DRAFT_Performance Requirements Summary.pdf

PDF 132 KB Posted

Attached to
Infrastructure Materials Laboratories (IML) Support Services Federal contract opportunity
Solicitation number
693JJ322R000003
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a Performance Requirements Summary (PRS) and a pre-solicitation notice for Infrastructure Materials Laboratories (IML) Support Services. The PRS outlines four key performance objectives for deliverables, reporting, cooperation with other contractors, and planning. Metrics are provided to measure acceptable performance thresholds for each objective. The pre-solicitation notice seeks proposals for IML support services at the Federal Highway Administration's Turner-Fairbank Highway Research Center. Multiple IDIQ contracts with a 60-month ordering period will be awarded on a small business set-aside basis. Contractors shall conduct research and development projects and tasks to support FHWA's infrastructure mission. Services include general lab support, daily operation and maintenance of test equipment, specimen preparation, materials testing and evaluation, data handling, and documentation for seven IMLs focused on asphalt, pavements, chemistry, coatings, aggregates, concrete, and petrography. The solicitation is expected to be released in March 2022 on sam.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Materials Laboratories (IML) Support Services, newest first.
File Type Posted
Questions and Answers_IML_For Draft RFP Only.pdf PDF
DRAFT_Labor Rates.xlsx XLSX spreadsheet
DRAFT_Pre-Award Accounting System Checklist.pdf PDF
DRAFT_Labor Category Descriptions.pdf PDF
DRAFT_RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective Performance Standard Performance Threshold

Method of Surveillance

PRS # 1.

The Contractor shall provide all deliverables

1. Deliverables are comprehensive, complete, and accurate

2. Deliverables are made in accordance with schedule

1. 90% of submittals require no change comments

2. >95% of the time

COR Review

PRS #2

The Contractor shall meet all reporting requirements

1. Reports shall be timely, accurate, and inclusive of all required information

2. No substantive or repeated flaws

1. 95% of submittals require no change comments

2. >95% of the time

COR Review

PRS #3

The Contractor shall be cooperative with all Contractors

1. Requests for cooperation shall be accommodated as soon as practical

2. Coordination shall be effective and good-faith effort provided that supports the objectives of the order

1. Acknowledged within 3 business days of notification and remediation steps provided within 2 weeks

COR Review

PRS #4

The Contractor shall provide all planning stated herein

1. Plans address all required information

2. Plans shall be timely and accurate

1. 90% of submittals require no change comments

2. >95% of the time

COR Review

File details come from the government source that posted it. Updated .