Results of Bid Opening - Project LA FW LOP 10(5).pdf

PDF 125 KB Posted

Attached to
Lake Ophelia National Wildlife Refuge
Solicitation number
693C73-24-B-000012
Issued by

About this file

This document is the results of a bid opening for Solicitation No. 693C73-24-B-000012, Project LA FW LOP 10(5), for the rehabilitation of Lake Long Road and School Board Road within the Lake Ophelia National Wildlife Refuge in Avoyelles Parish, Louisiana. The project consists of regraveling approximately 10 miles of Lake Long Road and 3 miles of School Board Road, drainage work, and other miscellaneous work. The project is split into multiple work schedules/contract options, with the total cost expected to be between $2,000,000 and $5,000,000. The bid opening was held on June 11, 2024 at 2:00 p.m. local time in Ashburn, VA. Ten bidders submitted bids, with the low bid of $2,759,950 from Cherokee Earthworks LLC and the high bid of $7,039,323.40 from McKenzie Construction and Site Development, LLC. The performance period is 80 calendar days if the Government awards the contract as Schedules A + B + C, or 65 calendar days for Schedule A, 25 calendar days for Schedule B, and 15 calendar days for Schedule C if awarded separately.

View the file

Other files

File Type Posted
Amendment 0002 - LA FW LOP 10(5).pdf PDF
Amendment 0001 - LA FW LOP 10(5).pdf PDF
VETS-4212 Form.pdf PDF
FP14_Eng.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
Plans - LA FW LOP 10(5).pdf PDF
ADV Bidders Qualifications Form.doc DOC document
IFB Solicitation - LA FW LOP 10(5).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

Lake Ophelia National Wildlife Refuge

PROJECT: LA FW LOP 10(5)

SOLICITATION NO. 693C73-24-B-000012

June 11, 2024 at 2:00 p.m.

Ashburn, VA

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)

June 11, 2024, 2:00 p.m. local time

BIDDERS BID TOTALS TOTAL PRICE

AAA Valley Gravel, LLC

SCHEDULE A

$3,315,550.00

SCHEDULE B (GOVERNMENT OPTION 1)

$1,341,880.00

SCHEDULE C (GOVERNMENT OPTION 2)

$485,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$5,124,430.00

Apeck Construction, LLC

SCHEDULE A

$3,737,403.49

SCHEDULE B (GOVERNMENT OPTION 1)

$1,316,442.15

SCHEDULE C (GOVERNMENT OPTION 2)

$384,086.01

SCHEDULE A + OPTION 1 + OPTION 2 =

$5,437,931.65

Brudd Construction Company, LLC

SCHEDULE A

$3,482,370.00

SCHEDULE B (GOVERNMENT OPTION 1)

$1,058,430.00

SCHEDULE C (GOVERNMENT OPTION 2)

$317,714.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$4,858,514.00

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.

If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.

BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)

June 11, 2024, 2:00 p.m. local time

BIDDERS BID TOTALS TOTAL PRICE

Central Southern Construction

SCHEDULE A

$3,901,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$1,015,900.00

SCHEDULE C (GOVERNMENT OPTION 2)

$332,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$5,248,900.00

Cherokee Earthworks LLC

SCHEDULE A

$1,906,875.00

SCHEDULE B (GOVERNMENT OPTION 1)

$655,500.00

SCHEDULE C (GOVERNMENT OPTION 2)

$197,575.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$2,759,950.00

Eclipse Co., LLC

SCHEDULE A

$4,084,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$1,438,700.00

SCHEDULE C (GOVERNMENT OPTION 2)

$509,200.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$6,031,900.00

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.

If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.

BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)

June 11, 2024, 2:00 p.m. local time

BIDDERS BID TOTALS TOTAL PRICE

E & L Construction Group LLC

SCHEDULE A

$2,441,740.00

SCHEDULE B (GOVERNMENT OPTION 1)

$838,340.00

SCHEDULE C (GOVERNMENT OPTION 2)

$265,240.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$3,545,320.00

Genesis 360, LLC

SCHEDULE A

$3,202,087.20

SCHEDULE B (GOVERNMENT OPTION 1)

$1,130,560.45

SCHEDULE C (GOVERNMENT OPTION 2)

$412,965.58

SCHEDULE A + OPTION 1 + OPTION 2 =

$4,745,613.23

Justin J. Reeves, LLC

SCHEDULE A

$3,019,647.35

SCHEDULE B (GOVERNMENT OPTION 1)

$963,058.39

SCHEDULE C (GOVERNMENT OPTION 2)

$307,295.02

SCHEDULE A + OPTION 1 + OPTION 2 =

$4,290,000.76

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.

If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.

BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)

June 11, 2024, 2:00 p.m. local time

BIDDERS BID TOTALS TOTAL PRICE

Keiland Construction, LLC

SCHEDULE A

$2,256,456.31

SCHEDULE B (GOVERNMENT OPTION 1)

$760,041.65

SCHEDULE C (GOVERNMENT OPTION 2)

$237,585.18

SCHEDULE A + OPTION 1 + OPTION 2 =

$3,254,083.14

McKenzie Construction and Site Development, LLC

SCHEDULE A

$4,932,955.63

SCHEDULE B (GOVERNMENT OPTION 1)

$1,611,878.73

SCHEDULE C (GOVERNMENT OPTION 2)

$494,489.04

SCHEDULE A + OPTION 1 + OPTION 2 =

$7,039,323.40

Tarpan Construction, LLC

SCHEDULE A

$3,217,500.00

SCHEDULE B (GOVERNMENT OPTION 1)

$1,085,070.00

SCHEDULE C (GOVERNMENT OPTION 2)

$329,700.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$4,632,270.00

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.

If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.

BID OPENING for SOLICITATION NO. 693C73-24-B-000012 Project: LA FW LOP 10(5)

June 11, 2024, 2:00 p.m. local time

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 80 calendar days.

If separate: Schedule A will be 65 calendar days, Schedule B will be 25 calendar days, and Schedule C will be 15 calendar days.

BIDDERS BID TOTALS TOTAL PRICE

T&L Dirtwork Inc.

SCHEDULE A

$2,499,825.00

SCHEDULE B (GOVERNMENT OPTION 1)

$742,320.00

SCHEDULE C (GOVERNMENT OPTION 2)

$256,900.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$3,499,045.00

Engineer’s Estimate

SCHEDULE A

$2,546,875.00

SCHEDULE B (GOVERNMENT OPTION 1)

$879,300.00

SCHEDULE C (GOVERNMENT OPTION 2)

$276,960.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$3,703,135.00

Slide Number 1
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time �
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time �
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time �
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time �
��FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-24-B-000012� Project: LA FW LOP 10(5)�June 11, 2024, 2:00 p.m. local time��

File details come from the government source that posted it. Updated .