Results_of_Bid_Opening_(ROBO)_-_FW-OCBA_T302(1).pdf
PDF 108 KB Posted
- Solicitation number
- 693C73-19-B-000034
About this file
Results of Bid Opening (ROBO)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001_-_FW-OCBA_T302(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_-_Form_-_2018.pdf | ||
| IFB_Solicitation_-_FW-OCBA_T302(1).pdf | ||
| FP14_Eng.pdf | ||
| NEPA_CE.pdf | ||
| Hydraulic_Memo.pdf | ||
| Plans_-_FW-OCBA_T302(1).pdf | ||
| Synopsis_-_FW-OCBA_T302(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Occoquan Bay National Wildlife Refuge
PROJECT: FW-OCBA T302(1)
SOLICITATION NO. 693C73-19-B-000034
August 15, 2019 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-19-B-000034 Project: FW-OCBA T302(1) August 15, 2019, 2:00 p.m. local time
BIDDER’S BID TOTALS TOTAL PRICE
Aspens Construction Company SCHEDULE A
$329,870.00
SCHEDULE B (OPTION 1)
$110,000.00
SCHEDULE C (OPTION 2)
$114,200.00
SCHEDULE D (OPTION 3)
$109,800.00
SCHEDULE E (OPTION 4)
$138,130.00
SCHEDULES A THRU E
$802,000.00
Kovilic Construction Co, Inc SCHEDULE A
$531,950.00
SCHEDULE B (OPTION 1)
$332,850.00
SCHEDULE C (OPTION 2)
$312,875.00
SCHEDULE D (OPTION 3)
$316,650.00
SCHEDULE E (OPTION 4)
$422,000.00
SCHEDULES A THRU E
$1,916,325.00
If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be 185 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-19-B-000034 Project: FW-OCBA T302(1) August 15, 2019, 2:00 p.m. local time
If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be 185 calendar days.
BIDDER’S BID TOTALS TOTAL PRICE
Eclipse Co. SCHEDULE A
$713,050.10
SCHEDULE B (OPTION 1)
$570,957.50
SCHEDULE C (OPTION 2)
$567,745.00
SCHEDULE D (OPTION 3)
$570,245.00
SCHEDULE E (OPTION 4)
$660,220.00
SCHEDULES A THRU E
$3,082,217.60
Engineer’s Estimate SCHEDULE A
$195,000.00
SCHEDULE B (OPTION 1)
$115,000.00
SCHEDULE C (OPTION 2)
$115,000.00
SCHEDULE D (OPTION 3)
$115,000.00
SCHEDULE E (OPTION 4)
$135,000.00
SCHEDULES A THRU E
$675,000.00
| Slide Number 1 |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-19-B-000034 Project: FW-OCBA T302(1)�August 15, 2019, 2:00 p.m. local time � |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION� BID OPENING for SOLICITATION NO. 693C73-19-B-000034 Project: FW-OCBA T302(1)�August 15, 2019, 2:00 p.m. local time �If the Government awards the contract as Schedules A + B + C + D + E, the performance period to�complete all contract work will be 185 calendar days. |
File details come from the government source that posted it.