Fulton_Hall_Boilers_SOW.pdf
PDF 156 KB Posted
- Attached to
- Boiler Inspection, Cleaning & Re-Tubing
- Solicitation number
- 693JF717R00008
About this file
Fulton Hall Boilers SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kewanee_Cut_Sheet.pdf | ||
| NEPA.pdf | ||
| Evaluation_Factors_and_Criteria.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Fulton Hall
Boiler Inspection, Cleaning and Re-tubing
U.S. MERCHANT MARINE ACADEMY
KINGS POINT, NEW YORK
U.S. DEPARTMENT OF TRANSPORTATION
MARITIME ADMINISTRATION
pg. 2
Background
The United States Merchant Martine Academy (USMMA) is an agency of the Maritime
Administration (MARAD) managed by the United States Department of Transportation.
The USMMA is listed on the National Register of Historic Places. Therefore, all work shall be consistent with the Secretary of the Interior's Standards for the Treatment of Historic
Properties (36 CFR part 68) http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.
All work shall meet or exceed the standards provided in the Secretary of the Interior’s
Standards for Rehabilitation and guidelines for applying the standards published by the
National Park Service, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.
Objective
Inspection and cleaning of the Kewanee Boilers # 1 and # 2 and re-tubing of the Kewanee Boiler
# 2 at Fulton Hall.
Scope
The USMMA is looking for a qualified, licensed and insured contractor to provide labor, material, transportation, tools, equipment and supervision to perform the following:
Annual inspection and tube cleaning of Fulton hall Kewanee L3W-300 high pressure hot water boiler # 1 (Serial #: 20137)
Re-tubing and annual inspection and tube cleaning of Kewanee L3W-300 high pressure hot water boiler #2 (Serial #: 20138)
Place of Performance
DOT/Maritime Administration
USMMA/Fulton Hall
300 Steamboat Road
Kings Point, N.Y. 11024
Hours of Operation
Performance Schedule: Monday thru Friday
Hours: 0730 to 1630 (7:30am to 4:30pm)
Period of Performance: Work is to be completed no later than 15 August 2017 after notice to proceed (NTP) is approved.
Note: The project should be performed during normal business hours unless approval is granted by the
Contracting Officer (CO).
http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf
pg. 3
Deliverables
Boiler #2, Serial #20138
Complete demolition of existing fire tubes in boiler
Supply and installation of new tubes matching the existing specifications of the boiler, see attached cut sheet.
Vacuum and clean entire boiler, breeching, chamber and chimney base
Inspection of ventori ring assembly
Upon successful completion of the above, fill boiler and hydrostatically test to 185 psi for water tightness
Boiler #1, Serial #20137
Wire brush clean all tubes
Inspect ventori ring assembly
Vacuum clean entire boiler, breeching chamber and chimney base
Note: This is a one-time inspection and cleaning services for these Boilers.
Contractor Responsibility
Furnish all labor and material, transportation and supervision in the performance of all tasks detailed in this statement of work.
Ensure all materials and parts are compatible with the specific unit specified in this statement of work.
Ensure that all systems will be checked, tested and started.
All work is to conform to federal, state and local building regulations and codes.
Maintain a work area compliant with all Federal safety standards.
Area worked on shall be cleaned and secured on a daily basis.
Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the contractor at no additional cost to the Government.
Examine existing conditions prior to any repair activities, a site visit will be scheduled to inspect the site where services are to be performed.
No vehicles shall be driven on the sidewalks or grass. Unless granted specific exception due to site access limitations. Repair of landscape, if any, will be the sole responsibility of the contractor.
Make every effort to minimize the impact to the daily routine of the Academy.
Contractors shall be licensed, bonded and insured as mandated by federal, state and local municipal regulations.
Remove all demolished and excess materials from the site and Academy grounds and dispose of according to all local, state and Federal ordinances.
The contractor shall be aware of the potential presence of hazardous materials, specifically lead-based paint and asbestos, in any buildings located at the USMMA. It is the
pg. 4 responsibility of the contractor to take appropriate measures in accordance with all local, state, and federal environmental and occupational safety and health laws and regulations.
Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or problems that arise).
Inform COR of any anticipated disruption in services for construction at least three (3) days in advance.
Close out:
The contractor shall provide a signed warranty of any damage, defective material and improper workmanship on any material provided in this contract.
Materials and labor to be warranted for a minimum of one year after completion of installation, and equipment to be warranted per manufacturer.
pg. 5
ACCRONYMS
ANSI American National Standards Institute
ASME (Formally known as) American Society of Mechanical Engineers
ASHRAE American Society of Heating Refrigeration and Air Conditioning Engineers
CFR Code of Federal Regulations
COR Contract Officer Representative
EPA The United States Environmental Protection Agency
IEEE The Institute of Electrical and Electronics Engineers
MARAD United States Maritime Administration
NEC National Electrical Code ANSI/NFPA 70
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NTP Notice to Proceed
TBD To Be Determined
USMMA Unites States Merchant Marine Academy
File details come from the government source that posted it. Updated .