This document is a Bid Opening results for the Rock Creek Park Project (Solicitation No. 693C73-25-B-000006) conducted by the Federal Highway Administration's Eastern Federal Lands Highway Division on May 6, 2025. The project involves roadway repairs on Waterside Drive and Piney Branch Parkway in Washington, D.C., including full depth reconstruction, milling and overlay, curb and gutter replacement, guardrail replacement, street light repairs, sidewalk construction, and drainage improvements.

Six construction companies submitted bids with total project costs ranging from $8,599,075.00 (Central Southern Construction Corp.) to $12,545,231.05 (Construction Solutions Group, LLC). The project is structured with three schedules (A, B, and C), with potential performance periods of 383 calendar days for all schedules, or 344 calendar days for Schedules A and B combined. The Engineer's Estimate for the entire project was $7,062,760.00, significantly lower than the submitted bids. The solicitation was restricted to certified Small Business Concerns, with the project cost expected to fall between $5,000,000 and $10,000,000.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

Rock Creek Park

PROJECT: DC NP ROCR 503(1), 24(2)

SOLICITATION NO. 693C73-25-B-000006

May 6, 2025 at 2:00 p.m. EDT

Ashburn, Virginia

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-25-B-000006 Project: DC NP ROCR 503(1), 24(2)

May 6, 2025, 2:00 p.m. EDT

BIDDERS BID TOTALS TOTAL PRICE

B3 Enterprises, LLC SCHEDULE A $5,208,057.25 SCHEDULE B (Government Option 1) $5,354,698.02 SCHEDULE C (Government Option 2) $1,437,621.12

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$12,000,376.39

Central Southern Construction Corp. SCHEDULE A $3,827,950.00 SCHEDULE B (Government Option 1) $3,937,525.00 SCHEDULE C (Government Option 2) $833,600.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$8,599,075.00

Construction Solutions Group, LLC SCHEDULE A $5,903,182.12 SCHEDULE B (Government Option 1) $5,714,460.10 SCHEDULE C (Government Option 2) $927,588.83

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$12,545,231.05

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 383 calendar days. If the Government awards the contract as Schedules A + B, the performance period to complete Schedule A + B work will be 344 calendar days. If separate:

Schedule A will be 152 calendar days, Schedule B will be 192 calendar days, and Schedule C will be 39 calendar days.

BID OPENING for SOLICITATION NO. 693C73-25-B-000006 Project: DC NP ROCR 503(1), 24(2)

May 6, 2025, 2:00 p.m. EDT

BIDDERS BID TOTALS TOTAL PRICE

McKenzie Construction and Site Development, LLC

SCHEDULE A

$3,884,462.28 SCHEDULE B (Government Option 1) $5,843,651.81 SCHEDULE C (Government Option 2) $858,930.44

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$10,587,044.52

Metro Paving Corporation SCHEDULE A $3,842,726.00 SCHEDULE B (Government Option 1) $4,923,897.00 SCHEDULE C (Government Option 2) $1,007,515.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$9,774,138.00

RBA Engineering International, PLLC

SCHEDULE A

$3,523,782.50 SCHEDULE B (Government Option 1) $4,465,728.00 SCHEDULE C (Government Option 2) $1,181,298.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$9,170,808.50

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 383 calendar days. If the Government awards the contract as Schedules A + B, the performance period to complete Schedule A + B work will be 344 calendar days. If separate:

Schedule A will be 152 calendar days, Schedule B will be 192 calendar days, and Schedule C will be 39 calendar days.

BID OPENING for SOLICITATION NO. 693C73-25-B-000006 Project: DC NP ROCR 503(1), 24(2)

May 6, 2025, 2:00 p.m. EDT

BIDDERS BID TOTALS TOTAL PRICE

Terra Site Constructors, LLC SCHEDULE A $3,788,036.00 SCHEDULE B (Government Option 1) $5,574,386.00 SCHEDULE C (Government Option 2) $989,802.50

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$10,352,224.50

Engineer’s Estimate SCHEDULE A $2,937,320.00 SCHEDULE B (Government Option 1) $3,426,520.00 SCHEDULE C (Government Option 2) $698,920.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$7,062,760.00

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 383 calendar days. If the Government awards the contract as Schedules A + B, the performance period to complete Schedule A + B work will be 344 calendar days. If separate:

Schedule A will be 152 calendar days, Schedule B will be 192 calendar days, and Schedule C will be 39 calendar days.

Slide Number 1
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-25-B-000006� Project: DC NP ROCR 503(1), 24(2)�May 6, 2025, 2:00 p.m. EDT�
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-25-B-000006� Project: DC NP ROCR 503(1), 24(2)�May 6, 2025, 2:00 p.m. EDT�
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-25-B-000006� Project: DC NP ROCR 503(1), 24(2)�May 6, 2025, 2:00 p.m. EDT�

File details come from the government source that posted it. Updated .