Specifications - Install One Government Furnished Localizer Shelter.....pdf

PDF 359 KB Posted

Attached to
SCREENING INFORMATION REQUEST/REQUEST FOR OFFER Replace the Localizer (LOC) shelter at the Lincoln Regional Airport, Runway 15 located in Lincoln, CA.
Solicitation number
6973GH-19-R-00127
Issued by

About this file

Specifications - Install One Government Furnished Localizer Shelter.... (pdf)

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

Date: 2/13/2019

Install One Government Furnished Localizer Shelter Lincoln Regional Airport

Runway 15 Lincoln, California

U.S. Department of Transportation Federal Aviation Administration

TABLE OF CONTENTS

Install One Government Furnished Electronic Equipment Shelter at the Lincoln Regional Airport

Lincoln, California

Division Description No. Pages

1 Project Requirements 3

2 Site Work and Demolition 2

3 Concrete 6

4 Not Used

5 Not Used

6 Not Used

7 Not Used

8 Not Used

9 Not Used

10 Not Used

11 Not Used

12 Not Used

13 Safety and Health 10

14 Not Used

15 Not Used

16 Electrical 3

End

DIVISION 1

PROJECT REQUIREMENTS

Print Date: February 13, 2019

1.1 GENERAL:

1.1.1 Project Locations: Lincoln Regional Airport Runway 15 Localizer Shelter, located on the Lincoln Regional Airport, 1480 Flightline Drive, Lincoln, California, 95648.

LHM LOC: Latitude 38°53′50.96″N and Longitude 121°20′54.19″W, Elevation: 114’

FAA ESCORT IS REQUIRED for this location.

1.1.2 Scope: Furnish all necessary labor, equipment, transportation, and service to "Replace the Localizer (LOC) shelter at the Lincoln Regional Airport, Runway 15.

For the LOC site, work includes, but is not necessarily limited to:

• Disconnecting and removing the existing concrete shelter. Set the existing shelter off to the side so that the FAA can remove the electronic equipment.

• Demolish the existing building foundations.

• Excavating for the three new grade beams. Excess material may be used to expand the site to the north.

• Placing base material, compacting, forming, installing rebar, placing concrete for the grade beams.

• Excavating and installing the new earth electrode system.

• Carefully setting the new government furnished shelter on to the new grade beam foundation.

• Supplying and installing building lightning protection, grounding and bonding.

• Installing and connecting all other new underground conduits as shown on the drawings.

• Placing base material, compacting, forming, installing rebar, placing concrete for the stoop.

• Removing the existing concrete equipment shelter and disposing of it.

• Cleaning up and restoring the site.

in accordance with this specification and the project drawings.

Prior to construction, the FAA will identify, to the best of their ability, the location of all underground FAA cables and grounding systems. The contractor shall make the necessary arrangements with an underground cable / utility location service to locate any other utilities that may be located within the construction area. The contractor shall repair or replace, at his expense, any damage to any existing cables that is caused by the contractors operations. All necessary repairs shall be performed per FAA-C-1391b, section 3.6.

Upon completion, the new localizer shelter shall be complete, ready for use by the FAA.

1.1.3 Work Hours: The Contractor shall schedule and perform work between the hours of 8:00 AM and 4:30 PM, Monday through Friday, excluding federally-established holidays, except when prior approval has been obtained from the Resident Engineer (RE). No work shall be scheduled or performed on Saturdays, Sundays or holidays without prior approval from the RE. Approval by the RE for overtime work shall not be construed as an agreement for payment of overtime work. If the contractor desires to work overtime, weekends or holidays, the written request for approval shall be forwarded to the Resident Engineer at least 48 hours in advance.

1.1.4 Maximum Allowable Duration per Site: The Contractor shall be required to (a) commence work under this contract within three (3) working days after the date the Contractor receives the Notice-To-Proceed date, (b) prosecute the work diligently, and

(c) complete the entire work ready for use no later than ten (10) working days. The time stated for completion shall include final cleanup of the premises.

1.1.5 Execution of Work: The contractor shall assume full responsibility for the protection and safekeeping of products stored on the site. The contractor and his subcontractors shall maintain the job site in a neat and orderly condition. This includes the daily removal of rubbish, waste and tools, equipment and materials not required for the work in progress.

1.1.6 Storage: The contractor will not be allowed to use the new shelter to store tools and materials. Make the necessary arrangements for your own storage container (Jobox, rental trailer, PODS, shipping container, whatever.).

1.2 INSPECTIONS:

1.2.1 Damage to the Site: All cost of repairs shall be paid by the contractor. After notice to proceed and prior to the commencement of construction, the contractor and the resident engineer shall conduct joint inspections of the existing areas affected by the construction. Damage or defects shall be noted and will be used as the basis for determination of damages caused by the contractors operations.

1.2.2 Protection of Existing Utilities, Vegetation, Structures, and Improvements: This item shall also apply to roadway, shoulders, slopes, culverts, guard posts, fencing, gates, etc. Where such items are disrupted or damaged, they shall be repaired or replaced at the contractors expense.

1.2.3 Protection and Clean-up: The contractor shall have the overall responsibility for the performance and enforcement of all forms of protection against the weather, and further the responsibility for repair and replacement of material or equipment damaged as a result of inadequate protection.

1.3 MISCELLANEOUS INFORMATION:

1.3.1 Brand Name or Equal Statement: The use of a brand name with, or without, an or equal statement following the purchase description in this specification or on the project drawings is intended to promote competition by encouraging the offering of products that are equal in all material respects to the brand name products cited in such descriptions.

Identification by brand name does not indicate a preference for the products mentioned but indicates the quality and characteristics that will meet the governments needs. All characteristics of a specified brand name product which are essential to the government are described in this specification or on the project drawings. The contractor shall obtain product literature from the manufacturer of the specified brand name product to determine its general quality and functional characteristics and shall use that information in making any desired substitutions.

1.4 SECURITY REQUIREMENTS: There are security requirements for this facility, and this project. This facility is located behind secure access points. Unscheduled work activities and deliveries are impossible to accommodate.

This facility is located within the secure areas of the airport. Airport badging is not necessary for the contractor. Contractors may not be left alone, even for one second.

An airport badged FAA person will be on-site at all times.

Vehicles operated on the airport must display company identification on both sides and be equipped with an orange rotating beacon. Heavy equipment must be equipped with a checkered orange and white flag while on the airport.

End of Division 1

DIVISION 2

Site Work and Demolition

2.0 GENERAL: This section covers site work consisting of excavating, trenching, backfilling, compacting, soil stabilization, grading, graveling, and demolition.

2.1 Site Materials: Aggregate base Specifications shall be in accordance with that indicated in Specification Division 3, Section 3.3.1.

Trench backfill material shall be native material. If native is not available, clean sand shall be used to make up the difference.

2.1.1 Local and Import Fill: All fill material shall be free from organic matter, debris vegetation, and other deleterious substances. It shall be of a quality suitable for the purpose intended and shall compact thoroughly without the presence of excessive voids when watered and compacted.

2.1.3 Over Excavation: Where excavation for footing and foundations is carried to a depth greater than required, backfilling with earth will not be permitted. In such instances, backfilling shall be done with concrete at no additional cost to the government.

2.1.4 Trenching: Underground cable and utility trenches shall be excavated where shown on the drawings. Trenches shall be excavated to a depth as indicated on the drawings. All trenches shall run in straight lines unless otherwise shown on the Project Drawings. Conduit shall not vary more than four (4) inches either side of the straight line layout.

2.1.5 Trench Backfill and Fill: Backfill and fill shall be placed in horizontal layers not exceeding loose depths of 12 inches. Each layer shall be properly moistened and compacted, as specified herein, by power operated mechanical equipment.

2.1.5.1 Foundation Backfill: After foundations have been constructed and have reached adequate set, excavations shall be backfilled. Backfill shall be placed on both sides of the foundations at the same time, and both sides tamped prior to placing of the next layer of material. Special care must be taken to prevent any uneven wedging action against the structure. The resident engineer shall inspect all installations prior to placement of backfill. Placement of backfill shall be in 6 inch layers.

2.1.6 Site Graveling:

2.1.6.1 Ground Stabilization Fabric: Site areas, roadways, walkways, and all other areas that were disturbed during the process of replacing this shelter shall receive ground stabilization fabric prior to spreading aggregate base material. Supply and install Marafi BasXgrid, or approved equal.

2.1.6.2 Aggregate Base: The contractor shall furnish up to 40 tons of 3/4” maximum road base in the locations that were disturbed. Finished surfacing of base shall be neatly shaped and graded.

2.1.6.3 Compaction: Compaction shall include watering, drying, blading, tamping, rolling, and/or such other operations required to produce the densities specified herein.

2.2 Demolition of the Existing Building: Remove the existing 8’ wide by 12’ long single story building, fiberglass shelter, and entrance way concrete step as shown on the project drawings.

2.2.1 Standards: Unless they are modified or exceeded by the requirements of this specification, conform to applicable parts of ANSI A10.6 Safety Requirements for Demolition.

2.2.2 General Requirements:

2.2.2.1 Protections: Provide barricades, coverings, etc., necessary to protect persons, electronic equipment and property from injury or damage as a result of this work.

2.2.3 Procedure:

2.2.3.1 Existing ILS Shelter: Remove and dispose of the shelter.

2.2.4. Workmanship:

General - Keep dust, and debris to a minimum.

Workmanship - Demolition work required for this structure shall be done carefully.

2.2.5 Scrap Materials: Unless otherwise indicated, material and debris resulting from demolition operations is the property of the contractor, who shall promptly remove them from the site. No sale of surplus materials shall be conducted on the site.

End of Division 2

DIVISION 3

CONCRETE

Dated: February 13, 2019

3.1 General: This section covers concrete work for one localizer shelter foundation at the Lincoln Regional Airport. This division includes the base material and formwork requirements for the complete project installation.

3.2 Applicable Documents:

3.2.1 Publications: The following publications, issue in effect on the date of this solicitation, form a part of this specification.

3.2.1.1 AMERICAN CONCRETE INSTITUTE (ACI)

SP4 Formwork for Concrete 309 Consolidation of Concrete 301 Specification for Structural Concrete for Buildings 302 Recommended Practice for Concrete Floor and Slab Construction 347 Recommended Practice for Concrete Formwork 613 Recommended Practice for Selecting Proportions for Concrete 614 Recommended Practice for Measuring, Mixing and placing Concrete

3.2.1.2 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

C-33 Concrete Aggregates C-39 Test for Compressive Strength, Concrete cylinders C-94 Specification for Ready Mixed Concrete C-143 Testing for Slump of Portland Cement Concrete C-150 Portland Cement C-172 Sampling Fresh Concrete A-185 Welded Steel Wire Fabric for Concrete Reinforcement C-260 Air-Entrainment Admixtures for Concrete C-309 Liquid Membrane Forming Compounds for Curing Concrete A-615 Deformed Billet Steel Bars for Concrete Reinforcement D-1751 Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (non-extruding and resilient bituminous type)

3.2.1.3 CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI-78 Recommended Practice for Placing Bars

3.2.1.4 FEDERAL SPECIFICATIONS

SS-C-1960/3A Cement, Portland SS-A-281 Aggregate: (for) Portland Cement - Concrete

3.3 Materials:

3.3.1 Aggregate Base: The aggregate shall conform to Section 26, "Aggregate Bases" in the California State Standard Specifications. The gradation shall be as follows:

Percentage Passing

1-1/2” Maximum 3/4" Maximum

Individual Individual Test Moving Test Moving Sieve Sizes Results Average Results Average

2” 100 100 --- --- 1-1/2" 87-100 90-100 --- --- 1” --- --- 100 100 3/4" 45-90 50-85 87-100 90-100 No. 4 20-50 25-45 30-60 35-55 No. 30 6-29 10-25 5-35 10-30 No. 200 0-12 2-9 0-12 2-9

3.3.2 Cement: Cement for concrete shall be Portland Cement conforming to ASTM C-

150. Cement type shall be Type 1 unless otherwise stated on the project drawings.

The type stated on the project drawing shall supersede the Type 1 specified herein.

3.3.3 Aggregate: Aggregate shall be well graded in conformance with ASTM C-33, maximum size 1 inch for coarse aggregate (Class 2). Aggregate shall be natural sand and crushed stone or gravel suitable for use in concrete structures, unless other inert material is specifically approved in writing by the Resident Engineer.

3.3.4 Water: Water shall be fresh, clean and potable.

3.3.5 Admixture: Air-entrainment admixtures (if applicable) shall conform to ASTM C- 260.

3.3.6 Grout: Grout used shall be Sonneborn "Sonogrout", or "Burke" pre-mix grout (non-metallic, non-shrink) or approved equal.

3.3.7 Reinforcement: Placement shall be in accordance with project drawings.

3.3.7.1 Reinforcing Steel: Steel bar reinforcing shall be intermediate grade, new billet, deformed and of sizes called for on the drawings and shall conform to the requirements of ASTM Serial Designations A-615, Grade 40. Reinforcing bars shall be delivered with identifying tags attached to each bundle of bent bars.

3.3.7.2 Mesh Reinforcement: Mesh reinforcement shall conform to ASTM A-185, of the sizes indicated.

3.3.7.3 Bar Supports: Chairs, spacers and bolsters shall be galvanized steel or plastic coated of galvanized design designated and spaced in accordance with the recommendations of CRSI-78, Recommended Practice for Placing Bar Supports.

3.3.8 Isolation Joint Filler: Shall be a premolded rigid canefiber board impregnated throughout with a minimum of 35% by weight of asphaltic compound, thickness as shown on the project drawings. The filler material shall conform to ASTM D-1751.

3.4 Installation:

3.4.1 Forms:

3.4.1.1 Exposed Surfaces: If forms are removed before curing is completed, the contractor shall provide protection to prevent spalling and damage to the new concrete edges.

3.4.1.2 Treating: The inside of forms shall be coated with non-staining mineral oil or other Resident Engineer approved material to provide proper release. Wood forms for unexposed concrete may be wet with water just before placing concrete in lieu of coating.

3.4.1.3 Checking Forms: As concrete is placed the contractor shall make frequent checks on forms to detect any change in position. If necessary, stop the placement operation and replace or tighten any displaced forms to bring them back to the required line and level before continuing.

3.4.1.4 Removal of Forms: The removal of forms shall not be started until the concrete has attained the necessary strength to support its own weight and any construction live loads. All VOIDS or honeycombing found upon removal of forms shall be repaired immediately with concrete grout.

3.4.2 Mixing:

3.4.2.1 "Ready Mixed" Mixing and Delivery Operation: "Ready Mixed" mixing and delivery operations shall conform with ASTM C-94. Do not add water at the job unless prior approval is given by the Resident Engineer. Record the amount of any added water on all copies of the delivery ticket. If water is added, mix batch a minimum of 70 revolutions at truck manufacturer's recommended mixing speed before placing.

Concrete which has been held in a mixer truck longer than 1 hour shall not be used.

3.4.3 Placement of Concrete:

3.4.3.1 Cold Weather: To maintain the temperature of the concrete above the minimum placing temperature of 40 degrees F the as-mixed temperature shall not be less then 55 degrees F when the mean temperature falls below 40 degrees F.

3.4.3.2 Hot Weather: The ingredients shall be cooled before mixing, if necessary, to maintain the temperature of the concrete below the maximum placing temperature of 90 degrees F. Concrete that arrives at site at a temperature above 90 degrees F shall be rejected.

3.4.3.3 Hardened Concrete: Concrete that is partially hardened shall not be tempered.

3.4.3.4 Method: Place concrete in the forms as rapidly as practical by methods that will prevent loss or separation of the ingredients. Deposit it as nearly as practical in its final position in such a manner as to maintain a plastic surface which is approximately horizontal. If necessary to accomplish this, provide additional chutes or hoppers. Place concrete continuously in layers of 12-inches to 18-inches high at deep sections and not over 10-inches in height at shallow sections, so that no concrete will be placed against concrete which has hardened, except at approved joints. Vibrators shall not be used to move concrete laterally in the forms. Remove any wood spreaders as concrete rises in forms. Method shall conform to requirements of ACI-614 and ACI-309.

3.4.4 Vibration: All concrete shall be consolidated by vibration so that the concrete is thoroughly worked around the steel reinforcement, embedded items and into corners of forms, eliminating all air or stone pockets which may cause honeycombing, pitting or planes of weakness. Mechanical vibrators shall have a minimum frequency of 7 revolutions per minute and shall be operated by competent workmen. Over-vibrating must be avoided. Vibrators shall not be attached to or held against the forms or reinforcing steel.

3.4.5 Concrete Finishing: All concrete surfaces shall have a Class 1 troweled finish in accordance with ACI-302, Section 7-2, except for exterior platforms and walkways which shall have a broom finish applied to produce a fine and uniform gritty, non-slip surface.

All housecleaning pads shall have a finish with Class A tolerances (1/8 in. in 10 ft.) in accordance with ACI-301.

3.4.6 Curing: Curing shall be accomplished by the use of rugs or plastic sheets with the concrete kept damp; or membrane forming curing compound applied in a two-coat, continuous operation using not less than one gallon for 200 square feet of surface for each coat. The second coat shall be applied in a direction approximately at right angles to the direction of the first coat. Curing compound membranes subjected to damage by construction operations within the curing period, shall be resprayed at the rate specified above. Permanently exposed surfaces shall be cured by use of a membrane forming curing compound containing a fugitive dye. If clear-type curing compounds are used, the concrete surfaces shall be shaded from the direct rays of the sun for the curing period. Curing compound shall conform to ASTM C-309. Selection of the curing compound shall be determined by compatibility with any finishes to be applied to the concrete surface.

3.4.7 Details of Concrete Reinforcement: All details not covered herein shall be in accordance with ACI-301, Chapter 5, "Reinforcement".

3.4.7.1 All Reinforced Bars: All reinforcing bars shall be supported and tied together to prevent displacement by construction loads or the placing of concrete. On ground and where necessary, supporting concrete blocks may be used. Over framework, concrete, metal, plastic or other Resident Engineer approved bar chairs and spacers shall be furnished. Where the concrete surface will be exposed to the weather in the finished structure, the portions of all accessories in contact with the formwork shall be galvanized or shall be made of plastic.

3.4.7.2 Ties: Tie reinforcing together with wire at every intersection of bars and of bars with stirrups. Provide not less than 2 ties at all joints in reinforcing to hold bars in alignment. All reinforcing shall be sufficiently tied to provide proper spacing and alignment of bars, and to prevent their dislocation during placement of concrete.

3.4.7.3 Surface Preparation: Remove from reinforcing, any scale, heavy rust, and any coating which would reduce bond.

3.4.8 Splices:

3.4.8.1 Continuous Bars: Shall be spliced by overlapping a minimum of 36 diameters.

3.4.8.2 Welded Wire Fabric: Adjacent sections of steel welded wire fabric shall edge lap two inches, exclusive of the overhang of the transverse wires, beyond the longitudinal wires and shall end lap nine inches.

3.4.9 Placing Loads:

Shelter – Placing of the shelter will be at the Resident Engineers descression, but usually the shelter can be placed on the grade beam foundations the following work day.

3.4.10 Protection of Exposed Concrete: Protect exposed surfaces as necessary to prevent staining and damage. Provide protection of exposed edges to prevent chipping.

3.5 Quality Assurance:

3.5.1 Concrete Strength: Concrete shall develop 3,000 pounds per square inch minimum compressive strength when tested at 28 days in accordance with ASTM 39.

Concrete shall be placed with a maximum slump of 4 inches. Placement and curing techniques shall conform to ACI Standard 301.

3.5.2 Testing: The Government may retain a testing laboratory to perform the testing of concrete cylinders. The costs of tests shall be born by the Government. Any retesting required because of failure of concrete to meet specification requirement shall be paid for by the Contractor.

The cylinders will represent the batch of concrete from which they were taken. Three

(3) test cylinders will be made for each strength test. Specimens will be tested at 7 and 28 days with one held in reserve in case improper sampling, molding, or testing requires an additional test. Test specimens will be tested in accordance with ASTM C-39.

Concrete that does not meet the requirements shall be removed and replaced at the expense of the Contractor.

Slump tests may be performed by the Resident Engineer. The slump cone and rod will be furnished by the Resident Engineer. Forming, curing, and testing of concrete cylinders will be done at the Government's expense. The concrete slump tests will be taken and tested in accordance with ASTM C-172 and ASTM C-143.

3.5.3 Forms: Forms for exposed concrete surfaces shall be designed and constructed so that the formed surface of the concrete does not undulate excessively in any direction between studs, joists, form stiffeners, form fasteners, or wales. Undulations exceeding either 3/32 inch or 1/270 of the center to center distance between studs, joists, form stiffeners, form fasteners or wales will be considered to be excessive.

Should any form or forming system even though previously approved for use, produce a concrete surface with excessive undulations, its use shall be discontinued until satisfactory modifications approved by the Resident Engineer have been made.

Portions of concrete structures with surface undulations in excess of the limits herein described may be rejected by the Resident Engineer.

3.5.4 Batch Weight Tickets: A copy of all concrete "batch weight tickets" shall be given to the Resident Engineer.

3.5.5 Field Inspections: Prior to placing any concrete in forms, reinforcing and formwork will be inspected by the Resident Engineer and any discrepancies found shall be corrected by the Contractor at his expense. The Contractor shall give the Resident Engineer at least 24 hours advance notice for such inspection. All concrete shall be placed in the presence of the Resident Engineer.

End of Division 3

DIVISION 13

SAFETY AND HEALTH

PART 13 - GENERAL

13.1 SECTION CONTENTS

A. The Contractor shall have full responsibility for construction site and construction work safety and health. This Section contains generic minimum requirements for jobsite safety and health. The Contractor shall provide beyond-minimum provisions as required by construction site conditions, activities, and regulatory requirements.

13.2 REFERENCES

A. The publications listed below form a part of this specification to the extent referenced. The publications listed below are referenced as the latest edition published as of the date of this document. The publications are referred to within the text by the basic designation only.

B. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

1. NFPA 10 Portable Fire Extinguishers

2. NFPA 241 Safeguarding Construction, Alteration, and Demolition Operations

3. NFPA 70 National Electrical Code

4. NFPA 70E Electrical Safety in the Workplace

C. U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

1. 29 CFR 1910 Occupational Safety and Health Standards

2. 29 CFR 1919 Gear Certification

3. 29 CFR 1926 Safety and Health Regulations for Construction

4. 29 CFR 1926.500 Fall Protection

13.3 SUBMITTALS

A. Submit the following. Government review and acceptance is required for submittals with a "GA" designation. Submittals without a "GA" designation are submitted for information only.

B. Preconstruction Submittals

1. Accident Prevention Plan (APP); GA.

2. Activity Hazard Analysis (AHA); GA.

C. Reports

1. Accident Reports, if any.

2. Regulatory Citations and Violations, if any.

3. Construction and Demolition Waste Tracking Log

13.4 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST

A. Contracting Officer will provide a "Contractor Safety Self-Evaluation checklist" to the Contractor at the pre-construction conference. The checklist will be completed monthly by the Contractor and submitted with each request for payment voucher. An acceptable score of 90 or greater is required. Failure to submit the completed safety self-evaluation checklist or achieve a score of at least 90, will result in a retention of up to 10 percent of the voucher.

13.5 REGULATORY REQUIREMENTS

A. In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with the following federal, state, and local, laws, ordinances, criteria, rules and regulations: OSHA 1910, OSHA 1926, 2012 edition of the International Building Code; 2012 Uniform Plumbing Code; 2012 Uniform Mechanical Code; 2011 National Electric Code; 2009 International Existing Building Code; Washington State Labor and Industry Standards, and FAA Sustainability Policy Statement. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.

13.6 SITE SAFETY AND HEALTH OFFICER QUALIFICATIONS

A. Site Safety and Health Officer (SSHO): A Site Safety and Health Officer (SSHO) shall be provided at the work site to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The SSHO shall meet the following requirements:

1. Level 3: A minimum of 5 years safety work on similar projects. 30-hour OSHA construction safety class or equivalent within the last 5 years. An average of at least 24 hours of formal safety training each year for the past 5 years. Competent person training as needed.

B. Allowable Overlapping Responsibilities: The SSHO may be a person solely dedicated to the work of this Section or may be a supervisory, superintendence, on-site engineering, or administrative member of the Contractor’s site-staff who is also qualified as an SSHO. The SSHO may simultaneously be the Contractor’s Quality Control System Manager per Section 01 45 00 Contractor’s Quality Control.

C. Site Attendance: The SSHO shall be a member of the Contractor’s site-staff who is normally on-site when construction activity is occurring. “Normally on site” shall be at least 80% of the time that construction activity is occurring.

13.7 SITE SAFETY AND HEALTH OFFICER DUTIES

A. The Site Safety and Health Officer’s (SSHO) duties include:

1. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Safety inspection logs shall be attached to the Contractors' daily quality control report.

2. Conduct mishap investigations and complete required reports.

Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.

3. Maintain applicable safety reference material on the job site.

4. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.

5. Implement and enforce accepted APPS and AHAs.

6. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. A list of unresolved safety and health deficiencies shall be posted on the safety bulletin board.

7. Ensure sub-contractor compliance with safety and health requirements.

8. Perform safety and occupational health management, surveillance, inspections, and safety enforcement for the project.

9. Conduct and document safety inspections.

10. Failure to perform the above duties will result in the FAA requiring replacement of the SSHO, with a project work stoppage, without extension of the Contract Time, until a suitable replacement SSHO is approved by the FAA and in-place on the site.

13.8 CRANE OPERATOR QUALIFICATIONS

A. Crane operators shall meet the requirements in USACE EM 385-1-1, Section 16 and Appendix G. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a government agency, or and organization that tests and qualifies crane operators). Proof of current qualification shall be provided.

13.9 MEETINGS

A. Pre-construction Conference

1. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).

2. The Contractor shall discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis. In addition, a schedule for the preparation, submittal, review, and acceptance of AHAs shall be established to preclude project delays.

3. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance.

Work shall not begin until there is an accepted APP.

B. Safety Meetings

1. Shall be conducted and documented daily. Minutes showing contract title, signatures of attendees and a list of topics discussed shall be attached to the Contractors' daily quality control report.

13.10 ACCIDENT PREVENTION PLAN (APP)

A. The Contractor shall use a qualified person to prepare the written site-specific APP. Specific requirements for some of the APP elements are described below.

The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer.

B. Submit the APP to the Contracting Officer 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

C. Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.

D. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard.

Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ANSI/ASSE A10.34,) and the environment.

E. Copies of the accepted plan shall be maintained at the Resident Engineer's office and at the job site.

F. The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.

13.11 ACCIDENT PREVENTION PLAN (APP) CONTENTS

A. In addition to the requirements outlines in Appendix A of USACE EM 385-1-1, the following is required:

1. Names and qualifications (resumes including education, training, experience and certifications) of all site safety and health personnel designated to perform work on this project to include the designated site safety and health officer and other competent and qualified personnel to be used such as CSPs, CIHs, STSs, or CHSTs. The duties of each position shall be specified.

2. Qualifications of competent and of qualified persons. As a minimum, competent persons shall be designated and qualifications submitted for each of the following major areas: excavation; scaffolding; fall protection; hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance.

3. For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.550 (g).

4. Lock-out tag-out procedures and requirements.

13.12 ACTIVITY HAZARD ANALYSIS (AHA)

A. Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHA’s as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.

B. The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.

C. The activity hazard analyses shall be developed using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHA’s will be developed by the contractor, supplier or subcontractor and provided to the Contractor for submittal to the Resident Engineer.

13.13 DISPLAY OF SAFETY INFORMATION

A. Within 1 calendar day after commencement of work, erect a safety bulletin board at the job site. The safety bulletin board shall include information and be maintained throughout the project.

13.14 SITE SAFETY REFERENCE MATERIALS

A. Maintain safety-related references applicable to the project, including those listed in the article "References”. Maintain applicable equipment manufacturer's manuals.

13.15 EMERGENCY MEDICAL TREATMENT

A. Contractors will arrange for their own emergency medical treatment.

Government has no responsibility to provide emergency medical treatment.

13.16 REPORTS

A. Accident Reports

1. For recordable injuries and illnesses, and property damage accidents resulting in at least $2,000 in damages, the Contractor shall conduct an accident investigation to establish the root cause(s) of the accident and provide the report to the Resident Engineer within 5 calendar day(s) of the accident.

2. For any weight handling equipment accident (including rigging gear accidents) the Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the WHE Accident Report (Crane and Rigging Gear) form and provide the report to the Resident Engineer within 30 calendar days of the accident.

Crane operations shall not proceed until cause is determined and corrective actions have been implemented to the satisfaction of the contracting officer.

B. Accident Notification: Notify the Contracting Officer as soon as practical, but not later than four hours, after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident. Information shall include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident;

names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.

C. Monthly Exposure Reports: Monthly exposure reporting to the Resident Engineer is required to be attached to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor.

D. Crane Reports: Submit crane inspection reports required in accordance with USACE EM 385-1-1, Appendix H and as specified herein with Daily Reports of Inspections.

E. Certificate of Compliance The Contractor shall provide a Certificate of Compliance for each crane entering an activity under this contract. Certificate shall state that the crane and rigging gear meet applicable OSHA regulations (with the Contractor citing which OSHA regulations are applicable, e.g., cranes used in construction, demolition, or maintenance shall comply with 29 CFR 1926 and USACE EM 385-1-1 section 16 and Appendix H. Certify on the Certificate of Compliance that the crane operator(s) is qualified and trained in the operation of the crane to be used. The Contractor shall also certify that all of its crane operators have been trained in the proper use of all safety devices (e.g., anti-two block devices). These certifications shall be posted on the crane.

13.17 HOT WORK

A. Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written permit shall be requested from the COTR. Contractors are required to meet all conditions before a permit is issued.. The Contractor will provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 30 minutes after completion of the task or as specified on the hot work permit.

B. When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency numbers. ANY FIRE, NO MATTER HOW

SMALL, SHALL BE REPORTED TO THE RESPONSIBLE BUILDING

MANAGER OR COTR IMMEDIATELY.

PART 14 - PRODUCTS

14.1 VOC CONTENT

A. All sealant, adhesives, and chemical compounds used on-site shall comply with UL 181, Class 1. VOC shall be less than 25 g/L. This shall be clear on MSDS submittals for the products.

PART 15 - EXECUTION

15.1 CONSTRUCTION AND/OR OTHER WORK

A. The Contractor shall comply with NFPA 241, the APP, the AHA, Federal and/or State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard shall prevail.

B. Hazardous Material Use: Each hazardous material must receive approval prior to being brought onto the job site or prior to any other use in connection with this contract. Allow a minimum of 10 working days for processing of the request for use of a hazardous material.

C. Hazardous Material Exclusions: Radioactive materials or instruments capable of producing ionizing/non-ionizing radiation as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited. Contractor shall provide certification that project did not introduce any lead or asbestos based products into the facility at the end of the project.

D. Unforeseen Hazardous Material: The design should have identified materials such as PCB, lead paint, and friable and non-friable asbestos. If additional material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."

E. Fire doors are assumed to contain asbestos, but otherwise no ACM has been identified in the facility.

15.2 ELECTRICAL

A. Conduct of Electrical Work: When work requires Contractor to work near energized circuits as defined by the NFPA 70, high voltage personnel must use personal protective equipment that includes, as a minimum, electrical hard hat, safety shoes, insulating gloves with leather protective sleeves, fire retarding shirts, coveralls, face shields, and safety glasses. In addition, provide electrical arc flash protection for personnel as required by NFPA 70E. Insulating blankets, hearing protection, and switching suits may also be required, depending on the specific job and as delineated in the Contractor's AHA. Lock-out tag-out (LOTO) procedures shall be provided on all work on an around live electrical equipment and gear.

B. Portable Extension Cords: Portable extension cords shall be sized in accordance with manufacturer ratings for the tool to be powered and protected from damage. All damaged extension cords shall be immediately removed from service. Portable extension cords shall meet the requirements of NFPA 70.

END OF SECTION 02

DIVISION 16

ELECTRICAL and GROUNDING

16.1 ELECTRICAL: The contractor shall install new conduits and conductors according to the project plans and in accordance with this specification.

The conduits shall be stubbed up at the new foundation. They shall be accurately located at the foundation per the contract drawings and/or field measurements. The contractor shall make the final connections to the building from the stub-ups. The contractor is not responsible for providing any RF and control wiring.

The contractor shall supply and install new power cable, as necessary. If splices are necessary, they shall be made using Burndy Tin Plated Copper Splice, compression, long barrel type. Each splice shall be sealed using 3M adhesive lined tubing heat shrink.

Items not shown in detail or covered by detailed specifications shall be as set forth in the National Electrical Code (Most Recent Edition), FAA Standard: FAA-C-1217g (Electrical Work, Interior) and FAA-C-1391b (Electrical Work, Exterior).

16.1.1 Conduit and Fittings: All exterior conduits, installed above ground, shall be galvanized rigid steel. Where galvanized rigid steel is installed below grade, it shall be PVC coated or half lapped using 10 mil pipe wrap. All changes in direction (ie: 90’s), both above and below grade, shall be made using standard radius galvanized rigid steel.

Underground conduit shall be Schedule 80 PVC. If concrete encasement is required, it will be shown or indicated on the contract drawings. Gentle changes in direction (45° or less) may be accomplished by heating the conduit with an approved conduit heater / blanket. All underground conduits shall be a Minimum of 24” depth from finished grade to the top of the conduit, unless ontherwise specified or shown on the contract drawings. All PVC fittings (connectors and couplings) shall be Schedule 80. Backfill shall consist of 3 inch thickness sand bedding above and below the conduit, or as per the contract drawings. The remainder of the backfill shall be native material excluding stone aggregate larger than 4 inches in diameter.

Conduits shall be installed parallel or at right angles to the building. Conduits shall be securely supported and fastened in place at intervals of not more than 5 feet and within 3 feet of each change of direction. Support shall be from building structural steel, walls, or other R.E. approved structural components. Fasteners shall be Unistrut, or B-Line Strut Systems, components with appropriate screws or bolts for the surface material.

Changes in direction shall be symmetrical bends, enclosures, or cast-metal fittings.

Each conduit entrance to outlet boxes, panel boards, and equipment cabinets shall be fitted with a lock nut and insulated throat connector.

Interior conduits shall be minimum ¾” EMT. All connectors, couplings and fittings shall be cast compression type. Screwed fittings are not allowed.

16.1.2 Conduit Grounding: All underground conduits to be installed under this contract shall be bonded to the facility grounding counterpoise. The bonding conductor size shall be 4/0 bare copper. All connections shall be made using exothermic welds.

For RF and control, insulated grounding bushings shall be installed whenever a conduit enters or exits the building. Otherwise, plastic bushings shall be installed on all conduit connectors.

For power, insulated grounding bushings shall be installed at panelboards, junction boxes, disconnects, and electrical components. Also, insulated grounding bushings shall be installed whenever a conduit enters or exits the building. Basically, anywhere there is a connector on a power conduit, it shall have an insulated grounding bushing.

Grounding bushings shall be Thomas and Betts Catalog No. 38XX, or approved equal.

16.1.3 Concrete Pull Box Penetrations: Where the conduits penetrate a concrete pull box, the box shall be sealed tight to the conduit using a mortar mix, or comparable product, prior to backfilling.

16.1.4 Entrance Box Connections: Where underground conduits enter the Entrance Box, all galvanized rigid steel conduits shall be installed with lock rings on both sides. A grounding bushing shall also be supplied and installed. The grounding bushing lugs shall be connected together using a #6 solid bare copper. This #6 solid bare copper shall be landed on an appropriate lug which is securely mounted to the enclosure. All paint shall be removed, using a grinder, from the cabinet surface where the lug is to be attached.

16.2 Wire: All wire shall have copper conductors. Size shall be American Wire Gauge (AWG) with size for power circuits as shown on the project drawings. Size for all control circuits shall be #16 AWG. Power wire #10 AWG and smaller may be stranded or solid; #8 and larger wire, and all control wire, shall be stranded. Insulation shall be type THW or THWN for power wire and type MTW for control wire and shall be color coded as follows:

Single Phase Three Phase

120 Volts 208/240 Volts 120/208 or 240 Volts 277/480 Volts Line-Black Line 1-Black Phase A-Black Phase A-Yellow Neutral-White Line 2-Red Phase B-Red Phase B-Brown Neutral-White Phase C-Blue Phase C-Orange

Neutral-White Neutral-White

All Circuits:

Ground Green Control Black with numbered adhesive markers on both ends or multiconductor with unique continuous color coded insulation

Power wires #6 and smaller shall have continuous colored insulation. Wires #4 and larger may utilize continuous colored insulation or colored tape. Where conductors are color coded with tape, they shall be half lapped for a minimum length of 3 inches in all junction and pull boxes, accessible raceways, panelboards, outlets, switches and equipment cabinets.

All wire shall be continuous; no splices will be permitted unless specified on the project drawings. Where permitted, splices shall be accomplished with compression type connectors bonded to the wire with a crimping tool and…