693JF724B000001 FINAL CAPE T LAYBERTHING SOLICITATION.pdf

PDF 3 MB Posted

Attached to
CAPE T LAYBERTHING SOLICITATION
Solicitation number
693JF724B000001
Issued by

About this file

This document is a solicitation for a contract to provide layberthing services for three RO/RO vessels, CAPE TAYLOR, CAPE TEXAS, and CAPE TRINITY, on the U.S. Gulf Coast. The Maritime Administration (MARAD) is seeking an exclusive long-term safe layberth facility that meets specific requirements, including full-service port complex capabilities, engineering drawings, water depth, mooring arrangements, fendering, pier apron, and security. The contract will have a 5-year base period with four 1-year option periods. Proposals are due by 11:30 AM EST on August 30, 2024, and the question and answer period ends on August 21, 2024. The solicitation includes details on the vessels' reduced operating status, the Contractor's obligations, utility requirements, and other technical specifications.

View the file

Other files

File Type Posted
Questions and Answers for CAPE T Layberthing Solicitation 693JF724B000001.docx DOCX document
mao_600-001-0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT 1. THIS CONTRACT IS A RATED

5. SOLICITATION TYPE2. CONTRACT NO. 4. SOLICITATION NUMBER

PAGE OF PAGES

7. ISSUED BY CODE 8. THIS ACQUISITION IS

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27

RATING

ORDER UNDER DPAS (15 CFR 700)

3. AWARD/

EFFECTIVE DATE ISSUE DATE

6. SOLICITATION

UNRESTRICTED OR SET ASIDE:

SMALL BUSINESS

SIZE STANDARD:

9. (AGENCY USE)

NO COLLECT CALLS

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN

CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A DIFFERENT

PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR

AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED

HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS

AND CONDITIONS STATED HEREIN.

CODE 12. ADMINISTERED BY

13. CONTRACTOR FACILITY 14. PAYMENT WILL BE MADE BY CODE CODE

OFFEROR CODE

TELEPHONE NO.

UNIQUE ENTITY IDENTIFER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:

15. PROMPT PAYMENT DISCOUNT 16. AUTHORITY FOR USING OTHER

THAN FULL AND OPEN COMPETITION

10 U.S.C. 2304 41 U.S.C. 253

NEGOTIATED

(RFP)

SEALED BIDS

(IFB)

1 99

US DOT MARITIME ADMINISTRATION

OFFICE OF ACQUISITION MAR-380

1200 NEW JERSEY AVENUE SE

MAIL STOP W-28-201

WASHINGTON DC 20590-0001 541380

% FOR:X

x

693JF7

$19

693JF724B000001

NAICS:

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS

8(A)

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

EDWOSB

17.

ITEM NO.

18.

SCHEDULE OF SUPPLIES/SERVICES

19.

QUANTITY

20.

UNIT

21.

UNIT PRICE

22.

AMOUNT

The purpose of this solicitation is to procure layberthing services for an exclusive use long-term safe layberth for three Ro/Ro vessels

CAPE TAYLOR, CAPE TEXAS, and CAPE TRINITY.

The geographic area of consideration for this solicitation is for three vessels on the Gulf

Coast.

Continued ...

27. SIGNATURE OF OFFEROR/CONTACTOR 28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

NAME AND TITLE OF SIGNER (TYPE OR PRINT) DATE SIGNED NAME OF CONTRACTING OFFICER DATE SIGNED

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET

FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION

NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS

OR CHANGES WHICH ARE SET FORTH HEREIN, IS

ACCEPTED AS TO ITEMS:

23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT

(FOR GOVERNMENT USE ONLY)

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION NOT USABLE

STANDARD FORM 1447 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.214(d)

COPIES TO

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include ZIP Code)

WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF ITEMS INVOLVEDWE DO

DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE OF ITEMS INVOLVED

CANNOT MEET DELIVERY REQUIREMENT

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS

PAGE

NO RESPONSE FOR REASONS CHECKED

99 2 OF

DATE AND LOCAL TIME

AFFIX

STAMP

HERE

TO:

FROM:

SOLICITATION NO.

WASHINGTON DC 20590-0001

US DOT MARITIME ADMINISTRATION

OFFICE OF ACQUISITION MAR-380

1200 NEW JERSEY AVENUE SE

MAIL STOP W-28-201

693JF7

693JF724B000001

STANDARD FORM 1447 (REV. 8/2016) BACK

(A)

ITEM NO.

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00001 Base Year 5-yr CAPE TAYLOR

Period of Performance: 09/21/2024 to 09/20/2025

00002 Berthage - Per Diem

Period of Performance: 09/21/2024 to 09/20/2025

00003 Security

Period of Performance: 09/21/2024 to 09/20/2025

00004 Connect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00005 Disconnect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00006 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2024 to 09/20/2025

00007 Water and Sewage Services

Period of Performance: 09/21/2024 to 09/20/2025

00008 Opt 1 Year 5-yr CAPE TAYLOR

Period of Performance: 09/21/2025 to 09/20/2026

00009 Berthage - Per Diem

Period of Performance: 09/21/2025 to 09/20/2026

00010 Security

Period of Performance: 09/21/2025 to 09/20/2026

00011 Connect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.214(d)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

4 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00012 Disconnect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00013 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2025 to 09/20/2026

00014 Water and Sewage Services

Period of Performance: 09/21/2025 to 09/20/2026

00015 Opt 2 Year 5-yr CAPE TAYLOR

Period of Performance: 09/21/2026 to 09/20/2027

00016 Berthage - Per Diem

Period of Performance: 09/21/2026 to 09/20/2027

00017 Security

Period of Performance: 09/21/2026 to 09/20/2027

00018 Connect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00019 Disconnect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00020 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2026 to 09/20/2027

00021 Water and Sewage Services

Period of Performance: 09/21/2026 to 09/20/2027

00022 Opt 3 Year 5-yr CAPE TAYLOR

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

5 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2027 to 09/20/2028

00023 Berthage - Per Diem

Period of Performance: 09/21/2027 to 09/20/2028

00024 Security

Period of Performance: 09/21/2027 to 09/20/2028

00025 Connect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00026 Disconnect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00027 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2027 to 09/20/2028

00028 Water and Sewage Services

Period of Performance: 09/21/2027 to 09/20/2028

00029 Opt 4 Year 5-yr CAPE TAYLOR

Period of Performance: 09/21/2028 to 09/20/2029

00030 Berthage - Per Diem

Period of Performance: 09/21/2028 to 09/20/2029

00031 Security

Period of Performance: 09/21/2028 to 09/20/2029

00032 Connect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00033 Disconnect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

6 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00034 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2028 to 09/20/2029

00035 Water and Sewage Services

Period of Performance: 09/21/2028 to 09/20/2029

00036 Cumulative 5 year total for CAPE TAYLOR

00037 Base Year 5-yr CAPE TEXAS

Period of Performance: 09/21/2024 to 09/20/2025

00038 Berthage - Per Diem

Period of Performance: 09/21/2024 to 09/20/2025

00039 Security

Period of Performance: 09/21/2024 to 09/20/2025

00040 Connect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00041 Disconnect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00042 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2024 to 09/20/2025

00043 Water and Sewage Services

Period of Performance: 09/21/2024 to 09/20/2025

00044 Opt 1 Year 5-yr CAPE TEXAS

Period of Performance: 09/21/2025 to 09/20/2026

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

7 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00045 Berthage - Per Diem

Period of Performance: 09/21/2025 to 09/20/2026

00046 Security

Period of Performance: 09/21/2025 to 09/20/2026

00047 Connect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00048 Disconnect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00049 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2025 to 09/20/2026

00050 Water and Sewage Services

Period of Performance: 09/21/2025 to 09/20/2026

00051 Opt 2 Year 5-yr CAPE TEXAS

Period of Performance: 09/21/2026 to 09/20/2027

00052 Berthage - Per Diem

Period of Performance: 09/21/2026 to 09/20/2027

00053 Security

Period of Performance: 09/21/2026 to 09/20/2027

00054 Connect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00055 Disconnect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

8 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00056 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2026 to 09/20/2027

00057 Water and Sewage Services

Period of Performance: 09/21/2026 to 09/20/2027

00058 Opt 3 Year 5-yr CAPE TEXAS

Period of Performance: 09/21/2027 to 09/20/2028

00059 Berthage - Per Diem

Period of Performance: 09/21/2027 to 09/20/2028

00060 Security

Period of Performance: 09/21/2027 to 09/20/2028

00061 Connect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00062 Disconnect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00063 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2027 to 09/20/2028

00064 Water and Sewage Services

Period of Performance: 09/21/2027 to 09/20/2028

00065 Opt 4 Year 5-yr CAPE TEXAS

Period of Performance: 09/21/2028 to 09/20/2029

00066 Berthage - Per Diem

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

9 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2028 to 09/20/2029

00067 Security

Period of Performance: 09/21/2028 to 09/20/2029

00068 Connect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00069 Disconnect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00070 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2028 to 09/20/2029

00071 Water and Sewage Services

Period of Performance: 09/21/2028 to 09/20/2029

00072 Cumulative 5 year total for CAPE TEXAS

00073 Base Year 5-yr CAPE TRINITY

Period of Performance: 09/21/2024 to 09/20/2025

00074 Berthage - Per Diem

Period of Performance: 09/21/2024 to 09/20/2025

00075 Security

Period of Performance: 09/21/2024 to 09/20/2025

00076 Connect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00077 Disconnect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00078 Electrical Service - Reimbursable electrical

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

10 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2024 to 09/20/2025

00079 Water and Sewage Services

Period of Performance: 09/21/2024 to 09/20/2025

00080 Opt 1 Year 5-yr CAPE TRINITY

Period of Performance: 09/21/2025 to 09/20/2026

00081 Berthage - Per Diem

Period of Performance: 09/21/2025 to 09/20/2026

00082 Security

Period of Performance: 09/21/2025 to 09/20/2026

00083 Connect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00084 Disconnect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00085 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2025 to 09/20/2026

00086 Water and Sewage Services

Period of Performance: 09/21/2025 to 09/20/2026

00087 Opt 2 Year 5-yr CAPE TRINITY

Period of Performance: 09/21/2026 to 09/20/2027

00088 Berthage - Per Diem

Period of Performance: 09/21/2026 to 09/20/2027

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

11 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00089 Security

Period of Performance: 09/21/2026 to 09/20/2027

00090 Connect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00091 Disconnect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00092 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2026 to 09/20/2027

00093 Water and Sewage Services

Period of Performance: 09/21/2026 to 09/20/2027

00094 Opt 3 Year 5-yr CAPE TRINITY

Period of Performance: 09/21/2027 to 09/20/2028

00095 Berthage - Per Diem

Period of Performance: 09/21/2027 to 09/20/2028

00096 Security

Period of Performance: 09/21/2027 to 09/20/2028

00097 Connect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00098 Disconnect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00099 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

12 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2027 to 09/20/2028

00100 Water and Sewage Services

Period of Performance: 09/21/2027 to 09/20/2028

00101 Opt 4 Year 5-yr CAPE TRINITY

Period of Performance: 09/21/2028 to 09/20/2029

00102 Berthage - Per Diem

Period of Performance: 09/21/2028 to 09/20/2029

00103 Security

Period of Performance: 09/21/2028 to 09/20/2029

00104 Connect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00105 Disconnect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00106 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2028 to 09/20/2029

00107 Water and Sewage Services

Period of Performance: 09/21/2028 to 09/20/2029

00108 Cumulative 5 year total for CAPE TRINITY

00109 Cumulative 5 year total for Vessels 1, 2, and 3

00110 Base Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2024 to 09/20/2025

00111 Berthage - Per Diem

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

13 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2024 to 09/20/2025

00112 Security

Period of Performance: 09/21/2024 to 09/20/2025

00113 Connect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00114 Disconnect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00115 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2024 to 09/20/2025

00116 Water and Sewage Services

Period of Performance: 09/21/2024 to 09/20/2025

00117 Opt 1 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2025 to 09/20/2026

00118 Berthage - Per Diem

Period of Performance: 09/21/2025 to 09/20/2026

00119 Security

Period of Performance: 09/21/2025 to 09/20/2026

00120 Connect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00121 Disconnect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00122 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

14 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

charges (check one)

Period of Performance: 09/21/2025 to 09/20/2026

00123 Water and Sewage Services

Period of Performance: 09/21/2025 to 09/20/2026

00124 Opt 2 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2026 to 09/20/2027

00125 Berthage - Per Diem

Period of Performance: 09/21/2026 to 09/20/2027

00126 Security

Period of Performance: 09/21/2026 to 09/20/2027

00127 Connect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00128 Disconnect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00129 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2026 to 09/20/2027

00130 Water and Sewage Services

Period of Performance: 09/21/2026 to 09/20/2027

00131 Opt 3 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2027 to 09/20/2028

00132 Berthage - Per Diem

Period of Performance: 09/21/2027 to 09/20/2028

00133 Security

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

15 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2027 to 09/20/2028

00134 Connect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00135 Disconnect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00136 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2027 to 09/20/2028

00137 Water and Sewage Services

Period of Performance: 09/21/2027 to 09/20/2028

00138 Opt 4 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2028 to 09/20/2029

00139 Berthage - Per Diem

Period of Performance: 09/21/2028 to 09/20/2029

00140 Security

Period of Performance: 09/21/2028 to 09/20/2029

00141 Connect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00142 Disconnect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00143 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2028 to 09/20/2029

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

16 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00144 Water and Sewage Services

Period of Performance: 09/21/2028 to 09/20/2029

00145 Opt 5 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2029 to 09/20/2030

00146 Berthage - Per Diem

Period of Performance: 09/21/2029 to 09/20/2030

00147 Security

Period of Performance: 09/21/2029 to 09/20/2030

00148 Connect Cycle

Period of Performance: 09/21/2029 to 09/20/2030

00149 Disconnect Cycle

Period of Performance: 09/21/2029 to 09/20/2030

00150 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2029 to 09/20/2030

00151 Water and Sewage Services

Period of Performance: 09/21/2029 to 09/20/2030

00152 Opt 6 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2030 to 09/20/2031

00153 Berthage - Per Diem

Period of Performance: 09/21/2030 to 09/20/2031

00154 Security

Period of Performance: 09/21/2030 to 09/20/2031

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

17 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00155 Connect Cycle

Period of Performance: 09/21/2030 to 09/20/2031

00156 Disconnect Cycle

Period of Performance: 09/21/2030 to 09/20/2031

00157 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2030 to 09/20/2031

00158 Water and Sewage Services

Period of Performance: 09/21/2030 to 09/20/2031

00159 Opt 7 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2031 to 09/20/2032

00160 Berthage - Per Diem

Period of Performance: 09/21/2031 to 09/20/2032

00161 Security

Period of Performance: 09/21/2031 to 09/20/2032

00162 Connect Cycle

Period of Performance: 09/21/2031 to 09/20/2032

00163 Disconnect Cycle

Period of Performance: 09/21/2031 to 09/20/2032

00164 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2031 to 09/20/2032

00165 Water and Sewage Services

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

18 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2031 to 09/20/2032

00166 Opt 8 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2032 to 09/20/2033

00167 Berthage - Per Diem

Period of Performance: 09/21/2032 to 09/20/2033

00168 Security

Period of Performance: 09/21/2032 to 09/20/2033

00169 Connect Cycle

Period of Performance: 09/21/2032 to 09/20/2033

00170 Disconnect Cycle

Period of Performance: 09/21/2032 to 09/20/2033

00171 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2032 to 09/20/2033

00172 Water and Sewage Services

Period of Performance: 09/21/2032 to 09/20/2033

00173 Opt 9 Year 10-yr CAPE TAYLOR Gulf Coast

Period of Performance: 09/21/2033 to 09/20/2034

00174 Berthage - Per Diem

Period of Performance: 09/21/2033 to 09/20/2034

00175 Security

Period of Performance: 09/21/2033 to 09/20/2034

00176 Connect Cycle

Period of Performance: 09/21/2033 to 09/20/2034

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

19 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00177 Disconnect Cycle

Period of Performance: 09/21/2033 to 09/20/2034

00178 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2033 to 09/20/2034

00179 Water and Sewage Services

Period of Performance: 09/21/2033 to 09/20/2034

00180 Cumulative 10-year total for CAPE TAYLOR Gulf

Coast

00181 Base Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2024 to 09/20/2025

00182 Berthage - Per Diem

Period of Performance: 09/21/2024 to 09/20/2025

00183 Security

Period of Performance: 09/21/2024 to 09/20/2025

00184 Connect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00185 Disconnect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00186 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2024 to 09/20/2025

00187 Water and Sewage Services

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

20 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2024 to 09/20/2025

00188 Opt 1 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2025 to 09/20/2026

00189 Berthage - Per Diem

Period of Performance: 09/21/2025 to 09/20/2026

00190 Security

Period of Performance: 09/21/2025 to 09/20/2026

00191 Connect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00192 Disconnect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00193 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2025 to 09/20/2026

00194 Water and Sewage Services

Period of Performance: 09/21/2025 to 09/20/2026

00195 Opt 2 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2026 to 09/20/2027

00196 Berthage - Per Diem

Period of Performance: 09/21/2026 to 09/20/2027

00197 Security

Period of Performance: 09/21/2026 to 09/20/2027

00198 Connect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

21 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00199 Disconnect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00200 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2026 to 09/20/2027

00201 Water and Sewage Services

Period of Performance: 09/21/2026 to 09/20/2027

00202 Opt 3 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2027 to 09/20/2028

00203 Berthage - Per Diem

Period of Performance: 09/21/2027 to 09/20/2028

00204 Security

Period of Performance: 09/21/2027 to 09/20/2028

00205 Connect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00206 Disconnect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00207 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2027 to 09/20/2028

00208 Water and Sewage Services

Period of Performance: 09/21/2027 to 09/20/2028

00209 Opt 4 Year 10-yr CAPE TEXAS Gulf Coast

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

22 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2028 to 09/20/2029

00210 Berthage - Per Diem

Period of Performance: 09/21/2028 to 09/20/2029

00211 Security

Period of Performance: 09/21/2028 to 09/20/2029

00212 Connect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00213 Disconnect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00214 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2028 to 09/20/2029

00215 Water and Sewage Services

Period of Performance: 09/21/2028 to 09/20/2029

00216 Opt 5 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2029 to 09/20/2030

00217 Berthage - Per Diem

Period of Performance: 09/21/2029 to 09/20/2030

00218 Security

Period of Performance: 09/21/2029 to 09/20/2030

00219 Connect Cycle

Period of Performance: 09/21/2029 to 09/20/2030

00220 Disconnect Cycle

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

23 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2029 to 09/20/2030

00221 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2029 to 09/20/2030

00222 Water and Sewage Services

Period of Performance: 09/21/2029 to 09/20/2030

00223 Opt 6 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2030 to 09/20/2031

00224 Berthage - Per Diem

Period of Performance: 09/21/2030 to 09/20/2031

00225 Security

Period of Performance: 09/21/2030 to 09/20/2031

00226 Connect Cycle

Period of Performance: 09/21/2030 to 09/20/2031

00227 Disconnect Cycle

Period of Performance: 09/21/2030 to 09/20/2031

00228 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2030 to 09/20/2031

00229 Water and Sewage Services

Period of Performance: 09/21/2030 to 09/20/2031

00230 Opt 7 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2031 to 09/20/2032

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

24 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00231 Berthage - Per Diem

Period of Performance: 09/21/2031 to 09/20/2032

00232 Security

Period of Performance: 09/21/2031 to 09/20/2032

00233 Connect Cycle

Period of Performance: 09/21/2031 to 09/20/2032

00234 Disconnect Cycle

Period of Performance: 09/21/2031 to 09/20/2032

00235 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2031 to 09/20/2032

00236 Water and Sewage Services

Period of Performance: 09/21/2031 to 09/20/2032

00237 Opt 8 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2032 to 09/20/2033

00238 Berthage - Per Diem

Period of Performance: 09/21/2032 to 09/20/2033

00239 Security

Period of Performance: 09/21/2032 to 09/20/2033

00240 Connect Cycle

Period of Performance: 09/21/2032 to 09/20/2033

00241 Disconnect Cycle

Period of Performance: 09/21/2032 to 09/20/2033

00242 Electrical Service - Reimbursable electrical

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

25 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2032 to 09/20/2033

00243 Water and Sewage Services

Period of Performance: 09/21/2032 to 09/20/2033

00244 Opt 9 Year 10-yr CAPE TEXAS Gulf Coast

Period of Performance: 09/21/2033 to 09/20/2034

00245 Berthage - Per Diem

Period of Performance: 09/21/2033 to 09/20/2034

00246 Security

Period of Performance: 09/21/2033 to 09/20/2034

00247 Connect Cycle

Period of Performance: 09/21/2033 to 09/20/2034

00248 Disconnect Cycle

Period of Performance: 09/21/2033 to 09/20/2034

00249 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2033 to 09/20/2034

00250 Water and Sewage Services

Period of Performance: 09/21/2033 to 09/20/2034

00251 Cumulative 10-year total for CAPE TEXAS Gulf Coast

00252 Base Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2024 to 09/20/2025

00253 Berthage - Per Diem

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

26 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2024 to 09/20/2025

00254 Security

Period of Performance: 09/21/2024 to 09/20/2025

00255 Connect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00256 Disconnect Cycle

Period of Performance: 09/21/2024 to 09/20/2025

00257 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2024 to 09/20/2025

00258 Water and Sewage Services

Period of Performance: 09/21/2024 to 09/20/2025

00259 Opt 1 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2025 to 09/20/2026

00260 Berthage - Per Diem

Period of Performance: 09/21/2025 to 09/20/2026

00261 Security

Period of Performance: 09/21/2025 to 09/20/2026

00262 Connect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00263 Disconnect Cycle

Period of Performance: 09/21/2025 to 09/20/2026

00264 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

27 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2025 to 09/20/2026

00265 Water and Sewage Services

Period of Performance: 09/21/2025 to 09/20/2026

00266 Opt 2 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2026 to 09/20/2027

00267 Berthage - Per Diem

Period of Performance: 09/21/2026 to 09/20/2027

00268 Security

Period of Performance: 09/21/2026 to 09/20/2027

00269 Connect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00270 Disconnect Cycle

Period of Performance: 09/21/2026 to 09/20/2027

00271 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2026 to 09/20/2027

00272 Water and Sewage Services

Period of Performance: 09/21/2026 to 09/20/2027

00273 Opt 3 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2027 to 09/20/2028

00274 Berthage - Per Diem

Period of Performance: 09/21/2027 to 09/20/2028

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

28 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00275 Security

Period of Performance: 09/21/2027 to 09/20/2028

00276 Connect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00277 Disconnect Cycle

Period of Performance: 09/21/2027 to 09/20/2028

00278 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2027 to 09/20/2028

00279 Water and Sewage Services

Period of Performance: 09/21/2027 to 09/20/2028

00280 Opt 4 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2028 to 09/20/2029

00281 Berthage - Per Diem

Period of Performance: 09/21/2028 to 09/20/2029

00282 Security

Period of Performance: 09/21/2028 to 09/20/2029

00283 Connect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00284 Disconnect Cycle

Period of Performance: 09/21/2028 to 09/20/2029

00285 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

29 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2028 to 09/20/2029

00286 Water and Sewage Services

Period of Performance: 09/21/2028 to 09/20/2029

00287 Opt 5 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2029 to 09/20/2030

00288 Berthage - Per Diem

Period of Performance: 09/21/2029 to 09/20/2030

00289 Security

Period of Performance: 09/21/2029 to 09/20/2030

00290 Connect Cycle

Period of Performance: 09/21/2029 to 09/20/2030

00291 Disconnect Cycle

Period of Performance: 09/21/2029 to 09/20/2030

00292 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2029 to 09/20/2030

00293 Water and Sewage Services

Period of Performance: 09/21/2029 to 09/20/2030

00294 Opt 6 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2030 to 09/20/2031

00295 Berthage - Per Diem

Period of Performance: 09/21/2030 to 09/20/2031

00296 Security

Period of Performance: 09/21/2030 to 09/20/2031

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

30 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

00297 Connect Cycle

Period of Performance: 09/21/2030 to 09/20/2031

00298 Disconnect Cycle

Period of Performance: 09/21/2030 to 09/20/2031

00299 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2030 to 09/20/2031

00300 Water and Sewage Services

Period of Performance: 09/21/2030 to 09/20/2031

00301 Opt 7 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2031 to 09/20/2032

00302 Berthage - Per Diem

Period of Performance: 09/21/2031 to 09/20/2032

00303 Security

Period of Performance: 09/21/2031 to 09/20/2032

00304 Connect Cycle

Period of Performance: 09/21/2031 to 09/20/2032

00305 Disconnect Cycle

Period of Performance: 09/21/2031 to 09/20/2032

00306 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2031 to 09/20/2032

00307 Water and Sewage Services

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

31 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2031 to 09/20/2032

00308 Opt 8 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2032 to 09/20/2033

00309 Berthage - Per Diem

Period of Performance: 09/21/2032 to 09/20/2033

00310 Security

Period of Performance: 09/21/2032 to 09/20/2033

00311 Connect Cycle

Period of Performance: 09/21/2032 to 09/20/2033

00312 Disconnect Cycle

Period of Performance: 09/21/2032 to 09/20/2033

00313 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2032 to 09/20/2033

00314 Water and Sewage Services

Period of Performance: 09/21/2032 to 09/20/2033

00315 Opt 9 Year 10-yr CAPE TRINITY Gulf Coast

Period of Performance: 09/21/2033 to 09/20/2034

00316 Berthage - Per Diem

Period of Performance: 09/21/2033 to 09/20/2034

00317 Security

Period of Performance: 09/21/2033 to 09/20/2034

00318 Connect Cycle

Continued ...

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

32 99

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693JF724B000001

Period of Performance: 09/21/2033 to 09/20/2034

00319 Disconnect Cycle

Period of Performance: 09/21/2033 to 09/20/2034

00320 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 09/21/2033 to 09/20/2034

00321 Water and Sewage Services

Period of Performance: 09/21/2033 to 09/20/2034

00322 Cumulative 10-year total for CAPE TRINITY Gulf

Coast

00323 Cumulative 10-Year Total for All Three CAPE T's

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

C-1 INTRODUCTION AND BACKGROUND

The Maritime Administration (MARAD) requires services for the exclusive long-term safe layberthing for three (3) Cape T class RRF vessels, CAPE TAYLOR, CAPE TEXAS, CAPE TRINITY on the U.S. Gulf Coast. Although the layberths are intended for the vessels identified in this solicitation, the Government may substitute vessels of a similar size or smaller.

C-2 DEFINITIONS

Alternative Mooring Arrangement: A mooring plan that uses a combination of fixed berthing structures and anchors to moor vessels to meet the heavy weather mooring standard.

Apron: An area adjacent to and extending the length of the berth used for vehicle passage, material staging, parking of vehicles engaged in maintenance, repair, delivery of parts, etc.

Berth: Any designated place where a vessel is secured including the dock and slip, usually indicated by a code or name.

Contract Award Date: Designated in accordance with the contract provision "Period of Performance" found in Section F.

Contract Start Date: The date the berth must meet the contract's requirement. It is 120 days after the Contract Award Date unless the parties agree to an earlier date.

Dock: The structure located within the layberth facility having the mooring hardware for vessels, synonymous with pier and wharf.

Dock Face: The exposed outward structural components of the pier or wharf that bears the vertical load of the structure and transfers the lateral load from the fenders to the structure.

Full service port complex: A port area with maritime services available, including but not limited to ship repair facilities, availability of around the clock pilotage, bunker supply and delivery services, and ship assist tugs as specified in section C-6(A).

Heavy Weather Mooring Plan: An analysis consisting of drawings and mooring calculations that combines vessel characteristics, existing or additional mooring points, effects of wind direction, wind speed, tides and currents proving that the vessel(s) can be safely moored permanently at the proposed layberth up to the maximum weather and wind conditions specified for the layberth geographical area.

Layberth: A berth used by a vessel for an extended period of time. This term includes the pier and water areas immediately surrounding the ship(s). It includes the fenders, and mooring points (buoys, bitts, bollards, etc.).

Layberth Facility: The layberth, plus the pier apron, the parking area, the guard shack, the perimeter barrier, and the security cameras.

Non-resilient fenders: Structures with an outer layer of High Impact Ultra High Molecular Weight (UHMW) instead of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.

Ramp: The primary vehicular access way onto a RO/RO vessel that is characterized by the location of entry (stern ramp/side-port ramp).

Resilient fenders: Structures with an outer layer of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.

ROS: Reduced Operating Status.

Slip: The water area of the layberth adjacent to the dock where the vessel is maneuvered during arrivals and departures.

Ship Manager/General Agent: The MARAD contractor for a designated group of MARAD vessels that is responsible for ship operation, maintenance, and activation readiness.

Vertical live loads: These are items moving or being caused to move over the dock.

Water level: The height of water above or below the datum reference point as predicted by local tide tables and affected by seasonal flooding or drought.

Working Area: The area of a dock adjacent to vessel to be used for deliveries, staging gear, and vehicle access.

C-3 STATUS OF VESSELS

(A) RRF vessels will normally be maintained in an idle status and will remain at the layberth site in all weather conditions, except to participate in a military exercise/operation, to conduct some repairs, or comply with periodic regulatory requirements. Ship activations and dock trials are expected to be conducted at the layberth.

(B) RRF vessels may have a reduced operating status (ROS) crew onboard. ROS is an operating status, which involves most systems not directly required to support the onboard crew being in an idle condition. An ROS crew of approximately 10 personnel will be assigned to each ship and will live aboard.

(C) The vessel(s) are expected to remain at the layberth in all weather conditions up to the maximum rating of the heavy weather mooring plan required by this contract.

(D) Engineering plants will be idle except for periodic preventive maintenance, dock trials, and other required readiness tests.

(E) The shipboard fire-fighting system may be inoperable.

(F) All deck and cargo handling equipment will be operational and periodically in use, including sideport platforms.

(G) The cathodic protection systems will be energized.

(H) Mooring equipment will be de-energized. The constant tension feature of mooring winches will not be in use. Mooring lines and wires will be provided by the Government or the Government's Ship Manager/General Agent for each vessel.

(I) The vessels may or may not be able to get underway.

(J) The vessels may be used for cargo handling training and for other training purposes.

(K) Interior house and engineering spaces may be dehumidified with ship's equipment.

(L) Ships shall be boomed or have booms available for deployment at all times. In circumstances where prevailing currents, tides, or vessel traffic preclude having booms continuously in place, the containment booms should be kept in readily deployable locations such as onboard or adjacent to the vessel.

C-4 BERTH REQUIREMENTS AND THE CONTRACTOR’S OBLIGATIONS

(A) The Contractor’s Obligations. The layberth Contractor shall bear all costs associated with obtaining and maintaining an acceptable safe layberth except as specifically identified.

Some items are identified for emphasis only. An acceptable safe layberth shall meet the following minimum criteria and technical features.

(B) Plan of Action and Milestones. If the facility proposed by the Contractor requires site improvements, the Contractor shall provide a plan of action and milestones listing the key events in the facility improvement process from the time of award to the designated completion date of the facility. During periods of facility improvement, an updated POA&M shall be submitted monthly to the Contracting Officer’s Representative.

(C) Permits/Licenses/Leases. The Contractor is responsible for acquiring and maintaining the currency of all permits, licenses, and leases necessary to operate the layberth facility for the duration of the contract. Thirty (30) days after contract award the Contractor shall provide copies of any required permits, licenses, and leases to the Contracting Officer and the COR.

(D) NEPA requirements. The bidder shall include a detailed scope of work for any facility modifications, renovations, and/or construction related to layberthing MARAD ships. This includes both landside and in-water work. MARAD will determine the anticipated National Environmental Policy Act (NEPA) level of review for the project: Categorical Exclusion, Environmental Assessment/Finding of No Significant Impact, or Environmental Impact Statement/Record of Decision. The successful bidder will be responsible for the completion of MARAD’s NEPA documentation, in collaboration with MARAD’s NEPA Coordinator in the Office of Environmental Compliance, prior to execution of the contract award.

The bidder should demonstrate receipt (or reasonably anticipated receipt) of all environmental permits and approvals necessary for the above-mentioned work, such as Army Corps of Engineers permits and consultations under Section 106 of the National Historic Preservation Act, 54 U.S.C. 306108, and Section 7 of the Endangered Species Act, 16 U.S.C. 1531, including satisfaction of all Federal, State, and local requirements, and completion of the NEPA process.

The successful bidder, in collaboration with MARAD, will be responsible for the completion of consultations under Section 106 of the National Historic Preservation Act and Section 7 of the Endangered Species Act prior to completing NEPA. Until the NEPA review is completed, no action concerning the proposed project may be taken that would have an adverse environmental impact or limit the choice of reasonable alternatives.

(E) OSHA, USCG, and Safety. The Contractor shall provide, operate, and maintain a safe layberth in accordance with the requirements of the U.S. Coast Guard Captain of the Port (COTP) and the contract. The Contractor shall ensure that the layberth facility satisfies all Occupational Safety and Health Administration (OSHA) safety requirements. The facility, including but not limited to the layberth and associated structures, shall be well preserved and maintained at all times to ensure:

1. The proper level of safety for the vessel(s), facility, and personnel

2. The safe movement of the vessel(s), personnel, and vehicular traffic within the facility

3. Clean appearance, proper maintenance, and free from garbage and debris

4. Vessels at layberth shall be clear from the main shipping channel, at all times. When ships are moored parallel to the main shipping channel, the outboard ship shall be at least 50 feet from the shipping channel.

C-5. LAYBERTH FACILITY REQUIREMENTS

(A) Layberth access shall be available at all times (including Contractor provided access between nested vessels) to facilitate crew boarding, training, cargo handling, ship husbanding, activations, and repair services required by the Government or its contractors. The Contractor shall ensure personnel and contractor access to and security of the layberth to meet the requirements set forth below:

1. Roadways. At all times during the term of this contract, access roads to the layberth facility, pier, and pier apron, (including bridges and tunnels if applicable) shall not present obstruction nor restrict the safe access to the dock by personnel and vehicular traffic…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .