Amendment 0002 - TN ERFO FS CHRKE804 2020-2(1).pdf
PDF 7 MB Posted
- Solicitation number
- 693C73-26-B-000011
About this file
This is Amendment No. 0002 to a federal construction solicitation for storm and flood damage repair work issued by the Federal Highway Administration's Eastern Federal Lands Highway Division for the Cherokee National Forest.
The amendment addresses questions and clarifications from interested bidders, provides amended bid schedule pages B-1 through B-5, supplies amended plan sheets (A04, A05, A06, B01, B03, C03, C08, C10, D13, D14, M13, and M15), and reschedules the bid opening to Thursday, July 9, 2026, at 2:00 p.m. EDT. The project involves repair work on three roads: Paint Mountain Road (FS 54), Briar Creek Road (FS 188), and Flatwoods Road (FS 87). The base contract (Schedule A) includes 107 calendar days for completion with work including clearing, grubbing, embankment construction, riprap placement, mechanically stabilized earth (MSE) walls, pipe culvert installation and replacement, cellular confinement systems for slope stabilization, and roadway reconditioning. Two government options are available: Schedule B (67 calendar days) and Schedule C (105 calendar days), with a combined performance period of 239 calendar days if all schedules are awarded simultaneously. Key clarifications address MSE wall design flexibility, temporary water diversion requirements, asphalt pavement repair, cellular confinement system specifications, and field access adjustments. The bid schedule reflects numerous line items using lump-sum pricing (LPSM) for mobilization, surveying, testing, and traffic control, along with unit prices for materials and labor measured in cubic yards, linear feet, square feet, acres, tons, and each.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7326B000011 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisition & Contracts
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1406/17/20260002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/06/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TN ERFO FS CHRKE804 2020-2(1)
The purpose of this Amendment is to:
1. Provide a summary of responses to questions/clarifications asked by interested bidders.
2. Provide an amended bid schedule pages B-1 through B-5.
3. Provide amended plan sheets A04, A05, A06, B01, B03, C03, C08, C10, D13, D14, M13, and
M15.
4. Reschedule the bid opening date to Thursday, July 9, 2026, at 2:00 p.m. EDT.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0002
Information Page 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002
Project TN ERFO FS CHRKE804 2020-2(1)
Cherokee National Forest
Solicitation: 693C73-26-B-000011
The purpose of this Amendment is to:
1. Provide a summary of responses to questions/clarifications asked by interested bidders.
2. Provide an amended bid schedule pages B-1 through B-5.
3. Provide amended plan sheets A04, A05, A06, B01, B03, C03, C08, C10, D13, D14, M13, and M15.
4. Reschedule the bid opening date to Thursday, July 9, 2026, at 2:00 p.m. EDT.
Questions / Clarifications
The following questions and issues were submitted to EFLHD at eflhd.contracts@dot.gov. The
Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised, and some questions may not have been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. Sheets D13 & D14: The current scale does not fully depict the project area. Response:
The scale has been adjusted. See amended Sheets D13 and D14.
2. Sheet D14 (Station +8): The schedules on Sheet C08 indicate 5 cubic yards of Class 2 riprap at Station +8. However, Sheet D14 does not show any work at this location that would require riprap. Response: The Sheet reference on Sheet C08 has been corrected. See amended Sheet C08.
3. Sheet D14 (Station 1+01): The schedule lists 151 cubic yards of Class 4 riprap here. I assume this is for the elliptical culvert outfall, but the drawing does not show the extent of the placement Response: The scale has been adjusted. See amended Sheet D14.
4. Sheet M15: I reviewed the E&S plan to see if the LOD indicates the length of the Class 4 riprap, but the LOD does not appear to extend to the end of the riprap placement area.
Response: The scale has been adjusted. See amended Sheet M15.
5. Will the work at the other sites potentially jeopardize the schedule due to anticipated road closures? Response: Projects have been arranged such that there is at least one access route to the sites that does not involve going through other projects. All projects are constructed with periods of complete road closures so bidders should plan accordingly.
file://///fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/_ACCESS/NY/Projects/natr/1e10/Proj_Dev/Eng_Coord/3Advertisement/Amendments/Amendment%201/Final%20Documents/eflhd.conracts@dot.gov
Information Page 2 of 3
6. A dry stack stone retaining wall exists at the location for the MSE wall on Paint
Mountain Road. Is this wall considered a historic feature. Response: The wall is not considered a historic feature.
7. Typically for FHWA project we will see Line Items associated for Temporary Water
Diversions. The large diameter culvert pipe (54" and 60" SCH A, 72" SCH B) will require some type of temporary diversion for pipe replacement. Please Advise if this needs to be added to the price schedules? Response: Any required temporary diversion needed for the pipe replacement is incidental to the pipe replacement.
8. Drawing D12, Flatwoods Road, MP 5.78, shows installing a MSE wall. The roadway in this area is existing asphalt paving. In order to install the MSE wall, the roadway will have to be excavated, and the asphalt will be removed. There are currently no line items for asphalt pavement repair. Please Advise if this needs to be added to the price schedules? Response: Asphalt pavement repair details and pay items have been added.
9. Drawing M13, Flatwoods Road, MP 5.78, shows installing a Cellular Confinement
System for Slope Stabilization. This drawing also outlines the LOD (limits of disturbance). Drawing B03 shows a typical section for the Cellular Confinement System, which shows the top section turned under, and what we assume is buried once trenched in the ground. The LOD doesn't allow enough room to allow this to happen. Are we allowed to clear additional to make this work? If so, how far back are we allowed to clear back? Also, the grade is too steep to access equipment. Will the contractor be allowed to gain access from another location that is safer to gain access to the top of the cellular construction area? Response: Sheet B03 has been updated to provide the dimensions for the limits of disturbance. Additional access points must be approved by the CO prior to bringing work.
10. Drawing D13, Paint Mountain Road, MP 4.81, shows installing a MSE Wall. This location seems to be directly over an existing drainpipe that carries a lot of water. Is the government expecting the MSE wall foundation to be above the existing large drain and go over? Or does a new culvert/box culvert etc. need to be installed at this location? If so, what size? Response: As shown on Sheet D13, backfill the existing 15-inch CPM at invert elevation 1293.46 with non-shrink grout.
11. In relation to the MSE walls designated in the plans, is there a particular style of facing that EFL is looking to have designed or does the contractor have flexibility in the design as long as it's not gabion? Response: The contractor may select the wall facing and must be approved by the CO prior to bringing work.
Information Page 3 of 3
12. Can EFL provide more information regarding the cellular confinement system? Sheet 18 has very limited information. Section sheets in the back of the plan set seem to show anchorage devices, but no details are provided in the plans. After visiting the site it would seem that re-grading the washed out area prior to installing geo confinement would be prudent, but those details are unclear. The types of geocell that would be acceptable is not clear. Is the expectation that the contractor will design this system? Response: See FP-24
Section 629 for additional requirements.
Bid Schedule (B Pages) Changes
Delete Bid Schedule pages B-1 through B-5 and substitute with the amended Bid Schedule pages
B-1 through B-5.
1. Revise Schedule C to add pay items 30101-2000 and 40301-0100 for asphalt and aggregate base.
Plan Sheet Changes
Delete plan sheets A04, A05, A06, B01, B03, C03, C08, C10, D13, D14, M13, and M15 and replace them with amended plan sheets A04, A05, A06, B01, B03, C03, C08, C10, D13, D14, M13, and M15.
1. Updated latitude and longitude callouts on sheets A04, A05, A06.
2. Added typical section on sheet B01.
3. Added dimensions and note on sheet B03.
4. Added pay items for asphalt and aggregate base on sheet C03.
5. Updated page reference on sheet C08.
6. Added pay items for asphalt and aggregate base on sheet C10.
7. Updated viewport area on sheets D13 and D14.
8. Added hatching for asphalt and label on sheet M13.
9. Revised LOD and updated viewport area on sheet M15.
BID SCHEDULE
Project No : TN ERFO FS CHRKE804 2020-2(1) Schedule : A
Project Name : Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road (FS 188), and Flatwoods Road (FS 87)
Schedule Type : Base
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION ALL LPSM
A0040 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
A0060 15401-0000 CONTRACTOR
TESTING ALL LPSM
A0080 15701-0000 SOIL EROSION
CONTROL ALL LPSM
A0100 20101-0000 CLEARING AND
GRUBBING 0.600 ACRE
A0120 20104-0000 CLEARING 8.800 ACRE
A0140 20301-1200 REMOVAL OF
HEADWALL 7.000 EACH
A0160 20301-1900 REMOVAL OF PIPE
CULVERT 29.000 EACH
A0180 20420-0000 EMBANKMENT
CONSTRUCTION 2,743.000 CUYD
A0200 20425-1000 DITCH, EXCAVATION 46.000 LNFT
A0220 20443-0000 BERMS 11.000 LNFT
A0240 25101-0200 PLACED RIPRAP,
CLASS 2 294.000 CUYD
A0260 25101-0300 PLACED RIPRAP,
CLASS 3 16.000 CUYD
A0280 25101-0400 PLACED RIPRAP,
CLASS 4 285.000 CUYD
A0300 25501-0000
MECHANICALLY
STABILIZED EARTH
WALL
2,880.000 SQFT
A0320 25701-0000
CONTRACTOR
PROVIDED RETAINING
STRUCTURE DESIGN
ALL LPSM
A0340 30101-2000 AGGREGATE BASE
GRADING D 14,548.000 TON
A0380 30301-6000 ROADWAY
RECONDITIONING 4.920 MILE
A0400 30302-1000 DITCH
RECONDITIONING 53.000 LNFT
A0420 55201-1200
STRUCTURAL
CONCRETE, CLASS S
(SEAL)
2.000 CUYD
A0440 60201-0800 24-INCH PIPE
CULVERT 787.000 LNFT
A0460 60201-0900 30-INCH PIPE
CULVERT 37.000 LNFT
A0480 60201-1100 42-INCH PIPE
CULVERT 58.000 LNFT
A0500 60201-1200 48-INCH PIPE
CULVERT 115.000 LNFT
B-1Bid Schedule Project: TN ERFO FS CHRKE804 2020-2(1), Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road (FS 188), and Flatwoods Road (FS 87)
A0520 60201-1300 54-INCH PIPE
CULVERT 115.000 LNFT
A0540 60201-1400 60-INCH PIPE
CULVERT 81.000 LNFT
A0560 60704-0000 CLEANING CULVERT
IN PLACE 24.000 EACH
A0580 62501-0000 TURF
ESTABLISHMENT 0.400 ACRE
A0600 62903-0000
CELLULAR
CONFINEMENT
SYSTEM
316.000 SQYD
A0620 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
A0640 63701-0000 FIELD OFFICE 1.000 EACH
Submitted By: Schedule Total:
B-2Bid Schedule Project: TN ERFO FS CHRKE804 2020-2(1), Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road
Project No : TN ERFO FS CHRKE804 2020-2(1) Schedule : B
Project Name : Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road (FS 188), and Flatwoods Road (FS 87)
Schedule Type : Option
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION ALL LPSM
B0040 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
B0060 15401-0000 CONTRACTOR
TESTING ALL LPSM
B0080 15701-0000 SOIL EROSION
CONTROL ALL LPSM
B0100 20101-0000 CLEARING AND
GRUBBING 0.300 ACRE
B0120 20301-1900 REMOVAL OF PIPE
CULVERT 1.000 EACH
B0140 25101-0200 PLACED RIPRAP,
CLASS 2 6.000 CUYD
B0160 25101-0400 PLACED RIPRAP,
CLASS 4 181.000 CUYD
B0180 25501-0000
MECHANICALLY
STABILIZED EARTH
WALL
1,020.000 SQFT
B0200 25701-0000
CONTRACTOR
PROVIDED RETAINING
STRUCTURE DESIGN
ALL LPSM
B0220 60201-0800 24-INCH PIPE
CULVERT 35.000 LNFT
B0240 60202-1200
72-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
41.000 LNFT
B0260 62501-0000 TURF
ESTABLISHMENT 0.130 ACRE
B0280 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
Submitted By: Schedule Total:
B-3Bid Schedule Project: TN ERFO FS CHRKE804 2020-2(1), Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road
Project No : TN ERFO FS CHRKE804 2020-2(1) Schedule : C
Project Name : Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road (FS 188), and Flatwoods Road (FS 87)
Schedule Type : Option
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
C0020 15101-0000 MOBILIZATION ALL LPSM
C0040 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
C0060 15401-0000 CONTRACTOR
TESTING ALL LPSM
C0080 15701-0000 SOIL EROSION
CONTROL ALL LPSM
C0100 20101-0000 CLEARING AND
GRUBBING 0.700 ACRE
C0120 25501-0000
MECHANICALLY
STABILIZED EARTH
WALL
3,456.000 SQFT
C0140 25701-0000
CONTRACTOR
PROVIDED RETAINING
STRUCTURE DESIGN
ALL LPSM
A002 C0145 30101-2000 AGGREGATE BASE
GRADING D 199.000 TON
A002 C0150 40301-0100 ASPHALT CONCRETE
PAVEMENT, TYPE 1
(TDOT grading D, PG64
-22) 108.000 TON
C0160 62501-0000 TURF
ESTABLISHMENT 0.530 ACRE
C0180 62903-0000
CELLULAR
CONFINEMENT
SYSTEM
697.000 SQYD
C0200 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
Submitted By: Schedule Total:
B-4Bid Schedule Project: TN ERFO FS CHRKE804 2020-2(1), Repair storm and flood damage on Paint Mountain Road (FS 54), Briar Creek Road
B-5
BID SUMMARY
Project TN ERFO FS CHRKE804 2020-2(1)
(1) Schedule A (Base Contract) BID Total (from Page B-2) = (1) $_________________________
(2) Schedule B (Government Option 1) BID Total (from Page B-3) = (2) $_________________________
(3) Schedule C (Government Option 2) BID Total (from Page B-4) = (3) $_________________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT =
(1) + (2) + (3) $_________________________
Maximum Time Allowed for the Contract if Schedules A, B, and C are Awarded at the Same Time:
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 239 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all
Schedule A work will be 107 calendar days and will start on the effective date of Schedule A’s Notice to
Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 67 calendar days and will start on the effective date of
Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 105 calendar days and will start on the effective date of
Schedule C’s Notice to Proceed.
SCHEDULE A
BRIAR CREEK ROAD
N
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION
Longitude: -82.4014082°
Latitude: 36.2276960°
Begin Project
Longitude: -82.3652227°
Latitude: 36.2209167°
End Project
Dry Creek Road
CHEROKEE NATIONAL FOREST
Scale in Feet
0 60003000
VICINITY MAP
:0
P
M
J u n e
N e w
B C
S h e e t] c p w w o r k in g
\i n f r a
\j f ie ld s \d
\A
M E
N D
T N
E R
F O p ln g e n
.d g n
06/15/26 JMF AMD #2 - Updated Latitude/Longitude callouts.
AMENDMENT NO.2 PROJECT
NUMBER
SHEET
A04
TN ERFO FS CHRKE804 2020-2(1)
FS 188
Briar Creek Road
SCHEDULE B
PAINT MOUNTAIN ROAD
N
Longitude: -82.8971393°
Latitude: 35.9469522°
Begin Project
Longitude: -82.8969388°
Latitude: 35.9472709°
End Project
Paint Mountain Road
Lower Paint Creek Road
FS 54
Paint Mountain Road
U.S. DEPARTMENT OF TRANSPORTATION
Longitude: -82.9007443°
Latitude: 35.9537497°
84" by 57" Elliptical (Begin Alignment)
Longitude: -82.9006474°
Latitude: 35.9537937°
84" by 57" Elliptical (End Alignment)
0 40002000
VICINITY MAP
:3
J u n e
N e w
P M
S h e p w w o r k in g
\i n f r a
\j f ie ld s \d
\A
M E
N D
T N
E R
F O p ln g e n
.d g n
06/15/26 JMF AMD #2 - Updated Latitude/Longitude callouts.
AMENDMENT NO.2 PROJECT
A05
SCHEDULE C
FLATWOODS ROAD
N
Longitude: -82.0382773°
Latitude: 36.5147551°
End Project
Little Oak Road
U.S. DEPARTMENT OF TRANSPORTATION
Longitude: -82.0392781°
Latitude: 36.5144037°
Begin Project
Big Creek Road
FS 87
Flatwoods Road
0 40002000
VICINITY MAP
:3
J u n e
N e w
F W
S h e p w w o r k in g
\i n f r a
\j f ie ld s \d
\A
M E
N D
T N
E R
F O p ln g e n
.d g n
06/15/26 JMF AMD #2 - Updated Latitude/Longitude callouts.
AMENDMENT NO.2 PROJECT
A06
U.S. DEPARTMENT OF TRANSPORTATION
BRIAR CREEK ROAD (FS 188)
CHEROKEE NATIONAL FOREST
NOT TO SCALE
See Detail A the subgrade elevation minimum of 6 inches below
Reestablish ditch flow line a
Abutment face class seal S
Structural concrete, Fill void with
Existing footing
See Detail A
See Detail A
FLATWOODS ROAD (FS 87)
204+93 TO 206+93
159+69 TO 161+19
136+31 TO 145+00
124+25 TO 127+90
80+00 TO 90+20
2+20 TO 30+50
2+20 TO 249+61
NOTES:
restabilize foundation to prevent undermining.
Clean up debris and grade to drain. Grout underneath to
AOP Foundation Repair the plans or as directed by the CO.
Regrade all existing roadway ditches to the limits shown in
Ditch reconditioning turnouts, and other road structure variations.
way width. Travel way includes shoulders, curve widening, Place aggregate within traveled way. Match existing travel
Traveled way widths.
necessary or as directed by the CO.
road aggregate to large rocks. Remove protruding rocks as and provide a minimum cover of 6 inches from bottom of
Reconstruct roadbed to reestablish roadway cross slopes
Embankment construction proposed roadway surface.
trunk as practicable and to a height of 14 feet above the removal. Trim tree limbs by sawing as near flush with the from a stream course unless tree is specifically marked for stream side of road when road edge is less than 100 feet
Do not clear trees greater than 8 inches in diameter on
Clearing Limits
TYPICAL SECTION
Existing Ground
1.5:1
1.5 :1
4%-6% 4%-6%
6" min.
6" Depth
Grading D, Aggregate Base
Recondition Ditch
V a rie s Traveled Way Varies
(14' +/-)7' 7'1 1
WITH SPECIAL FILL CONDITION
TYPICAL SECTION
Existing Ground
1.5:1
1.5 :1
4%-6% 4%-6%
6" MIN.
6" Depth
Grading D, Aggregate Base
Recondition Ditch
V a rie s
Traveled Way Varies
(14' +/-)7' 7'1 1 when specified in the plans
Special fill embankment construction
Clearing Limits
Roadway Reconditioning Limits
1:1 1.
5:
Detail A
FOUNDATION REPAIR
AOP
124+25
Clearing Limits
Roadway Reconditioning Limits
0+05 TO 2+40
MSE Wall
1.5:1
1.5 :1
2%-10% 2%-10%
6" min.
Recondition Ditch
Traveled Way Varies
(19' +/-)
6" Depth
Grading D, Aggregate Base
3.5" Depth
Pavement, Type 1, Asphalt Concrete
PAVEMENT RESTORATION AT MSE WALL
TYPICAL SECTION
:0
J u n e
R o a d w a y T y p ic a l
S e c ti o n s p w w o r k in g
\i n f r a
\j f ie ld s \d
\A
M E
N D
T N
E R
F O p ln g e n
.d g n
TYPICAL SECTIONS
AMENDMENT NO.2
06/15/26 JMF AMD #2 - Added typical section.
PROJECT
B01
U.S. DEPARTMENT OF TRANSPORTATION
CHEROKEE NATIONAL FOREST
NOT TO SCALE
Geocell with max density
Fill with topsoil
Non-woven geotextile (optional)
Subgrade
FLATWOODS ROAD (FS 87)
BRIAR CREEK ROAD (FS 188)
CELLULAR CONFINEMENT SYSTEM
V a r ie s
GENERALIZED CELLULAR CONFINEMENT SYSTEM SECTION
20+50 to 21+50
2+30 to 3+10 confinement system indicated by hatching on plans.
Complete extents inclusive of anchoring for cellular except paved surfaces, traveled way, or rock face.
Apply turf establishment to all disturbed area approved or directed by the CO.
Adjust the construction limits to fit field conditions as
Refer to the geotechnical report for site conditions.
NOTES:
1'
M
IN
IM
U
M
TYPICAL SECTIONS
AMENDMENT NO.2
06/15/26 JMF AMD #2 - Added dimensions and note.
PROJECT
TN ERFO FS CHRKE804 2020-2(1) B03
U.S. DEPARTMENT OF TRANSPORTATION
CHEROKEE NATIONAL FOREST
FLATWOODS ROAD (FS 87)
2 2
2 06/15/2026 JMF AMD #2 - Added pay items for asphalt and aggregate base.2 :4
J u n e
C
E
W D ra in
E S
C p w w o r k in g
\i n f r a
\j f ie ld s \d
\A
M E
N D
T N
E R
F O p ln g e n
.d g n
SCHEDULE C
SUMMARIES AND SCHEDULES
AMENDMENT NO.2 PROJECT
C10
-1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50
1,296 1,296
1,298 1,298
1,300 1,300
1,302 1,302
1,304 1,304
1,306 1,306
1,308 1,308
1,310 1,310
1,312 1,312
1,314 1,314
1,316 1,316
1,318 1,318
1,320 1,320
1,322 1,322
1,324 1,324
1,326 1,326
1,328 1,328
1,330 1,330
END BURIED
G P S
J H
J H
B H
G P S
H
P
LOD
LOD
LOD
LO
D
LO
D
LOD
L O
D
L O
D
L O
D
LO
D
LOD
LOD
LOD
L O
D
LOD
L O
D
LO
D
LO
D
LO
D
O ffs e t
B
B
IE 1
.00
IE
4.
N v a r
E 2886784.152
N 601925.589
0+61.66
BEGIN WORK
E 2886839.798
N 602043.437
1+95.32
END WORK
Centerline
Offset varies 11' to 17'
Bottom of MSE wall, 0+98.00 to 1+48.00
Wall Typical Section
See MSE
IE 1293.46'
Washout
Existing
I N P
R O
F I L E
S E
E N
O T
E
EOT (typ.)
Existing
EOT (typ.)
Existing
See MSE Wall Typical Section
Existing ground
0+98.00 to 1+48.00
Bottom of MSE wall, elev. 1306 existing cross slope or crown.
existing ground elevation. Maintain transitions between the overlay and
NOTE: Provide gradually graded
See Note
Match existing elev.
0+61.66
BEGIN WORK
See Note
Match existing elev.
1+95.32
END WORK
needed to fit field conditions as approved by the CO.
shown on the plans. Adjust proposed pipe locations as alignment data is not provided except for select areas as to follow the existing curvature of the roadway, therefore variations compared to the actual alignment. The intent is
GIS, not from survey equipment. This could result in minor
The project baseline and pipe locations were created from
NOTE
Construct new 24" CMP
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLAN-PROFILE
PAINT MOUNTAIN ROAD (FS 54)
SCHEDULE B
MP 4.81
wall designer.
designed by the Contractor's the stepping of the MSE wall are to be
NOTE: The dimensions and drawings for w/ non-shrink grout
Backfill existing 15" CMP @ IE 1293.46
2%
Underdrain, see Det. E605-A
C
M P e = ___ '70.90L = '36.43T = '125.00R = (RT)32°30'00"Δ = 1+39.52PI e = ___ '6.98L = '3.50T = '50.00R = (LT)08°00'00"Δ = 1+98.26PI
Scale in Feet
CHEROKEE NATIONAL FOREST
0 20 40
Scale in Feet
:1
J u n e p a in t5
-1
S h e p w w o rk in g
\i n fr a
\j fi e ld s \d
\A
M E
N D
T N
E R
F O
-2
-2 (1 p ln p p
.d g n
06/15/26 JMF AMD #2 - Updated viewport area.
AMENDMENT NO.2 PROJECT
D13
Existing EOT (typ.)
Centerline
Existing EOT (typ.)
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLAN-PROFILE
PAINT MOUNTAIN ROAD (FS 54)
SCHEDULE B
MP 0.00
E 2885627.7187
N 604362.5537
0+91.00
BEGIN WORK
E 2885655.9190
N 604379.4676
1+25.00
END WORK
See Note
Match existing elev.
0+91.00
BEGIN WORK
See Note
Match existing elev.
1+25.00
END WORK
existing cross slope or crown.
existing ground elevation. Maintain transitions between the overlay and
NOTE: Provide gradually graded
P-FSR54-1
IE 1565.19
84" by 57" ELLIPTICAL CULVERT
STA 1+00.84
and return to forest service.
Note: Contractor to salvage existing pipe
N32°20'36"W
S '0 "E
P C
.3
PT
.5
P O
B
.0
PO
E 1+
.0
ELLI
PT
ICAL
CULVERT
0+00 0+50 1+00 1+50
1,564 1,564
1,566 1,566
1,568 1,568
1,570 1,570
1,572 1,572
1,574 1,574
1,576 1,576
0+10 0+20 0+30 0+40 0+60 0+70 0+80 0+90 1+10 1+20 1+30 1+40
0 10 20
Scale in Feet
CHEROKEE NATIONAL FOREST
:3
J u n e p a in t5 h e p w w o r k in g
\i n f r a
\j f ie ld s \d
\A
M E
N D
T N
E R
F O p ln p p
.d g n
06/15/26 JMF AMD #2 - Updated viewport area.
AMENDMENT NO.2 PROJECT
D14 needed to fit field conditions as approved by the CO.
shown on the plans. Adjust proposed pipe locations as alignment data is not provided except for select areas as to follow the existing curvature of the roadway, therefore variations compared to the actual alignment. The intent is
GIS, not from survey equipment. This could result in minor
The project baseline and pipe locations were created from
NOTE
.0
2 3
LOD LOD
L O
D L
O D
L O
D L
O D
LOD
LOD
LOD
LOD
L O
DL
O
D
LO
D
LOD
LOD
LOD
L O
D
LOD
LOD
LOD
L O
D L
O D
L O
D
LOD
LOD
LOD
LOD
LOD
L O
D
LOD
R
C P
P
R
EB
-C
A
P
R
EB
-C
A P
C A
M P
TO
M H
O W
A R D R
D
P
TR
A V M
A G
WASHOUT AREA
Centerline
Limits of disturbance
See Detail E157-04
Fiber roll (typ.)
Existing EOT (typ.)
Proposed EOT (typ.)
See Detail E157-04 at 20' max. spacing
Fiber roll check dam (typ.)
MSE wall
Cellular Confinement System Slope Stabilization
U.S. DEPARTMENT OF TRANSPORTATION
FLATWOODS ROAD (FS 87), MP 5.78
CHEROKEE NATIONAL FOREST
Replacement
Full Depth Asphalt
BEGIN WORK
STA 0+01.02
N 817833.346
E 3132465.938
END WORK
STA 3+46.60
N 817483+621
E 3132177.233
Scale in Feet
0 8040
:2
J u n e e s c
F la tw o o d p w w o r k in g \i n f r a \j f ie ld s \d
\A
M E
N D
T
N E
R F
O p ln e c .d g n
SEDIMENT CONTROL PLAN
EROSION AND
AMENDMENT NO.2
06/15/26 JMF AMD #2 - Added hatching for asphalt and label.
PROJECT
M13
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L O
D L
O D
L O
D L
O D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L O
D
L O
D
L O
D
L O
D
L O
D L
O D
L O
D
L O
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L O
D
L O
D
N
Centerline
Limits of disturbance
Existing EOT (typ.)
BEGIN WORK
0+91.00
N 604363.7659
E 2885633.4933
Fiber Roll (typ.)
See Detail E157-04
END WORK
1+25.00
N 604379.4676
E 2885655.9190
ELL
IPT
IC
AL
CULVERT
0+18.00
8ft-0in
U.S. DEPARTMENT OF TRANSPORTATION
PAINT MOUNTAIN ROAD (FS 54), MP 0.00
CHEROKEE NATIONAL FOREST
Scale in Feet
0 2010 SEDIMENT CONTROL PLAN
EROSION AND 2
:4
J u n e
B
L
P a in t2
S h e p w w o r k in g \i n f r a \j f ie ld s \d
\A
M E
N D
T
N E
R F
O p ln e c .d g n
AMENDMENT NO.2
06/15/26 JMF AMD #2 - Revised LOD and updated viewport area.
PROJECT
M15
| AmendedSheets_2(1).pdf |
| AMEND_01_TNERFO-2020-2(1)_pln_gen03 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen03 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen03 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen10 |
| AMEND_01_TNERFO-2020-2(1)_typ05 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_pp02 |
| AMEND_01_TNERFO-2020-2(1)_pln_pp02 |
| AMEND_01_TNERFO-2020-2(1)_pln_pp02 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec04 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec04 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec04 |
| AmendedSheets_2(1).pdf |
| AMEND_01_TNERFO-2020-2(1)_pln_gen03 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen03 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen03 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen10 |
| AMEND_01_TNERFO-2020-2(1)_typ05 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_gen07 |
| AMEND_01_TNERFO-2020-2(1)_pln_pp02 |
| AMEND_01_TNERFO-2020-2(1)_pln_pp02 |
| AMEND_01_TNERFO-2020-2(1)_pln_pp02 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec03 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec04 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec04 |
| AMEND_04_TNERFO-2020-2(1)_pln_ec04 |
File details come from the government source that posted it. Updated .