6973GH-18-R-00227 (ES-18-01329) BGM RTR Pre-bid Questions.ES-18-01329

40 KB Posted

Attached to
Tower Replacement of 2 guyed towers (approx. 75’ each) BGM RTR, Johnson City, NY
Solicitation number
6973GH-18-R-00227
Issued by

About this file

6973GH-18-R-00227 (ES-18-01329) BGM RTR Pre-bid Questions (pdf)

Text of this file

BGM RTR Pre-bid Questions

Binghamton, NY

- How many feet of LMR-400 is the FAA requesting.

o About 450’ of cable.

- What is the foundation size of the existing towers?

o Existing Foundations are a triangle base about 4.5’ on each side. Depth most likely is just below frost depth, but we only ask them to be taken down 12” below grade. You may fully remove foundations if you want.

- Are there any abandoned foundations in the area?

o Not Available

- How large are the guy wire concrete anchors?

o Not Available.

- Do we use entry ports inside and out on both entry walls?

o Yes, entry plates shall be installed on both sides of both walls, and entry boots shall be installed through both walls.

Other files

File Type Posted
Experience Information Form.pdf PDF
SIR 6973GH-18-R-00227.pdf PDF
Wage Determination JOHNSON CITY, NY - BROOME CTY.pdf PDF
performancebond.pdf PDF
paymentbond.pdf PDF
(Attachment to Technical Specifications) BGM RTR Tower Repl Project Final Drawings.Attachment to Technical Specifications —
BGM RTR Tower Replacement Tech Specs Final.pdf PDF
Scope of Work BGM RTR Final.pdf PDF
6973GH-18-R-00227 (ES-18-01329) BGM RTR Pre-bid Questions.ES-18-01329 —
Scope of Work BGM RTR Final.pdf PDF
Experience Information Form.pdf PDF
(Attachment to Technical Specifications) BGM RTR Tower Repl Project Final Drawings.Attachment to Technical Specifications —
SIR 6973GH-18-R-00227.pdf PDF
BGM RTR Tower Replacement Tech Specs Final.pdf PDF
performancebond.pdf PDF
Wage Determination JOHNSON CITY, NY - BROOME CTY.pdf PDF
paymentbond.pdf PDF
BGM RTR Tower Replacement Tech Specs Final.pdf PDF
Wage Determination JOHNSON CITY, NY - BROOME CTY.pdf PDF
performancebond.pdf PDF
SIR 6973GH-18-R-00227.pdf PDF
(Attachment to Technical Specifications) BGM RTR Tower Repl Project Final Drawings.Attachment to Technical Specifications —
Experience Information Form.pdf PDF
Scope of Work BGM RTR Final.pdf PDF
paymentbond.pdf PDF
Experience Information Form.pdf PDF
(Attachment to Technical Specifications) BGM RTR Tower Repl Project Final Drawings.Attachment to Technical Specifications —
BGM RTR Tower Replacement Tech Specs Final.pdf PDF
Scope of Work BGM RTR Final.pdf PDF
performancebond.pdf PDF
Wage Determination JOHNSON CITY, NY - BROOME CTY.pdf PDF
SIR 6973GH-18-R-00227.pdf PDF
paymentbond.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.