galvanized or stainless steel.

H. Insulation: 1½” Polyisocyanurate insulation, minimum 2 PCF, as recommended by membrane manufacturer. The insulation shall be mechanically attached to the roof decking. A composite insulation sheet may be used if it meets the manufacturer’s 20-year warranty requirements. An air barrier shall be provided if required by the manufacturer for a 20-year warranty

I. Roof Board: ½” DensDeck® roof board as manufactured by G-P Gypsum Corporation. The contractor shall determine if the roof membrane manufacturer requires a separator sheet.

J. Nailers or Blocking: Shall be treated lumber for rot resistance (Wolmanized, Osmose K-33 or similar), #2 or better lumber. Asphaltic or creosote treated lumber is not acceptable. Lumber treated with Pentachlorophenol, Copper Naphthenate, or Copper 8-quinnolinol shall not be used.

7-1.3 Execution

Preparation

Roofing surfaces must be clean, smooth, dry, and free of depressions, projections, fines, sharp edges, loose and foreign materials, oil, grease, and fresh roof cement.

Installation A manufacturer approved roofing contractor, who is approved for self-adhering modified bitumen membrane roofing system, must install the roof system. The roofing contractor must provide a two-year workmanship warranty and provide a manufacturer’s 20-year, no dollar limit, guarantee.

Nailers:

Install nailers and/or batten strips where recommended by the membrane manufacturer. Nailers shall be pressure treated lumber (Wolmanized, Osmose K-33 or similar) #2 or better lumber. Asphaltic or creosote tested lumber is not acceptable. Nailers are to be installed with the top flush with the top surface of the membrane underlayment.

Insulation Installation:

Installation of insulation shall comply with manufacturer's installation recommendations. Fastening of the insulation is to be in accordance with approved shop drawings. Fastening plates are required.

Do not install more insulation than can be covered by membrane in the same day.

Install insulation butted together with no gaps greater than ¼ inch. Gaps greater than ¼ inch must be filled with the same material.

Membrane Application:

Unroll modified bitumen membrane materials and allow to relax a minimum of 30 minutes prior to installation. In cold weather, adhere to membrane manufacturer's additional recommendations for pre-installation membrane handling and preparation. Inspect for damage, pinholes, particles of foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability. Edges of seams must be straight and flat so that they may be seamed to one another without forming fish mouths or wrinkles. Discard damaged or defective materials.

Apply membrane to clean, dry surfaces only. Do not apply membrane to surfaces that have been wet by rain or frozen precipitation within the previous 12 hours. Provide cleaning and artificial drying with heated blowers, as necessary, to ensure clean, dry surface prior to membrane application.

Apply roofing materials as specified herein unless approved otherwise by the Contracting Officer. Keep roofing materials dry before and during application. Complete application of roofing in a continuous operation. Begin and apply only as much roofing in one day as can be completed that same day.

Base Sheet installation

Ensure proper sheet alignment prior to installation. Bucking or backwater laps are prohibited. Fully adhere membrane sheets to underlying substrate materials. Provide minimum 3-inch side laps and minimum 6-inch end laps and as otherwise required by membrane manufacturer. Stagger end laps minimum 36 inches. Offset side laps between membrane layers a minimum of 12-inch. Offset end laps between membrane layers a minimum of 36 inch. Install all membrane layers the same workday, unless supported otherwise by roof membrane manufacturer application instructions and approved by the COR. Provide tight smooth laminations of each membrane layer without wrinkles, ridges, buckles, kinks, fishmouths, or voids. Ensure full membrane adhesion and full lap seals. Rework to seal any open laps prior to application of subsequent membrane layers. The completed membrane application must be free of surface abrasions, air pockets, blisters, ridges, wrinkles, buckles, kinks, fishmouths, voids, or open seams.

Cap Sheet Installation

Underlying applied membrane must be inspected and repaired free of damage, holes, puncture, gouges, abrasions, and any other defects, and free of moisture, loose materials, debris, sediments, dust, and any other conditions required by the membrane manufacturer prior to cap sheet installation. Do not apply cap sheet if rain or frozen precipitation has occurred within the previous 24 hours. Align cap membrane and apply by the specified method with the proper side and end lap widths. Cut at a 45-degree angle across selvage edge of cap membrane to be overlapped in end lap areas prior to applying overlapping cap membrane. Apply matching granules in any areas of adhesive bleed out while the adhesive is still tacky. Minimize traffic on newly installed cap sheet membrane.

Flash all projections (pipes, conduits, etc.) passing through the membrane. Prefabricated pipe seals shall be used to flash all pipes. Install all flashings and terminations in accordance with manufacturer's details.

Daily Seal When the completion of flashings and terminations is not completed by the end of each workday, provisions must be provided to temporarily close the membrane to prevent water infiltration.

Temporarily seal any loose membrane edge down slope so that the membrane edge will not buck water. Caution must be exercised to ensure that the membrane is not temporarily sealed near drains in such a way as to promote water migration below the membrane. A product approved by the manufacturer shall be used for temporary sealing of membrane edges.

Clean up Upon completion of the work all materials, equipment and debris are to be removed from the roofs. All waste materials and debris generated by work under this contract shall be processed, handled, transported, stored, and disposed of by the Contractor in accordance with all federal, state, and local regulations and laws.

7-2

FLASHING

7-2.1 General

This section specifies requirements for all metal fascia and soffit materials.

7-2.2 Submittal

Submit, in accordance with Division 1, manufacturer's product data, installation instructions and general recommendations for each specified sheet material and fabricated product.

7-2.3 Materials

All materials shall be 24-gauge aluminum.

7-2.4 Execution

Installation

Except as otherwise shown on the Contract Drawings, comply with manufacturer's installation instructions and recommendations, and with SMACNA "Architectural Sheet Metal Manual." Anchor work in place with adhesives, setting compounds or other devices as recommended by the manufacturer. Install work with laps, and joints filled with sealant, which will be permanently watertight and weatherproof. Where metal is directly over masonry concrete and/or wood, provide felt between metal and such materials.

Protection

Perform required procedures or surveillance and protection of flashings during construction to ensure that work shall be without damage or deterioration, other than natural weathering at time of issuance of the Certificate of Final Completion.

7-3

TEMPORARY ROOF

The Contractor will supply and install tarps each day to cover the RCAG equipment and all areas where the roof has been removed. This will continue until the new roof system is installed.

At no time shall the roof be left uncovered.

7-4

SEALANT

7-4.1 General

Work included ‑ Furnish and install caulking and sealant required for the joints between dissimilar materials and to close other joints unless they are specifically specified to be done under another section.

7-4.2 Applicable documents The following specifications and standards of the issues currently in force, form a part of this section, and are applicable as specified herein:

American Society for Testing and Materials (ASTM) Standards

C 920 Elastomeric Joint Sealants

Commercial Item Description (CID)

A-A-883 Tape, Pressure Sensitive Adhesive, Masking

Federal Specifications

QQ-A-1876

Aluminum Foil

UU-P-270

Paper, Wrapping, Waxed (Dry)

TT-S-00227E

Sealing Compound: Elastomeric type multi-components for caulking, sealing and glazing in buildings and other structures.

7-4.3 Materials

The following materials shall conform to the respective specifications and other requirements hereinafter specified: Caulking compounds and sealants shall be delivered to the jobsite in sealed containers labeled to show the designated name, formula, or specification number, lot number, color, date of manufacture, shelf life, curing time when applicable at 73.4 plus or minus 2 degrees F. and 50 plus or minus 10 percent humidity, manufacturer's directions, and name of manufacturer.

Sealants Single component types ‑ Rubber base, chemical curing which includes sulfides, silicones and polyurethanes in selected standard colors.

Known acceptable sources are:

Dow‑Corning Corp.

790 Building Sealant

General Electric Co.

Silpruf Weatherproofing Sealant

Pecora Chemical Corp.

864 Silicone Sealant

Tremco

Dymeric

Or approved equal.

Clear sealant ‑ Single component type translucent silicone rubber compound.

Known acceptable sources are:

Dow Corning

999 Building Sealant

General Electric

Silglaze II, SCS 2800

Pecora

863 Silicone Sealant, 610 clear

Or approved equal.

Special sealant ‑ Three component chemically curing, epoxidized polyurethane terpolymer sealant.

Known acceptable sources are:

Tremco

Dymeric

Caulk ‑ Use one of the following for interior application when specifically noted on drawings:

Known acceptable sources are:

Pecora Corp.

"AC‑20" acrylic latex calk

Tremco

Tremco acrylic latex calk 834

Sonneborn‑Contech

"Sonolac" acrylic latex calk

Or approved equal.

Backup material ‑ Backup material shall be one of the following types: closed‑cell resilient urethane, polyvinyl‑chloride foam or PVC foam tape, closed‑cell polyethylene foam, closed‑cell sponge of vinyl or rubber; polychloroprene tubes or beads; polyisobutylene extrusions; oil less dry jute. Backup material shall be nonabsorbent, nonstaining, and shall be compatible with the sealant used. Tube or rod stock when used shall be rolled into the joint cavity.

Bond‑preventive materials ‑ Bond‑preventive materials shall be one of the following, as best suited for the application:

Polyethylene tape, pressure‑sensitive adhesive ‑ the adhesive is required only to hold tape to the construction materials as indicated.

Aluminum foil shall conform to Federal Specification QQ-A-1876.

Wax paper shall conform to Federal Specification UU‑P‑270.

Masking tape ‑ Masking tape shall conform to CID A-A-883.

Primer ‑ Primer for calk and sealants shall not stain surfaces to be sealed and shall be as recommended by the sealant manufacturer. Primer shall have been tested for durability on samples of the surfaces to be sealed.

7-4.4 Installation

Single component types ‑ Use where expansion joints and other movable joints in concrete and metal occur.

Also perimeter sealing of metal frames and masonry in exterior walls; in curtain‑ wall construction as joint sealer, and bedding and setting of glass and/or panels. Type I (self‑leveling) is used for joints in horizontal slab surfaces, and Type II (nonsag) for joints in vertical wall panel surfaces.

Special sealant ‑ Used for filling one‑inch and wider building joints and horizontal joints.

Clear sealant ‑ Used for sealing metal-to-metal joints.

Preparation of joint General ‑ Provide joint filler or joint backing under sealant and under calk where joint is over 1/2 inch deep. Position material to provide for specified depth of compound.

Joint backing ‑ Required behind sealant where depth of joint will not accept joint filler. Cover surface at back of joint with joint backing to form a continuous bond breaker between sealant and the back surface of the joint.

Caulk ‑ The surfaces of joints to be sealed with caulking compound shall be cleaned of particles of mortar, dust, and other foreign matter and shall be brushed out just prior to caulking. Where necessary to provide a suitable backstop, the joint shall be packed tightly with rope yarn to the depth of the joint indicated. Clean non‑porous surfaces with oil‑free solvents such as Tuluol, methyl ethyl ketone, or a mixture of equal parts of xylol and acetone. Remove lacquer from aluminum surfaces in contact with sealant if necessary to achieve adhesion. Do not use soap, detergent, or any water based cleaner.

Sealants

Concrete surfaces in contact with sealant shall be dry, sound, and well brushed and wiped dust free. Oil or grease shall be removed with solvents, and surfaces shall be wiped with clean rags. Where surfaces have been treated, sandblasting or wire brushing shall remove curing compounds, oil, or other such materials. Laitance and mortar shall be removed from the joint cavity. Where a backstop is required, backup material shall be inserted in the joint cavity to the required depth.

Protection ‑ Cover adjacent finish surfaces with a continuous strip of masking tape 2 inches wide. Apply tape prior to priming.

Primer ‑ Comply with compound manufacturer's recommendations for type of primer and its application for the substrate materials involved.

Application Sealant

Single‑component types ‑ The ambient temperature at the time of application shall be between 50 and 100 degrees F., except that silicone type will be 0 to 120 degrees F.

Two‑component types ‑ The ambient temperature at the time of application shall be 40 to 80 degrees F.

Primer ‑ Primer shall be used on wood or other porous surfaces in accordance with instructions furnished with the sealant.

Joints ‑ Joints shall be tooled slightly concave after sealant is installed. When tooling white or light‑color sealant, dry or water‑wet tool shall be used.

Caulk ‑ The ambient temperature shall be between 40 degrees F and 100 degrees F. when the caulking is applied. Compound shall be gun‑applied with a nozzle of proper size to fit the width of joint indicated, and shall be forced into grooves with sufficient pressure to expel air and fill the groove solidly. Caulking shall be uniformly smooth and free of wrinkles, and shall be left sufficiently convex to result in a flush joint when dry. One coat of sealer shall be applied over joint after compound has dried sufficiently to develop a surface skin so as not to deform the surface of the joint.

Colors ‑ Sealants shall be colored with dye, colorfast and compatible with the material. Colors shall reasonably match the adjacent surfaces. Colored calking batches shall cover the total area to be calked. Where colors of adjacent surfaces (except such small items as window frames) differ, the darker color shall be matched. In larger areas, which will later be painted, calking shall be grey or transparent.

Cleaning ‑ The surfaces adjoining the caulked and sealed joints shall be cleaned of smears or other soiling resulting from the caulking and sealing application.

7-4.5 Quality assurance

Submittals ‑ Submit 2 copies of manufacturer's literature for the caulk and sealant proposed for use. This literature shall state the procedures for pre‑treatment of joint surfaces, and list approved joint surface materials as well as application instructions. Include a list showing the product proposed for use in each type of joint to be sealed or caulked under the scope of this work.

Special guarantee ‑ Duration 5 years.

Defects ‑ Any type of leak or loosening or tearing of caulking or sealant will be considered among defects to be corrected.

END OF SECTION 7

DIVISION 8 – DOORS AND WINDOWS

8-1

HOLLOW METAL DOORS AND FRAMES

8-1.1

General

Fabricate the following work of formed metal complete with accessories related to it:

Steel Hollow Metal Frames

Steel Hollow Metal Doors

Install this work unless installation is specified in another section. Deliver to the site those items specified to be installed in other sections.

Related work in other sections

Section 7‑4:

Sealant

Section 8‑3:

Finish Hardware

Section 8‑5:

Weatherstripping and Seals

Section 9‑3:

Painting

Applicable documents

The following specifications and standards, of the issues currently in force, form a part of this section and are applicable as specified herein.

American Society for Testing and Materials (ASTM) Publications A525 General Requirements for Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process

E90 Air Borne - Sound Transmission Loss of Building Partitions, Laboratory Measurement

American National Standards Institute (ANSI) Publications Series 82 A collection of A115.1 - A115.17 specifications for steel door and frame preparation for hardware.

National Fire Protection Association (NFPA) Publications No. 80 Fire Doors and Windows

National Association of Architectural Metal Manufacturers (NAAMM)

Pamphlet Fire-Rated Custom Metal Doors and Frames

Steel Door Institute (SDI) No. 100 Recommended Specifications Standard Steel Doors and Frames

Federal Specifications (FS)

QQ‑S‑775

Steel Sheets, Carbon, Zinc‑Coated (Galvanized) by the Hot‑Dip Process

ADA

The Americans with Disabilities Act

Underwriters' Laboratories, Inc. (UL) Publications

UL-10B

UL Rating for Fire Doors

UL-10C

Positive Pressure Tests of Door Assemblies

8‑1.2

Materials

Products

Standard steel doors and frames conforming to Standards below with doors of SDI Grade III, Extra Heavy Duty Seamless Model 2 or 3. Doors shall be 1 3/4 inches thick unless otherwise indicated.

Known acceptable sources:

Curries Division of ASSA ABLOY Door Group

Mesker Industries, Inc.

Pioneer Industries Div., Core Industries, Inc.

Ceco Door Products Division of ASSA ABLOY Door Group

Astragals - For pairs of exterior steel doors provide overlapping steel astragals with the doors.

Steel - Prime grade, cold rolled sheet steel, annealed and process leveled, with smooth, clean surface. Steel for exterior doors and frames shall be zinc coated. Coating shall conform to ASTM A‑525 and Federal Specification QQ‑S‑775, Type I, Class D.

Primer - Bonderized treatment followed by baked‑on rust inhibiting primer. Submit manufacturer and product specification for approval.

Visible fastenings - Oval head countersunk Phillips type screws.

Sound rated door and frame - Shall conform to all other requirements of this section and have an STC rating of 47 when tested in accordance with ASTM E‑90.

Insulated doors - Conform to all other requirements of this section and provide a "U" value of not more than 0.27. Provide insulated doors at all exterior doors and at other locations shown on the drawings. Manufacture frame with a continuous thermal break.

8‑1.3

Fabrication

Door construction - Doors shall be of the standard type, of Grade III seamless Model 2 or 3, size and design shown. Door clearances, except where indicated otherwise, shall not exceed the following: ⅛-inch at jambs and heads; ¼-inch at meeting stiles of pair of doors; and ¾-inch at bottom measured from finished floor-line. Exterior doors shall have top and bottom edges closed flush and sealed against water penetration. Exterior doors in pairs shall have a metal astragal welded to the active leaf.

Provisions for glazing - Doors and frames with openings to be glazed shall be prepared to receive the glass. Glazing stops on the exterior of openings at exterior walls shall be nonremovable. Glazing beads on the inside face of openings shall be removable screw‑on or snap‑on type.

Frame construction - Pressed steel frames shall be of the combination buck, and trim type of the sizes and details shown. Gages of metal shall be not lighter than 16-gage or 14-gage for frames for multiple door openings. Frames shall be welded unit type. Form exterior frames from hot-dipped galvanized steel.

Welded unit type frames - Frames shall have headers and jambs secured at the corners either by internal welding of faces or by welded splice plates, and shall be further secured at the rabbet either by welding or by mechanical interlock. As an alternative, the headers and jambs shall be secured at the corners by external welding of faces and grinding smooth. Faces of frames at junction of head and jamb shall present neat line joints, invisible under paint finish. Field joints will not be accepted except when necessary for shipping or installation of unusually long frames and then only when approved. They shall be flush butt type backed up with splice reinforcement. Show location and detail of such joints on shop drawings.

Jamb anchors - Unless shown otherwise, or otherwise required by abutting construction, locate an anchor near the top, the bottom, and at one intermediate point of the frame. For frames to eight feet high provide two intermediate anchors. For taller frames, provide intermediate anchors spaced 24 inches or less apart. Anchors shall be not less than 18‑gage steel.

Floor clips - Fabricate of 18‑gage or heavier metal. Anchor each clip into floor with two fastenings, parallel to plane of wall.

Spreaders - Provide a metal angle temporarily secured to bottom of frame between jambs so that it can be removed after frame has been placed and floor clips properly anchored.

Struts - Where required by the drawings, provide 1/4 x 1‑inch steel bar or 16‑gage steel channel fastened by approved adjustable means to jamb of frame and to structure above.

Fire doors and frames - Fire doors and frames shall bear the identifying label of the Underwriters' Laboratories, Inc., or Factory Mutual, Inc. Where required, fire-rated doors shall have a vision panel of ¼ “ wire glass. The vision panel shall be factory installed, be rated the same as the door, and be no more than 100 square inches.

Floor clips - NAAMM Pamphlet, NFPD 80, Fabricate of 14‑gage or heavier metal.

Preparation for hardware - Doors and frames shall be prepared for hardware in conformance with the templates provided under the requirements of ANSI/DH1-A115 Series 82. Cutting, reinforcing, drilling, and tapping of doors and frames shall be done at the factory, except drilling and tapping for surface applied hardware will be done in the field when the hardware is applied. In addition to the plaster guards required for strike reinforcement in the referenced ANSI Publications, plastic guards shall be provided on the door frames for the hinge reinforcement. Door frames shall be prepared for silencers. Rubber silencers as specified in Section 8‑3 shall be provided with the frames. Three silencers per jamb in single doors and an additional one in head of each pair of double doors shall be provided. Reinforcement of doors and frames for hardware shall be as specified in the following table:

Reinforcement

Hardware Item Minimum Gage Minimum Size, Inches

Hinges Door 10 8 x 1‑5/8

Frame 10 8 x 1‑5/8

Locksets and Door 14 10 x 3‑3/4

Latchsets Frame 14 6‑1/2 x 1‑1/2

Flush Bolts Door 14 7‑1/2 x 1‑1/4

Frame 14 4 x 1

Surface‑Applied Door 12 16 x 4‑1/2

Closers Frame 12 18 x width of face of head and 8 x width of jamb, or stop as required

Gage and size of reinforcement for hardware items not listed above shall be as required by the templates for those items.

Shop painting - After fabrication, doors and frames shall be thoroughly cleaned pretreated to provide a strong bond between metal and paint, and shop painted with the specified primer paint. Welds at galvanized surfaces shall be cleaned and covered with zinc‑rich coating prior to primer application.

Delivery and storage - To provide protection during shipment, welded unit type frames shall be strapped together in pairs with heads at opposite ends. Materials shall be delivered to the site in undamaged condition, and shall be stored out of contact with the ground under a weathertight cover permitting good air circulation. Whenever they become evident, abraded, scarred or rusty areas shall be cleaned and touched up with the paint used for the shop painting.

8‑1.4 Installation

Frames shall be plumbed, leveled, and rigidly secured in place. Temporary spreaders shall not be removed until the wall at the frame is completed and the frame is securely anchored in its final position. Wall anchors on door frames shall be installed approximately at the hinge and strike levels. Frame anchors shall be fastened to partition framing as recommended by the partition manufacturer.

Struts - For drywall partitions, use 1/4 inch bar or 16 gauge steel channel fastened by approved adjustable means to jamb of frame and to structure above.

Fasteners - Conceal all anchors and other fastenings in any hollow metal work unless approved by the COR. Screw heads, where occurring, shall be countersunk sufficiently to allow the use of metallic filler ground smooth, to conceal the screw head prior to field painting.

Doors - Doors shall be installed in conjunction with the application of hardware.

8‑1.5 Quality assurance

Standards - Unless exceeded or modified by the requirements of this Section, conform to the following:

Standard steel doors and frames - Steel Door Institute Technical Data Series 100 Recommended Specifications Standard Steel Doors and Frames.

Fire rated doors and frames - NAAMM pamphlet entitled Fire Rated Hollow Metal Doors and Frames and NFPA 80 Standard for Fire Doors and Windows.

Submittals - Conform to procedures specified and the requirements below.

Shop drawings - Shop Drawings shall be submitted for approval in accordance with Division 1, GENERAL REQUIREMENTS. Shop Drawings shall indicate the location of each door and frame, elevation of each type of door and frame, details of construction, method of assembling sections, location and extent of hardware reinforcement, hardware locations, type and location of struts and anchors for frames, and thicknesses of metal. Shop Drawings shall include specifications for shop painting including pretreating and painting materials and processes, and catalog cuts or descriptive data.

Correction of defects - Work that does not conform to the standards of the manufacturer and these specifications or which is delivered damaged will be rejected. Such work must be satisfactorily repaired or replaced promptly and installed only after approval by the COR.

Relation with other trades - Carefully coordinate sizing of frames with suppliers of other items of work required to be built into frames to assure proper fit of all components.

8‑3

FINISH HARDWARE

8‑3.1 General

Work included

Furnish and install or deliver to door manufacturers for installation Finish Hardware items that are required for the Work.

Related work in other sections

Section 8-1:

Hollow Metal Doors and Frames

Section 8-4:

Entrances and Storefront Systems

Section 8-5:

Thresholds

Division 16:

Electrical Systems

Delivery, Storage, and handling - Deliver hardware in original individual containers, complete with necessary appurtenances including fasteners and instructions. Mark each individual container with manufacturer's name and catalog number as shown in hardware schedule. Deliver permanent keys and removable cores to the Contracting Officer's Technical Representative (COR), either directly or by certified mail. Deliver construction master keys with the locks.

Salvage – Existing door hardware, panic devices, security devices, and other items identified by the COR shall be turned over to the COR.

8-3.2 Applicable documents

The following specifications and standards, of the issues currently in force, form a part of this Section and are applicable as specified herein:

American National Standards

ANSI/BHMA A156.1

Butts and Hinges (BHMA 101)

ANSI/BHMA A156.3

Exit devices (BHMA 701)

ANSI/BHMA A156.4

Door Controls - closer (BHMA 301)

ANSI/BHMA A156.5

Auxiliary Locks and Associated Products (BHMA A501)

ANSI/BHMA A156.7

Template Hinge Dimensions (BHMA III)

ANSI/BHMA A156.12

Interconnected Locks and Latches (BHMA 611)

ANSI/BHMA A156.13

Mortise Locks and Latches (BHMA 621)

ANSI/BHMA A156.15

Closer Holder Release Devices (BHMA 321)

ANSI/BHMA A156.6

Auxiliary Hardware (BHMA 1201)

ANSI/BHMA A156.18

Materials and Finishes (BHMA 1301)

ANSI A115.1

Standard Steel Door and Frame Preparation for Mortise Locks for 1 ⅜” and 1 ¾” Doors

ANSI A115.2

Standard Steel Door and Frame Preparation for Bored or Cylindrical Locks for 1 ⅜” and 1 ¾” Doors

ANSI A117.1

Buildings and Facilities - Providing Accessibility and Usability for Physically Handicapped

American Society for Testing and Materials (ASTM). ‑

ASTM E283

Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors.

National Fire Protection Association (NFPA)

NFPA 80

Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors.

NFPA 101

Code for Safety to Life from Fire in Buildings and Structures.

NFPA 80A

Recommended Practice for Protection of Building from Exterior Fire Exposures.

Steel Door Institute (SDI). ‑

SDI 100

Standard Steel Doors and Frames

Building Officials Code Administrators (BOCA). - BOCA Building Code

8‑3.3 Materials Template Hardware - Hardware to be applied to metal or to prefinished doors shall be made to template. Promptly furnish template information or templates to door and frame manufacturers. Template hinges shall conform to ANSI/BMHA A156.7. Coordinate hardware items to prevent interference with other hardware.

Hardware for fire doors and exit doors - Provide all hardware necessary to meet the requirements of NFPA 80 for fire doors and NFPA 101 for exit doors, as well as to other requirements specified, even if such hardware is not specifically mentioned under paragraph entitled, "Hardware Schedule." Such hardware shall bear the label of Underwriters Laboratories, Inc. and be listed by another testing laboratory acceptable to the COR.

Hardware Items - Conform to the respective standards listed and to requirements specified herein. Hinges, pivots, locks, latches, exit devices, bolts, and losers shall be clearly and permanently marked with the manufacturer's name of trademark where it will be visible after the item is installed. For closers with covers, the name or trademark may be beneath the cover. Provide hardware items as specified below and as listed under paragraph entitled "Hardware Schedule."

Hinges - ANSI/BHMA A156.1, 4.5 x 4.5 and 4.5 x 4 inches unless otherwise specified. Construct loose pin hinges for exterior doors and reverse-bevel interior doors so that pins will be nonremovable when door is closed. Other antifriction bearing hinges may be provided in lieu of ball-bearing hinges.

Cylindrical locks and Latches - Best Lock 9K Series. Locksets shall be extra heavy-duty cylindrical type with 2 3/4" (70 mm) backset or greater as specified, with a 9/16" (14 mm) throw latchbolt. Locksets to have anti-rotational studs that are thru-bolted. Keyed lever shall not have exposed keeper hole. Each lever to have independent spring mechanism designed to control lever only. Outside lever sleeve to be seamless, of 1-piece construction, made of a hardened steel alloy. Keyed lever to be removable only after core is removed, by authorized control key, to allow access to knob keeper. Hub, side plate, anti-rotational studs to be a 1-piece casting with a shrouded locking lug. Permanent core face must be same finish as lockset finish. When excessive torque is applied, a replaceable part will shear.

All locks shall be provided with seven pin removable and interchangeable cores, which are removable, by special control keys. Stamp each interchangeable core with a key control symbol in concealed place on the core. The contractor shall remove the existing cores and replace them in the new locks.

Known acceptable source: Best Lock Corporation (Best Access Systems) Series 9K

Pivots - ANSI/BHMA A156.4

Auxiliary locks - ANSI/BHMA A156.5, Grade 1

Exit Devices - Provide panic hardware, or fire exit hardware and auxiliary items. Von Duprin 33 series, 98 series. Furnish modern push-pad type, reversible exit devices with heavy-duty metal chassis and touch bar with metal end caps.

Cylinders and core - Provide cylinders and cores for new locks, including locks provided under other sections of this specifications. Cylinders and cores shall have seven pin tumblers. Cylinders shall be product of one manufacturer. Rim cylinders, mortise cylinders, and lever of bored locksets shall have interchangeable cores, which are removable by special control keys. Stamp each interchangeable core with a key control symbol in a concealed place on the core.

Keying system - Provide an extension of the keying system. Existing locks were manufactured by Best and have…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.