About this file

SITE SURVEY REPORT - CRG LOC (pdf)

View the file

Other files

File Type Posted
Experience Information Form.pdf PDF
WAGE DETERMINATION FL190202.pdf PDF
DESIGN DRAWING - CRG LOC.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
SCOPE OF WORK - CRG LOC.pdf PDF
FINAL SIR 6973GH-19-R-00161.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Aviation Administration

Site Survey Report

11/15/2017 Replace LOC Shelter, CRG LOC RWY 32, Jacksonville FL Unstaffed Infrastructure Sustainment Project, (UIS)

JCN: 1305110 JON: 1217SO0258

Background:

On 11/15/2017 FAA Engineering Services visited Jacksonville Executive Airport at Craig Field RW 32 Localizer Facility in order to perform a site survey for a shelter replacement design. Richard Polk from the Atlanta Engineering Center was accompanied by James Dano WET16-JAX from Jacksonville SSC NAV/COMM during inspection. Weather was cold, windy &, overcast.

Report:

CRG LOC shelter is a typical FAA white fiberglass equipment building. Exterior dimensions are 8’ x 14’ x 8-1/2’h. Fiberglass shelter has plywood floors, vinyl floor tile and, galvanized steel & wood frame. Interior has a high luster fiberglass finish. Building sits on six 18” round concrete piers and, has one door with concrete landing. Shelter bears a Plastidome by Andrew Corporation brand label. See photographs attached below.

There is Mark 1F Localizer & RMS equipment inside shelter. Equipment outside shelter includes a RMS antenna & Flight Check antenna mounted on the shelter roof, 25KVA step down transformer, REIL disconnect, PAPI disconnect, REIL System Control Cabinet and, a Localizer antenna array. No exterior disconnect for the Localizer shelter could be found.

Shelter exterior is in poor condition. Shelter exterior bottom edge is disintegrating. Shelter interior is in fair condition. Shelter floor appears to have been repaired at some point in the recent past. Stains on interior walls indicate moisture intrusion. There are no lightning air terminals on shelter. There is no main ground plate for electronic equipment on interior shelter wall.

Shelter transformer power supply does not meet current FAA standards. Shelter is served by a 25KVA pole mounted transformer inside a large metal enclosure. There are two disconnects mounted on enclosure that serve RW14 PAPI and RW14 REIL. However, no disconnect for the Localizer equipment was found. Power to LOC shelter could possibly be coming from the PAPI switch. Otherwise, power must come directly from secondary side of transformer to main distribution panel inside shelter.

There are only two drawings in the CRG LOC file in ProjectWise. ILS Runway 31 LOC License Area and Plot Layout. Drawings show as built dates of 10/08/1987. FSEP records indicate a commissioning date of 04/01/1989. According to these records the shelter is close to 30 years old.

Local Issues:

SSC personnel asked if there were any NAP entries in CWP to upgrade this facility to Mark 20 ILS.

Electrical layout described on 1987 drawings doesn’t match what is installed on site.

Field Notes & Measurements:

1. Typical 8’ x 14’ FAA fiberglass shelter bolted to (6) 18” diameter round concrete footers.

2. (6) 18” concrete footers centerline distance 69” x 132” outside 69” x 66” inside

3. Bottom of shelter 9” above ground

4. Front door landing: 4’ x 5’

5. XFMR foundation: 66” x 66”

6. Shelter located 10’ from XFMR

7. REIL system cabinet located 13-1/2’ from XFMR

8. Both the shelter & XFMR have flaking paint, stains, mold, lichen. Very poor exterior condition.

9. Perimeter at underside bottom of shelter is rotting out.

10. Gravel road & parking area look good. Need more gravel from entrance drive to LOC array.

11. New shelter must be 10’ x 16’. Power distribution panel located on LH side of entrance door.

12. See handwritten notes for plot layout sketch.

Shelter Contents:

- 2’ x 3’ x 34”h storage/work desk

- 1-1/2’ x 3’ x 6-1/2’ metal storage cabinet

- 22” x 33” x 14” battery box

- 120/240 w/100A MLO distribution panel

- 26” x 17” Freidrich window unit HVAC

- Exhaust fan w/motorized louver

- Fire extinguisher

- Roll around equipment cart

- First aid kit

- LOC Mark 1F w/ RMS Unit floor mounted equipment rack

- Wall mounted power supply

- Wall mounted antenna pull box enclosure

List of Items to Upgrade & Replace:

1. 10’ x 16’ Shelter

2. (1) XFMR, 4160-120/240 25KVA

3. (3) 100A, HD, NEMA4X, 1PH, 3W, 120/240 Fused Disconnects

4. (1) NEMA 4X FAA Std. Switchrack

5. (1) 120/240 UG Shelter Feed

6. (1) Shelter Grounding System

Reference Drawings:

DOU5KE 0001, ILS Runway 31 Localizer License Area, 02/20/1986, Rev A: Add REIL, 06/20/1986 DOU5KE 0002, ILS Runway 31 Localizer Plot Layout, 02/20/1986, Rev A: Ass Built, 10/08/1987

Location:

30.344740 N, 81.52006 W FAA Jacksonville SSC

Jacksonville Executive Airport at Craig 14400 Whirlwind Ave 855-1 Saint Johns Bluff Rd North, Suite 500 Jacksonville, FL 32218 Jacksonville, FL 32225-8388 Mgr.: Michael Anderson Mgr.: Tiffany Gillem ph.:904-741-0232 ph.:904-741-5061

Action items:

1.Determine if any other JCN’s are associated with this project. Check equivalent projects at Cecil Field, reimbursable, JAI 10/2017.

2. Determine current cost for a Dupont 10’x 16’ shelter.

3. Contact FAA Shelter Support.

4. Add cost for upgrading electrical equipment. Request guidance from Electrical Engineer.

5. Produce Electrical drawing.

6. Produce SOW and IGCE and submit to JAX SSC for approval.

7. Produce final shelter design and submit to the Jacksonville SSC for approval.

8. Produce a final cost estimate.

9. Obtain construction project authorization funding.

10. Purchase new GFM 10’ x 16’ shelter through TSSC Shelter Support.

11. Advertise SOW for Construction Award.

12. Provide JAX SSC with a complete new CRG LOC RW32 LOC shelter & Electrical Upgrades

Pictures:

1. CRG LOC RW32

2. CRG LOC Equipment Shelter Site

3. LOC Equipment Shelter Front & Left Side

4. Front Door

5. Left side

6. Left Side and Back

7. Back

8. Right Side

9. Bottom Edge

10. XFMR Enclosure, PAPI 14 & REIL 14 Main Switch

11. PAPI 14

12. REIL 14

13. XFMR: 4160-120/240, 25KVA

15. REIL 14 System Control Cabinet

16. REIL 14 Control Panel

17. LOC Equipment Shelter Nameplate

18. LOC Equipment Shelter Interior

19. LOC Equipment Shelter Floor

20. LOC Equipment Shelter Ceiling

21. LOC Equipment Shelter Wall

21. LOC Equipment Shelter Distribution Panel

22. LOC 100A Distribution Panel

Let me know if you have any questions or concerns about this report.

Richard Polk

DOT/FAA, AJW-2E15J

Campus Building 1701 Columbia Ave.

College Park, GA 30337 o: 404-305-7445 c: 678-485-6811

*~* END *~*