Results of Bid Opening - Project LA FW LOP 10(5).pdf
PDF 125 KB Posted
- Attached to
- Lake Ophelia National Wildlife Refuge
- Solicitation number
- 693C73-24-B-000012
About this file
This document is the results of a bid opening for Solicitation No. 693C73-24-B-000012, Project LA FW LOP 10(5), for the rehabilitation of Lake Long Road and School Board Road within the Lake Ophelia National Wildlife Refuge in Avoyelles Parish, Louisiana. The project consists of regraveling approximately 10 miles of Lake Long Road and 3 miles of School Board Road, drainage work, and other miscellaneous work. The project is split into multiple work schedules/contract options, with the total cost expected to be between $2,000,000 and $5,000,000. The bid opening was held on June 11, 2024 at 2:00 p.m. local time in Ashburn, VA. Ten bidders submitted bids, with the low bid of $2,759,950 from Cherokee Earthworks LLC and the high bid of $7,039,323.40 from McKenzie Construction and Site Development, LLC. The performance period is 80 calendar days if the Government awards the contract as Schedules A + B + C, or 65 calendar days for Schedule A, 25 calendar days for Schedule B, and 15 calendar days for Schedule C if awarded separately.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - LA FW LOP 10(5).pdf | ||
| Amendment 0001 - LA FW LOP 10(5).pdf | ||
| VETS-4212 Form.pdf | ||
| FP14_Eng.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| Plans - LA FW LOP 10(5).pdf | ||
| ADV Bidders Qualifications Form.doc | DOC document | |
| IFB Solicitation - LA FW LOP 10(5).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Lake Ophelia National Wildlife Refuge
PROJECT: LA FW LOP 10(5)
SOLICITATION NO. 693C73-24-B-000012
June 11, 2024 at 2:00 p.m.
Ashburn, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)
June 11, 2024, 2:00 p.m. local time
BIDDERS BID TOTALS TOTAL PRICE
AAA Valley Gravel, LLC
SCHEDULE A
$3,315,550.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,341,880.00
SCHEDULE C (GOVERNMENT OPTION 2)
$485,000.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$5,124,430.00
Apeck Construction, LLC
SCHEDULE A
$3,737,403.49
SCHEDULE B (GOVERNMENT OPTION 1)
$1,316,442.15
SCHEDULE C (GOVERNMENT OPTION 2)
$384,086.01
SCHEDULE A + OPTION 1 + OPTION 2 =
$5,437,931.65
Brudd Construction Company, LLC
SCHEDULE A
$3,482,370.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,058,430.00
SCHEDULE C (GOVERNMENT OPTION 2)
$317,714.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,858,514.00
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.
If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.
BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)
June 11, 2024, 2:00 p.m. local time
BIDDERS BID TOTALS TOTAL PRICE
Central Southern Construction
SCHEDULE A
$3,901,000.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,015,900.00
SCHEDULE C (GOVERNMENT OPTION 2)
$332,000.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$5,248,900.00
Cherokee Earthworks LLC
SCHEDULE A
$1,906,875.00
SCHEDULE B (GOVERNMENT OPTION 1)
$655,500.00
SCHEDULE C (GOVERNMENT OPTION 2)
$197,575.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$2,759,950.00
Eclipse Co., LLC
SCHEDULE A
$4,084,000.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,438,700.00
SCHEDULE C (GOVERNMENT OPTION 2)
$509,200.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$6,031,900.00
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.
If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.
BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)
June 11, 2024, 2:00 p.m. local time
BIDDERS BID TOTALS TOTAL PRICE
E & L Construction Group LLC
SCHEDULE A
$2,441,740.00
SCHEDULE B (GOVERNMENT OPTION 1)
$838,340.00
SCHEDULE C (GOVERNMENT OPTION 2)
$265,240.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,545,320.00
Genesis 360, LLC
SCHEDULE A
$3,202,087.20
SCHEDULE B (GOVERNMENT OPTION 1)
$1,130,560.45
SCHEDULE C (GOVERNMENT OPTION 2)
$412,965.58
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,745,613.23
Justin J. Reeves, LLC
SCHEDULE A
$3,019,647.35
SCHEDULE B (GOVERNMENT OPTION 1)
$963,058.39
SCHEDULE C (GOVERNMENT OPTION 2)
$307,295.02
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,290,000.76
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.
If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.
BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)
June 11, 2024, 2:00 p.m. local time
BIDDERS BID TOTALS TOTAL PRICE
Keiland Construction, LLC
SCHEDULE A
$2,256,456.31
SCHEDULE B (GOVERNMENT OPTION 1)
$760,041.65
SCHEDULE C (GOVERNMENT OPTION 2)
$237,585.18
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,254,083.14
McKenzie Construction and Site Development, LLC
SCHEDULE A
$4,932,955.63
SCHEDULE B (GOVERNMENT OPTION 1)
$1,611,878.73
SCHEDULE C (GOVERNMENT OPTION 2)
$494,489.04
SCHEDULE A + OPTION 1 + OPTION 2 =
$7,039,323.40
Tarpan Construction, LLC
SCHEDULE A
$3,217,500.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,085,070.00
SCHEDULE C (GOVERNMENT OPTION 2)
$329,700.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,632,270.00
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.
If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.
BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)
June 11, 2024, 2:00 p.m. local time
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.
If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.
BIDDERS BID TOTALS TOTAL PRICE
T&L Dirtwork Inc.
SCHEDULE A
$2,499,825.00
SCHEDULE B (GOVERNMENT OPTION 1)
$742,320.00
SCHEDULE C (GOVERNMENT OPTION 2)
$256,900.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,499,045.00
Engineer’s Estimate
SCHEDULE A
$2,546,875.00
SCHEDULE B (GOVERNMENT OPTION 1)
$879,300.00
SCHEDULE C (GOVERNMENT OPTION 2)
$276,960.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,703,135.00
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time � |
| ��FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time�� |
File details come from the government source that posted it. Updated .