This is Amendment No. 1 to Graphic Design Solicitation No. 693JK427R500001, issued by the U.S. Department of Transportation (DOT). The amendment provides comprehensive answers to 55 questions submitted by prospective offerors regarding the original solicitation.

The procurement is for graphic design services on a Woman-Owned Small Business (WOSB) set-aside basis, classified as a Fixed-Price contract with fully-loaded hourly rates billed only for hours actually worked. The contract includes two full-time on-site Level II graphic designers (1,920 hours each annually), one on-call Level II designer (200 hours), and one Graphic Design Manager/Program Manager (40 hours annually). The controlling NAICS Code is 541430 (Specialized Design Services), with a small business size standard of less than $9,000,000 in average annual gross revenue. The proposal submission deadline is 11:30 PM Eastern Standard Time on December 3, 2026, with an anticipated contract award by March 31, 2027, and performance beginning April 1, 2027. All proposals must use the revised pricing table published in SAM.gov on November 20, 2026. The contract requires employees to obtain and maintain a Public Trust designation and DOT-PIV card; the amendment clarifies this is not a security clearance but a low-risk background check using Standard Form 85. Compensation must comply with DOL Wage Determination 2015-4281 Revision 39 for labor category 15080 (Graphic Artist). DOT will provide all workstations, production equipment, software licenses (Adobe Creative Cloud, Enfocus PitStop Pro, XMPie, MS 365), network access, and remote access capabilities with laptop and VPN for approved telework. The amendment removes numerous errors and inconsistencies from the original solicitation, including references to locksmiths, task orders, BPAs, and NASA guidelines, and clarifies that the award is a stand-alone contract. Key personnel requirements name only the Program Manager as a designated key person. Past performance questionnaires (minimum three) may come from federal or commercial staffing contracts. For WOSB eligibility, firms must be officially certified through the SBA or have a pending application with no negative determination at time of proposal submission. The amendment establishes evaluation factors of equal weight: Technical Capability, Management Approach, Past Performance, and Price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 1

To

Graphic Design Solicitation No. 693JK427R500001

This Amendment No. 1 provides answers to questions posed by prospective offerors concerning the subject Graphic Design Solicitation.

1.Question: Why did the initially-published Solicitation contradict itself by specifying both

December 3rd, 2026 and December 3rd, 2027 as the Proposal-Submission-Deadline?

1.Answer: Because DOT’s cognizant contracting officer is fallible. And he hereby atones for that shortcoming by disavowing his 2027-stumble and by confirming that 11:30 PM

Eastern Standard Time December 3, 2026 is in fact the deadline for all proposals to reach

DOT via proposal-conveying e-mails to be sent to james.mowery@dot.gov and to Jeffrey.McLean@dot.gov and to Briyannah.Harris@dot.gov . And all offerors shall therefore consider the subject Graphic Design Solicitation’s Standard Form 33 and all other Solicitation-portions as having been changed-and-corrected accordingly by the publishing of this Soliciation-Amendment-Number-1 in the SAM.gov website.

2. Question: Could DOT’s contracting officer please quell any equivocation by specifying the subject Solicitation’s one-and-only-one controlling NAICS Code?

2. Answer: He can and hereby does. The Solicitation’s Controlling NAICS Code is 541430--

---which has an SBA-prescribed Small-Business-Size-Standard of average-annual-gross-revenue amounting to less than $9,000,000 as computed across an offeror-company’s five most-recently-completed company-fiscal-years. Further, the contracting officer, in uploading this Solication-

Amendment-1 into the SAM.gov system, has done his best to forcibly implant that 541430

NAICS Code into every applicable SAM.gov-information-field. Further, the contracting officer asks all prospective offerors to please disregard any indication(s), which might appear anywhere in the subject Solicitation’s SAM.gov record, that this Solicitation’s NAICS Code is anything other than 541430.

mailto:james.mowery@dot.gov mailto:Jeffrey.McLean@dot.gov mailto:Briyannah.Harris@dot.gov

3.Question: Per RFP page 11, 'Clearances: All contract personnel must be able to successfully pass a background check and obtain a security clearance.'

● Are contractors required to have a facility clearance for this effort?

Answer: The subject Graphic Design Solicitation’s initially-specified security clearance requirement is hereby amended / corrected to the following requirement: A Public Trust designation and a DOT-PIV-card must be obtained and maintained for each and every

Graphic-Design-staffing-position that serves in the contract awarded from this Solicitation. A Public Trust designation is a determination for federal or contractor positions that handle sensitive, unclassified information (such as government databases, financial systems, or personally identifiable information), rather than a national security clearance. A Public Trust Designation is not a clearance, does not grant access to classified information, and requires sponsorship after a conditional job offer. Public Trust positions are categorized by the level of potential damage or risk to the government:

Low Risk: Involves basic background checks using the Standard Form 85 (SF85).

Moderate Risk (Tier 2): Requires a Moderate Risk Background Investigation (MBI) via the SF85P Questionnaire for Public Trust Positions, typically checking the past 5 to 7 years of history, credit, and police records.

High Risk (Tier 4): Requires an extensive Background Investigation (BI) involving personal and reference interviews alongside deep background checks.

The best-guess of this Graphic Design project’s cognizant Contracting Officer’s Representative (COR), as of the date of publishing of this Solicitation Amendment No. 1, is that: (A) only a Low Risk basic background check would be needed, using a Standard Form 85 (SF 85), for each and every Graphic Design Staffing position that would be serving in the performance of the contract awarded from this Solicitation; and (B) no such background check would need to be applied for, nor completed, as of this Solicitation’s Proposal Submission Deadline; and (C) past experience in other procurements indicates the likelihood of a lag-time (delay) between (i) the award-date of any contract resulting from this Graphic Design Solicitation; and (ii) the date on which the needed Low Risk background checks get completed.

4. Question: Remote performance for the on-call designer and manager. Solicitation Section C.B describes one on-call Level II designer for surges and after-hours requests, and one Graphic Design Manager (40 hours per year). Section C.F permits "occasional situational telework." Would DOT allow these two roles to work remotely, with daily timesheets, documented work products, daily virtual check-ins, and in-person attendance as the COR requests? We suggest DOT clarify by amendment which roles must be on site.

4.Answer: On-call designer need will be a small percentage of overall staffing-hours, amounting to no more than about 10%, and would be implemented only when overtime work by the two Graphic Designers cannot accommodate a particular Graphic-Design-request. The project manager can work 100% remotely with regular check-ins and supporting reports to support designer's performance, time and attendance and invoicing. The on-call designer may primarily work remotely on projects where access to the physical equipment is not required. All offerors are hereby directed to compile their Graphic Design Cost Proposals by using only, and precisely, the REVISED configuration of estimated-staffing-hours shown in the REVISED Pricing Table published in SAM.gov on November 20th, 2026 as a SEPARATE file ACCOMPANYING this Solicitation-Amendment-1-document.

5. Question: Service Contract Act. Solicitation Section I lists FAR 52.222-41, but no wage determination appears to be attached. Please confirm whether the Service Contract Act applies and, if so, provide the applicable Washington, DC wage determination and occupation code(s).

5. Answer:

A. Each offeror is hereby directed to include------somewhere in the pricing-portion of its Graphic Design proposal initially-submitted to DOT in response to the subject Solicitation------the following signed-and-dated-by-the-offeror-company confirmation:

“[Insert, here, the offeror-company’s full legal-name] hereby certifies that its pricing and compensation proposed herein for each and every Graphic Design staff-member is fully-compliant with the requirements given for the labor category numbered 15080 (“Graphic Artist”) as set forth in the U. S. Department of Labor’s (DOL’s) Wage Determination 2015-4281 Revision 39 as issued on August 22, 2026.”

B. Any offeror who has any difficulty in finding the DOL Wage Determination cited in part A above should try doing an AI-assisted Google-search for it, and / or should try to find that Wage Determination in the SAM.gov website. (Googling would probably be easier and faster.)

C. Accordingly, the contracting officer’s plan is to leave FAR 52.222-41 in the subject Solicitation and also in any resulting awarded contract-document.

6. Question: On-call pricing. In the Pricing Table (Sections B.2 and L), lines 4, 10004, 20004, 30004, and 40004 have no unit-price cell. Please confirm offerors should propose a fully loaded hourly rate for the on-call designer.

6. Answer: In further confirmation of his fallibility, the contracting officer hereby confesses that he simply forgot to put dollar-signs in those particular cells which are missing a dollar-sign in the subject Solicitation’s Pricing-Table. And so the answer to this question 6 is an emphatic “yes”: Each offeror, in compiling its Cost Proposal to be submitted to DOT in response to the subject Graphic Design Solicitation, shall indeed include not only a dollar-sign but also a proposed fully-loaded-hourly-billing-rate into each such cell. And, in order to do that: All offerors are hereby directed to compile their Graphic Design Cost Proposals by using only, and precisely, the REVISED configuration of estimated-staffing-hours shown in the REVISED Pricing Table published in SAM.gov on November 20th, 2026 as a SEPARATE file ACCOMPANYING this Solicitation-Amendment-1-document.

7. Question: Re: Incumbent-contractor, and transition. Please identify the predecessor contract, the number of contractor designers currently on site, and whether a transition period is planned before April 1, 2027.

7. Answer: OST’s incumbent Graphic Design Contract is held by Interactive Government Holdings, Inc., and is numbered as 693JK421C500006, and has been extended to run through March 31st, 2027-----because of delays encountered in clearing this subject Solicitation’s re-compete-acquisition through the Form-4250-review-process in OST. That incumbent contract has one graphic designer on site and is adding an additional on site graphic designer to that incumbent-effort that is scheduled to run through March 31st, 2027. In order to maintain a “level playing field” among all of the various competing proposals submitted to DOT in response to this re-compete solicitation, DOT’s contracting officer is hereby instructing all offerors to not propose any “transition-period”.

However, DOT does reserve the right to discuss, with this Graphic Design Solicitation’s selected winning-offeror-company, in perhaps March or April of 2027, the possibility of then issuing a bilateral Modification, to this Solicitation’s resulting contract, which might then implement any transition-period which DOT might then conclude is needed. But, again: Offerors shall not build into, and shall not price-out, any such “transition period” in the proposals which they submit to DOT in response to this re-compete Solicitation.

8. Question: Re: Government-furnished equipment. Will DOT provide on-site workstations and licenses for Adobe Creative Cloud, Enfocus PitStop Pro, and XMPie, or should offerors include software costs in their rates?

8. Answer: DOT will provide, to this Solicitation’s resulting contract-awardee-firm, all needed on-DOT-site workstations, and all needed on-DOT-site-production-equipment including, but not limited to, production equipment (such as plotters, copiers, and cutters) used by contractor personnel, and all licenses for Adobe Creative Cloud, Enfocus PitStop Pro, XMPie, and MS 365, and licenses for any additional or other software which DOT hereafter determines is needed for the performance of the subject solicitation’s resulting awarded Graphic Design contract. Accordingly------and in order to maintain a “level playing field” among all of this Solicitation’s offerors, DOT’s contracting officer is hereby instructing this Solicitation’s offerors to not propose any costs for any of the items listed or referred to in the immediately-preceding-sentence. Further, this Answer 8 confirms that the graphic design talent, which is deployed by this Solicitation’s winning offeror in the performance of this Solicitation’s resulting contract, will have free access to DOT’s network and job-tracking software and file servers and e-mail-----and any language to the contrary, in the initially-published-Solicitation’s Section H.4, is hereby deleted from the Solicitation.

9. Question: Re: Past Performance (Solicitation Section M.2, Factors 2 and 3; and

Solicitation Section L, Past Performance Questionnaires: A. Since the work is performed mainly by contractor-furnished graphic design personnel, will DOT consider the relevant experience, portfolios, and prior project performance of the proposed personnel when evaluating Factor 3, together with the offeror's corporate experience providing federal staffing, personnel management, and contract administration? B. May the three required Past Performance Questionnaires come from comparable federal and commercial staffing contracts, including a federal print specialist support contract?

9. Answer: Yes to “A”, and yes to “B”. And also, as a clarification: Nothing in the subject

Solicitation prohibits or discourages any offeror from including more than three completed-

Past-Performance-Questionnaire-forms in the proposal submitted by the offeror to DOT in response to this Solicitation.

10. Question: Re: Graphic Design Manager and Program Manager (Solicitation Sections B.2, C.B, G, and H.12): Please confirm whether the Graphic Design Manager in Section C.B is the same position as the 40-hour Graphic Design Project Management labor category. May this person perform oversight, quality assurance, and contract administration remotely, coming on site only when requested? May the Program Manager key person also serve as the contract administrator, and does the Program Manager need to be a graphic designer?

10. Answer: Yes, the Graphic Design Manager and Program Manager references the same position. This position is eligible to work primarily remotely, but must come to DOT’s-site as needed to ensure oversight and quality assurance. The Program Manager is the only key personnel person. Yes, the Program Manager may also serve as the contract-awardee’s contract-administrator. Program management in this solicitation refers to the designer being responsible for managing each design project assigned by DOT to the contractor, in order to ensure that Graphic Designs are completed by DOT’s requested date. The program manager’s role includes, but is not limited to: ensuring the reports required and invoices in support of the contract are submitted to DOT each month addressing attendance and shortcomings of designers if any arise, and addressing replacement of any designer should it be necessary during the period of performance of this Solicitation’s resulting contract. In order to be able to competently oversee the Graphic Design work performed under this Solicitation’s resulting contract, the resulting contract-awardee’s Program Manager should possess significant Graphic-Design-work-experience, and should also possess significant Graphic-Design-talent. Each Graphic Design proposal, as initially-submitted to DOT in response to the subject Solicitation, must show named individual staff-members. However, an offeror’s proposed named graphic-designers can be supported by contingent-hire letters of commitment placed in the proposal.

11. Question: Solicitation Section L states a WOSB offeror must propose to itself perform more than half of the work. Please confirm that, consistent with FAR 52.219-14 and 13 CFR 125.6, work performed by a similarly situated WOSB subcontractor counts toward the prime's performance for this purpose.

11. Answer: Based on relevant AI-assisted Google-results obtained by DOT’s cognizant contracting officer, this Solicitation Amendment No. 1: (A) removes the subject initially-published-Graphic Design Solicitation’s absolute requirement that more than fifty-percent of the resulting contract-project’s aggregate grand total number of staffing-hours be worked by the prime-contractor itself; and (B) confirms and instates an absolute requirement that more than fifty-percent of the resulting contract-project’s aggregate grand total number of dollars paid out by DOT, be earned by, and flow to, Woman-

Owned-Small-Business-firms, which can include not only the WOSB-prime-contract-awardee-company, but also any first-tier WOSB-subcontractor-company(s); but (C) nevertheless encourages each offeror to show, in its proposal submitted to DOT in response to this Solicitation, at least a substantial portion of this project’s aggregate grand total number of staffing-hours being worked by the WOSB-prime-offeror-company itself, in order to help demonstrate the strength of the offeror’s “Management Approach” mentioned in the Solicitation’s Evaluation Factor numbered 2;

and (D) confirms that DOT does not wish to award this Solicitation’s resulting contract from any proposal whose staffing-hours and / or dollars are so sharply down-flowed to sub-contractor-entities as to give the appearance that the prime-offeror-company, in DOT’s judgment, amounts to little more than a broker or a talent-scout or an employment-agency.

12. Question: Will the Government evaluate past performance questionnaires, corporate experience and key personnel—to be furnished by a proposed sub-contractor—under the

Solicitation’s Evaluation Factors numbered 2 and 3?

12. Answer: Yes-----but DOT nevertheless expects to see those considerations addressed and featured favorably, and most-prominently, in the proposal-areas which directly and specifically pertain to the prime-offeror-company.

13. Question: Will the Government accept commercial (non-Federal) customer questionnaires on Attachment J-1, and are the three questionnaires a minimum or a preference?

13. Answer: DOT has no objections to non-Federal-customer Past-Performance- Questionnaire-Forms being included in any offeror’s proposal submitted in response to this Graphic Design Solicitation. A minimum of three completed-by-a-customer Past Performance Questionnaire Forms is a strong preference of DOT’s cognizant Contracting Officer’s Representative and contracting officer. But any company whose earnest-efforts leave the firm unable to provide three such completed Past Performance Questionnaire Forms should, in its proposal submitted to DOT: (A) try to explain why not, such as by honestly-citing the offeror-company’s short-company-history; and / or (B) try to include such Past Performance Questionnaire Forms that are completed for a project performed by a predecessor of the offeror-company; and / or (C) try to include such Past Performance Questionnaire Forms that are completed in testament to the merits of any one or more particular named-staff-members who are included in an offeror’s Graphic Design proposal submitted to DOT in response to this Solicitation. Note that there is no upper-limit on the number of completed Past Performance Questionnaire Forms that can be included in an offeror’s proposal submitted to DOT in response to this Solicitation.

14. Question: For purposes of being eligible to submit a proposal in response to the subject Graphic Design Solicitation, should an offeror-company self-certify, in the firm’s SAM.gov record, the firm’s eligibility to perform contract-work falling under NAICS Code 541430 (by the firm’s listing 541430 as a contract-work-area in the company’s SAM.gov record)?

14. Answer: A. Yes----but DOT of course reserves, to itself, the right to determine the extent to which the offeror-company’s Graphic Design proposal, submitted to DOT in response to this Solicitation, actually demonstrates the company’s ability to perform the work contemplated in this Solicitation. B. Each offeror company should either (i) do its best to show NAICS Code 541430 as a NAICS-Code-contract-work-area in the firm’s SAM.gov registration, by the date on which the offeror submits its Graphic Design proposal to DOT; or else (ii) confirm, in the offeror’s proposal submitted to DOT in response to this Graphic Design Solicitation, that the offeror-company is in-the-process of amending its SAM.gov registration so as to show NAICS Code 541430 as a contract-work-area.

15. Question: Can an offeror-company self-certify its status as a Woman-Owned-Small- Business (WOSB) company, for purposes of being eligible to submit a proposal to DOT in response to the subject Graphic Design Solicitation?

15. Answer: No. As of October 16th, 2020, no offeror is allowed to self-certify its WOSB status. Instead, the cognizant DOT contracting officer’s AI-assisted Google-research indicates the following:

To be eligible to submit a proposal in response to the subject WOSB set-aside Graphic Design Solicitation, a firm must either:

A. Be officially certified as a WOSB in the SBA’s Business Search website, at the time when that offeror-company submits its Graphic Design proposal to DOT, and ALSO have that WOSB status reflected in the firm’s SAM.gov registration-record; or else

B. Have a pending application for WOSB certification submitted to the SBA or to an approved third-party certifier at the time of the firm’s submission of its Graphic Design Proposal to DOT, provided that the Graphic Design offeror-company has not received a negative determination regarding the firm’s WOSB-status.

16. Question: May the three customer-completed Solicitation-Attachment-J-1 Past Performance Questionnaire Forms submitted with an offeror’s Graphic Design proposal include Past Performance Questionnaire Forms covering a proposed subcontractor's past performance, and will a proposed subcontractor's relevant corporate experience be evaluated under Factor 3?

16. Answer: Yes—but DOT nevertheless expects to see those considerations addressed and featured favorably, and most-prominently, in the proposal-areas which directly and specifically pertain to the prime-offeror-company.

17. Question: The solicitation is described as a competitive Woman-Owned Small Business set-aside, but Section I incorporates FAR 52.219-6 (Notice of Total Small Business Set-Aside) rather than FAR 52.219-30 (Notice of Set-Aside for WOSB Concerns). Please correct that error..

17. Answer: This Solicitation Amendment No. 1: (A) re-confirms the fact that the subject Solicitation is a competitive Woman Owned Small Business Set-Aside acquisition; and accordingly (B) DELETES FAR clause 52.219-6 from the subject Graphic Design

Solicitation; and accordingly (C) SUBSTITUES, in lieu of that deleted clause, FAR clause 52.219-30 (Notice of Set-Aside for…..Woman Owned Small Business Concerns.

18. Question: Re: Questions deadline (Section B Note 1; Section L Note 1). The question deadline of 11:30 PM EST November 15, 2026 falls on a Sunday, 18 days before the Section L proposal deadline. DOT's answers may change staffing, pricing and teaming decisions. Please confirm the date, and confirm that DOT will issue the Q&A amendment with sufficient time before the proposal deadline, extending the deadline if the amendment issues late. The SAM.gov posting is captioned as a draft solicitation but the document carries a binding proposal deadline and award language. Offerors need to know whether a final solicitation will follow and whether the response requested now is a proposal or industry comment. Please confirm whether this document is the final solicitation and, if not, the expected date of the final.

18. Answer: A. A closer reading of the initially-published version of the subject Solicitation will reveal the fact that November 15th was not a firm-deadline for posing Solicitation-questions, but was instead merely a question-posing-date beyond which DOT was not promising to provide answers. B. Although the initially-published Solicitation’s file-name mentioned a “draft” Solicitation, that version was not, in fact a mere draft. C. Because of the high-volume of excellent Solicitation-questions posed to DOT by prospective offerors, the initially-published version of the subject Solicitation turned out not to be a final version, but has instead been significantly amended and clarified and corrected by the publishing of this Amendment No. 1. D. The contracting officer does not----at the present time-----plan to compile or publish a clean-and-comprehensive-and-stand-alone corrected-version of the Solicitation, but instead trusts that prospective offerors will be able to navigate successfully by using this Amendment No. 1 and its accompaning-published REVISED PRICING TABLE as an indispensable Solicitation-accompanying-road-map in their compilation of Graphic Design proposals. E. The subject Solicitation did not, and still does not, and in all probability will not, specifically-request any “industry comment”—but all of the excellent Solicitation-questions submitted to DOT thus far do, arguably, constitute what amounts to industry-comment. F. This Solicitation-Amendment No. 1 does not change the initially-published Solicitation’s specified Proposal- Submission-Deadline.

19. Question: Re: Scope and Statement of Work. 6. Residual locksmith language (Section C "Type of Contract"; Attachment J-1). Section C refers to hours worked by "contractor-company's locksmiths," and Solicitation Attachment J-1 refers to the offeror's "Locksmith Services proposal under RFQ No. 693JK427R500001." Please confirm that those usages of the locksmith-word were errors made by the DOT contracting Officer, and please correct those errors via the publishing of a Solicitation-Amendment.

19. Answer: “Locksmith” error hereby confessed. And a corrected Past Performance Questionnaire Form is given between the horizontal-lines appearing below in this Answer numbered 19.

Attachment J-1 (Past Performance Questionnaire)

Past Performance Questionnaire

Referencee Information: Provide the following information for the Organization that performed the referenced work.

Each particular completed Past Performance Questionnaire, as filled out and signed by the offeror’s customer, shall be included in the Past Performance Volume of the offeror’s initially–submitted Graphic Design proposal under RFQ No.

693JK427R500001. Any customer who has completed one of these Questionnaires may seal the Questionnaire before giving it to the offeror, if the customer does not want the offeror to see the past performance evaluation given by the customer.

Referencee Information

Offeror’s (Prime) Name:

Referencee’s Name:

Solicitation Number & Title:

693JK427R500001 “Graphic Design Services for DOT”

Organization/Person Providing the Reference Information: Provide the following information for the Organization and Person/Point of Contact (POC) providing the reference (to assist us in tracking responses received and resolving any conflicts in the evaluation process if necessary):

Reference

Organization Name:

Questionnaire Completion Date:

Name of Contact:

Contact Numbers:

Telepho ne:

Facsim ile:

Organization/Office:

Position Title:

Reference Project Information: Provide the following information about the referenced project.

Customer Organization/Office:

Project Title:

Reference Project

POC Period of Involvement:

Type of Contract:

Period of Project Performance:

Start Date:

Length:

Contract Value:

Initial:

Current

NOTE: THIS INFORMATION WILL BE KEPT CONFIDENTIAL

For the following questions, please circle/check the appropriate rating. Comment lines are provided for additional information if the #2 or #1 rating is given (however the comment lines may be used to provide any additional information deemed noteworthy).

High

Low

1.

TECHNICAL QUALITY OF SERVICE:

This area deals with compliance of contract requirements, to include appropriateness of personnel and technical excellence.

2.

TIMELINESS OF PERFORMANCE:

This area deals with the contractor’s ability to meet milestones and delivery schedules, to include responsiveness to technical direction, completion of efforts on time including wrap-up and contract administration.

3.

PRICE/COST CONTROL:

This area deals with the contractor’s ability to control price/cost escalation during performance to include appropriate budgetary estimates, current/accurate/complete billings/invoices, relationship of negotiated costs to actual, claim submissions, cost efficiencies, and change order issues.

4 BUSINESS RELATIONS:

This area deals with the contractor’s commitment to satisfaction and cooperative/reasonable businesslike behavior with own staff and customers to include: effective management, responsiveness to contract requirements, operates with honesty and integrity, prompt notification of problems, flexible and proactive qualities, effective contractor-recommended solutions, and effective subcontracting and teaming arrangements.

Comments (attach additional page(s) as necessary):

GENERAL INFORMATION: Please provide answers to the following questions.

5. Has the contractor ever been given a cure notice, show cause notice, suspension of progress payments, or other letters directing the correction of a performance problem; or has this contract been partially or completely terminated, or are there any pending termination actions? ( ) No

( ) Yes

If yes: ( ) Default ( ) Convenience; and please explain:

6. Changes in contract dollar value throughout the life of the contract are/were attributable, for the most part, to:

( ) Government-issued change orders ( ) claims submitted by the contractor

( ) other Government actions ( ) other contractor actions (please explain below)

7. Based on this contractor’s overall performance, would you award this contractor another

Government contract?

( ) Yes ( ) No If no, please explain:

8. If any of the above responses are based on adverse past performance, have you discussed it with the contractor and has the contractor had an opportunity to comment?

( ) Not Applicable ( ) Yes ( ) No If yes or no, please explain:

9. Contract’s Period of Performance: (month / year – month /year)_____________________

10. Contract’s Reimbursement Structure (Fixed-Price, CPFF, Labor-Hour, etc.)

11. Contract Dollar Value (with Options)_________________________

12. Was the contractor the prime contractor, or a sub? _____________________

13. Complexity of the Work (e.g., difficult, routine) ________________________

14. Type and extent of Subcontracting (if applicable):

15. Service Description:

1. Contractor’s Strengths:

20. Question: Re; Solicitation’s Section C, Scope and Statement of Work: Section C refers to hours worked by "contractor-company's locksmiths," Was that use of the word “locksmiths” an error?

20. Answer: Yes. That word “locksmiths” had appeared in a prior-and-unrelated solicitation-template that was used by the contracting officer in compiling the current subject Graphic Design Solicitation; and in compiling the current subject Graphic Design Solicitation, the contracting officer neglected to change that word “locksmiths”. And so this Answer 20 does change that phrase, quoted in Question 20, to the following: “hours worked by the contractor-company’s Graphic Design staff-members”.

21. Question: Re: Staffing configuration (Section C.B; Section B Pricing Table; Section H.12). Section C.B lists two full-time on-site Level II designers, one on-call Level II designer and one Graphic Design Manager. The Pricing Table prices two designers at 1,920 hours each, on-call at 200 hours and "Graphic Design Project Management" at 40 hours per year; Section H.12 names a Program Manager as the only key person. Offerors must know whether the Manager is the same person as the H.12 Program Manager, whether 40 hours per year is DOT's estimate of that role's billable effort, and whether the Manager is expected to work on-DOT’s-site, and whether the Manager is expected on site beyond (more than) 40 hours. Please clarify.

21. Answer: Yes, the Graphic Design Manager is the same as the 40-hour Design Project Management labor category. The project manager can work 100% remotely with regular check-ins and supporting reports to support designer's performance, time and attendance and invoicing. The program manager can serve as the contract administrator and does not need to be a graphic designer----but, ideally, the program manager should possess some work-experience in graphic design, and some talent in graphic design. All offerors are hereby directed to compile their Graphic Design Cost Proposals by using only, and precisely, the REVISED configuration of estimated-staffing-hours shown in the REVISED Pricing Table published in SAM.gov on November 20th, 2026 as a

22. Question:

8. On-call designer terms (Section C.B; Section C.C.1; Pricing Table lines 4, 10004–40004). The on-call rows have no unit-price cell, and Section C.C.1 anticipates nights, weekends and holidays. Rationale: offerors cannot price on-call work without knowing whether a unit rate is to be proposed, whether after-hours work bills at the same fixed rate or an authorized premium (F.4.C references authorized premium pay; Section I includes FAR 52.222-2), and what response time DOT expects. Remedy: please add a unit-price cell for on-call hours and state the required response time, minimum call-out, and premium-pay treatment.

22. Answer: On-call designer need will be a small percentage of no more than 10%, only implemented when overtime of the two Graphic Designers cannot accommodate the request. All offerors are hereby directed to compile their Graphic Design Cost Proposals by using only, and precisely, the REVISED configuration of estimated-staffing-hours shown in the REVISED Pricing Table published in SAM.gov on November 20th, 2026 as a

23. Question: Re: Billable hours and closures (Pricing Table; Section C.C.1; Section F.4):

1,920 hours per designer equals 48 forty-hour weeks. Offerors need to know whether DOT expects 1,920 hours to absorb the eleven federal holidays, leave and any Government closures, and whether hours lost to closures under F.4.D or a lapse in appropriations are billable. Please confirm the basis of the 1,920-hour estimate and that only hours actually worked on site or on approved telework are billable.

23. Answer:

A. Overview: 1. Each offeror is hereby directed to include, in the fixed-fully-loaded-hourly-billing-rates shown in the filled-in Pricing Table that appears in the offeror’s Cost Proposal which is submitted to DOT in response to this Graphic Design Solicitation—a full-allowance for the contractor to fully-recover the costs of all direct-labor-costs and all fringe-benefits which are provided by the contractor to the contractor’s managerial and non-managerial staff-members serving in the performance of the Graphic Design contract awarded from this Solicitation, on non-overtime work, and on overtime-work. 2. DOT will only ever pay the contractor at the fixed-fully-loaded-hourly-billing-rates shown in the contractor’s Pricing-Table that was included in the contractor’s Cost Proposal submitted to DOT in response to this Solicitation. 3. Given below in this Answer numbered 23 are estimated summaries of some, but not necessarily all, of the fringe benefits which the contractor will be required to provide to non-managerial staff-members. 4.

Overtime-work specifically-requested by DOT will be paid for, by DOT, at only the Overtime-hourly-rates required by Federal law, which must be included in the fixed-fully-loaded hourly-billing rates shown in the Pricing Table displayed in the contract-awardee’s Cost Proposal submitted to DOT in response to this Solicitation. 5. DOT is not planning to pay for any fringe-benefit-costs, nor for any direct-labor-costs, which are not recovered by the contractor from the contractor’s fixed-fully-loaded hourly-billing-rates shown in the filled-in Pricing-Table that is included in the contract-awardee’s proposal submitted to DOT in response to this Graphic Design Solicitation. 6. Hours lost to DOT-closures or to a lapse-in-funding will not be billable.

B. Re: The contract-awardee’s non-managerial employees: Per job-category numbered 15080 (“Graphic Artist”) as set forth in the U. S. Department of Labor’s (DOL’s) Wage Determination 2015-4281 Revision 39 as issued on August 22, 2026, it is estimated that this Graphic Design Solicitation’s resulting contract-awardee-company will be required to incur the costs of providing, to the firm’s non-managerial-employees serving in the performance of that awarded contract (such as Graphic Designers / Graphic Artists): A. 11 paid Federal Holidays per year; and B.

the minimum level of Health-and-Welfare days, and the minimum level of vacation-time, shown in that Wage Determination.

C. Re: The contract-awadee’s managerial employees: It is estimated that this Graphic Design Solicitation’s resulting contract-awardee-company will be required to incur the costs of providing, to that firm’s managerial-employees serving in the performance of that awarded contract, 11 paid Federal holidays per year.

24.Question: Re: Job-tracking and file systems (Section C.C.5; Section C.C.8). :

Training time and backup obligations depend on the systems used.

Please name the job-tracking software and confirm whether backup systems in C.C.5 are DOT-managed or contractor-furnished.

24. Answer: The current job tracking solution is a Sharepoint web-based solution. This may not be the solution at the time of the award as a new solution is being pursued due to the fact that the current solution exceeded its end-of-life date. Backup systems are managed by DOT.

25. Question: Re: 14. "NASA Communications Material Review (CMR) guidelines" (Section C.C.7, Quality Standard). This appears to be a non-DOT standard.

Please confirm the intended quality standard (for example DOT or OST brand and publication guidelines), and provide or cite the document.

25. Answer: This was a clerical error. The intended quality standards for DOT are The Graphic Standards for the U.S. Department of Transportation and the DOT Digital Branding guidelines.

26. Question: Re: Production management and GPO duties (Section C.C.8; Section C.K.1): Tasks include "reviewing and awarding bids," completing GPO forms, and "comprehensive knowledge of Federal Procurement Regulations" and JCP regulations. Offerors read these tasks as the designer acting as production manager for assigned projects, preparing specifications and obtaining and evaluating GPO production quotes, while award decisions rest with the Government; awarding bids is an inherently governmental function.

Please confirm contractor staff prepare specifications, obtain and evaluate quotes and recommend awards, with award decisions made by the Government supervisor holding budget authority, and describe the expected depth of GPO and JCP knowledge.

27. Answer: Yes, the contractor staff will be responsible for preparing specifications, obtaining quotes, evaluating quotes and recommending awards, with the award decisions made by Federal employees authorized to do so on behalf of the Government and in compliance with FAR regulations.

28. Question: Re: Media production scope (Section C.C.4). The SOW includes photography, 2D/3D animation, digital video, sound, interactive multimedia, exhibit design and construction, and kiosk media. Those projects are typically performed by a motion designer or video producer rather than a Level II graphic designer, and may need equipment and software not listed.

Please provide examples of the project types DOT has in mind that require these skills, indicate how often such work is expected and whether it is in scope for the two on-site designers, confirm that "exhibit construction" means design of exhibits for fabrication rather than physical construction, and state whether DOT furnishes the equipment and software.

Answer 28: The level of this type of work is that of animated graphics/designs for the DOT led wall display system. Primarily backdrops for events.

29. Question: Re: Section 508 compliance (Solicitation Section C.C.6; Section H.6).

Remediation at Levels 1–4 is labor intensive, and the standard and tooling drive the effort. Please confirm DOT's minimum compliance standard (for example WCAG 2.0 Level AA or AAA), whether the designers are solely responsible for accessibility validation or a DOT accessibility specialist is the final approver, and whether DOT furnishes all testing and remediation software or the contractor is expected to provide any tools.

29. Answer: WCAG 2.0 Level AA with designer responsible for validation. DOT will provide all testing and remediation software and tools.

30. Question: Deliverables cross-references (Solicitation Section C.D). The deliverables table cites C.5.1, F.6.2 and F.6.3, which do not appear in the solicitation, and the report text refers to "active task orders" on a stand-alone contract. Rationale:

offerors need the correct references and templates. Remedy: please correct the references, confirm there are no task orders, and provide the weekly and monthly report templates.

30. Answer: The column headed “Task Reference” is hereby deleted from that deliverables-table.

31. Question: Re: Interviews and skillset test (Solicitation Section C.I; Section C.J.1): All proposed personnel will be interviewed and a skillset test administered by the COR.

Offerors need to know whether this occurs during evaluation or after award, the format, and whether it affects the adjectival rating. Remedy:

please describe timing, format and how results are used.

31. Answer: The test consists of the candidates being provided elements to create a cover design and text page layout and provide native files created for the test to be assessed to obtain the skill level of the candidate and how they perform with short notice and limited time restraints. The test will be conducted only after DOT’s awarding of the Graphic Design contract resulting from this Solicitation. And the test will be used to predict success in the DOT environment. If one or more of the contract awardee’s proposed designers fails DOT’s post award test it, would then become necessary for DOT and the Contract Awardee company to negotiate a NO-COST contract modification which would replace each designer who failed DOT’s test. Therefore, DOT strongly urges each offeror company to propose well-qualified designers in the offeror-company’s proposal submitted to DOT in response to this solicitation.

What will be judged in the test is the designer’s skill level with the Adobe Creative Cloud Suite software and creativity with limited time restraint.

32. Question: Re: Level II experience requirement (Solicitation Section C.C.2, Key Qualifications:

item 1). The solicitation lists 2 to 5 years of professional experience for Level II designers. Two years of experience is generally considered a Level I designer in commercial practice. Please confirm that DOT seeks Level II designers and state the minimum years of experience required.

32. Answer: DOT seeks a level II designer. Two to five years of professional experience is the requirement, so as not to rule out an exceptional candidate with talent far above her or his years of experience.

33. Question. Re: Web development and motion graphics skills (Section C.C.2, Key Qualifications, item 2, "Digital & Web Assets"). The qualification lists HTML/CSS basics, email templates and motion graphics. Web development and motion graphics are not typical Level II graphic designer skills. Remedy: please confirm whether the designer is expected to develop or code websites or only to produce visual and UI design, and whether motion graphics skills are required and, if so, at what level of proficiency and in what software (for example Premiere Pro or After Effects).

33. Answer: Web development and motion graphics is at a basic level equivalent to the abilities of a level 2 designer. Example: Title text fading in or out of a design,

34. Question: Re: Project management duties (Solicitation Section C.C.2, Key Qualifications, item 3;

Section C.C.8; Pricing Table "Graphic Design Project Management").

Project management is typically part of a Senior (Level III) designer's skillset. Please confirm whether project management duties are expected of the Level II designers or will be performed by the Program Manager.

34. Answer: Project management in this solicitation refers to the designer being responsible for managing the design project assigned to ensure that it is completed by the date requested by DOT. The program manager’s role includes, but is not limited to:

ensuring the reports required and invoices in support of the contract are submitted each month addressing attendance and shortcomings of designers if any arise, replacement of designer should it be necessary during the period of performance of the contract.

35. Question: Re: Evaluation, Past Performance and Proposal Instructions:

Evaluation criteria conflict (Solicitation Section C.J; Section M.2; Section M.3):

Section C.J lists five criteria (Portfolio with a skillset test, Prior Performance, Immediate Availability, Security Standards, Pricing). Section M.2 lists four factors (Technical Capability, Management Approach, Past Performance, Price), and M.3 is captioned "Factor 6 – Price." Offerors must organize proposals against the factors DOT will actually score. So please confirm that Section M governs, correct the M.3 caption, and state whether Factors 1 through 3 are of equal weight to one another.

35. Answer:

A. The Solicitation Section C.J, as cited in Question 35, is hereby amended / revised so as to read only as follows: “Evaluations of vendor proposals will be based on the criteria specified in major-Section-M appearing near the end (bottom) of this Solicitation--- --but an offeror’s readiness to start performance, with successfully-obtained Public Trust Designations and with DOT-issued PIV-cards, in a short time after this Solicitation’s resulting contract has been awarded, is a consideration which DOT reserves the right to include in DOT’s evaluation of each offeror on the Solicitation’s Evaluation Factor 2 given in the Solicitation’s major-Section-M.”

B. The initially-issued Solicitation’s section which was headed as “M.3 Factor 6 –

Price” is hereby amended / corrected to read as follows: “M.3 Factor 4 – Price”.

C. The following sentence is hereby added at the bottom of the Solicitation’s section headed “M.2 Evaluation Factors / Selection Factors”: “Evaluation Factors numbered

1 and 2 and 3 are equal, to each other, in importance.”

36. Question: Re: Portfolio content (Solicitation Section C.J.1; Section M Factor 1): Section C.J.1 asks for "work samples (digital and website)" and Section M Factor 1 evaluates the offeror company's technical capability, but the solicitation does not request resumes or state whose work the samples must be. The portfolio is the primary technical evidence. Please specify the minimum sample count, the types of work samples desired (for example publications, digital, branding), and whether samples must be the proposed designers' own work or may include company work.

36. Answer: The work samples should be of work produced by the candidate designers whom the offeror-company is considering or has chosen to fill the positions. Portfolio samples should consist of various types of work that supports the type of work which the offeror’s proposed designers would be expected to perform under any contract which might be awarded to the offeror-company from the subject Graphic Design solicitation.

37. Question: Re: Past performance questionnaires (Solicitation Section L Part II;

Attachment J-1): Offerors are asked to include at least three customer-completed questionnaires in the proposal. Customers often prefer to send questionnaires directly to the Government, and the solicitation does not define recency, relevance or minimum size.

Please state whether customers may e-mail questionnaires directly to DOT, the recency window (for example three or five years), what DOT considers relevant, whether key-personnel past performance counts, and how an offeror with fewer than three responsive customers will be rated. Also, please say whether or not CPARS-performance-ratings received by an offeror-company may be cited in that offeror-company’s Graphic-Design proposal, in lieu of that offeror-company’s inclusion of any completed Past Performance Questionnaire Forms in that firm’s Graphic

Design proposal.

37. Answer:

A. Each supporting completed Past Performance Questionnaire Form shall be / must be included in the Graphic Design Proposal which is e-mailed, by the Graphic

Design offeror-company itself, directly to DOT. No Past Performance Questionnaire

Form may be e-mailed to DOT, or otherwise submitted to DOT, by the customer who completed that Form.

B. The ideal “recency window”—for a past-project referred to in a completed Past Performance Questionnaire Form—would be a project which was completed by the offeror-company within the three-to-five-year period immediately preceding this Solicitation’s Proposal-Submission-Deadline.

C. This acquisition’s cognizant COR and contracting officer see nothing arcane or difficult in the concept of the “relevancy” of a cited-past-project performed by an offeror-company. Ideally, such a project’s subject-area should simply match up, as closely as possible, to the subject-area of the contract-project envisioned in the subject solicitation.

D. Ideally, each completed Past Performance Questionnaire Form would pertain to a project which was actually performed by the very same company that is submitting a Graphic Design proposal to DOT in response to the subject Solicitation. However, and for purposes of an offeror-company’s being able to obtain a count of three or more completed Past Performance Questionnaire Forms: 1. This Solicitation does not prohibit an offeror from submitting completed Past Performance Questionnaire Forms pertaining only to a particular named staff-member (such as a named Key Personnel staff-member) who is being proposed, by that offeror, to serve on the contract awarded from this Solicitation;

and 2. This Solicitation does not prohibit an offeror from submitting a completed Past Performance Questionnaire Form pertaining not to the offeror-company itself but rather to some predecessor of that offeror-company; and 3. This Solicitation does make the permissible-procedures numbered 1 and 2, as set forth immediately above, available, also, to any offeror which, for any reason, would not otherwise be able to include a minimum of three completed Past Performance Questionnaires Forms in the offeror’s proposal submitted to DOT in response to this Graphic Design solicitation; and 4. This Solicitation places no upper-limit on the number of completed Past Performance Questionnaire Forms submitted by an offeror to DOT.

E. This Solicitation-Amendment-1 intentionally stops short of forecasting precisely how DOT will rate an offeror who submits fewer than three completed Past Performance Questionnaire Forms, or who submits fewer than three pertaining to a project performed by the offeror-company itself. The COR and contracting officer are merely pledging, instead, to consider all of the relevant facts and circumstances, and to treat all offerors equally.

F. The subject Graphic Design procurement’s cognizant Contracting Officer’s

Representative and cognizant contracting officer strongly prefer to not have to…