693JF724B000001 FINAL CAPE T LAYBERTHING SOLICITATION.pdf
PDF 3 MB Posted
- Attached to
- CAPE T LAYBERTHING SOLICITATION
- Solicitation number
- 693JF724B000001
About this file
This document is a solicitation for a contract to provide layberthing services for three RO/RO vessels, CAPE TAYLOR, CAPE TEXAS, and CAPE TRINITY, on the U.S. Gulf Coast. The Maritime Administration (MARAD) is seeking an exclusive long-term safe layberth facility that meets specific requirements, including full-service port complex capabilities, engineering drawings, water depth, mooring arrangements, fendering, pier apron, and security. The contract will have a 5-year base period with four 1-year option periods. Proposals are due by 11:30 AM EST on August 30, 2024, and the question and answer period ends on August 21, 2024. The solicitation includes details on the vessels' reduced operating status, the Contractor's obligations, utility requirements, and other technical specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers for CAPE T Layberthing Solicitation 693JF724B000001.docx | DOCX document | |
| mao_600-001-0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT 1. THIS CONTRACT IS A RATED
5. SOLICITATION TYPE2. CONTRACT NO. 4. SOLICITATION NUMBER
PAGE OF PAGES
7. ISSUED BY CODE 8. THIS ACQUISITION IS
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27
RATING
ORDER UNDER DPAS (15 CFR 700)
3. AWARD/
EFFECTIVE DATE ISSUE DATE
6. SOLICITATION
UNRESTRICTED OR SET ASIDE:
SMALL BUSINESS
SIZE STANDARD:
9. (AGENCY USE)
NO COLLECT CALLS
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN
CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A DIFFERENT
PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR
AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED
HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS
AND CONDITIONS STATED HEREIN.
CODE 12. ADMINISTERED BY
13. CONTRACTOR FACILITY 14. PAYMENT WILL BE MADE BY CODE CODE
OFFEROR CODE
TELEPHONE NO.
UNIQUE ENTITY IDENTIFER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:
15. PROMPT PAYMENT DISCOUNT 16. AUTHORITY FOR USING OTHER
THAN FULL AND OPEN COMPETITION
10 U.S.C. 2304 41 U.S.C. 253
NEGOTIATED
(RFP)
SEALED BIDS
(IFB)
1 99
US DOT MARITIME ADMINISTRATION
OFFICE OF ACQUISITION MAR-380
1200 NEW JERSEY AVENUE SE
MAIL STOP W-28-201
WASHINGTON DC 20590-0001 541380
% FOR:X
x
693JF7
$19
693JF724B000001
NAICS:
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS
8(A)
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
EDWOSB
17.
ITEM NO.
18.
SCHEDULE OF SUPPLIES/SERVICES
19.
QUANTITY
20.
UNIT
21.
UNIT PRICE
22.
AMOUNT
The purpose of this solicitation is to procure layberthing services for an exclusive use long-term safe layberth for three Ro/Ro vessels
CAPE TAYLOR, CAPE TEXAS, and CAPE TRINITY.
The geographic area of consideration for this solicitation is for three vessels on the Gulf
Coast.
Continued ...
27. SIGNATURE OF OFFEROR/CONTACTOR 28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
NAME AND TITLE OF SIGNER (TYPE OR PRINT) DATE SIGNED NAME OF CONTRACTING OFFICER DATE SIGNED
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION
NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS
OR CHANGES WHICH ARE SET FORTH HEREIN, IS
ACCEPTED AS TO ITEMS:
23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT
(FOR GOVERNMENT USE ONLY)
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
STANDARD FORM 1447 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.214(d)
COPIES TO
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include ZIP Code)
WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF ITEMS INVOLVEDWE DO
DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE OF ITEMS INVOLVED
CANNOT MEET DELIVERY REQUIREMENT
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS
PAGE
NO RESPONSE FOR REASONS CHECKED
99 2 OF
DATE AND LOCAL TIME
AFFIX
STAMP
HERE
TO:
FROM:
SOLICITATION NO.
WASHINGTON DC 20590-0001
US DOT MARITIME ADMINISTRATION
OFFICE OF ACQUISITION MAR-380
1200 NEW JERSEY AVENUE SE
MAIL STOP W-28-201
693JF7
693JF724B000001
STANDARD FORM 1447 (REV. 8/2016) BACK
(A)
ITEM NO.
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00001 Base Year 5-yr CAPE TAYLOR
Period of Performance: 09/21/2024 to 09/20/2025
00002 Berthage - Per Diem
Period of Performance: 09/21/2024 to 09/20/2025
00003 Security
Period of Performance: 09/21/2024 to 09/20/2025
00004 Connect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00005 Disconnect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00006 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2024 to 09/20/2025
00007 Water and Sewage Services
Period of Performance: 09/21/2024 to 09/20/2025
00008 Opt 1 Year 5-yr CAPE TAYLOR
Period of Performance: 09/21/2025 to 09/20/2026
00009 Berthage - Per Diem
Period of Performance: 09/21/2025 to 09/20/2026
00010 Security
Period of Performance: 09/21/2025 to 09/20/2026
00011 Connect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.214(d)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
4 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00012 Disconnect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00013 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2025 to 09/20/2026
00014 Water and Sewage Services
Period of Performance: 09/21/2025 to 09/20/2026
00015 Opt 2 Year 5-yr CAPE TAYLOR
Period of Performance: 09/21/2026 to 09/20/2027
00016 Berthage - Per Diem
Period of Performance: 09/21/2026 to 09/20/2027
00017 Security
Period of Performance: 09/21/2026 to 09/20/2027
00018 Connect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00019 Disconnect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00020 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2026 to 09/20/2027
00021 Water and Sewage Services
Period of Performance: 09/21/2026 to 09/20/2027
00022 Opt 3 Year 5-yr CAPE TAYLOR
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
5 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2027 to 09/20/2028
00023 Berthage - Per Diem
Period of Performance: 09/21/2027 to 09/20/2028
00024 Security
Period of Performance: 09/21/2027 to 09/20/2028
00025 Connect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00026 Disconnect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00027 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2027 to 09/20/2028
00028 Water and Sewage Services
Period of Performance: 09/21/2027 to 09/20/2028
00029 Opt 4 Year 5-yr CAPE TAYLOR
Period of Performance: 09/21/2028 to 09/20/2029
00030 Berthage - Per Diem
Period of Performance: 09/21/2028 to 09/20/2029
00031 Security
Period of Performance: 09/21/2028 to 09/20/2029
00032 Connect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00033 Disconnect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
6 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00034 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2028 to 09/20/2029
00035 Water and Sewage Services
Period of Performance: 09/21/2028 to 09/20/2029
00036 Cumulative 5 year total for CAPE TAYLOR
00037 Base Year 5-yr CAPE TEXAS
Period of Performance: 09/21/2024 to 09/20/2025
00038 Berthage - Per Diem
Period of Performance: 09/21/2024 to 09/20/2025
00039 Security
Period of Performance: 09/21/2024 to 09/20/2025
00040 Connect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00041 Disconnect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00042 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2024 to 09/20/2025
00043 Water and Sewage Services
Period of Performance: 09/21/2024 to 09/20/2025
00044 Opt 1 Year 5-yr CAPE TEXAS
Period of Performance: 09/21/2025 to 09/20/2026
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
7 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00045 Berthage - Per Diem
Period of Performance: 09/21/2025 to 09/20/2026
00046 Security
Period of Performance: 09/21/2025 to 09/20/2026
00047 Connect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00048 Disconnect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00049 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2025 to 09/20/2026
00050 Water and Sewage Services
Period of Performance: 09/21/2025 to 09/20/2026
00051 Opt 2 Year 5-yr CAPE TEXAS
Period of Performance: 09/21/2026 to 09/20/2027
00052 Berthage - Per Diem
Period of Performance: 09/21/2026 to 09/20/2027
00053 Security
Period of Performance: 09/21/2026 to 09/20/2027
00054 Connect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00055 Disconnect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
8 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00056 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2026 to 09/20/2027
00057 Water and Sewage Services
Period of Performance: 09/21/2026 to 09/20/2027
00058 Opt 3 Year 5-yr CAPE TEXAS
Period of Performance: 09/21/2027 to 09/20/2028
00059 Berthage - Per Diem
Period of Performance: 09/21/2027 to 09/20/2028
00060 Security
Period of Performance: 09/21/2027 to 09/20/2028
00061 Connect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00062 Disconnect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00063 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2027 to 09/20/2028
00064 Water and Sewage Services
Period of Performance: 09/21/2027 to 09/20/2028
00065 Opt 4 Year 5-yr CAPE TEXAS
Period of Performance: 09/21/2028 to 09/20/2029
00066 Berthage - Per Diem
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
9 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2028 to 09/20/2029
00067 Security
Period of Performance: 09/21/2028 to 09/20/2029
00068 Connect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00069 Disconnect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00070 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2028 to 09/20/2029
00071 Water and Sewage Services
Period of Performance: 09/21/2028 to 09/20/2029
00072 Cumulative 5 year total for CAPE TEXAS
00073 Base Year 5-yr CAPE TRINITY
Period of Performance: 09/21/2024 to 09/20/2025
00074 Berthage - Per Diem
Period of Performance: 09/21/2024 to 09/20/2025
00075 Security
Period of Performance: 09/21/2024 to 09/20/2025
00076 Connect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00077 Disconnect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00078 Electrical Service - Reimbursable electrical
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
10 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2024 to 09/20/2025
00079 Water and Sewage Services
Period of Performance: 09/21/2024 to 09/20/2025
00080 Opt 1 Year 5-yr CAPE TRINITY
Period of Performance: 09/21/2025 to 09/20/2026
00081 Berthage - Per Diem
Period of Performance: 09/21/2025 to 09/20/2026
00082 Security
Period of Performance: 09/21/2025 to 09/20/2026
00083 Connect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00084 Disconnect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00085 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2025 to 09/20/2026
00086 Water and Sewage Services
Period of Performance: 09/21/2025 to 09/20/2026
00087 Opt 2 Year 5-yr CAPE TRINITY
Period of Performance: 09/21/2026 to 09/20/2027
00088 Berthage - Per Diem
Period of Performance: 09/21/2026 to 09/20/2027
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
11 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00089 Security
Period of Performance: 09/21/2026 to 09/20/2027
00090 Connect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00091 Disconnect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00092 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2026 to 09/20/2027
00093 Water and Sewage Services
Period of Performance: 09/21/2026 to 09/20/2027
00094 Opt 3 Year 5-yr CAPE TRINITY
Period of Performance: 09/21/2027 to 09/20/2028
00095 Berthage - Per Diem
Period of Performance: 09/21/2027 to 09/20/2028
00096 Security
Period of Performance: 09/21/2027 to 09/20/2028
00097 Connect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00098 Disconnect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00099 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
12 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2027 to 09/20/2028
00100 Water and Sewage Services
Period of Performance: 09/21/2027 to 09/20/2028
00101 Opt 4 Year 5-yr CAPE TRINITY
Period of Performance: 09/21/2028 to 09/20/2029
00102 Berthage - Per Diem
Period of Performance: 09/21/2028 to 09/20/2029
00103 Security
Period of Performance: 09/21/2028 to 09/20/2029
00104 Connect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00105 Disconnect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00106 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2028 to 09/20/2029
00107 Water and Sewage Services
Period of Performance: 09/21/2028 to 09/20/2029
00108 Cumulative 5 year total for CAPE TRINITY
00109 Cumulative 5 year total for Vessels 1, 2, and 3
00110 Base Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2024 to 09/20/2025
00111 Berthage - Per Diem
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
13 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2024 to 09/20/2025
00112 Security
Period of Performance: 09/21/2024 to 09/20/2025
00113 Connect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00114 Disconnect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00115 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2024 to 09/20/2025
00116 Water and Sewage Services
Period of Performance: 09/21/2024 to 09/20/2025
00117 Opt 1 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2025 to 09/20/2026
00118 Berthage - Per Diem
Period of Performance: 09/21/2025 to 09/20/2026
00119 Security
Period of Performance: 09/21/2025 to 09/20/2026
00120 Connect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00121 Disconnect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00122 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
14 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
charges (check one)
Period of Performance: 09/21/2025 to 09/20/2026
00123 Water and Sewage Services
Period of Performance: 09/21/2025 to 09/20/2026
00124 Opt 2 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2026 to 09/20/2027
00125 Berthage - Per Diem
Period of Performance: 09/21/2026 to 09/20/2027
00126 Security
Period of Performance: 09/21/2026 to 09/20/2027
00127 Connect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00128 Disconnect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00129 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2026 to 09/20/2027
00130 Water and Sewage Services
Period of Performance: 09/21/2026 to 09/20/2027
00131 Opt 3 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2027 to 09/20/2028
00132 Berthage - Per Diem
Period of Performance: 09/21/2027 to 09/20/2028
00133 Security
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
15 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2027 to 09/20/2028
00134 Connect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00135 Disconnect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00136 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2027 to 09/20/2028
00137 Water and Sewage Services
Period of Performance: 09/21/2027 to 09/20/2028
00138 Opt 4 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2028 to 09/20/2029
00139 Berthage - Per Diem
Period of Performance: 09/21/2028 to 09/20/2029
00140 Security
Period of Performance: 09/21/2028 to 09/20/2029
00141 Connect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00142 Disconnect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00143 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2028 to 09/20/2029
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
16 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00144 Water and Sewage Services
Period of Performance: 09/21/2028 to 09/20/2029
00145 Opt 5 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2029 to 09/20/2030
00146 Berthage - Per Diem
Period of Performance: 09/21/2029 to 09/20/2030
00147 Security
Period of Performance: 09/21/2029 to 09/20/2030
00148 Connect Cycle
Period of Performance: 09/21/2029 to 09/20/2030
00149 Disconnect Cycle
Period of Performance: 09/21/2029 to 09/20/2030
00150 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2029 to 09/20/2030
00151 Water and Sewage Services
Period of Performance: 09/21/2029 to 09/20/2030
00152 Opt 6 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2030 to 09/20/2031
00153 Berthage - Per Diem
Period of Performance: 09/21/2030 to 09/20/2031
00154 Security
Period of Performance: 09/21/2030 to 09/20/2031
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
17 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00155 Connect Cycle
Period of Performance: 09/21/2030 to 09/20/2031
00156 Disconnect Cycle
Period of Performance: 09/21/2030 to 09/20/2031
00157 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2030 to 09/20/2031
00158 Water and Sewage Services
Period of Performance: 09/21/2030 to 09/20/2031
00159 Opt 7 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2031 to 09/20/2032
00160 Berthage - Per Diem
Period of Performance: 09/21/2031 to 09/20/2032
00161 Security
Period of Performance: 09/21/2031 to 09/20/2032
00162 Connect Cycle
Period of Performance: 09/21/2031 to 09/20/2032
00163 Disconnect Cycle
Period of Performance: 09/21/2031 to 09/20/2032
00164 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2031 to 09/20/2032
00165 Water and Sewage Services
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
18 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2031 to 09/20/2032
00166 Opt 8 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2032 to 09/20/2033
00167 Berthage - Per Diem
Period of Performance: 09/21/2032 to 09/20/2033
00168 Security
Period of Performance: 09/21/2032 to 09/20/2033
00169 Connect Cycle
Period of Performance: 09/21/2032 to 09/20/2033
00170 Disconnect Cycle
Period of Performance: 09/21/2032 to 09/20/2033
00171 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2032 to 09/20/2033
00172 Water and Sewage Services
Period of Performance: 09/21/2032 to 09/20/2033
00173 Opt 9 Year 10-yr CAPE TAYLOR Gulf Coast
Period of Performance: 09/21/2033 to 09/20/2034
00174 Berthage - Per Diem
Period of Performance: 09/21/2033 to 09/20/2034
00175 Security
Period of Performance: 09/21/2033 to 09/20/2034
00176 Connect Cycle
Period of Performance: 09/21/2033 to 09/20/2034
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
19 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00177 Disconnect Cycle
Period of Performance: 09/21/2033 to 09/20/2034
00178 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2033 to 09/20/2034
00179 Water and Sewage Services
Period of Performance: 09/21/2033 to 09/20/2034
00180 Cumulative 10-year total for CAPE TAYLOR Gulf
Coast
00181 Base Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2024 to 09/20/2025
00182 Berthage - Per Diem
Period of Performance: 09/21/2024 to 09/20/2025
00183 Security
Period of Performance: 09/21/2024 to 09/20/2025
00184 Connect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00185 Disconnect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00186 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2024 to 09/20/2025
00187 Water and Sewage Services
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
20 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2024 to 09/20/2025
00188 Opt 1 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2025 to 09/20/2026
00189 Berthage - Per Diem
Period of Performance: 09/21/2025 to 09/20/2026
00190 Security
Period of Performance: 09/21/2025 to 09/20/2026
00191 Connect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00192 Disconnect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00193 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2025 to 09/20/2026
00194 Water and Sewage Services
Period of Performance: 09/21/2025 to 09/20/2026
00195 Opt 2 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2026 to 09/20/2027
00196 Berthage - Per Diem
Period of Performance: 09/21/2026 to 09/20/2027
00197 Security
Period of Performance: 09/21/2026 to 09/20/2027
00198 Connect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
21 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00199 Disconnect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00200 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2026 to 09/20/2027
00201 Water and Sewage Services
Period of Performance: 09/21/2026 to 09/20/2027
00202 Opt 3 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2027 to 09/20/2028
00203 Berthage - Per Diem
Period of Performance: 09/21/2027 to 09/20/2028
00204 Security
Period of Performance: 09/21/2027 to 09/20/2028
00205 Connect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00206 Disconnect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00207 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2027 to 09/20/2028
00208 Water and Sewage Services
Period of Performance: 09/21/2027 to 09/20/2028
00209 Opt 4 Year 10-yr CAPE TEXAS Gulf Coast
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
22 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2028 to 09/20/2029
00210 Berthage - Per Diem
Period of Performance: 09/21/2028 to 09/20/2029
00211 Security
Period of Performance: 09/21/2028 to 09/20/2029
00212 Connect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00213 Disconnect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00214 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2028 to 09/20/2029
00215 Water and Sewage Services
Period of Performance: 09/21/2028 to 09/20/2029
00216 Opt 5 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2029 to 09/20/2030
00217 Berthage - Per Diem
Period of Performance: 09/21/2029 to 09/20/2030
00218 Security
Period of Performance: 09/21/2029 to 09/20/2030
00219 Connect Cycle
Period of Performance: 09/21/2029 to 09/20/2030
00220 Disconnect Cycle
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
23 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2029 to 09/20/2030
00221 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2029 to 09/20/2030
00222 Water and Sewage Services
Period of Performance: 09/21/2029 to 09/20/2030
00223 Opt 6 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2030 to 09/20/2031
00224 Berthage - Per Diem
Period of Performance: 09/21/2030 to 09/20/2031
00225 Security
Period of Performance: 09/21/2030 to 09/20/2031
00226 Connect Cycle
Period of Performance: 09/21/2030 to 09/20/2031
00227 Disconnect Cycle
Period of Performance: 09/21/2030 to 09/20/2031
00228 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2030 to 09/20/2031
00229 Water and Sewage Services
Period of Performance: 09/21/2030 to 09/20/2031
00230 Opt 7 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2031 to 09/20/2032
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
24 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00231 Berthage - Per Diem
Period of Performance: 09/21/2031 to 09/20/2032
00232 Security
Period of Performance: 09/21/2031 to 09/20/2032
00233 Connect Cycle
Period of Performance: 09/21/2031 to 09/20/2032
00234 Disconnect Cycle
Period of Performance: 09/21/2031 to 09/20/2032
00235 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2031 to 09/20/2032
00236 Water and Sewage Services
Period of Performance: 09/21/2031 to 09/20/2032
00237 Opt 8 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2032 to 09/20/2033
00238 Berthage - Per Diem
Period of Performance: 09/21/2032 to 09/20/2033
00239 Security
Period of Performance: 09/21/2032 to 09/20/2033
00240 Connect Cycle
Period of Performance: 09/21/2032 to 09/20/2033
00241 Disconnect Cycle
Period of Performance: 09/21/2032 to 09/20/2033
00242 Electrical Service - Reimbursable electrical
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
25 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2032 to 09/20/2033
00243 Water and Sewage Services
Period of Performance: 09/21/2032 to 09/20/2033
00244 Opt 9 Year 10-yr CAPE TEXAS Gulf Coast
Period of Performance: 09/21/2033 to 09/20/2034
00245 Berthage - Per Diem
Period of Performance: 09/21/2033 to 09/20/2034
00246 Security
Period of Performance: 09/21/2033 to 09/20/2034
00247 Connect Cycle
Period of Performance: 09/21/2033 to 09/20/2034
00248 Disconnect Cycle
Period of Performance: 09/21/2033 to 09/20/2034
00249 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2033 to 09/20/2034
00250 Water and Sewage Services
Period of Performance: 09/21/2033 to 09/20/2034
00251 Cumulative 10-year total for CAPE TEXAS Gulf Coast
00252 Base Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2024 to 09/20/2025
00253 Berthage - Per Diem
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
26 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2024 to 09/20/2025
00254 Security
Period of Performance: 09/21/2024 to 09/20/2025
00255 Connect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00256 Disconnect Cycle
Period of Performance: 09/21/2024 to 09/20/2025
00257 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2024 to 09/20/2025
00258 Water and Sewage Services
Period of Performance: 09/21/2024 to 09/20/2025
00259 Opt 1 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2025 to 09/20/2026
00260 Berthage - Per Diem
Period of Performance: 09/21/2025 to 09/20/2026
00261 Security
Period of Performance: 09/21/2025 to 09/20/2026
00262 Connect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00263 Disconnect Cycle
Period of Performance: 09/21/2025 to 09/20/2026
00264 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
27 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2025 to 09/20/2026
00265 Water and Sewage Services
Period of Performance: 09/21/2025 to 09/20/2026
00266 Opt 2 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2026 to 09/20/2027
00267 Berthage - Per Diem
Period of Performance: 09/21/2026 to 09/20/2027
00268 Security
Period of Performance: 09/21/2026 to 09/20/2027
00269 Connect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00270 Disconnect Cycle
Period of Performance: 09/21/2026 to 09/20/2027
00271 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2026 to 09/20/2027
00272 Water and Sewage Services
Period of Performance: 09/21/2026 to 09/20/2027
00273 Opt 3 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2027 to 09/20/2028
00274 Berthage - Per Diem
Period of Performance: 09/21/2027 to 09/20/2028
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
28 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00275 Security
Period of Performance: 09/21/2027 to 09/20/2028
00276 Connect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00277 Disconnect Cycle
Period of Performance: 09/21/2027 to 09/20/2028
00278 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2027 to 09/20/2028
00279 Water and Sewage Services
Period of Performance: 09/21/2027 to 09/20/2028
00280 Opt 4 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2028 to 09/20/2029
00281 Berthage - Per Diem
Period of Performance: 09/21/2028 to 09/20/2029
00282 Security
Period of Performance: 09/21/2028 to 09/20/2029
00283 Connect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00284 Disconnect Cycle
Period of Performance: 09/21/2028 to 09/20/2029
00285 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
29 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2028 to 09/20/2029
00286 Water and Sewage Services
Period of Performance: 09/21/2028 to 09/20/2029
00287 Opt 5 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2029 to 09/20/2030
00288 Berthage - Per Diem
Period of Performance: 09/21/2029 to 09/20/2030
00289 Security
Period of Performance: 09/21/2029 to 09/20/2030
00290 Connect Cycle
Period of Performance: 09/21/2029 to 09/20/2030
00291 Disconnect Cycle
Period of Performance: 09/21/2029 to 09/20/2030
00292 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2029 to 09/20/2030
00293 Water and Sewage Services
Period of Performance: 09/21/2029 to 09/20/2030
00294 Opt 6 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2030 to 09/20/2031
00295 Berthage - Per Diem
Period of Performance: 09/21/2030 to 09/20/2031
00296 Security
Period of Performance: 09/21/2030 to 09/20/2031
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
30 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
00297 Connect Cycle
Period of Performance: 09/21/2030 to 09/20/2031
00298 Disconnect Cycle
Period of Performance: 09/21/2030 to 09/20/2031
00299 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2030 to 09/20/2031
00300 Water and Sewage Services
Period of Performance: 09/21/2030 to 09/20/2031
00301 Opt 7 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2031 to 09/20/2032
00302 Berthage - Per Diem
Period of Performance: 09/21/2031 to 09/20/2032
00303 Security
Period of Performance: 09/21/2031 to 09/20/2032
00304 Connect Cycle
Period of Performance: 09/21/2031 to 09/20/2032
00305 Disconnect Cycle
Period of Performance: 09/21/2031 to 09/20/2032
00306 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2031 to 09/20/2032
00307 Water and Sewage Services
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
31 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2031 to 09/20/2032
00308 Opt 8 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2032 to 09/20/2033
00309 Berthage - Per Diem
Period of Performance: 09/21/2032 to 09/20/2033
00310 Security
Period of Performance: 09/21/2032 to 09/20/2033
00311 Connect Cycle
Period of Performance: 09/21/2032 to 09/20/2033
00312 Disconnect Cycle
Period of Performance: 09/21/2032 to 09/20/2033
00313 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2032 to 09/20/2033
00314 Water and Sewage Services
Period of Performance: 09/21/2032 to 09/20/2033
00315 Opt 9 Year 10-yr CAPE TRINITY Gulf Coast
Period of Performance: 09/21/2033 to 09/20/2034
00316 Berthage - Per Diem
Period of Performance: 09/21/2033 to 09/20/2034
00317 Security
Period of Performance: 09/21/2033 to 09/20/2034
00318 Connect Cycle
Continued ...
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
(B)
SUPPLIES/SERVICES
(C)
QUANTITY
(D)
UNIT
(E)
UNIT PRICE
(F)
AMOUNT
NAME OF OFFEROR OR CONTRACTOR
32 99
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF724B000001
Period of Performance: 09/21/2033 to 09/20/2034
00319 Disconnect Cycle
Period of Performance: 09/21/2033 to 09/20/2034
00320 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)
Period of Performance: 09/21/2033 to 09/20/2034
00321 Water and Sewage Services
Period of Performance: 09/21/2033 to 09/20/2034
00322 Cumulative 10-year total for CAPE TRINITY Gulf
Coast
00323 Cumulative 10-Year Total for All Three CAPE T's
NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)
C-1 INTRODUCTION AND BACKGROUND
The Maritime Administration (MARAD) requires services for the exclusive long-term safe layberthing for three (3) Cape T class RRF vessels, CAPE TAYLOR, CAPE TEXAS, CAPE TRINITY on the U.S. Gulf Coast. Although the layberths are intended for the vessels identified in this solicitation, the Government may substitute vessels of a similar size or smaller.
C-2 DEFINITIONS
Alternative Mooring Arrangement: A mooring plan that uses a combination of fixed berthing structures and anchors to moor vessels to meet the heavy weather mooring standard.
Apron: An area adjacent to and extending the length of the berth used for vehicle passage, material staging, parking of vehicles engaged in maintenance, repair, delivery of parts, etc.
Berth: Any designated place where a vessel is secured including the dock and slip, usually indicated by a code or name.
Contract Award Date: Designated in accordance with the contract provision "Period of Performance" found in Section F.
Contract Start Date: The date the berth must meet the contract's requirement. It is 120 days after the Contract Award Date unless the parties agree to an earlier date.
Dock: The structure located within the layberth facility having the mooring hardware for vessels, synonymous with pier and wharf.
Dock Face: The exposed outward structural components of the pier or wharf that bears the vertical load of the structure and transfers the lateral load from the fenders to the structure.
Full service port complex: A port area with maritime services available, including but not limited to ship repair facilities, availability of around the clock pilotage, bunker supply and delivery services, and ship assist tugs as specified in section C-6(A).
Heavy Weather Mooring Plan: An analysis consisting of drawings and mooring calculations that combines vessel characteristics, existing or additional mooring points, effects of wind direction, wind speed, tides and currents proving that the vessel(s) can be safely moored permanently at the proposed layberth up to the maximum weather and wind conditions specified for the layberth geographical area.
Layberth: A berth used by a vessel for an extended period of time. This term includes the pier and water areas immediately surrounding the ship(s). It includes the fenders, and mooring points (buoys, bitts, bollards, etc.).
Layberth Facility: The layberth, plus the pier apron, the parking area, the guard shack, the perimeter barrier, and the security cameras.
Non-resilient fenders: Structures with an outer layer of High Impact Ultra High Molecular Weight (UHMW) instead of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.
Ramp: The primary vehicular access way onto a RO/RO vessel that is characterized by the location of entry (stern ramp/side-port ramp).
Resilient fenders: Structures with an outer layer of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.
ROS: Reduced Operating Status.
Slip: The water area of the layberth adjacent to the dock where the vessel is maneuvered during arrivals and departures.
Ship Manager/General Agent: The MARAD contractor for a designated group of MARAD vessels that is responsible for ship operation, maintenance, and activation readiness.
Vertical live loads: These are items moving or being caused to move over the dock.
Water level: The height of water above or below the datum reference point as predicted by local tide tables and affected by seasonal flooding or drought.
Working Area: The area of a dock adjacent to vessel to be used for deliveries, staging gear, and vehicle access.
C-3 STATUS OF VESSELS
(A) RRF vessels will normally be maintained in an idle status and will remain at the layberth site in all weather conditions, except to participate in a military exercise/operation, to conduct some repairs, or comply with periodic regulatory requirements. Ship activations and dock trials are expected to be conducted at the layberth.
(B) RRF vessels may have a reduced operating status (ROS) crew onboard. ROS is an operating status, which involves most systems not directly required to support the onboard crew being in an idle condition. An ROS crew of approximately 10 personnel will be assigned to each ship and will live aboard.
(C) The vessel(s) are expected to remain at the layberth in all weather conditions up to the maximum rating of the heavy weather mooring plan required by this contract.
(D) Engineering plants will be idle except for periodic preventive maintenance, dock trials, and other required readiness tests.
(E) The shipboard fire-fighting system may be inoperable.
(F) All deck and cargo handling equipment will be operational and periodically in use, including sideport platforms.
(G) The cathodic protection systems will be energized.
(H) Mooring equipment will be de-energized. The constant tension feature of mooring winches will not be in use. Mooring lines and wires will be provided by the Government or the Government's Ship Manager/General Agent for each vessel.
(I) The vessels may or may not be able to get underway.
(J) The vessels may be used for cargo handling training and for other training purposes.
(K) Interior house and engineering spaces may be dehumidified with ship's equipment.
(L) Ships shall be boomed or have booms available for deployment at all times. In circumstances where prevailing currents, tides, or vessel traffic preclude having booms continuously in place, the containment booms should be kept in readily deployable locations such as onboard or adjacent to the vessel.
C-4 BERTH REQUIREMENTS AND THE CONTRACTOR’S OBLIGATIONS
(A) The Contractor’s Obligations. The layberth Contractor shall bear all costs associated with obtaining and maintaining an acceptable safe layberth except as specifically identified.
Some items are identified for emphasis only. An acceptable safe layberth shall meet the following minimum criteria and technical features.
(B) Plan of Action and Milestones. If the facility proposed by the Contractor requires site improvements, the Contractor shall provide a plan of action and milestones listing the key events in the facility improvement process from the time of award to the designated completion date of the facility. During periods of facility improvement, an updated POA&M shall be submitted monthly to the Contracting Officer’s Representative.
(C) Permits/Licenses/Leases. The Contractor is responsible for acquiring and maintaining the currency of all permits, licenses, and leases necessary to operate the layberth facility for the duration of the contract. Thirty (30) days after contract award the Contractor shall provide copies of any required permits, licenses, and leases to the Contracting Officer and the COR.
(D) NEPA requirements. The bidder shall include a detailed scope of work for any facility modifications, renovations, and/or construction related to layberthing MARAD ships. This includes both landside and in-water work. MARAD will determine the anticipated National Environmental Policy Act (NEPA) level of review for the project: Categorical Exclusion, Environmental Assessment/Finding of No Significant Impact, or Environmental Impact Statement/Record of Decision. The successful bidder will be responsible for the completion of MARAD’s NEPA documentation, in collaboration with MARAD’s NEPA Coordinator in the Office of Environmental Compliance, prior to execution of the contract award.
The bidder should demonstrate receipt (or reasonably anticipated receipt) of all environmental permits and approvals necessary for the above-mentioned work, such as Army Corps of Engineers permits and consultations under Section 106 of the National Historic Preservation Act, 54 U.S.C. 306108, and Section 7 of the Endangered Species Act, 16 U.S.C. 1531, including satisfaction of all Federal, State, and local requirements, and completion of the NEPA process.
The successful bidder, in collaboration with MARAD, will be responsible for the completion of consultations under Section 106 of the National Historic Preservation Act and Section 7 of the Endangered Species Act prior to completing NEPA. Until the NEPA review is completed, no action concerning the proposed project may be taken that would have an adverse environmental impact or limit the choice of reasonable alternatives.
(E) OSHA, USCG, and Safety. The Contractor shall provide, operate, and maintain a safe layberth in accordance with the requirements of the U.S. Coast Guard Captain of the Port (COTP) and the contract. The Contractor shall ensure that the layberth facility satisfies all Occupational Safety and Health Administration (OSHA) safety requirements. The facility, including but not limited to the layberth and associated structures, shall be well preserved and maintained at all times to ensure:
1. The proper level of safety for the vessel(s), facility, and personnel
2. The safe movement of the vessel(s), personnel, and vehicular traffic within the facility
3. Clean appearance, proper maintenance, and free from garbage and debris
4. Vessels at layberth shall be clear from the main shipping channel, at all times. When ships are moored parallel to the main shipping channel, the outboard ship shall be at least 50 feet from the shipping channel.
C-5. LAYBERTH FACILITY REQUIREMENTS
(A) Layberth access shall be available at all times (including Contractor provided access between nested vessels) to facilitate crew boarding, training, cargo handling, ship husbanding, activations, and repair services required by the Government or its contractors. The Contractor shall ensure personnel and contractor access to and security of the layberth to meet the requirements set forth below:
1. Roadways. At all times during the term of this contract, access roads to the layberth facility, pier, and pier apron, (including bridges and tunnels if applicable) shall not present obstruction nor restrict the safe access to the dock by personnel and vehicular traffic…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .