SOW HUM NDAG DEMOLITION.pdf
PDF 226 KB Posted
- Solicitation number
- 6973GH-19-R-00247
About this file
SOW HUM NDAG DEMOLITION (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONTRACTOR'S RELEASE FORM.doc | DOC document | |
| EXPERIENCE INFO FORM.pdf | ||
| DRAWINGS.pdf | ||
| 6973GH-19-R-00247 (SIR).SIR | — | |
| WD-LA20190046 (WAGE DETERMINATION).WAGE DETERMINATION | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION (FAA)
REQUEST FOR QUOTE
Houma, LA
HUM NDAG
Building Demolition, with Asbestos Tile and Mastic Removal Including New Crushed Gravel Drive, Gravel Site with Fencing and Gates.
June 2019
A. INTRODUCTION
A.1 Background The Federal Aviation Administration (FAA) office of NAS Defense Program (NDP) is soliciting quotes to furnish all labor, equipment and materials to abate asbestos, demolish the existing brick building, install a new fence with vehicle gates, gravel the newly enclosed plot and provide a new gravel drive with county or city compliant transition.
A.2 Mandatory Site Visit Site visit is mandatory. The Contracting Officer will schedule a site visit to view the facility.
A.3 Description Project location:
Houma (HUM) NDAG 808 Blimp Rd Houma, LA 70363
Approximate Coordinates: N 29°34'50.6" W 09°040'29.5"
A.4 Period of Performance The Contractor must start the on-site work within three (3) calendar days of receiving the Notice to Proceed from the Contracting Officer. All work must be completed within 45 calendar days after the date of the Notice to Proceed.
After award, the contractor has a maximum of 15 calendar days to provide the FAA with a proposed schedule of completion. The contractor shall incorporate a 30-day lead-time to obtain the required permits, materials and equipment and submittal approvals. Notice-To-Proceed with on-site work will not be granted until the Contractor certifies to the Contracting Officer that all required permits, materials and equipment, as approved by the Government, are in his possession and ready for installation. The Contracting Officer will coordinate the Notice-To-Proceed date with the Contractor to ensure his ability to commence work upon that date.
A.5 Availability of Utilities Electricity, water, sanitary facilities and telephones will not be available for the Contractor's use.
A.6 Kick-off Meeting A conference will be held between the representatives of the Government and the Contractor prior to the start of work.
A.7 Security Requirements The contractor’s employees are not required to go through any security screening. All workers must be United States Citizens. Contractor is required to provide a list of workers to be on site prior and during the project.
B. REQUIREMENTS:
B.1 Statement of Work
The contractor shall furnish all the materials/supplies, equipment/tools, labor/services and disposal required to remove and dispose of the contents of the building, perform an asbestos floor tile and mastic abatement, demolish the building, install a new fence with a new and existing gates, add gravel to the newly enclosed plot area, and a new gravel drive off of Blimp Road with a county compliant entrance.
The contractor shall supervise the activities of their workers and shall ensure that all demolished materials are properly disposed of in the proper landfills.
The Contractor shall:
(1) Participate in a post-award meeting to discuss coordination of activities, project impact, and scheduling.
(2) Participate in a pre-construction meeting where the Notice to Proceed will be determined.
(3) Be responsible for ensuring that his/her employees and all subcontractors comply with the contents of this specification and applicable regulatory requirements for the duration of the work.
(4) Ensure that if conflicts exist between the contents of this Statement of Work/Specification and applicable regulations, the most stringent requirement(s) shall apply.
(5) Remove and properly dispose of all interior contents of the building. Including, but not limited to the desks, chairs, file cabinets, work benches, etc.
(6) Abate the asbestos tile floor and mastic. There is approximately 500 sf of tile/mastic to be abated. Approximately 250 sf of the floor is additionally covered with carpet.
(7) File a 10-day notification with the Louisiana Department of Environmental Quality for the asbestos abatement as required by law.
(8) Be a licensed and certified asbestos abatement/removal company in the State of Louisiana.
(9) Ensure that the work be performed by accredited Asbestos Workers in accordance with Federal and State of regulations governing Asbestos Abatement and disposal activities including State of Louisiana permits.
(10) Be responsible to make the proper notifications, and will pay any/all required state fees.
(11) Comply with the 3rd party developed Scope of Work for the abatement, as required by
Louisiana State law. The subsequent asbestos information in this SOW is for general information and bidding purposes.
(12) Cooperate with other contractors that may be present at the facility and prevent work by others from jeopardizing the asbestos work. Provide access to a third party Air Monitoring Contractor, hired and arranged for by the FAA, for all required testing. This cooperation shall include allowing access to the work areas to conduct visual inspections and air monitoring, collection of samples, providing requested data related to personnel, equipment, and scheduling, and facilitating the FAA’s monitoring of the work. The FAA’s consultant shall specify the protocol for monitoring the project. This will include the duties and responsibilities of the project manage and the air monitoring requirements.
(13) Provide protective clothing/disposable coveralls for those authorized persons allowed to enter the containment each day. Protective clothing supplied by the Contractor shall be identical to the clothing the Contractor provides for his/her own employees.
(14) Properly dispose of all generated ACM wastes. Specific operational procedures shall be outlined in the required Asbestos Abatement Plan.
(15) Demolish and properly dispose of the building. Including cutting and capping all utilities 3 ft below grade and removing the slab and foundations to a minimum of 3-feet below grade.
(16) Remove the existing fence, furnish and install a new fence with 2 new gates, and reinstalling or protecting one existing gate. Install new concrete gate drop stops to ensure the gates cannot be opened in the locked position.
(17) Install new crushed gravel and fabric within the newly enclosed plot.
(18) Remove existing asphalt and rock drive, including the 18” RCP and install new gravel drive from Blimp Road to inside the fence including new 18” RCP and repairing drainage area.
(19) Ensure that the transition from the county/city street to the gravel drive meets all county/city codes. New transition will be required if not to code. State highway/county or City construction specifications, latest edition, form a part of this specification and are applicable for all work unless otherwise specified.
C. ASBESTOS SUBMITTALS
C.1 Plans and Programs: All submittals shall be submitted and approved prior to any work commencing. Asbestos submittals may be adjusted due to the Scope of Work provided by the 3rd party consultant.
1. Hazard Communication Program. A written hazard communication (HAZCOM) program shall be established and implemented in accordance with 29 CFR 1926.59.
Copies of Material Safety Data Sheets for hazardous chemicals brought on-site by the Abatement Contractor shall be attached to the written HAZCOM Program. The HAZCOM Program shall be approved by the Contractor’s IH. All the following submittals shall be submitted and provided:
i. Solvent and Adhesive Specifications and Material Safety Data Sheet(s).
ii. Contractor/Manufacturer qualifications.
iii. Work Plan and Project Schedule.
iv. Written warranty for all workmanship.
v. Any other products to be used
2. Respiratory Protection Program. The Contractor shall establish in writing, and implement a Respiratory Protection Program in accordance with 29 CFR 1926.1101, 29 CFR 1910.134, ANSI Z88.2, CGA G-7 and CGA G-7.1. NO. 12. This shall include evidence of most recent respirator fit-tests in accordance with 29 CFR 1926.1101. The Respiratory Protection Program shall be approved in writing by the Contractor’s IH.
3. Safety, Health, and Accident Prevention Plan. The Contractor shall prepare a Safety, Health and Accident Prevention Plan (SHAPP) for all work that will be performed under this contract. At a minimum, the plan will address the following:
a. Site-specific hazards expected to be encountered during each phase of the work [confined space, electrical hazards, hazardous chemicals present or brought on-site by the contractor, noise, heat and cold stress, power tools, fire and explosion hazards, slips, trips & falls, etc].
b. Procedures that will be used to prevent injury/exposure of workers due to the hazards including preparation of Activity Hazard Analyses for each major phase of the work.
c. A designated on-site point of contact that will be responsible for enforcing the plan.
4. Asbestos Abatement Plan. The Asbestos Abatement Plan is a detailed plan of the response actions to be taken and the control procedures to be used in the abatement of the ACM. The plan shall take into consideration all the individual ACM abatement work tasks as summarized the description of work. The plan shall be prepared by, signed, sealed, and dated by the Abatement Contractor's IH. The plan shall include, but not be limited to, the following items:
a. The type of material(s) to be removed and the approximate quantity.
b. Interface of trades involved in the construction and sequencing of asbestos related work.
c. Type of wetting agent to be used.
d. Abatement contractor’s personal air monitoring strategies.
e. A detailed description of the method to be employed in order to control the spread of ACM wastes and airborne fiber concentrations.
f. The specific procedures to be used for all asbestos regulated work areas and critical equipment.
g. Detail of the curtained doorway (Z-flap) construction
h. A description of the abatement methods and work practices to be used for of material and personal protective equipment to be worn by employees.
i. Personal hygiene and decontamination procedures.
j. Labeling procedures, including descriptions of warning signs and labels to be used.
k. A description of the method to be used to transport waste material, including the name address, phone number, contact, EPA licenses, and certificates of insurance for the transporter.
l. Location and details of the EPA [state]-approved landfill (name, POC, address, phone number, EPA [state] license or permit).
5. Medical. A copy of the physician’s written opinion for each worker who will perform work within the regulated asbestos work area.
6. Training. Training certificates and documentation of project specific training for all on-site workers and supervisors/competent persons who will perform work on this contract prior to performing work within the asbestos regulated area.
7. Provide a copy of any other documentation such as Confined Space Entry Plan.
8. Contractor’s Industrial Hygienist (Abatement Project Manager).
a. Provide the name, address, home & emergency telephone numbers, and copies of the IH’s current certificates, Asbestos certifications and resume documenting at least two years of asbestos abatement experience.
b. Provide the names, addresses, telephone numbers, resumes and current Asbestos Contractor/Supervisor, Asbestos Project Monitor, or NIOSH 582 or equivalent certifications of additional IHs and IHTs who will be assisting with this project.
9. Permits Licenses and Notifications. Provide copies of all permits, licenses and notifications required by regulations.
10. Materials and Equipment.
a. A manufacturer’s catalog for all materials and equipment to be used in the work, including brand name, model, capacity, performance characteristics, and any other pertinent information.
b. Manufacturer's certifications showing compliance with ANSI Z9.2 for vacuums, water filtration equipment, ventilation equipment, and other equipment required to contain airborne asbestos fibers.
c. Test results and certificates from the manufacturer of encapsulates’ substantiating compliance with performance requirements of these specifications.
11. Reports.
a. Provide Asbestos Waste Shipment Records to the COR within 3 days after delivery of ACM to the landfill.
b. A copy of the Site Entry/Exit Log shall be submitted to the COR at project closeout.
12. Material Safety Data Sheets/ Safety Data Sheets.
Material safety data sheets (MSDSs/SDSs) shall be provided for all hazardous materials brought onto the work-site. One copy shall be provided to the COR and one copy shall be included in the Contractor's Hazard Communication Program. The FAA has the option of disallowing the use of some chemicals due to high toxicity, objectionable odors, and when more suitable substitutes are available.
13. Flooring work plan. A work plan shall be submitted along with the schedule before the pre-construction meeting, detailing work and methods.
D. ASBESTOS EXECUTION
D.1 Regulatory Agency Reference; The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The current version of referenced material at the time of the bid shall be used. Where conflicts exist between documents, the most stringent requirements will comply.
A. American National Standards Institute (ANSI).
1. ANSI Z9.2 (1979; R 1991), Fundamentals Governing the Design and Operation of Local Exhaust Systems
2. ANSI Z87.1 (1989; Errata; Z87.1a), Occupational and Educational Eye and Face Protection
3. ANSI Z88.2 (1992), Respiratory Protection
B. American Society for Testing and Materials (ASTM).
1. ASTM C 732 (1995), Aging Effects of Artificial Weathering on Latex Sealants
2. ASTM D 522 (1993a), Mandrel Bend Test of Attached Organic Coatings
3. ASTM D 1331 (1989), Surface and Interfacial Tension of Solutions of Surface-Active Agents
4. ASTM D 2794 (1993), Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
5. ASTM D 4397 (1996), Polyethylene Sheeting for Construction, Industrial, and Agricultural
Applications
6. ASTM E 84 (1996a), Surface Burning Characteristics of Building Materials
7. ASTM E 96 (1995), Water Vapor Transmission of Materials
8. ASTM E 119 (1998), Fire Tests of Building Construction and Materials
9. ASTM E 736 (1992), Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural
Members
10. ASTM E 1368 (1997), Visual Inspection of Asbestos Abatement Projects
11. ASTM D 2986 (1995a), Evaluation of Air Assay Media by the Monodisperse DOP (Dioctyl Phthalate)
Smoke Test C. United States Occupational Safety and Health Administration (OSHA)
1. 29 CFR 1910, Occupational Safety and Health Standards
2. 29 CFR 1926, Safety and Health Regulations for Construction
3. 42 CFR 84, Respiratory Protective Devices
D. Compressed Gas Association (CGA).
1. CGA G-7 (1990), Compressed Air for Human Respiration
2. CGA G-7.1 (1997), Commodity Specification for Air
E. United States Environmental Protection Agency (USEPA).
1. EPA 340/1-90-018 (1990), Asbestos/NESHAP Regulated Asbestos-Containing Materials Guidance
2. EPA 340/1-90-019 (1990), Asbestos/NESHAP Adequately Wet Guidance
3. EPA 560/5-85-024 (1985), Guidance for Controlling Asbestos-Containing Materials in Buildings
4. EPA 600/4-85-049 (1985), Measuring Airborne Asbestos Following an Abatement Action
5. 40 CFR 61, National Emission Standards for Hazardous Air Pollutants
6. 40 CFR 763, Asbestos Hazard Emergency Response Act
7. 49 CFR 171, through 180 DOT Hazardous Material Regulations Pertaining to Asbestos
F. National Fire Protection Association (NFPA).
1. NFPA 70E(2009), National Electrical Code
2. NFPA 701(1996), Methods of Fire Test for Flame-Resistant Textiles and Films
3. NFPA 101(2009), Life Safety Code Handbook
G. National Institute for Occupational Safety and Health (NIOSH).
1. NIOSH Pub No. 94-113 (1994), NIOSH Manual of Analytical Methods, 4th edition with First
Supplement H. Underwriters Laboratories (UL).
1. UL 586 (1990), High-Efficiency Particulate Air Filter Units I. Federal Aviation Administration (FAA).
1. 3910.5, Asbestos Control
2. 1050.20, Airway Facilities Asbestos Control
3. Regional Asbestos Control Program Supplement
4. Article 52 Agreement Between DOT/FAA and the Professional Airways System Specialists (PASS)
5. FAA OSH Order 3900.19B
J. Louisiana Requirements:
1. Louisiana Department of Environmental Quality;
D.2 Asbestos Definitions
1. Asbestos Containing Material. Any material containing more than one percent Asbestos.
For purposes of these specifications, ACM includes Presumed Asbestos-Containing Material (PACM) as defined by 29 CFR 1926.1101.
2. Asbestos Regulated Work Area. An area established to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulates; and a work area where the airborne concentration of asbestos fibers exceeds, or has a possibility to exceed, the permissible exposure limit.
3. Certified Industrial Hygienist (CIH). An Industrial Hygienist certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.
4. Class II Asbestos Work. Activities involving the removal of ACM that is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, siding shingles, and construction mastic.
5. Competent Person. On all construction worksites the contractor shall designate a competent person having the qualifications and authority for ensuring worker safety and health as required by 29 CFR 1926.20 and for overseeing asbestos-related work as required by 29 CFR 1926.1101. The duties of the competent person include, but are not limited to, the following: establishing the negative pressure containment, ensuring its integrity, controlling entry into and exit from the containment, and ensuring workers wear required personal protective equipment and are trained in the use of hygiene facilities, work practices, and decontamination procedures specified in this specification and applicable regulations.
6. Friable ACM. A term as defined in 40 CFR 61, Subpart M and EPA 340/1-90-018 that means any material containing more than 1 percent asbestos as determined using the method specified in 40 CFR 763, Appendix A, Subpart F, Section 1, Polarized Light Microscopy, that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
7. High Efficiency Particulate Air (HEPA) filter. A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
8. Permissible Exposure Limit (PEL). OSHA PELs are worker exposure limits regulating the amount or concentration of a substance in air that shall not be exceeded. (1) An airborne concentration of asbestos of 0.1 fibers per cubic centimeter of air (f/cc) as an eight- (8) hour time weighted average (TWA). (2) An airborne concentration of asbestos of 1.0 f/cc as averaged over a sampling period of thirty (30) minutes (Excursion Limit).
9. Time-Weighted Average (TWA). The TWA is an 8-hour time weighted average concentration of airborne asbestos fibers (longer than 5 micrometers) per cubic centimeter of air that represents the employee's 8-hour workday as determined by OSHA’s requirements.
D.3 Government Furnished Supplies and Services
1. The FAA will contract the services of an independent Environmental Monitoring Services Contractor (herein referred to as the Environmental Contractor) to monitor the Asbestos Abatement Contractor’s compliance with the Contract Documents.
D.4 Contractor Requirements.
1. Medical.
a. Medical requirements shall conform to 29 CFR 1926.1101. Before being exposed to airborne asbestos fibers, workers shall be provided with a comprehensive medical examination as required by 29 CFR 1926.1101 and other pertinent state or local requirements. This requirement must have been satisfied within the past year.
b. Complete and accurate records shall be maintained on file at the work site of each employee's medical examinations, medical records and exposure data as required by 29 CFR 1910.1020 and 29 CFR 1926.1101.
2. Training.
Contractor personnel shall attend and successfully complete training per 40 CFR Part 763, Subpart E Appendix C. Such training shall be current during time of qualification and will be maintained during the course of the project for workers directly involved in ACM removal, handling and disposal. Workers shall take and successfully complete the "Worker" course. Onsite supervisory personnel shall take and successfully complete the "Contractor/Supervisor" course. In addition, prior to the commencement of work, each worker shall be instructed by the Contractor's IH and onsite competent person/supervisor on the content and requirements of the Contractor's Asbestos Abatement Plan, Safety, Health, and Accident Prevention Plan, Hazard Communication Program and all additional requirements of 29 CFR
1926.1101. The Abatement Contractor shall maintain copies of workers’ state licenses or EPA-accredited training certificates at the work site for the duration of the project.
3. Industrial Hygienist. The abatement contractor is responsible for conducting personal air sampling of their workers. Contractor's competent person/supervisor shall implement and ensure safety and health requirements are complied with during the performance of all required work.
4. Permits, Licenses, and Notifications. The Contractor shall obtain all necessary permits and licenses in conjunction with the anticipated asbestos abatement, transportation and disposal actions and timely notification furnished of such actions as required by Federal, state, regional, and local authorities and as otherwise specified herein. This may include, but not be limited to the following:
a. If required by the State of Louisiana a 10-day advance notification in accordance with 40 CFR Part 61, Subpart M.
b. State worker and supervisor licenses for contractor personnel who will perform work on this contract.
c. The current permit for the disposal facility that will accept all asbestos waste generated as part of this contract.
d. The written notification provided to any rental company concerning the intended use of rental equipment, the possibility of asbestos contamination, and the decontamination procedures that will be used prior to the return of the equipment.
e. Additional permits, licenses, and notifications as applicable.
5. Contractor Supplied Materials and Equipment. All materials and equipment to be used in the work shall comply with applicable regulations and standards. This may include, but not be limited to, the following items:
Air monitoring equipment Paperboard boxes Airless Sprayer Personal protective clothing Chemical encapsulant Polyethylene Sheet - FlamResistant Coveralls Polyethylene Sheet – General Disposal bags Polyethylene Sheet – Reinforced Disposal Container Removal encapsulant Duct Tape Respirators Encapsulants Sheet Plastic Eye protection Strippable Coating Fiberboard drums Underclothing Foot coverings Vacuum equipment Hard hats Wetting Agent Other work clothing Tiles and adhesives
6. The Contractor shall submit manufacturer’s documentation/testing to the
Environmental Contractor for review.
7. Contractor Reports and Records
a. Asbestos waste disposal record report. The Abatement Contractor shall maintain final completed copies of the Waste Shipment Record for all shipments of waste material as specified in 40 CFR 61, Subpart M and other required state waste manifest shipment records as specified herein. Detailed information of all asbestos waste disposals shall be documented on the mandatory waste shipment record form.
i Entry/Exit Log. The Contractor shall maintain a Site Entry/Exit Log. The log shall be made available to the COR throughout the course of the project.
ii Air Monitoring Contractor. The Contractor shall maintain a daily log of all Personal air testing results.
8. Insurance; The Contractor shall have the following insurance coverage, with the stated minimum limits:
Type of Coverage Minimum Limit General Liability $1 million per occurrence
Contractual Liability 1 million per occurrence Automobile Liability 50,000 per occurrence for property damage
Property Damage Liability $1 million per occurrence Worker’s Compensation $1 million per occurrence
Pollution Liability $1 million per occurrence
a. The policies evidencing required insurance shall be written on a comprehensive form of policy listing the FAA as the certificate holder and contain no pollution exclusions. The policies shall also contain an endorsement to the effect that any cancellation or any material change adversely affecting the FAA’s interest shall not be effective for such period as the laws of State of Michigan allow or until 30 days after the insurer or the Contractor gives written notice to the RE, whichever period is longer. Each policy shall include a provision that the FAA will be notified at least 30 days in advance of the effective date of any reduction in coverage or cancellation.
D.5 Contractor’s Personal Protective Equipment (PPE).
1. Contractor workers shall be provided with personal protective clothing and equipment selected by the Contractor’s IH and/or Competent Person/Supervisor and as specified herein. The Contractor shall ensure that PPE is worn properly.
2. Respiratory protection worn shall be approved by the Abatement Contractor’s IH. For air-purifying respirators, either high-efficiency particulate air or HEPA cartridges - N, R, or P-100 cartridges approved for use in airborne asbestos environments shall be used.
Respirators shall be selected and used in accordance with manufacturer’s recommendations and approved for use in environments containing airborne asbestos fibers in accordance with applicable regulations. Personnel, who handle ACM, enter asbestos regulated work areas that require the wearing of a respirator, or who are otherwise carrying out abatement activities that require the wearing of a respirator, shall be provided with approved respirators that are fully protective of the worker at the measured or anticipated airborne asbestos concentration level to be encountered. A qualitative or quantitative fit test conforming to 29 CFR 1926.1101 and 29 CFR 1910.134 shall be conducted for each Contractor worker required to wear a respirator. A respirator fit test shall be performed for each worker prior to initially wearing a respirator on this project and every 6 months thereafter. If physical changes in a worker develop that will affect the fit, a new fit test shall be performed. Functional fit checks shall be performed by employees each time a respirator is put on and in accordance with the manufacturer's recommendation.
3. The Contractor's IH and competent person/supervisor shall select and approve the whole body protection to be used. Disposable whole body protection worn shall be disposed of as asbestos-contaminated waste in accordance with the Contractor’s Asbestos Abatement Plan. Asbestos abatement whole body protection shall not be removed from the work site to be cleaned.
a. Coveralls. Disposable coveralls with attached hoods and booties and a zipper front shall be provided. Coveralls shall be secured at the wrists and ankles with duct tape.
b. Gloves. Disposable plastic or rubber gloves shall be provided to protect hands.
Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but shall not be used alone. Where there is the potential for hand injuries (i.e., scrapes, punctures, cuts, etc.) a suitable outer glove shall be provided and used.
c. Under Clothing. Disposable underwear shall be provided and worn next to the skin or cloth under clothing. Non-disposable under clothing may be permitted if approved by the COR and the Air Monitoring Contractor.
d. Work Clothing. An additional coverall similar to that required in paragraph
Coveralls shall be provided when the abatement and control method employed does not provide for the exit from the asbestos regulated work area directly into an attached decontamination unit. Cloth work clothes shall be provided for wear under the protective coverall and foot coverings when work is being conducted in low temperature conditions. Cloth work clothes shall be either disposed of as asbestos contaminated material or properly laundered in accordance with 29 CFR 1926 and as specified in the Contractor's Asbestos Abatement Plan.
e. Foot Coverings. Rubber boots or equivalent safety shoes shall be used in moist or wet areas.
f. Head Covering. Hood type [disposable] or [reusable] head covering shall be provided. In addition, protective headgear (hard hats) shall be provided as required. Hard hats shall only be removed from the asbestos regulated work area after being thoroughly decontaminated.
g. Protective Eye Wear. When vision correction is necessary to perform the work task, prescription safety eyewear shall be used. Contact lenses are authorized for use while wearing a respirator. Fog-proof goggles shall be worn by personnel engaged in asbestos abatement activities in the asbestos regulated work area when the use of a full face-piece respirator is not required. Eye protection provided shall be in accordance with ANSI Z87.1.
h. Other Items. All other protective equipment shall be provided as required and approved by the Contractor's IH.
D.6 Worker Decontamination
Prior to exiting the regulated asbestos work area, all employees shall adhere to the following procedures:
1. Respirators shall be worn while employees remove all gross contamination and debris from their work clothing using a HEPA vacuum and wet wiping.
2. Employees shall remove the outer layer of protective clothing in the regulated asbestos work area and deposit the clothing in labeled impermeable bags or containers for disposal.
3. Employees shall not remove their respirators in the regulated asbestos work area.
D.7 Contractor Supplied Products and Equipment.
1. Vacuums. Vacuums shall be leak proof to the filter, equipped with HEPA filters, and be of sufficient capacity and provide the necessary capture velocity at the nozzle or nozzle attachment to efficiently collect, transport and retain the ACM waste material. Power tools shall not be used to remove ACM unless the tool is equipped with an effective, integral HEPA-filtered exhaust ventilation capture and collection system or has otherwise been approved for use by the COR. All residual asbestos shall be removed from reusable tools prior to storage and reuse. Reusable tools shall be thoroughly decontaminated prior to being removed from asbestos containments.
2. Warning signs and Warning Labels. The Contractor shall ensure that all personnel understand the warning signs. Warning signs and tape printed in English and other predominant languages shall be provided at the regulated boundaries and entrances to asbestos regulated work areas. Signs shall be located at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Warning signs shall be in vertical format conforming to 29 CFR 1910, 29 CFR 1926, and state and local requirements. Warning labels shall be affixed to all asbestos disposal containers used to contain asbestos materials, scrap, waste debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to requirements specified herein are acceptable. Warning labels shall comply with 29 CFR 1926 and all state and local requirements.
3. Air Monitoring Equipment. The Contractor's IH shall select and approve the personal air monitoring equipment to be provided and used by the contractor for evaluation of airborne asbestos fiber concentrations. The equipment shall include, but not be limited to:
a. Low-volume, battery powered, body-attachable, portable personal pumps with a power pack capable of sustaining the calibrated flow rate for a minimum of 10 hours.
b. Standard 25-millimeter diameter, 0.8 micron pore size filters and cassettes in accordance with 29 CFR 1926, for personal air sampling.
c. A flow calibrator capable of calibration to within plus or minus 2 percent of reading over a temperature range of minus 20 degrees C (minus 4 degrees F) to plus 60 degrees C (140 degrees F) and traceable to a National Institute of Standards and Technology (NIST) primary standard.
4. Expendable Supplies.
a. Duct Tape. Industrial grade duct tape shall be provided in 2 inch and 3 inch widths.
b. Disposal Containers. Leak-tight disposal containers shall be provided for ACM generated wastes. Leak-tight means that solids, liquids or dust cannot escape or spill out. All disposal containers shall be either pre-labeled or affixed with OSHA warning label as specified in 29 CFR 1926.
c. Disposal Bags. Six-mil (6 mil) thick leak-tight pre-labeled OSHA warning label bags shall be provided for placement of asbestos generated waste in accordance with Federal and state requirements.
d. Fiberboard Drums. Fiberboard drums shall be provided if required by state or local requirements.
e. Leak-tight Wrapping. Two layers of 6 mil (minimum) thick polyethylene sheet stock shall be used for the containment of removed asbestos-containing components or materials such as reactor vessels, large tanks, boilers, insulated pipe segments and other materials too large to be placed in disposal containers.
Upon placement of the ACM component or material, each layer shall be individually leak-tight sealed with duct tape.
f. Sheet Plastic.
i. Polyethylene Sheet, General - Six-mil (minimum) thick polyethylene sheet shall conform to ASTM D 4397.
ii. Polyethylene Sheet, Flame Resistant - Where a potential for fire exists, 6 mil (minimum) thick flame-resistant polyethylene sheet shall be used and conform to the requirements of NFPA 701.
iii. Polyethylene Sheet, Reinforced - 6-mil thick reinforced polyethylene sheet shall be provided where high skin strength is required such as where it constitutes the only barrier between the asbestos regulated work area and the outdoor environment, occupied building areas, or floors where required. The sheet stock shall consist of translucent, nylon-reinforced or +woven-polyethylene thread laminated between two layers of polyethylene film. Film shall meet flame resistant standards of NFPA 701.
g. Wetting Agents. Amended water shall be used in accordance with manufacturer’s specifications.
h. Spray Adhesive. Spray adhesive use shall be confined to well-ventilated areas.
i. Other items. A sufficient quantity of other items shall be provided that may include, but not be limited to: scrapers, brushes, brooms, staple guns, tarpaulins, shovels, rubber squeegees, dust pans, other tools, scaffolding, staging, enclosed chutes, wooden ladders, lumber necessary for the construction of asbestos regulated containment work areas, UL approved temporary electrical equipment, material and cords, ground fault circuit interrupters, water hoses of sufficient length, fire extinguishers, first aid kits, portable toilets, logbooks, log forms, markers with indelible ink, spray paint in bright color to mark areas, project boundary fencing, etc.
D.8 Contractor Installation Requirements
Asbestos abatement work tasks shall be performed as specified herein. Personnel shall wear and utilize protective clothing and equipment as specified herein. Eating, smoking, drinking, chewing tobacco, chewing gum, or applying cosmetics shall not be permitted in the asbestos containment areas. All hot work (burning, cutting, welding, etc.) shall be conducted under strictly controlled conditions in conformance with 29 CFR 1926. Personnel of other trades not engaged in asbestos abatement activities shall not be exposed at any time to airborne concentrations of asbestos.
1. Preparation of Work Area.
a. Signs. The Contractor shall post warning sings prior to asbestos removal in accordance with FAA Asbestos Signs and Labels Document. The signs shall display the legend indicated below:
DANGER
ASBESTOS
MAY CAUSE CANCER
CAUSES DAMAGE TO LUNGS
AUTHORIZED PERSONNEL ONLY
WEAR RESPIRATORS AND PROTECTIVE CLOTHING IN THIS AREA
REGULATED AREA
2. Furnishings.
a. Removal of Furnishings. All materials stored in the QSI ARSR abatement areas are to be removed from the work area by the Asbestos Abatement contractor before any asbestos abatement work begins. All materials that are removed shall be pre-cleaned using HEPA filtered vacuum followed by wet wiping and/or steam cleaning. These items shall be removed to an area or site designated by the COR and stored or other appropriate action taken.
b. Replacement of Furnishings. At the conclusion of the asbestos abatement work in each work area and after meeting the final PCM clearance air testing requirements and the new tile has been installed and sealed, objects so removed shall be transferred back to the cleaned area from which they came and reinstalled at the direction of the
COR.
3. Asbestos Control Area Requirements.
a. Regulated containment area shall be established and maintained for the abatement work task as required by 29 CFR 1926 and approved Contractor’s Asbestos Abatement Plan. The following procedures shall be performed sequentially and each activity shall be completed before proceeding to the next.
Furnishings/materials in the regulated asbestos work area shall be pre-cleaned and removed if possible.
Surfaces shall be pre-cleaned as required.
Containment area shall be installed as required.
b. Upon completion of the work area containment, the COR and the FAA Air Monitoring Contractor will conduct a pre-abatement inspection. The Contractor shall receive notification from the COR before any asbestos abatement removal work is initiated.
4. Asbestos Handling Procedures
a. The Contractor shall employ proper handling procedures in accordance with 29 CFR 1926, 40 CFR 61, Subpart M and the requirements herein. The specific abatement techniques and items identified shall be detailed in the Contractor's Asbestos Abatement Plan including, but not limited to, details of construction materials, equipment, and handling procedures.
5. Clean-Up. The Contractor shall maintain a clean work area by performing the following housekeeping functions at the end of each shift:
a. Loose ACM shall be prepared for disposal by packaging the waste and removing it from the work area.
b. Mist and mop floor in the work area.
c. Polyethylene in work and high traffic areas shall be inspected and repaired.
6. Final Cleaning and Visual Inspection. The abated regulated asbestos work area shall be cleaned by collecting, packing, and properly storing/disposing of all gross contamination. A final cleaning shall use HEPA vacuum and wet cleaning of all exposed surfaces and equipment in the regulated asbestos work area. Upon completion of the cleaning, the Contractor shall conduct a visual pre-inspection of the cleaned area in preparation for a final inspection before final air clearance monitoring and re-clean, as necessary. Upon completion of the final cleaning, the Abatement Contractor, the RE, and Air Monitoring Contractor shall conduct a final visual inspection of the cleaned work area in accordance with ASTM E 1368 and document the results on the Final Cleaning and Visual Inspection Form. If the Air Monitoring Contractor rejects the abatement area as not meeting final cleaning requirements, he will notify the COR and the COR will direct the Abatement Contractor to re-clean the area as necessary and have a follow-up inspection conducted by the Air Monitoring Contractor.
Re-cleaning, follow-up re-inspections shall be at the Abatement Contractor's expense.
7. Lock Down. Prior to removal of plastic barriers and after clean up of gross contamination and final visual inspection, a post removal (lockdown sealer) encapsulant shall be spray applied to floors in the abatement area.
8. Air Sampling:
a. Personnel sampling and analyses of airborne fibers on asbestos workers shall be performed in accordance with 29 CFR 1926.1101. Results of personnel samples shall be posted at the job site and made available to the COR. It is the Responsibility of the abatement contractor to conduct this personnel sampling of the abatement workers.
b. The FAA will contract the services of an independent Air Monitoring Contractor to conduct air sampling inside and outside of containment areas, and to conduct final PCM clearance air testing for this project.
9. Stop Work: Should sampling results fail to meet the final clearance requirements, the Abatement Contractor shall pay all costs associated with all required re-cleaning, air re-sampling and analysis until final clearance requirements are met.
a. Any of the following conditions will be sufficient evidence for the COR to direct the
Abatement Contractor to stop work and take corrective action as outlined in the Facility Asbestos Abatement Contingency Plan.
10. If air sampling and analysis conducted in accordance with these specifications and the Air
Monitoring Contractor’s approved Area Air Monitoring Plan indicates airborne fiber concentrations of 0.02 f/cc above baseline or greater outside of the regulated asbestos work area.
11. Work or conditions found to be in violation of this specification or applicable regulations.
This includes, but is not limited to, puncture or collapse of containment barriers, electrical power loss, ground-fault circuit interrupter failure, equipment failure, dry removal of ACM, and visible emission from the asbestos regulated work area.
a. After corrective action has eliminated the condition(s) responsible for the work stoppage, the COR will notify the Abatement Contractor when work may restart.
Standby time required to resolve the condition(s) shall be at the Abatement Contractor's expense.
12. Site Inspection. While performing asbestos removal work, the Abatement Contractor shall be subject to onsite inspections by the COR who may be assisted by or represented by quality assurance, safety and industrial hygiene personnel, and the Air Monitoring Contractor.
13. Clean-Up and Disposal.
a. Housekeeping. Surfaces of the regulated work area shall be kept free of accumulations of asbestos-containing debris. Meticulous attention shall be given to restricting the spread of dust and debris. HEPA filtered vacuum cleaners shall be used. The space shall not be blown down with compressed air. The COR or their representative will visually inspect all surfaces within the containment for residual material or accumulated debris. The Contractor shall re-clean all areas showing dust or residual materials. The Air Monitoring Contractor shall document in writing that the area is safe before unrestricted entry is permitted.
b. Title to Materials. Non-hazardous material resulting from abatement work, except as specified otherwise, shall become the property of the Abatement Contractor and shall be disposed of as specified in applicable local, state, and Federal regulations and herein.
c. Collection and Disposal of Asbestos. Consult 40 CFR 61 Subpart M, customer, state, regional and local requirements.
After final clean-up and acceptable airborne concentrations are attained, and the containment removed, the Contractor shall remove all asbestos waste, asbestos contaminated water, scrap, debris, bags, containers, equipment, and asbestos contaminated clothing, shall be collected and placed in sealed leak-tight, containers (e.g. double 6 mil plastic bags), sealed 6 mil double wrapped polyethylene sheet, sealed fiberboard boxes or other approved containers. Waste within the containers must be adequately wetted in case the container is breached. A warning and Department of Transportation (DOT) label identifying the contractor by name and the generator’s EPA ID number and any additional state requirements shall be affixed or preprinted on each bag. Waste asbestos material shall be disposed of at an EPA, state and local approved asbestos landfill. For temporary storage, sealed impermeable containers shall be stored in the asbestos waste load-out unit or in a storage/transportation conveyance (i.e.; covered, lined trailer, roll-off waste boxes, etc.) in a manner as accepted by and in an area as assigned by the COTR/RE. Procedures for hauling, storage and disposal shall comply with 40 CFR 61, Subpart M, and State of Louisiana, regional, and local standards.
When asbestos removal is complete, all asbestos waste is removed from the work site, and final clean up is completed, the COR will instruct the abatement contractor when to remove the warning signs and boundary warning tape.
14. Emergency Planning and Procedures. The following items are intended to supplement the emergency response procedures listed in the Abatement Contractor’s Safety, Health and Accident Prevention Plan:
a. Abatement Contractor employees shall be trained in recognition of life-threatening and non-life threatening emergencies and in the following evacuation procedures:
For non-life threatening situations, employees injured or otherwise incapacitated shall be decontaminated following normal procedures (assisted by fellow workers if necessary) before exiting the work area to obtain medical treatment.
For life-threatening situations, all affected workers shall evacuate the work area using the nearest accessible exit. Worker decontamination shall be secondary to exiting the work area, contacting appropriate emergency response personnel, and getting prompt medical attention for injured or ill workers.
b. Telephone numbers of emergency response personnel and the location of the nearest telephone shall be prominently displayed.
c. Fire and emergency medical response procedures including written directions and a map to the nearest hospital and emergency phone numbers
15. Prior to FAA employees being allowed to re-enter the QSI ARSR building, work will not be accepted until a visual and PCM clearance air test has been performed by a third party Industrial Hygienist hired by the FAA.
16. Submittals Required at Conclusion of Project
a. Submit the waste manifest documenting the company used and total amount of ACM discarded, within five (5) days after finishing the project.
b. All air sample results from the analytical lab that were not previously submitted.
c. A complete log book of all the documentation acquired during the project. Contractor shall insure that minutes of final walk-thru with IH, and FAA representative are incorporated into the final project documents along with any corrective actions taken by the Contractor.
d. Complete written reports on proper OSHA forms of any accidents, emergency or other safety and/or health incidents.
e. Summary of corrective actions.
E. ADDITIONAL WORK REQUIRED
E.1 SUBMITTALS
1. Safety, Health, and Accident Prevention Plan. The Contractor shall prepare a Safety, Health and Accident Prevention Plan (SHAPP) for all work that will be performed under this contract. At a minimum, the plan will address the following:
a. Site-specific hazards expected to be encountered during each phase of the work [confined space, electrical hazards, hazardous chemicals present or brought on-site by the contractor, noise, heat and cold stress, power tools, fire and explosion hazards, slips, trips & falls, etc].
b. Procedures that will be used to prevent injury/exposure of workers due to the hazards including preparation of Activity Hazard Analyses for each major phase of the work.
c. A designated on-site point of contact that will be responsible for enforcing the plan.
2. Fence Material
3. Materials for the drive and site
E.2 FENCING AND GATES
2B.1 APPLICABLE DOCUMENTS: The latest revision of the publications listed below form a part of this Specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM A 428 Weight of Aluminum coating
ASTM A 392 Specification for Zinc-Coated steel Chain-Link Fence Fabric
ASTM A 491 Specification for Aluminum-Coated steel Chain-Link Fence Fabric
ASTM B 117 1990 Salt Spray (Fog) Testing ASTM C 94 1990 Ready-Mixed Concrete ASTM F 883 1990 Padlocks ASTM F 567 Practice for Installation of Chain-Link Fence
FEDERAL SPECIFICATIONS (FS)
FS RR-F-191 Fencing, Wire and Post Metal (and Gates, Chain-Link
Fence Fabric, and Accessories) (General Specification)
FS RR-F-191/1 Fencing, Wire and Post, Metal (Chain-Link Fence Fabric) (Detail Specification)
FS RR-F-191/2 Fencing, Wire and Post, Metal (Chain-Link Fence Gates) (Detail Specification)
FS RR-F-191/3 Fencing, Wire and Post, Metal (Chain-Link Fence Posts, Top Rails and Braces) (Detail Specification)
FS RR-F-191/4 Fencing, Wire and Post, Metal (Chain-Link Fence Accessories) (Detail Specification)
2B.2 MANUFACTURER: All fencing materials, including fabric, gates, posts, and fittings, shall be obtained from a single qualified manufacturer having a minimum of five years experience manufacturing chain link fencing.
2B.3 FABRIC: The fabric shall be woven from a 9 gauge galvanized steel wire in a 2-inch mesh and shall conform to the requirements of ASTM A 392, class 2. Fabric shall be galvanized after weave (GAW). Fabric height shall be 7 feet and furnished in one-piece fabric width. The standard length of fabric roll shall be 50 feet. The top and bottom of the fence fabric shall be twisted & barbed. The fence fabric must be within 1 inch of packed ground and shall be anchored in such a manner as to preclude the fence fabric being lifted more than 4 inches from the ground. Fabric shall be attached to the exterior side of line posts. Fabric shall conform to FS
RR-F-191/1
2B.4 WIRE TIES: Wire ties shall be provided for attaching fabric to line posts, brace rail, and tension wire. Wire ties shall be 9-gauge galvanized steel wire spaced not greater than 14-inches apart. Wire ties shall not fracture when tested by being bent on a mandrel through an angle of 180 degrees.
2B.5 TENSION (STRETCHER) BARS: One continuous piece of galvanized steel equal to full height of fabric, minimum cross-section of 0.25” x 0.75”. Provide one tension bar for each gate or end post, and two for each corner or pull post.
2B.6 TENSION BANDS: The tension bars shall be held to the fence post with…
This is the start of the file's text. The full file is on GovTribe.