About this file

This is a Request for Quotation (RFQ) issued by the Federal Highway Administration (FHWA) for a multi-phase study examining the long-term applicability and transferability of Crash Modification Factors (CMFs), Phase I: Feasibility Study and Groundwork. The solicitation number is 693JJ326Q000012, released April 10, 2026, with technical questions due April 24, 2026 at 3:00 p.m. Eastern Time and quotations due May 8, 2026 at 1:00 p.m. Eastern Time. This is a Small Business Set-Aside with NAICS code 336110 (Automobile and Light Duty Motor Vehicle Manufacturing, size standard 1,500 employees). The Government intends to award one Firm-Fixed-Price (FFP) Purchase Order with an 18-month period of performance from the effective date of award.

The contractor must provide non-personal support services including project management, literature review and gap analysis, data collection from at least 20 states, database development, and documentation of deliverables. Key tasks include conducting a kickoff meeting and developing a work plan; reviewing existing research on CMF longevity and transferability; collecting crash data, infrastructure mapping files, and related data from all states; merging collected data to develop integrated databases; and producing a data library, user manual, and technical presentation. Quotations must include technical capability addressing detailed technical approach and understanding, personnel titles and duties, level of effort tables, pricing in the specified Schedule of Services format, past performance references from the last two years (three minimum), and mandatory organizational information. Evaluation will be based equally on technical capability, price, and past performance references using a best-value determination. Quotations must be submitted electronically as PDF files in a single email not exceeding 10 megabytes, with all information valid for at least 60 business days from the closing date. The contracting office is located at 12300 W. Dakota Avenue, Lakewood, CO 80228, with primary contacts Jerry Danso and Monique Snow-Manning.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

693JJ326Q000012

REQUEST FOR QUOTATION (RFQ)

Issuing Office: United States Department of Transportation

Federal Highway Administration (FHWA) 12300 W. Dakota Avenue Lakewood, CO 80228

Agency Contact: Jerry Danso, Contract Specialist Telephone:720-963-3065 Email: jerry.danso@dot.gov

Monique Snow-Manning Email: Monique.Snowmanning@dot.gov

Solicitation Number: 693JJ326Q000012

Title: Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors

- Phase I: Feasibility Study and Groundwork

Solicitation Release Date: April 10, 2026

Technical Questions Due Date: April 24, 2026, at 3:00 p.m., Eastern Time

Quotation Due Date: May 08, 2026, at 1:00 p.m., Eastern Time

NOTE: This solicitation is a Small Business Set-Aside, and the

North American Industry Classification System (NAICS) code is 336110, 336110 - Automobile and Light Duty Motor Vehicle Manufacturing (size standard is 1,500 employees).

mailto:jerry.danso@dot.gov mailto:Monique.Snowmanning@dot.gov

PART I

RFQ INFORMATION AND INSTRUCTIONS FOR PREPARATION OF QUOTATIONS

RFQ INFORMATION

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 12; Acquisition of Commercial Products and Commercial Services.

Solicitation Number 693JJ326Q000012 is issued as a Request for Quote (RFQ) for Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors - Phase I: Feasibility Study and Groundwork.

This solicitation is a Small Business Set-Aside, and the North American Industry Classification System (NAICS) code is 336110 - Automobile and Light Duty Motor Vehicle Manufacturing (size standard is 1,500 employees).

This solicitation incorporates provision and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquistion.gov and https://www.acquisition.gov/far-overhaul/far-part-deviation-guide

All contractors must have a current active registration in the System for Award Management (www.SAM.gov) may continue to require entities to complete representations based on provisions that are not included in DOT solicitations. Examples include:

• 52.212-3(d), Quoter Representations and Certifications—Commercial Products and Commercial Services.

Contracting officers will not need to consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

1. GENERAL INFORMATION TO QUOTERS

The Government intends for this RFQ to result in the award of one Firm-Fixed-Price (FFP) Purchase Order to a responsible quoter. However, the Government reserves the right to make no award depending on the quality of the quotations submitted or changes in the requirements, if it is in the best interest of the Government.

The Government solicits a quotation to provide non-personal support services, as described in the Performance Work Statement.

file://cflprnt2.cflhd.local/common/P&A/ACQTEAM/FAR%20Overhaul/Part%2012/www.acquistion.gov https://www.acquisition.gov/far-overhaul/far-part-deviation-guide http://www.sam.gov/

2. PERIOD OF PERFORMANCE

All work and services required hereunder must be performed within 18 months from the effective date of the award. The Contractor is required to abide by the terms and conditions of the contract until the conclusion of the performance period.

3. INSTRUCTIONS FOR PREPARATION OF QUOTATIONS

In responding to this RFQ, quotations MUST include the following:

1. Technical Quote: Narrative discussion addressing the quoter’s technical approach and technical merit factors identified in Part I, Section 6.0, Evaluation of Quotations. A description of how the Performance Work Statement requirements will be completed.

2. Price Quote: Submitted pricing in the format of the Schedule of Service, Contract Line- Item Number (CLIN) Structure table shown in PART II

3. Past Performance References: Please provide a matrix of recent relevant past performance (within the last two years), which shall include the following: a short description of the work, the dates of work performance, the name of the client and a contact phone number and email address, so a reference check can be conducted.

Quotations shall include three references. The government reserves the right to use other past performance records like Contractor Performance Assessment Reporting System (CPARS) and Past Performance Information Retrieval System. The Federal Highway Administration utilizes the contractor Performance Assessment Reporting System (CPARS) to record and maintain past performance information. CPARS is used to document contractor performance information that is required by Federal Regulations.

CPARS reference material can be accessed at http://www.cpars.gov/.

4. Organizational Information: Quotations shall include the following mandatory business information regarding your company in the body of the cover email message:

a. Confirmation your company accepts government purchase orders

b. Business Size (Small, Woman-Owned, Disadvantaged, Hub-Zone, Large, Non-

Profit, etc.)

c. Payment Terms (Government Standard is NET 30)

d. Unique Entity Identifier (UEI)

e. Correct Mailing Address for the order (include name, telephone, email address);

Note: Mailing address and entity name shall match the information in www.sam.gov

f. Verification company information listed in the System for Award Management

(SAM) current and accurate? https://www.sam.gov/SAM/

5. Instructions for Preparation of Quotations: Quotations must be submitted electronically as Adobe (pdf) files with the technical capability, pricing, past performance and organizational information sections submitted in a SINGLE email whose size shall not exceed 10 Megabytes.

http://www.sam.gov/ https://www.sam.gov/SAM/

6. Evaluation of Quotations: The Government will evaluate quotes and make a best value award decision based on the following factors rated equally: (1) Technical Capability; (2) Price; and (3) Past Performance References. The ultimate award decision will be made based on a determination of overall best value, each of the three factors considered.

Technical Capability shall be based on the factors below:

• Detailed technical approach and understanding to performing the work.

• The quoter must provide the title and a description of the duties the personnel will perform.

• The Technical Quote must set forth any information that the quoter wishes to bring to the attention of the Government.

• Level of Effort table (table displaying labor categories and labor hours per task. (Names and cost information shall not be provided in the Technical Quote.).

The method of evaluation for each of these factors is described as follows: the ultimate award decision will be made based on a determination of overall best value, considering each of the three factors all weighted equally.

NOTE: Failure to furnish all information required above may result in your quotation being considered non-responsive and eliminated from further consideration.

INSTRUCTIONS FOR PREPARATION OF QUOTATIONS

In responding to this RFQ, quotations MUST include the following:

Technical Quote: The quoter’s technical approach to address that contractor’s quotes are technically acceptable. If the quote does not meet any one of the requirements below, it will be considered non-responsive and removed from further consideration:

Questions/Inquiries:

All questions concerning this RFQ must be submitted electronically to jerry.danso@dot.gov no later than the due date and time on page 1 of this RFQ.

Each prospective quoter should attempt to state each question in such a way that the quoter would have no objection to the Government publishing that precise question (and its answer) in a formal amendment to the RFQ. Additionally, each prospective quoter should attempt to word each question in such a way that the publication of that question (and its answer) would not divulge any information that the prospective quoter considers to be proprietary or confidential.

mailto:jerry.danso@dot.gov

Quotations Quotations submitted must be valid for a period of no less than 60 business days from the closing date of the RFQ.

PART II

SCHEDULE OF SERVICES

CLIN DESCRIPTION QUANTITY UNIT

PRICE PRICE

00101

TITLE

Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors

- Phase I: Feasibility Study and Groundwork

Pricing: Firm-Fixed-Price

Period of Performance: Effective date of award through 18 months

1 $ $

TOTAL PRICE: $

NOTE: Unless otherwise negotiated and approved, the contractor will be paid the FFP for CLIN 00101, as applicable, upon successful completion and Government acceptance. The contractor may also request milestone payments in accordance with work completed and accepted by the Government. Satisfactory completion and acceptance will be made by the Technical Point of Contact (TPOC).

PART III

PERFORMANCE WORK STATEMENT

For

Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash

Modification Factors - Phase I: Feasibility Study and Groundwork

1.0 Overview

This is a non-personal services contract to provide technical services for Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors ― Phase I: Feasibility Study and Groundwork. The Government will not exercise any supervision or control over the purchase order service providers performing the services herein. Such service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government as defined in this Performance Work Statement (PWS). The Contractor must perform to the standards herein.

1.1 Background

Under 23 U.S. Code §503(b), Highway Research and Development Program, the Secretary of the Department of Transportation is directed to carry out highway research and development that addresses current and emerging highway transportation needs. The objectives of the Highway Research and Development (HRD) Program are: (A) identify research topics; (B) coordinate research and development activities; (C) carry out research, testing, and evaluation activities; (D) provide technology transfer and technical assistance; (E) engage with public and private entities to spur advancement of emerging transformative innovations through accelerated market readiness; and (F) consult frequently with public and private entities on new transportation technologies.

The mission of the Federal Highway Administration (FHWA) is to improve safety and mobility on our nation’s highways through national leadership, innovation, and program delivery. As part of that mission, FHWA is the Operating Administration (OA) responsible to the Secretary to conduct research and provide technical assistance to state and local agencies to improve safety and mobility, and to encourage innovation, in accordance with the requirements of the HRD Program.

The Office of Safety and Operations Research and Development (HRSO) performs transportation safety and operations research and development (R&D) for the FHWA. HRSO conducts safety and operations R&D based upon a national perspective of the transportation needs of the United States (US).

Since the establishment in 2012, the FHWA Development of Crash Modification Factors Program (DCMF) has addressed highway safety research needs for evaluating new and innovative safety strategies (improvements) by developing quantitative estimates of their effectiveness in reducing crashes and mitigating injury severities (also known as crash modification factors (CMFs)). This program successfully developed nearly 900 CMFs to date.

However, the majority of the efforts to develop these CMFs encountered data challenges such as unavailability, poor quality, misalignments between datasets, varying definitions among states, etc. These challenges hinder development of reliable CMFs based on a large sample collected from numerous states and various road types and conditions, which would increase transferability of developed CMFs across the states. Additionally, some CMFs were developed nearly 20 years ago. For some safety countermeasures (such as curve delineators, speed humps, signal backplates with retroreflective borders), the older CMFs are the only available ones for state and local practitioners to use. These practitioners often inquiry if these CMFs are dated and still applicable to current driving conditions and road environments.

This effort is a feasibility study that seeks to investigate CMF applicability over time and CMF transferability between states and to better understand the abovementioned gaps and challenges pertaining to crash data, infrastructure countermeasures installation inventory, and other necessary data (e.g., traffic/pedestrian volume data, weather data) in safety evaluations. Based upon findings from this assessment, this feasibility study should also determine the type of information needed to assess CMF longevity and transferability and include data collection. It is expected that information will be data that can be used for multi-purpose safety analyses and be collected from a large number of states and sources. The resulting data will support a variety of future research including, but not limited to, the current study investigating the transferability and longevity of CMFs derived from a small sample and examining nationwide impact of infrastructure countermeasures on traffic safety.

1.2 Objective

To support FHWA mission to improve safety on our nation’s roadways. Within this broader goal are two objectives in accordance with 23 U.S.C. §503(b)(1)(A, B, C & D); 23 U.S.C.

§503(b)(2)(B)(iii, v & vi); 23 U.S.C. §503(b)(2)(C)(i, ii, iii); and 23 U.S.C. §503(b)(3)(B)(i & ii):

i. Determine how to assess longevity and transferability of CMFs and identify information needed to conduct assessment.

ii. Examine gaps and challenges related to the data needed to examine CMF longevity and transferability and other future safety studies (e.g., estimating nationwide impact of installed safety infrastructure in terms of number of reduced crashes and saved casualties).

1.3 Detailed Requirement

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform this purchase order.

TASK 1: Project Management The Contractor shall coordinate and facilitate a virtual kickoff meeting with the FHWA Technical Point of Contact (TPOC) and other FHWA stakeholders within three weeks of award of the purchase order. The purpose of the kickoff meeting is to discuss the overall project to ensure desired outcomes are achieved. The Contractor shall prepare a draft work plan that is consistent with the quote and includes, at a minimum, the proposed schedule and deliverables.

The Contractor shall prepare an agenda and presentation to guide the meeting. The Contractor shall send the draft agenda, presentation, and work plan to the TPOC one week in advance of the kickoff meeting, at the latest, for review. After the kickoff meeting, the Contractor shall incorporate all feedback received into the work plan to be submitted to the TPOC for review and feedback.

NOTE: The Work Plan shall be consistent with the performance work statement and all exhibits, which address how CMF longevity and transferability will be defined and assessed and what data will be needed for the assessment. The Work Plan shall not be construed to override or change the requirement or exhibits of this performance work statement. The controlling document for the requirement shall be the performance work statement, its exhibits, and any modifications issued. The Contractor shall participate in regular check-in meetings (frequencies to be determined after the kickoff meeting) with the TPOC and FHWA’s stakeholders to discuss the progress, possible risks, and opportunities under this study. The Contractor shall prepare quarterly progress reports (QPRs) with risk assessment for this task.

TASK 1 Deliverables:

Contractor shall submit the following to the TPOC for review and approval:

• Kickoff meeting agenda, draft work plan, and draft presentation.

• Meeting notes and presentations.

• Revised work plan.

• Regular check-in meetings.

• Quarterly progress reports.

TASK 2: Conduct Literature Review, Gap Analysis and Feasibility Study The Contractor shall conduct literature review regarding CMF longevity and transferability to see if any studies have looked into these topics and what research gaps and challenges exist.

Additionally, the Contractor shall explore existing databases that store traffic and infrastructure project related data collected from a large number of states (at least 20 States), such as, but not limited to, Highway Performance Monitoring System (HPMS) and Highway Safety Improvement Program database. The Contractor shall examine gaps and challenges related to that those databases are combined with crash data and used for nation-level safety evaluations (e.g., conducting before-and-after studies). The Contractor shall also investigate in what format (e.g., paper, spreadsheet, or Geographic Information Systems (GIS) map) each state currently develops and maintains safety infrastructure databases (e.g., median barrier, roundabout, rumble strips) and whether they can be integrated with data from different sources (e.g., crash data, traffic data) for more comprehensive information. The existing data gaps and challenges examined in this study may include but not limit to availability, quality, alignments between datasets within a state, data fusion with multiple sources, varying definitions/categorizations of same types of variables among states, etc.

Based upon findings from the literature review and gap analysis, the Contractor shall also conduct a risk assessment of project completion and identify opportunities to narrow the gaps and to proceed with data collection for augmenting the existing databases for future studies. This task seeks to better understand what challenges and gaps hinder conducting large scale (ideally national level) safety evaluations.

TASK 2 Deliverables:

Contractor shall submit the following to the TPOC for review and approval:

• Technical memo for literature review, gap analysis, and research needs.

• Technical memo for feasibility study.

• Revised work plan based on findings from the literature review, gap analysis, feasibility study that includes a data collection plan with collection period.

TASK 3: Data Collection Upon approval from the COR, the Contractor shall acquire information on State crash data, GIS files of safety infrastructure related data, and other data to be used in future traffic safety studies including, but not limited to assessment of CMF longevity and transferability and nationwide impact of safety infrastructure countermeasures. The Contractors shall also explore existing databases (e.g., Fatal Analysis Reporting System, Highway Safety Information System, HPMS, federal agencies’ other internal databases, etc.) for use of this purpose. Additionally, the Contractors shall contact all States and request all necessary files (population data, not sample data) to complete this task.

The Contractor shall produce summary information to display what is available in each State in terms of data type (e.g., crash data, infrastructure data, etc.) and information type for each data type (e.g., crash severity, infrastructure installation date). The Contractor shall also include States, which are determined to have no applicable GIS infrastructure mapping information available. Based upon the results of this effort, the Contractor shall discuss with the TPOC and FHWA’s stakeholders and determine which infrastructures and States would be selected for the TASK 4 – developing databases for future traffic safety studies.

TASK 3 Deliverables:

The Contractor shall submit the following to the TPOC for review and approval:

• Data available for at least past 7 to 8 years from 2023 or 2024 obtained from all States, which include the following at a minimum:

o Crash data. The Contractor shall check each State’s compliance status of MMUCC and provide the summary.

o Infrastructure map files (or State data with beginning and end point location information used to determine infrastructure locations, if GIS asset map layers or similar files are not available), to determine which safety infrastructure types exist at the crash location. The Contractor shall include map files focusing on the following categories at a minimum: longitudinal barriers, shoulder width, rumble strips, curve delineations, high friction surface treatment, and roundabouts.

o Other data related to above-listed safety infrastructure, such as, but not limited to, installation date and specifications of infrastructure – for example, for rumble strips, the information about types (standard or sinusoidal), widths, installation methods (milled, rolled, raised, etc.), etc.

o Involvement of those infrastructure types in crashes, based on the police crash report, crash type, crash location, infrastructure location, and other applicable data. For example, the Contractor may use a distance between front the crash and the safety infrastructure to determine the involvement of the infrastructure in the crash.

o Roadway characteristics and traffic inventory data. The Contractor shall check each State’s compliance status of MIRE and provide the summary.

o Other data needed for safety evaluations, if available, such as pedestrian volumes and turning movement counts.

• Inventory of infrastructure information for each infrastructure category where mapping data do or do not exist, by State, with State names, contact information for State GIS leader, GIS file information, infrastructure variable and category names, and overall data quality categories for each State (e.g., poor, acceptable, good, exceptional).

o Include year which State produced the maps and additional relevant data details.

• Inventory of State crash data information, including contact information for crash data, crash data file names, information on availability of State crash data files, overall crash data quality categories (e.g., poor, acceptable, good, exceptional), existence (yes/no) of latitude/longitude of crash data to allow for locating crashes and merging with mapped infrastructure information, infrastructure data from police crash report to augment mapping information.

• Inventory of roadway characteristics and traffic inventory where mapping data do or do not exist, by State, with information on overall data quality categories for each State (e.g., poor, acceptable, good, exceptional), and contact information for the data acquisition.

• Inventory of other data information for each data category (e.g., pedestrian volumes, weather data, etc.) where mapping data do or do not exist, by State, with information on overall data quality categories for each State (e.g., poor, acceptable, good, exceptional) and contact information for the data acquisition.

• Technical memo summarizing data collection efforts, gaps and challenges encountered while performing this task, and broad data quality assessment results. One of section in this memo shall discuss recommendation of the best infrastructure types and States for TASK 4 based on data availability and data quality. The number of infrastructure types and States in the list shall be maximized.

TASK 4: Development of Databases for Assessment of CMF Longevity and Transferability The Contractor shall merge crash data, selected infrastructure mapping data, roadway characteristics, traffic inventory data, and other collected data of selected States (from TASK 3) using primary keys and develop databases for future traffic safety studies. These databases shall be used to produce layers of maps for collected data and determine the involvement (yes/no) of safety infrastructure of interest in the crashes. HPMS has annual collected state roadway network in GIS format. The Contractor may consider this as a basemap (https://www.fhwa.dot.gov/policyinformation/hpms.cfm).

TASK 4 Deliverables:

The Contractor shall submit the following to the TOTPOC for review and approval:

• Database(s) that produce layers of crash data map, infrastructure data maps, roadway characteristics map, traffic inventory map, and maps of other collected data for future traffic safety studies. The data in different domains should be linked to each other using primary keys.

https://www.fhwa.dot.gov/policyinformation/hpms.cfm

• Technical memo summarizing database development efforts, gaps and challenges encountered while performing this task, and broad quality assessment results about data included in the final product (database(s)).

TASK 5: Documentation of Database Manual, Data Library and Dictionary for Future Usage At the completion of this project, a data library, which is a tabular version of the summary information regarding the developed database and collected data, shall be produced for each State. This information shall include all new findings, for each infrastructure type, including but not limited to:

• Data quality (e.g., rumble strips are well mapped for all State-owned roads in State X, or poor roundabouts mapping quality prevented use of State Y’s roundabouts data due to [Fill in blank]).

• Variable information for infrastructure types analyzed (including related files names, variable names, utilized category names and numbers).

• Data sources which can be used to locate this variable information, such as Open Data links for States with publicly available GIS maps, Excel Spreadsheets for States with mapping information in spreadsheets, and points-of-contact for GIS leaders in States.

• Percent of crashes can be mapped by year (e.g., 27 percent of crashes occurred on State roads where safety infrastructure is mapped).

• Percent of roadway for which infrastructure GIS maps exist (e.g., 100 percent of State-owned roads have existing concrete barriers mapped, and this represents an estimated 22 percent of this State’s total roads, and over 95 percent of existing concrete barriers).

• Percent of other data collected can be mapped by year (e.g., 56 percent of Annual Average Daily Traffic are mapped on State roads).

“Notes” which shall be included in mapping information results can include statements like “State X was determined to not only have data Y but also have data Z, which will be used for this report.” Summary information for each State, such as the date that the infrastructure map file was last updated, infrastructure types mapped, and additional helpful information, shall be included for each State. If States are determined to not have any mapping information for infrastructure, and/or no beginning and end point data recorded in any format, then that information shall also be included, along with contact information of the mapping supervisor in each State and/or State employee mapping expert most familiar with GIS mapping, or website which provided that information. This information is intended to be used to efficiently update this project in later years with future years of crash data and mapping data, or to expand this project to include additional infrastructure types beyond the types used in this project.

The Contractor shall store these data files in a location (to be determined by TPOC) for future updates and future usage, organize the data and databases, and produce a User Manual and Data Dictionary for others at FHWA to use in later years. This is intended to prepare for and improve efficiency of updates for future traffic safety analyses, or other to-be-determined use of these mappings of infrastructure and crashes. This will allow future projects to efficiently use this existing data, and efficiently collect similar data in future years.

TASK 5 Deliverables:

The Contractor shall submit the following to the TPOC for review and approval:

• Organized data:

o State mapping files (including beginning and endpoint data used to produce maps) utilized in this project.

o State police crash report manuals and data files utilized in this project.

o Other data files collected for and utilized in this project.

o Established State crash data and GIS infrastructure map storage patterns, such that

GIS files and State crash data can be efficiently used and updated for use in future research projects on CMF longevity and transferability, impact of safety countermeasures, or other topics.

• Documentation including Data library, dictionary, and user manual for others to use in future years.

• A 30 to 40-minute technical presentation summarizing the efforts.

2.0 Period of Performance

The period of performance will be for a period of 18 months from date of award.

3.0 General

N/A

3.1 Hours of Operation

N/A

3.2 Place of Performance

The work to be performed under this purchase order will be performed at the Contractor’s facility.

3.3 Physical Security

N/A

3.4 Special Qualifications

The following skill types are anticipated for this effort.

• Technical Specialists and/or Experts in o GIS, spatial data, GIS-related standards and applications o Data extraction from police crash reports and infrastructure maps o Data/information extraction from video footage o Data storage for future use o Database development o Big data analysis o Basic knowledge about CMFs development

• Writer/Editor

3.5 Periodic Progress Meetings

The contractor agrees to attend progress meetings. The Contracting Officer or Technical Point of Contact (TPOC), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the CO will apprise the Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

3.6 Identification of Contractor Employees

All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

3.7 Contractor Travel

N/A

3.8 Materials

N/A

3.9 Organizational Conflict of Interest

Contractor and subcontract personnel performing work under this award may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the CO immediately whenever he/she becomes aware that such access or participation may result in any actual or potential OCI and may merit the submittal of a plan to the CO to avoid or mitigate any such OCI. This mitigation plan would be determined to be acceptable solely at the discretion of the CO, and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

3.10 Phase In /Phase out Period

N/A

4.0 Government Furnished Equipment and Services

N/A

4.1 Services

N/A.

4.2 Facilities

N/A

4.3 Materials

N/A

5.0 Applicable Publications (Current Editions)

The Contractor must abide by the following regulations, publications, manuals, and local policies and procedures. TFHRC Communication Reference Guide (CRG)-https://www.fhwa.dot.gov/publications/research/general/15058/15058.pdf

6.0 Attachment/Exhibit List

6.1 Exhibit 1

Performance Requirements Summary

6.2 Exhibit 2

Deliverables Schedule

6.3 Exhibit 3

Schedule of Services (To be included at award)

EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective (The Service required— usually a shall statement)

Performance Standard Performance

Threshold (This is the maximum error rate.)

Method of Surveillance

PRS # 1.

TASK 1 – Project management

The Contractor shall provide:

• Kickoff meeting agenda and draft work plan.

• Meeting notes and presentations.

• Revised work plan.

• Regular check-in meetings.

• Quarterly progress reports.

No technical and grammatical errors.

100% review by the TPOC https://www.fhwa.dot.gov/publications/research/general/15058/15058.pdf

(The Service required— usually a shall statement)

Performance Standard Performance

Threshold (This is the maximum error rate.)

Method of Surveillance

PRS # 2

TASK 2 – Literature review, gap analysis, and feasibility study

The Contractor shall provide:

• Technical memo for literature review, gap analysis, and research needs.

• Technical memo for feasibility study

• Revised study plan, which includes data collection plan with collection period.

No technical and grammatical errors.

100% review by the TPOC

PRS # 3

TASK 3 – Data collection

The Contractor shall provide:

• Data obtained from

States that meet minimum requirements determined by TOCOR.

• Documents of information about collected data and States’ contact information.

• Technical memo summarizing data collection efforts, gaps and challenges encountered while performing this task, broad data quality assessment results, and recommendation of the best infrastructure types and States for TASK 4 based on data availability and quality.

• Minium quality assessment and control for collected data.

• No technical and grammatical errors in documents.

• Consensus among COR, FHWA stakeholders, and contractor.

100% review

(The Service required— usually a shall statement)

Performance Standard Performance

Threshold (This is the maximum error rate.)

Method of Surveillance

PRS # 4

TASK 4 – Development of databases for assessment of CMF longevity and transferability

The Contractor shall provide:

• Database(s) that produce layers of maps of collected data.

• Technical memo summarizing database development efforts, gaps and challenges encountered while performing this task, and broad assessment results about data quality included in the final product (database(s)).

• Thorough quality assessment and control for collected data.

• Self-explanatory design of database structure.

PRS # 5

TASK 5 – Documentation of database manual, data library, and data dictionary for future usage; 30 to 40 minutes technical presentation

The Contractor shall provide:

• Organized collected data files.

• Developed data library, dictionary, and user manual.

• Developed 30 to 40 minutes technical presentation summarizing the efforts.

• Thorough quality assessment and control for collected data.

• No technical and grammatical errors in documents.

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverables for TASK 1

Deliverable Print Ready Frequency # of Copies Medium/Format Submit To Kickoff meeting agenda, draft work plan, Yes One week before the kickoff meeting

1 Word document

TPOC

and draft presentation

Kickoff

No Within three weeks of award

N/A Conference call TPOC and

FHWA

stakeholde rs

Meeting notes, final presentations , and final work plan

Yes Three weeks after the kickoff

1 Word documents, power point slides

Regular check-in meetings

No On a regular basis (frequency will be determined after the kickoff meeting)

N/A Conference call TPOC

Quarterly progress reports

Yes Quarterly 1 Word documents or power point slides

Deliverables for TASK 2

Technical memo for literature review, gap analysis, and research needs

Yes Two months after the award

1 Word document memo for feasibility study

Yes Three months

1 Word documents TPOC

Revised study plan that includes

Yes Three months data collection plan with collection period

Deliverables for TASK 3

Data obtained from States including police crash report data, infrastructure map files, and other data

Yes 10 months

1 Excel, GIS data, Comma-separated values files

Documents of information about collected data and States’ contact information

1 10 months

1 Word documents memo summarizing data collection efforts, gaps and challenges, data quality assessment results, and recommenda tion of the best

1 10 months

1 Word documents infrastructure types and States for

TASK 4

Deliverables for TASK 4

Database(s) that produce layers of maps of collected data

No 16 months

1 Database platform (to be determined) memo summarizing database development efforts, gaps and challenges, and assessment results about data included in the final database

Yes 16 months

1 Word document TPOC

Deliverables for TASK 5

Organized collected data files

No 18 months

1 To be determined

Documentati on including data library, Yes 18 months dictionary, and user manual

30 to 40-minute technical presentation

Yes 18 months

1 Power point slides

PART IV

PROVISIONS

Federal Acquisition Requestion & Transportation Acquisition Regulation (FAR & TAR

PROVISIONS INCORPORATED BY REFERENCE

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The quoter is cautioned that the listed provisions may include blocks that must be completed by the quoter and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the quoter may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at https://www.acquisition.gov/far 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain

Federal Transactions (SEP 2024) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal

Confidentiality Agreements or Statement-Representation (JAN 2017) 52.204-7 System for Award Management (NOV 2024) (DEVIATION Sept 2025) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations –

Representation (NOV 2015) (DEVIATION SEP 2025) 52.212-1 Instructions to Quoters -- Commercial Products and Commercial Services

(SEP 2023) (DEVIATION SEP 2025)

52.222-18 Certification Regarding Knowledge of Child Labor for Listed End Products

(FEB 2021)

52.222-48 Exemption from Application of the Service Contract Labor Standard to

Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Certification (MAY 2014) (DEVIATION OCT 2025)

52.222-52 Exemption form Application of the Service Contract Labor Standards to Contract for Certain Services—Certification (MAY 2014)(DEVIATION

OCT 2025)

52.229-11 Tax on Certain Foreign Procurements -- Notice and Representation (Jun 2020) https://www.acquisition.gov/far

FAR & TAR PROVISIONS IN FULL TEXT

52.204-29 Federal Acquisition Supply Chain Security Act Orders—Representation and

Disclosures (Dec 2023)

(a) Definitions. As used in this provision—

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The quoter □ has □ does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the quoter checked "has" in paragraph (b) of this provision, the quoter represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the quoter, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the quoter of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in–

(A) The payment of a monetary fine or penalty of $5,000 or more;

or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the quoter has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the quoter has provided the requested information with regard to each occurrence.

(d) The quoter shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

(End of provision)

CLAUSES

FAR AND TAR CLAUSES INCORPORATED BY REFERENCE AND FULL TEXT

52.203-6 Restrictions on Subcontractor Sales to the Government (June 2020), with

Alternate I (Nov 2021)

52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun

2020) (DEVIATION SEP 2025)

52.204-13 System for Award Management – Maintenance (OCT 2018) (DEVIATION

NOV 2025)

52.204-14 Service Contract Reporting Requirements (Oct 2016) (DEVIATION NOV 2025))

52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts

(Oct 2016) (DEVIATION NOV 2025)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (DEVIATION SEP 2025)

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (DEVIATION SEP 2025)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(DEVIATION SEP 2025)

52.212-4 Contract Terms and Conditions – Commercial Products and Commercial

Services (NOV 2023) (DEVIATION SEP 2025)

52.219-3 Notice of HUBZone Set-Aside or Sole Source Award (Oct 2022)

(DEVIATION NOV 2025)

52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) (DEVIATION NOV 2025)

52.219-8 Utilization of Small Business Concerns (Jan 2025) (DEVIATION NOV 2025)

52.219-9 Small Business Subcontracting Plan (Jan 2025) (DEVIATION NOV 2025)

52.219-13 Notice of Set-Aside of Orders (Mar 2020)

52.219-14 Limitations on Subcontracting (Oct 2022) (DEVIATION NOV 2025)

52.219-16 Liquidated Damages-Subcontracting Plan (Sep 2021) (DEVIATION NOV 2025)

52.219-28 Post award Small Business Program Representation (Jan 2025)

(DEVIATION NOV 2025))

52.219-29 Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022)

(DEVIATION NOV 2025)

52.222-3 Convict Labor (June 2003) (DEVIATION OCT 2025) https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1064214 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1064243 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1062651 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1057314 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1057393 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_219-9 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1057715 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1057730 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1057758 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1057902 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1055332

52.222-35 Equal Opportunity for Veterans. (JUN 2020) (DEVIATION OCT 2025)

52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) (DEVIATION

OCT 2025)

52.222-37 Employment Reports on Veterans (Jun 2020) (DEVIATION OCT 2025)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (DEVIATION OCT 2025)

52.222-41 Service Contract Labor Standards (Aug 2018) (DEVIATION OCT 2025)

52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) (DEVIATION OCT 2025)

52.222-50 Combating Trafficking in Persons (Oct 2025) (DEVIATION OCT 2025)

52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (DEVIATION

OCT 2025)

52.222-54 Employment Eligibility Verification (Jan 2025) (DEVIATION OCT 2025)

52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) (DEVIATION

OCT 2025)

52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION

OCT 2025)

52.223-9 Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008)

52.223-23 Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025)

(DEVIATION DEC 2025))

52.225-1 Buy American-Supplies (Oct 2022) (DEVIATION NOV 2025)

52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023)

(DEVIATION NOV 2025)

52.225-5 Trade Agreements (NOV 2023)

52.226-7 Drug-Free Workplace (May 2024)

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056265 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056304 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_222_41 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056410 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056463 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056535 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056732 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056753 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1056818 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_222_62 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1053138 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1053372 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1053446 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1053648 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1050674

52.232-36 Payment by Third Party (May 2014)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)

52.233-3 Protest After Award (Aug 1996) (DEVIATION SEP 2025)

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) (DEVIATION SEP

2025).

52.240-91 Security Prohibitions and Exclusions (DEVIATION SEP 2025)

(a) Definitions. As used in this clause—

American Security Drone Act-covered foreign entity means an entity included on a list that the Federal Acquisition Security Council (FASC) develops and maintains and publishes in the System for Award Management (SAM) at https://www.sam.gov (section 1822 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .