About this file

FRANKLIN (FKN) VOR BUEC GOVERNMENT FURNISHED MATERIAL (pdf)

Text of this file

GOVERNMENT FURNISHED MATERIAL

The following Material will be furnished to the contractor. The contractor shall be responsible for furnishing all of the other material called for in this contract.

Product Specification Qty Est. Cost 40’ Antenna pole 13 10 00 2 $ 10,000 LMR Heliax Cable 13 10 00 4,000 $ 6,000 12’ x 20’ x 10’ Precast Concrete Shelter 26 10 00 1 $ 69,000

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.