Calibration_SOW_FY19.pdf
PDF 85 KB Posted
- Attached to
- FHWA EFLHD CALIBRATION SERVICES Federal contract opportunity
- Solicitation number
- 693C7319Q000002
About this file
STATEMENT OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CalRefProc_Att(C).pdf | ||
| CSC_Work_Att(A)a_FY19.pdf | ||
| CalCertReq_Att(B)_FY19.pdf | ||
| RFQ_NO._693C7319Q000002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Introduction and Overview
The Materials Laboratory performs testing for the Eastern Federal Lands Highway Division (EFLHD) of the Federal Lands Highway Administration (FHWA). The Lab performs testing materials used in highway construction. The testing includes materials information needed for project development and during active construction projects.
Testing services are also provided to other government agencies upon request.
The laboratory is AASHTO and ISO/IEC 17025 accredited.
The lab is divided into four main testing areas: the Soils & Aggregate section, the Asphalt Mixture section, the Asphalt Binder & Emulsion section, and the Concrete section. A different EFLHD Lab Technician coordinates the work in each section and is designated as Section Leader.
The laboratory utilizes external calibration service providers (Provider) to perform calibration work on its equipment.
Ordering the Work
The laboratory's representative will initiate, in writing, the cost quotation process with details of items to receive Calibration, Standardization, or Check (C/S/C work), and identify the appropriate AASHTO/ASTM test method criteria governing the use of the items. The service Provider then replies with a written price quote. Upon the laboratories acceptance of the price quote, the C/S/C work will be authorized and scheduled.
Cost estimate quotations from the Provider must be itemized for travel, qualified labor, equipment, parts and materials needed to perform the C/S/C work and provide the certificate.
Work Requirements
Calibration work must conform to the most current published standard of AASHTO R-18 and ISO/IEC 17025 and is designated as Calibration, Standardization, or Check (C/S/C work).
The calibration service provider (Provider) furnishes own equipment/tools and materials, as well as the trained, qualified technician(s), to perform the C/S/C work.
Attachment “C” Calibration procedures are provided as a reference only. The calibration procedures provided represent a minimum standard of calibration services. In-house or other calibration procedures may be used with the minimum requirement met from the calibration procedures provided. Not all calibration procedures for every piece of equipment are available.
Work Hours and Laboratory Facility Access
The C/S/C work typically occurs on-site in the laboratory. On-site work must occur between regular shift hours, 0600 to 1630 Monday through Friday, except observed holidays when closed. A temporary gate access code and temporary access badge will be issued and returned upon completion of work.
On-Site C/S/C Work
Attachment "A" is a list of C/S/C work items in the laboratory.
The C/S/C work must conform to the requirements of the AASHTO R-18 Tables, and in compliance with specified AASHTO and ASTM test methods/specifications; and includes minor adjustments necessary to bring the item within specified tolerances, as well as routine maintenance (such as cleaning) necessary to perform the calibration accurately. In the event that unforeseen repairs or maintenance are found to be necessary that work must be authorized separately prior to performing the additional work.
The Section Leaders and Laboratory Team Leader are responsible for identifying and providing the items of C/S/C work to the Provider's technician(s). Deviations from the pre-approved written work order must be approved and authorized in advance of any additional work.
When there are large quantities of the same item, such as wire sieves, a detailed list of work to be done in each section will be given to the Provider's service technician the day the C/S/C work takes place.
As the C/S/C work is being completed, a laboratory employee (usually the Section Leader) approves completed work per the approved work order. Any deficiency in C/S/C work for compliance to AASHTO R-18 and ISO/IEC 17025 requirements must be corrected if found incomplete. At the end of each day a photocopy of the signed work order is received as documentation for invoice approval.
Provider also places a calibration sticker on each piece of equipment showing identification, Laboratory room number, date, next due date, and the service technician's signature.
All measures made in calibration shall be provided. A copy of worksheets must be provided when averages are reported. Otherwise all measurements shall be reported in entirety on the final calibration report. All recorded measurements must be provided.
If any items must be taken off-site to the Provider's facility, this must be approved in advance by the Laboratory Team Leader or designee.
After the equipment portion of the C/S/C work has been performed and approved, the Provider submits an invoice to the Laboratory Team Leader. An advance copy may be faxed; but to be processed, the original invoice must be submitted.
Certificates
Due to strict accreditation requirements, after the C/S/C work is performed, Provider must supply the laboratory with calibration certificates that conform to AASHTO Accreditation Program's policy Guide on Calibration and Traceability, and ISO/IEC 17025, which includes statements of measurements of uncertainty. Attachment "B" (Checklist) is information currently required on all certificates. The Checklist may be amended from time to time by the laboratory as dictated by AASHTO and ISO/IEC 17025 requirements and updates will be supplied to the Provider.
Certificates are to be delivered in the order of Attachment “B” (Checklist) as closely as possible.
Certificates are due within 30 days after the C/S/C work has been performed. Certificates will be checked by laboratory personnel within 30 days of receipt and if errors are found will be returned to the Provider for corrections and re-submitted. The C/S/C work will not be paid until correct certificates have been received.
Schedule
The established frequencies and intervals, which are required by AASHTO R-18 and the laboratories current schedule, will remain in effect and the C/S/C work ordered must occur within the specified month in order to maintain the appropriate schedule. However, unanticipated repairs may affect the intervals or schedule and will be handled on a case-by-case basis.
Typically, the C/S/C work is priced and ordered one to two months in advance. When the Provider calls the laboratory to schedule work, a minimum of three days advance notice is required to accommodate testing activities, which may be affected by C/S/C work.
Payment
C/S/C work services will be considered complete and payable upon the receipt of the completed, correct certificates and the invoice for work performed.
File details come from the government source that posted it.