Tabulation of Bids - PR ER DOT PRMNT RPR(18).pdf

PDF 220 KB Posted

Attached to
Landslide Repairs in Ciales, Puerto Rico
Solicitation number
693C73-24-C-000010
Issued by

About this file

This document is a Tabulation of Bids for a federal contract opportunity for the repair of landslides on various highways in Ciales, Puerto Rico. The project is identified as PR ER DOT PRMNT RPR(18) and the solicitation number is 693C73-24-C-000010. The contract was awarded to LPC CONTRACTORS, INC. on June 7, 2024 for $6,449,997.50. The project includes repairs to PR-144, HWY-203, 205; PR-146, HWY-218, 220, 221, 224; and PR-149, HWY-227, 228. The bid tabulation provides a detailed list of bid items, quantities, units, and unit prices from multiple contractors. The Engineer's Estimate for the overall project was $6,735,000. The document also includes information about mobilization, clearing and grubbing, excavation, paving, concrete work, guardrails, and other construction activities required for the project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S Schedule Eastern Federal Lands Highway Division

Project No : PR ER DOT PRMNT RPR(18) FLMA No:

Project Name : PR-144, HWY-203, 205; PR-146, HWY-218, 220, 221, 224; PR-149, HWY-227 Solcitation No:

State : PUERTO RICO County : CIALES Federal Location : PR-144 (KM: 14.35,18.2); PR-146 (KM: 9.8, 16.4, 19.3, 14.1); PR-149 (KM:

Opened at: EFLHD, Ashburn, VA Opened by: C. Shawn Long Date: 5/23/2024

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date: 5/23/2024

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 6,735,000.00$

LPC CONTRACTORS, INC. 6,449,997.50$

NOVEL CONSTRUCTION, LLC 6,781,000.00$

MAGLEZ ENGINEERING & CONTRAC 6,997,723.00$

JPI CONSTRUCTION, LLC 7,842,545.00$

CONSTRUCCIONES JOSE CARRO, S 8,754,000.00$

JJM CONSTRUCTION, CORP. 10,302,337.00$

PR-937 Km. 3 Bo. Boquerón Las Piedras, PR 00771

Yes

PR-140 Km. 59.0 Puerto Blanco Florida, PR 00650

1513 Las Marias St., Suite 1-A San Juan, PR 00911

Yes

Yes

Yes

Yes

Yes

Carr. PR 510 Km. 0.1 Barrio Capitanejo Ponce, PR 00731

546 Altos Ave. Emerito Estrada Rivera San Sebastian, PR 00685

1738 Calle Amarillo Suite 205- Box 15 San Juan, PR 00926

693C73-24-B-000008

C. Shawn Long

Contracting Officer

5/28/2024 FHWA Confidential Page 1 of 4

LPC Contractors, Inc. 7 June 2024

693C73-24-C-000010

Schedule Total of Bid Items: 6,735,000.00$ -4.2% 6,449,997.50$ 0.7% 6,781,000.00$ 3.9% 6,997,723.00$ 16.4% 7,842,545.00$ 30.0% 8,754,000.00$ 53.0% 10,302,337.00$ Project No: PR ER DOT PRMNT RPR(18)

Project Name: PR-144, HWY-203, 205; PR-146, HWY-218, 220, 221, 224; PR-149, HWY-227, 228

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

15000-1000

Line 0010 ALL LPSM 140,000.00$ 140,000.00$ 800,000.00$ 80,000.00$ 74,400.00$ 100,000.00$ 450,000.00$ 100,000.00$

15100-1000

Line 0020 ALL LPSM 331,017.00$ 331,017.00$ 590,000.00$ 678,000.00$ 699,780.00$ 600,000.00$ 858,075.00$ 1,610,000.00$

15102-0000

Line 0030 1 CTSM 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$

15401-0000

Line 0040 ALL LPSM 165,000.00$ 165,000.00$ 400,000.00$ 300,000.00$ 180,000.00$ 120,000.00$ 150,000.00$ 150,000.00$

15401-1000

Line 0050 ALL LPSM 183,500.00$ 183,500.00$ 400,000.00$ 30,000.00$ 180,000.00$ 200,000.00$ 80,000.00$ 360,000.00$

15401-2000

Line 0060 ALL LPSM 140,000.00$ 140,000.00$ 400,000.00$ 30,000.00$ 450,000.00$ 300,000.00$ 100,000.00$ 360,000.00$

15501-0000

Line 0070 ALL LPSM 85,000.00$ 85,000.00$ 200,000.00$ 40,000.00$ 27,000.00$ 85,000.00$ 80,000.00$ 55,000.00$

20100-0000

Line 0080 2.95 Cuerda 25,000.00$ 73,750.00$ 2,950.00$ 118,000.00$ 29,500.00$ 73,750.00$ 59,000.00$ 17,700.00$

20100-2000

Line 0090 40 Each 1,200.00$ 48,000.00$ 8,000.00$ 120,000.00$ 80,000.00$ 28,000.00$ 12,000.00$ 40,000.00$

20100-3000

Line 0100 4 Each 1,600.00$ 6,400.00$ 12,000.00$ 16,000.00$ 20,000.00$ 12,000.00$ 12,000.00$ 6,000.00$

20200-1000

Line 0110 ALL LPSM 44,000.00$ 44,000.00$ 200,000.00$ 39,540.00$ 82,500.00$ 100,000.00$ 250,000.00$ 20,000.00$

20300-1000

Line 0120 2,100 m3 55.00$ 115,500.00$ 42,000.00$ 52,500.00$ 157,500.00$ 126,000.00$ 210,000.00$ 105,000.00$

20300-4000

Line 0130 154 m3 45.00$ 6,930.00$ 770.00$ 9,240.00$ 11,550.00$ 11,550.00$ 3,080.00$ 19,250.00$

20300-5000

Line 0140 3,400 m3 55.00$ 187,000.00$ 17,000.00$ 119,000.00$ 170,000.00$ 255,000.00$ 102,000.00$ 425,000.00$

20300-7000

Line 0150 125 m3 65.00$ 8,125.00$ 3,500.00$ 3,125.00$ 5,000.00$ 9,375.00$ 125.00$ 15,625.00$

20300-8000

Line 0160 175 m2 7.00$ 1,225.00$ 87.50$ 1,750.00$ 4,375.00$ 17,500.00$ 1,750.00$ 17,500.00$

20500-1000

Line 0170 75 m3 60.00$ 4,500.00$ 7,500.00$ 3,750.00$ 4,875.00$ 4,275.00$ 18,750.00$ 18,750.00$

20600-1000

Line 0180 4,000 m3 65.00$ 260,000.00$ 16,000.00$ 160,000.00$ 260,000.00$ 260,000.00$ 120,000.00$ 280,000.00$

20600-5000

Line 0190 ALL LPSM 108,000.00$ 108,000.00$ 5,000.00$ 25,000.00$ 175,000.00$ 25,000.00$ 50,000.00$ 396,000.00$

20600-6000

Line 0200 ALL LPSM 71,000.00$ 71,000.00$ 5,000.00$ 25,000.00$ 175,000.00$ 25,000.00$ 50,000.00$ 396,000.00$

20700-1000

Line 0210 675 m3 10.00$ 6,750.00$ 3,375.00$ 27,000.00$ 60,750.00$ 50,625.00$ 54,000.00$ 60,750.00$

21000-1000

Line 0220 1,030 M 10.00$ 10,300.00$ 10,300.00$ 10,300.00$ 10,300.00$ 10,300.00$ 10,300.00$ 10,300.00$

21000-2000

Line 0230 110 Each 15.00$ 1,650.00$ 1,650.00$ 1,650.00$ 1,650.00$ 1,650.00$ 1,650.00$ 1,650.00$

21000-3000

Line 0240 6 Each 50.00$ 300.00$ 240.00$ 900.00$ 600.00$ 600.00$ 1,800.00$ 900.00$

21001-1000

Line 0250 8 Each 9,000.00$ 72,000.00$ 8,000.00$ 40,000.00$ 52,000.00$ 40,000.00$ 80,000.00$ 48,000.00$

21002-1000

Line 0260 ALL LPSM 12,000.00$ 12,000.00$ 5,000.00$ 70,000.00$ 133,500.00$ 75,000.00$ 50,000.00$ 45,000.00$

30100-1000

Line 0270 1,150 m3 40.00$ 46,000.00$ 5,750.00$ 69,000.00$ 69,000.00$ 115,000.00$ 57,500.00$ 115,000.00$

30100-2000

Line 0280 50 m3 65.00$ 3,250.00$ 5,000.00$ 2,000.00$ 3,000.00$ 5,000.00$ 2,500.00$ 10,000.00$

30400-2000

Line 0290 210 m3 65.00$ 13,650.00$ 1,680.00$ 16,800.00$ 18,900.00$ 36,750.00$ 31,500.00$ 15,750.00$

30500-1000

Line 0300 295 m2 550.00$ 162,250.00$ 5,900.00$ 59,000.00$ 59,000.00$ 162,250.00$ 147,500.00$ 177,000.00$

40300-1000

Line 0310 2,270 m2 55.00$ 124,850.00$ 11,350.00$ 340,500.00$ 9,080.00$ 90,800.00$ 227,000.00$ 681,000.00$

42101-3000

Line 0320 400 TON 360.00$ 144,000.00$ 80,000.00$ 140,000.00$ 154,000.00$ 160,000.00$ 220,000.00$ 220,000.00$

42101-4000

Line 0330 380 TON 360.00$ 136,800.00$ 76,000.00$ 133,000.00$ 152,000.00$ 152,000.00$ 121,600.00$ 209,000.00$

42101-6000

Line 0340 490 TON 360.00$ 176,400.00$ 98,000.00$ 171,500.00$ 196,000.00$ 196,000.00$ 156,800.00$ 269,500.00$

60200-1000

Line 0350 57,400 lb 3.00$ 172,200.00$ 114,800.00$ 229,600.00$ 157,850.00$ 143,500.00$ 114,800.00$ 143,500.00$

60300-3000

Line 0360 32 M 400.00$ 12,800.00$ 12,800.00$ 9,600.00$ 13,600.00$ 25,600.00$ 22,400.00$ 17,600.00$

Contractor Testing

400,000.00$ 300,000.00$ 180,000.00$ 120,000.00$ 150,000.00$ 150,000.00$

Lean Concrete Base

36" R i f d C t Pi Cl III

Cold Milling Bituminous Concrete Pavement, Variable Depth (0.050m to 0.075m)

Hot Plant Mix Asphalt Concrete, Type S (75)(12)

Hot Plant Mix Asphalt Concrete, Type B (75)(12)

Hot Plant Mix Asphalt Concrete, Type B (75)(34)

Reinforcing Steel

30" Reinforced Concrete Pipe Class-III

Construction Survey and Staking

Mobilization

Reimbursement for Municipal Tax Payments

Proof Rolling

Trench Excavation, Unclassified

Unclassified Excavation for Structures

Construction Schedule

Clearing and Grubbing

Cutting and Removing Trees, Small

Cutting and Removing Trees, Large

Removal of Structures and Obstructions

Unclassified Excavation

Stabilized Construction Exit

Temporary Erosion Control Measures (HWY-218, 220, 224)

Subbase Course, Class A

Subbase Course, Class B

Aggregate Base Course, Class A

Temporary Shoring and Bracing (HWY-227)

Temporary Shoring and Bracing (HWY-228)

Foundation Fill

Silt Fence

Straw Bales

Fiber Rolls (Sediment Log)

Contractor Testing (Biological Species Monitoring)

Contractor Testing (Cultural Resources Protection and Monitoring Plan)

Borrow Class A

Borrow Class B

Borrow Class D

80,000.00$ 74,400.00$ 100,000.00$

JJM CONSTRUCTION, CORP.LPC CONTRACTORS, INC. NOVEL CONSTRUCTION, LLC LEZ ENGINEERING & CONTRACTORS, C JPI CONSTRUCTION, LLC CONSTRUCCIONES JOSE CARRO, S.E.

590,000.00$

800,000.00$

400,000.00$ 30,000.00$ 180,000.00$ 200,000.00$ 80,000.00$ 360,000.00$

450,000.00$ 100,000.00$

678,000.00$ 699,780.00$ 600,000.00$ 858,075.00$ 1,610,000.00$

610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$ 610,000.00$

1,000.00$ 40,000.00$ 10,000.00$ 25,000.00$ 20,000.00$ 6,000.00$

200,000.00$ 40,000.00$ 27,000.00$ 85,000.00$ 80,000.00$ 55,000.00$

400,000.00$ 30,000.00$ 450,000.00$ 300,000.00$ 100,000.00$ 360,000.00$

3,000.00$ 4,000.00$ 5,000.00$ 3,000.00$ 3,000.00$ 1,500.00$

200.00$ 3,000.00$ 2,000.00$ 700.00$ 300.00$ 1,000.00$

20.00$ 25.00$ 75.00$ 60.00$ 100.00$ 50.00$

200,000.00$ 39,540.00$ 82,500.00$ 100,000.00$ 250,000.00$ 20,000.00$

5.00$ 35.00$ 50.00$ 75.00$ 30.00$ 125.00$

5.00$ 60.00$ 75.00$ 75.00$ 20.00$ 125.00$

0.50$ 10.00$ 25.00$ 100.00$ 10.00$ 100.00$

28.00$ 25.00$ 40.00$ 75.00$ 1.00$ 125.00$

4.00$ 40.00$ 65.00$ 65.00$ 30.00$ 70.00$

100.00$ 50.00$ 65.00$ 57.00$ 250.00$ 250.00$

5,000.00$ 25,000.00$ 175,000.00$ 25,000.00$ 50,000.00$ 396,000.00$

5,000.00$ 25,000.00$ 175,000.00$ 25,000.00$ 50,000.00$ 396,000.00$

10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$

5.00$ 40.00$ 90.00$ 75.00$ 80.00$ 90.00$

40.00$ 150.00$ 100.00$ 100.00$ 300.00$ 150.00$

15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$

5,000.00$ 70,000.00$ 133,500.00$ 75,000.00$ 50,000.00$ 45,000.00$

1,000.00$ 5,000.00$ 6,500.00$ 5,000.00$ 10,000.00$ 6,000.00$

100.00$ 40.00$ 60.00$ 100.00$ 50.00$ 200.00$

5.00$ 60.00$ 60.00$ 100.00$ 50.00$ 100.00$

20.00$ 200.00$ 200.00$ 550.00$ 500.00$ 600.00$

8.00$ 80.00$ 90.00$ 175.00$ 150.00$ 75.00$

200.00$ 350.00$ 385.00$ 400.00$ 550.00$ 550.00$

5.00$ 150.00$ 4.00$ 40.00$ 100.00$ 300.00$

200.00$ 350.00$ 400.00$ 400.00$ 320.00$ 550.00$

200.00$ 350.00$ 400.00$ 400.00$ 320.00$ 550.00$

400.00$ 300.00$ 425.00$ 800.00$ 700.00$ 550.00$

2.00$ 4.00$ 2.75$ 2.50$ 2.00$ 2.50$

Engineer's Estimate

5/28/2024 Page 2 of 4

Schedule Total of Bid Items: 6,735,000.00$ -4.2% 6,449,997.50$ 0.7% 6,781,000.00$ 3.9% 6,997,723.00$ 16.4% 7,842,545.00$ 30.0% 8,754,000.00$ 53.0% 10,302,337.00$ Project No: PR ER DOT PRMNT RPR(18)

Project Name: PR-144, HWY-203, 205; PR-146, HWY-218, 220, 221, 224; PR-149, HWY-227, 228

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

C t ti S d St ki

JJM CONSTRUCTION, CORP.LPC CONTRACTORS, INC. NOVEL CONSTRUCTION, LLC LEZ ENGINEERING & CONTRACTORS, C JPI CONSTRUCTION, LLC CONSTRUCCIONES JOSE CARRO, S.E.

60300-4000

Line 0370 20 M 450.00$ 9,000.00$ 10,000.00$ 8,000.00$ 10,540.00$ 20,000.00$ 16,000.00$ 18,000.00$

60301-1000

Line 0380 2 Each 2,000.00$ 4,000.00$ 5,000.00$ 4,000.00$ 7,200.00$ 2,000.00$ 10,000.00$ 3,000.00$

60301-2000

Line 0390 22 M 650.00$ 14,300.00$ 66,000.00$ 88,000.00$ 77,000.00$ 44,000.00$ 66,000.00$ 99,000.00$

60301-3000

Line 0400 5 M 300.00$ 1,500.00$ 600.00$ 1,000.00$ 1,850.00$ 2,750.00$ 5,000.00$ 3,750.00$

60301-4000

Line 0410 90 M 250.00$ 22,500.00$ 3,150.00$ 8,100.00$ 11,250.00$ 27,000.00$ 18,000.00$ 11,250.00$

60301-6000

Line 0420 2 Each 7,200.00$ 14,400.00$ 20,000.00$ 30,000.00$ 14,000.00$ 50,000.00$ 60,000.00$ 30,000.00$

60301-8000

Line 0430 1 Each 6,500.00$ 6,500.00$ 10,000.00$ 6,000.00$ 2,500.00$ 6,000.00$ 20,000.00$ 3,500.00$

60402-1000

Line 0440 1 Each 4,500.00$ 4,500.00$ 15,000.00$ 10,000.00$ 10,200.00$ 8,500.00$ 35,000.00$ 27,500.00$

60402-4000

Line 0450 1 Each 2,000.00$ 2,000.00$ 1,000.00$ 4,000.00$ 1,200.00$ 8,000.00$ 3,000.00$ 2,500.00$

60403-2000

Line 0460 1 Each 5,500.00$ 5,500.00$ 6,000.00$ 8,000.00$ 10,200.00$ 8,500.00$ 50,000.00$ 4,500.00$

60403-3000

Line 0470 1 Each 3,500.00$ 3,500.00$ 15,000.00$ 15,000.00$ 10,000.00$ 6,500.00$ 20,000.00$ 7,500.00$

60403-6000

Line 0480 1 Each 6,500.00$ 6,500.00$ 16,000.00$ 20,000.00$ 12,000.00$ 7,000.00$ 25,000.00$ 7,500.00$

60403-7000

Line 0490 1 Each 3,000.00$ 3,000.00$ 15,000.00$ 12,000.00$ 12,000.00$ 8,500.00$ 20,000.00$ 27,000.00$

60500-4000

Line 0500 110 M 45.00$ 4,950.00$ 4,400.00$ 8,800.00$ 8,250.00$ 8,800.00$ 16,500.00$ 8,250.00$

60500-6000

Line 0510 66 M 55.00$ 3,630.00$ 2,640.00$ 5,940.00$ 6,600.00$ 5,280.00$ 19,800.00$ 4,950.00$

60500-7000

Line 0520 100 M 65.00$ 6,500.00$ 6,000.00$ 11,000.00$ 15,000.00$ 8,000.00$ 20,000.00$ 15,000.00$

60500-8000

Line 0530 80 M 45.00$ 3,600.00$ 1,600.00$ 4,000.00$ 4,560.00$ 6,400.00$ 8,000.00$ 7,600.00$

60600-1000

Line 0540 550 M 350.00$ 192,500.00$ 82,500.00$ 121,000.00$ 154,000.00$ 247,500.00$ 165,000.00$ 302,500.00$

60600-4000

Line 0550 20 M 60.00$ 1,200.00$ 400.00$ 800.00$ 1,500.00$ 1,000.00$ 4,000.00$ 4,500.00$

60600-6000

Line 0560 2 Each 6,000.00$ 12,000.00$ 2,000.00$ 16,000.00$ 20,000.00$ 21,000.00$ 28,000.00$ 20,000.00$

60600-7000

Line 0570 1 Each 10,000.00$ 10,000.00$ 7,000.00$ 6,000.00$ 11,000.00$ 10,500.00$ 10,000.00$ 3,000.00$

60700-1000

Line 0580 150 M 175.00$ 26,250.00$ 30,000.00$ 15,000.00$ 16,500.00$ 21,000.00$ 22,500.00$ 11,250.00$

61000-6000

Line 0590 15 m 800.00$ 12,000.00$ 1,500.00$ 5,250.00$ 7,500.00$ 6,750.00$ 30,000.00$ 12,750.00$

61100-1000

Line 0600 24 mo 4,850.00$ 116,400.00$ 120,000.00$ 48,000.00$ 120,000.00$ 120,000.00$ 144,000.00$ 360,000.00$

61314-1000

Line 0610 3 m2 625.00$ 1,875.00$ 3,000.00$ 3,000.00$ 3,000.00$ 2,700.00$ 1,500.00$ 2,250.00$

61314-2000

Line 0620 1 m2 850.00$ 850.00$ 1,000.00$ 1,000.00$ 1,600.00$ 900.00$ 1,000.00$ 750.00$

61400-1000

Line 0630 1,120 m3 600.00$ 672,000.00$ 448,000.00$ 672,000.00$ 644,000.00$ 700,000.00$ 1,456,000.00$ 896,000.00$

61701-2000

Line 0640 75 m2 200.00$ 15,000.00$ 7,500.00$ 15,000.00$ 9,375.00$ 15,000.00$ 26,250.00$ 13,125.00$

61800-2000

Line 0650 1,110 M 20.00$ 22,200.00$ 11,100.00$ 16,650.00$ 19,425.00$ 19,980.00$ 22,200.00$ 49,950.00$

61800-3000

Line 0660 215 M 22.00$ 4,730.00$ 2,150.00$ 3,225.00$ 3,655.00$ 3,870.00$ 4,300.00$ 9,675.00$

62000-4000

Line 0670 1 Each 40,000.00$ 40,000.00$ 5,000.00$ 20,000.00$ 18,000.00$ 14,000.00$ 30,000.00$ 15,000.00$

62101-2000

Line 0680 25 Each 350.00$ 8,750.00$ 7,500.00$ 7,500.00$ 9,375.00$ 5,000.00$ 2,500.00$ 18,750.00$

62200-2000

Line 0690 444 m3 200.00$ 88,800.00$ 26,640.00$ 133,200.00$ 100,788.00$ 222,000.00$ 53,280.00$ 288,600.00$

62200-4000

Line 0700 60 m3 250.00$ 15,000.00$ 3,600.00$ 18,000.00$ 13,800.00$ 30,000.00$ 12,000.00$ 39,000.00$

62200-8000

Line 0710 595 m3 125.00$ 74,375.00$ 35,700.00$ 178,500.00$ 59,500.00$ 59,500.00$ 29,750.00$ 44,625.00$

62200-9000

Line 0720 80 m3 300.00$ 24,000.00$ 4,800.00$ 24,000.00$ 22,960.00$ 56,000.00$ 24,000.00$ 52,000.00$ 60.00$ 300.00$ 287.00$ 700.00$ 300.00$ 650.00$

60.00$ 300.00$ 100.00$ 100.00$ 50.00$ 75.00$

60.00$ 300.00$ 230.00$ 500.00$ 200.00$ 650.00$

60.00$ 300.00$ 227.00$ 500.00$ 120.00$ 650.00$

300.00$ 300.00$ 375.00$ 200.00$ 100.00$ 750.00$

5,000.00$ 20,000.00$ 18,000.00$ 14,000.00$ 30,000.00$ 15,000.00$

10.00$ 15.00$ 17.00$ 18.00$ 20.00$ 45.00$

10.00$ 15.00$ 17.50$ 18.00$ 20.00$ 45.00$

100.00$ 200.00$ 125.00$ 200.00$ 350.00$ 175.00$

400.00$ 600.00$ 575.00$ 625.00$ 1,300.00$ 800.00$

1,000.00$ 1,000.00$ 1,600.00$ 900.00$ 1,000.00$ 750.00$

36" Reinforced Concrete Pipe Class-III

12" End Section (RCP)

66" Reinforced Concrete Pipe Class V

15" Reinforced Concrete Pipe Class-III

6" PVC Pipe, SCH 40

Special Headwall (HWY-218)

Inlet, Type I, Depth 4.18m

6 inch Pipe Underdrain, Type PVC

8 inch Pipe Underdrain, Perforated, Type PVC

12 inch Pipe Underdrain, Perforated, Type PVC

4 inch Pipe Underdrain, Perforated, Type PVC (Weep Holes)

W-Beam Guardrail, Single Face

36" Headwall, Type A

Inlet, Type I, Depth 4.3m

Inlet Adjustments

Inlet, Type Custom

Inlet, Type I, Depth 1.74m

Double Grate Inlet, Type 1, Depth 1.7m

Traffic Sign Assembly, Code 1

Traffic Sign Assembly, Code 2

Gabions

Concrete Paved Waterway (Swale)

Thermoplastic Pavement Marking Stripes, White

Thermoplastic Pavement Marking Stripes, Yellow

Removal, Storage and Delivery of Existing Guardrail

Crashworthy End Terminal, Type 1, TL-3

ThrieBeam Transition Section, Type I

Barbed Wire Fence, Type A

Concrete Barrier, Type F

Field Office

Traffic Impact Attenuation Module, Type 4

Right-of-way Marker

Dumped Riprap, Class I

Dumped Riprap, Class III

Filter Blanket

Dumped Riprap, Class VII

2,500.00$ 2,000.00$ 3,600.00$ 1,000.00$ 5,000.00$ 1,500.00$

500.00$ 400.00$ 527.00$ 1,000.00$ 800.00$ 900.00$

120.00$ 200.00$ 370.00$ 550.00$ 1,000.00$ 750.00$

3,000.00$ 4,000.00$ 3,500.00$ 2,000.00$ 3,000.00$ 4,500.00$

10,000.00$ 15,000.00$ 7,000.00$ 25,000.00$ 30,000.00$ 15,000.00$

35.00$ 90.00$ 125.00$ 300.00$ 200.00$ 125.00$

15,000.00$ 10,000.00$ 10,200.00$ 8,500.00$ 35,000.00$ 27,500.00$

10,000.00$ 6,000.00$ 2,500.00$ 6,000.00$ 20,000.00$ 3,500.00$

6,000.00$ 8,000.00$ 10,200.00$ 8,500.00$ 50,000.00$ 4,500.00$

1,000.00$ 4,000.00$ 1,200.00$ 8,000.00$ 3,000.00$ 2,500.00$

16,000.00$ 20,000.00$ 12,000.00$ 7,000.00$ 25,000.00$ 7,500.00$

15,000.00$ 15,000.00$ 10,000.00$ 6,500.00$ 20,000.00$ 7,500.00$

40.00$ 80.00$ 75.00$ 80.00$ 150.00$ 75.00$

15,000.00$ 12,000.00$ 12,000.00$ 8,500.00$ 20,000.00$ 27,000.00$

60.00$ 110.00$ 150.00$ 80.00$ 200.00$ 150.00$

40.00$ 90.00$ 100.00$ 80.00$ 300.00$ 75.00$

150.00$ 220.00$ 280.00$ 450.00$ 300.00$ 550.00$

20.00$ 50.00$ 57.00$ 80.00$ 100.00$ 95.00$

1,000.00$ 8,000.00$ 10,000.00$ 10,500.00$ 14,000.00$ 10,000.00$

20.00$ 40.00$ 75.00$ 50.00$ 200.00$ 225.00$

200.00$ 100.00$ 110.00$ 140.00$ 150.00$ 75.00$

7,000.00$ 6,000.00$ 11,000.00$ 10,500.00$ 10,000.00$ 3,000.00$

1,000.00$ 1,000.00$ 1,000.00$ 900.00$ 500.00$ 750.00$

5,000.00$ 2,000.00$ 5,000.00$ 5,000.00$ 6,000.00$ 15,000.00$

100.00$ 350.00$ 500.00$ 450.00$ 2,000.00$ 850.00$

5/28/2024 Page 3 of 4

Schedule Total of Bid Items: 6,735,000.00$ -4.2% 6,449,997.50$ 0.7% 6,781,000.00$ 3.9% 6,997,723.00$ 16.4% 7,842,545.00$ 30.0% 8,754,000.00$ 53.0% 10,302,337.00$ Project No: PR ER DOT PRMNT RPR(18)

Project Name: PR-144, HWY-203, 205; PR-146, HWY-218, 220, 221, 224; PR-149, HWY-227, 228

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

C t ti S d St ki

JJM CONSTRUCTION, CORP.LPC CONTRACTORS, INC. NOVEL CONSTRUCTION, LLC LEZ ENGINEERING & CONTRACTORS, C JPI CONSTRUCTION, LLC CONSTRUCCIONES JOSE CARRO, S.E.

62500-1000

Line 0730 70 m3 80.00$ 5,600.00$ 4,200.00$ 5,600.00$ 1,890.00$ 4,200.00$ 3,500.00$ 17,500.00$

63504-2000

Line 0740 1 CTSM 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$

63504-6000

Line 0750 ALL LPSM 22,500.00$ 22,500.00$ 200,000.00$ 20,000.00$ 30,000.00$ 75,000.00$ 10,000.00$ 13,771.00$

63600-1000

Line 0760 215 M 190.00$ 40,850.00$ 64,500.00$ 11,395.00$ 26,875.00$ 43,000.00$ 43,000.00$ 75,250.00$

63600-4000

Line 0770 4 Each 2,000.00$ 8,000.00$ 8,000.00$ 12,000.00$ 4,400.00$ 6,000.00$ 16,000.00$ 6,000.00$

63604-8000

Line 0780 1 CTSM 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$

63801-1000

Line 0790 ALL LPSM 531,000.00$ 531,000.00$ 700,000.00$ 548,725.00$ 30,000.00$ 670,000.00$ 600,000.00$ 35,000.00$

64000-7000

Line 0800 7 Each 12.00$ 84.00$ 35.00$ 140.00$ 280.00$ 210.00$ 210.00$ 525.00$

64000-8000

Line 0810 37 Each 12.00$ 444.00$ 185.00$ 740.00$ 1,480.00$ 1,110.00$ 1,110.00$ 2,775.00$

64000-9000

Line 0820 69 Each 10.00$ 690.00$ 345.00$ 1,380.00$ 2,760.00$ 2,070.00$ 2,070.00$ 5,175.00$

66100-1000

Line 0830 3 Each 2,000.00$ 6,000.00$ 9,000.00$ 15,000.00$ 15,000.00$ 12,000.00$ 15,000.00$ 22,500.00$

92600-0000

Line 0840 190 m2 1,500.00$ 285,000.00$ 76,000.00$ 190,000.00$ 399,000.00$ 285,000.00$ 285,000.00$ 161,500.00$

93400-1000

Line 0850 99 m3 1,300.00$ 128,700.00$ 29,700.00$ 128,700.00$ 89,100.00$ 148,500.00$ 79,200.00$ 89,100.00$

93400-2000

Line 0860 35 m3 1,375.00$ 48,125.00$ 14,000.00$ 45,500.00$ 35,000.00$ 52,500.00$ 56,000.00$ 33,250.00$

93400-3000

Line 0870 309 m3 1,450.00$ 448,050.00$ 123,600.00$ 401,700.00$ 339,900.00$ 463,500.00$ 556,200.00$ 308,691.00$

93501-0000

Line 0880 8 Each 1,500.00$ 12,000.00$ 4,000.00$ 10,400.00$ 24,000.00$ 8,000.00$ 32,000.00$ 20,000.00$ 500.00$ 1,300.00$ 3,000.00$ 1,000.00$ 4,000.00$ 2,500.00$

400.00$ 1,300.00$ 1,100.00$ 1,500.00$ 1,800.00$ 999.00$

400.00$ 1,300.00$ 1,000.00$ 1,500.00$ 1,600.00$ 950.00$

300.00$ 1,300.00$ 900.00$ 1,500.00$ 800.00$ 900.00$

400.00$ 1,000.00$ 2,100.00$ 1,500.00$ 1,500.00$ 850.00$

3,000.00$ 5,000.00$ 5,000.00$ 4,000.00$ 5,000.00$ 7,500.00$

5.00$ 20.00$ 40.00$ 30.00$ 30.00$ 75.00$

5.00$ 20.00$ 40.00$ 30.00$ 30.00$ 75.00$

5.00$ 20.00$ 40.00$ 30.00$ 30.00$ 75.00$

700,000.00$ 548,725.00$ 30,000.00$ 670,000.00$ 600,000.00$ 35,000.00$

30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$

2,000.00$ 3,000.00$ 1,100.00$ 1,500.00$ 4,000.00$ 1,500.00$

300.00$ 53.00$ 125.00$ 200.00$ 200.00$ 350.00$

200,000.00$ 20,000.00$ 30,000.00$ 75,000.00$ 10,000.00$ 13,771.00$

30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$

60.00$ 80.00$ 27.00$ 60.00$ 50.00$ 250.00$

Furnishing and Placing Loamy Topsoil

Utility Company Compensation (PREPA)

Adjustment of Facilities (PREPA)

4" PVC Pipe, DR 14

4" Gate Valve

Utility Company Compensation (PRASA)

Structural Concrete, Class III (General Use)

Structural Concrete, Class IV (General Use)

Structural Concrete, Class V (General Use)

Locate Utility, Test Pit

Maintenance of Traffic (MOT)

Reflective Raised Pavement Markers, Two way, Yellow-Yellow

Reflective Raised Pavement Markers, Two way, Clear-Red

Reflective Raised Pavement Markers, Two way, Clear-Clear

Project Funding Sign

Mechanically Stabilized Earth Wall (MSE)

5/28/2024 Page 4 of 4

Bid Tabs Summary
Bid Tabs