DESCRIPTION OF PROJECT
IMPROVEMENT:
PLANS PREPARED BY
U.S. DEPARTMENT OF THE INTERIOR
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
DESIGN DESIGNATION:
SPECIFICATIONS:
and Bridges on Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads
INDEX TO SHEETS
DESCRIPTION
SHEET
PLAN
Administration
Federal Highway
U.S. Department of Transportation
A01 50
STATE OF NORTH CAROLINA
EASTERN TENNESSEE AND
KEY MAP
SCALE IN MILES
0 50 100
Knoxville
Chattanooga Asheville
Raleigh
Wilmington
Charlotte
Greensboro81
26 85
Virginia
South C a ro lin a
T e n n
N C a r.
At la nt ic
Oc ea n
N www.nc811.org
1-800-632-4949
811 or
Waynesville
Newport
Dou gla s L ak e
Townsend
Dome
Clingman's
Cher okee
City
Bryson
Sevierville
Pigeon Forge
Gatlinburg
Natio nal
Park
Great
S moky
Moun tains
NORT
HTE
N N E
S E E
S C A
O R
L
IN
A
N
Fontana Lake
INTERSTATE
INTERSTATE
INTERSTATE
441 411
23 276
SCALE IN MILES
50 10
B lu e
Ridge
P k w y
Maryville
Cove
Cades
Alcoa
R.
A
N .C
N T
INTERSTATE
INTERSTATE
INTERSTATE
75 INTERSTATE
INTERSTATE
Fo o th ill s P a rk w a y
Knoxville
N
E
UNESCO
PLANS FOR PROPOSED
NATIONAL PARK SERVICE
GREAT SMOKY MOUNTAINS NATIONAL PARK
PMIS# 157219
WORLD HERITAGE SITE
PROJECT NP-GRSM 116(1)
SWAIN COUNTY, NORTH CAROLINA
PROJECT NP-GRSM 116(1)
asphalt concrete overlay markings, and other miscellaneous work.
patching, crack cleaning and sealing, permanent pavement area roads, parking areas, and pull-offs, pavement of the Deep Creek Work includes
Standards and Details
Temporary Traffic Control Narrative & Plan
Erosion and Sediment Control Narrative
Tabulation of Quantities and Summary Sheets
Typical Sections
Park Map, Project Location Map
Symbols And Abbreviations
Road Inventory Data and Structure Summary
Title Sheet
S01-S19
N01-N02
M01-M02
C01-C18
B01-B04
A04-A05
A03
A02
A01
PROJECT NP-GRSM 116(1)
LANE MILES:
PROJECT LENGTH:
4.44
3.28 miles
STRUCTURE:
Project Manager Lead DesignerHighway Design Manager
Katerina Roman Mark HooverAlazar Feleke
Posted speeds for all roads are 15 MPH
51¼" ACP17-18'Deep Creek Maintenance and Residence Road
31¼" ACP11-12'Deep Creek Campground Loop 2
31¼" ACP12-13'Deep Creek Campground Loop 1
31¼" ACP18-19'Deep Creek Campground/Tent/Group Access Road
31¼" ACP17-18'Deep Creek Picnic Area Road
21¼" ACP18-19'East Deep Creek Road
21¼" ACP25-27'Deep Creek Campground Entrance Road
11¼" ACP19-20'West Deep Creek Road
CLASSSURFACEWIDTHROAD:
NPS
Creek Road (Rte. 0116) only.
Design designation listed for West Deep
NoneC/A
NCe (max)
20 MPHV (design)
1%Buses
1%Trucks
50/50D
110DHV
460Design ADT (2029)
710Seasonal ADT (2019)
440Current ADT (2019)
0116Route No.
OVERLAY OF DEEP CREEK AREA ROADS
Structure No. 5460-106P, Last inspected 05/23/2017
Tom Branch Road Bridge
Structure No. 5460-100P, Last inspected 05/23/2017
Deep Creek Campground Entrance Bridge
MAY 2019
SHEETS
TOTAL
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D A g r s m tt l.
d g n
STATE
NC
PROJECT
No.
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
151,619
A02
STRUCTURE SUMMARY
AND
ROAD INVENTORY DATA
divided by 11 before converting to miles.
11-foot (nominal) lane width to convert into the linear measure. The reported square footage value is
Lane miles for miscellaneous features such as pull-offs and parking areas are determined by using an2.
Lane Miles are calculated by multiplying the centerline roadway length by the number of through lanes.1.
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D A g r s m tt l.
d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
PROJECT
GREAT SMOKY MOUNTAINS NATIONAL PARK
No.
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
A03 R/W
R/W
No Symbol
P or
UD UD
W
No Symbol
P or
UD UD
W c
PROPOSEDEXISTING
PROJECTED
EXISTING PROPOSED
B-1
TP-1
ABBREVIATIONS
SYMBOLS AND
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C L
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
FO=Fibre optics
T=Telephone, P&T or E&T=Joint Power/Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics, P&T=power/electric SD=storm drain, T=telephone, W=water G=gas, O=oil, P=power, SA or FMS=sanitary sewer, UNDERGROUND UTILITIES
UNABLE TO DETERMINE
ELECTRIC BOX, PULL BOX, or
TELEPHONE BOOTH or PEDESTAL, or UTD
TB, TP, EB, PB,
or UTD
TB, TP, EB, PB,
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Vertical point of intersection VPI
Vehicle per hour vph embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
Back BK
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
MATERIAL SOURCE
NORTH ARROW
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
DIVERSION CHANNEL
TEST PIT
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
LARGE CREEK/RIVER
RAILROAD
SPRING
TRAIL
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
RETAINING WALL
STREET LIGHT
SUPPORT POLE with ANCHOR
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MEDIAN & SIDE (CONCRETE) BARRIER
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
MULTIPLE TRACK
EOP
EOG
INTERSTATE U.S. STATE
or wall face
R/W
R/W
P/E C/E
P
W
P/E C/E
P
W
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 wall face
P/LP/L
LIMITS OF DISTURBANCE (LOD)
WLWheel Line
V.C.Visitor Center
VCVertical Curve
TCTop of Curb
SDStorm Drain
ShldrShoulder
SSSanitary Sewer
RCPReinforced Concrete Pipe
RCBCReinforced Concrete Box Culvert
H.Q.Park Headquarters
NMSANominal Maximum Size Aggregate
NFGNewfound Gap
IEInvert Elevation
GRSMGreat Smoky Mountains National Park
GBYGatlinburg Bypass
FHPFoothills Parkway
Ex or ExistExisting
CPControl Point
BYPBypass
ACPAsphalt Concrete Pavement
GENERAL:
SYSolid Yellow
SWSolid White
DSYDouble Solid Yellow
DWDotted White
BYBroken Yellow
BWBroken White
PAVEMENT MARKINGS:
ASPHALT PAVEMENT PATCHING, TYPE 1 OR 2
N
FIBER ROLLS
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D A g r s m s y m .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
SCALE IN MILES
30 6
A04
PARK MAP
PROJECT NP-GRSM 116(1)
of roads and parking areas within the Deep Creek Area.
Refer to the Project Location Map for schedule breakdown
NOTE:
INTERSTATE
INTERSTATE
SPRINGS
KINZEL
COVE CREEK
DELLWOOD
GATLINBURG
COSBY
HAYWOOD CO.
SWAIN CO.
C O
C K
E C
O
S E
V
IE
R C
O
G R
A H
A M C
O
S W
A I N C
O
GAPROAD
N
EW
FO
UN
D
S E
V I E
R C
O
B L
O U
N T C
O
LAKE
CATALOOCHEE
A P P A
LA
C H
IA
N
T R A
ILS
E V
IE
R C
O
B L O
U N
T C
O
CHILHOWEE
PA
R S O
N B
R A N C H
R O
A D
WALLAND
V.C.
CADES
COVE
ABRAMS
CREEK
CLINGMANS
DOME
ELKMONT
GREENBRIER
BIG CREEK
FONTANA
TWENTYMILE
FONTANA
VILLAGE
ROCK
LOOK
CREEK
DEEP
V.C. & H.Q.
SUGARLANDS
COVE
WEAR
TRAIL
MOTOR NATURE
ROARING FORK
DAM
FONTANA
CAMPGROUND
COSBY
F O
O T
H I L L S
P A
R K
W A
Y
NATIO
NAL
PARKTRAIL
A P P
A L A
C H
IA
N
TENNESSEE
NORTH C
AROLIN
A
YA
W
K R
A
P
L
L I
H T
O O
F
SMOKEMONT
CHEROKEE
MAGGIE
BLUE RIDGE
PA
R K
W A Y
TO
BYP
MOUNTAIN
BALSAM
GREAT
SM
OKY
MOUNTAIN
BRYSON
CITY
(QUALLA BOUNDARY)
INDIAN RESERVATION
EASTERN CHEROKEE
PIGEON FORGE 321
R O
A D
INSTITUTE
TREMONT
L A
U R
E L C
R E E
K
(150 miles)
GEORGIA
TO ATLANTA,
(16 miles)
NORTH CAROLINA
TO ROBBINSVILLE,
(24 miles)
TENNESSEE
MARYVILLE,
TO
(10 miles)
TENNESSEE
MARYVILLE,
TO
TENNESSEE
& KNOXVILLE (34 miles), TO SEVIERVILLE (9 miles)
(10 miles)
TENNESSEE
TO NEWPORT,
(30 miles)
NORTH CAROLINA
TO ASHEVILLE,
(10 miles)
NORTH CAROLINA
TO DILLSBORO,
TOWNSEND
V.C.
OCONALUFTEE
E L
T
TI
L
EVOC SEDAC DA
OR P
O O
L
DR
P
A G
KEERC
N
EGROG
DAOR
REVIR
GNIT
H
GIF
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D A g r s m lo c .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
et R et R et R
10 etR
A et
R
Z C et R
Z B et R
Z B et R
ZB6320 etR
SCALE IN FEET
0 150 300 et R yl n
O st n e
T s eti S st n e T s'
V R
7 , 5-s eti
S st n e T s'
V R s eti
S1
2 3 yr a d n u o
B kr a P li ar
T e sr o
H k e er
C p e e
D
Station
Ranger
A05
PROJECT LOCATION MAP
d R yr et e m e C k e er C p e e D
Falls and Trail
To Indian Creek
(3 miles)
Route 19
To U.S.
To Bryson City (2.5 miles)
100P
106P hcnar B mahruD ke er
C p e e
D et R sff o -ll u p a er
A ci n ci
P
Parking
Trailer
Horse
N sr eli art ,s kc urt oN ;)devapnu( d a o
R h c n a r
B m o T et o
N e e S( et o
N e e S(
Residence
Garages
B
A
Kiosk
Campground*
Tom Branch Road Bridge5460-106P
Deep Creek Campground Entrance Bridge5460-100P
Structure NameStruct. No.
Bridge Structures
Campground Sites 53-77----
Campground Sites 43-52, 78-92----
Deep Creek Campground Dump Station104316
Deep Creek Campground Parking Area C #31039CZ15
Deep Creek Campground Parking Area C #21039BZ14
Deep Creek Campground Parking Area C #11039AZ13
Deep Creek Maintenance and Residence Road0445--
Deep Creek Campground Loop 20236CZ--
Deep Creek Campground Loop 10236BZ--
Deep Creek Campground / Tent / Group Access Road0236A--
SCHEDULE C
Picnic Area pull-offs--
Deep Creek Picnic Area Parking #81038HZ12
Deep Creek Picnic Area Parking #71038GZ11
Deep Creek Picnic Area Parking #61038FZ10
Deep Creek Picnic Area Parking #51038EZ9
Deep Creek Picnic Area Parking #41038DZ8
Deep Creek Picnic Area Parking #31038CZ7
Deep Creek Picnic Area Parking #21038BZ6
Deep Creek Picnic Area Parking #11038AZ5
Deep Creek Picnic Area Road0208--
SCHEDULE B
Deep Creek Campground Entrance Parking10424
Deep Creek Emergency Vehicle Parking10403
Deep Creek Falls and Trail Parking10362
Deep Creek Picnic Shelter Parking10411
East Deep Creek Road0167--
Deep Creek Campground Entrance Road0138--
West Deep Creek Road0116--
Route NameRte No.No.
SCHEDULE A
ROADS AND PARKING AREAS
Schedule B
Schedule A
Schedule A
). See sheet C05.Culvert replacement ( -†
See sheets C06 and C13, respectively.
).traffic loop detectors (main entrance, Transverse rumble strip pavement markings and -‡
See sheets B01 and C07.
).Asphalt concrete apron (two locations, -*
7. Miscellaneous work includes the following:
Campground Parking Area C #3.
dumpsters relocated from the end of road near Deep Creek of construction activities on Route 0236A to have the trash
6. Notify the CO at least 10 days in advance of the start to the plans and as directed by the CO.
vary in size and configuration. Pave these sites according campground sites 43-92. These Campground Site Pull-offs
5. Paved areas for vehicular parking are not shown for
Road and Tom Branch Road.
4. Commercial vehicles are prohibited on Newfound Gap
5460-100P and 5460-106P.
3. Do not pave the decks of Bridge Structure Numbers paving limits in the field.
2. The CO will mark the begin and end points of the
Deep Creek Road and East Deep Creek Road.
1. The project begins at the Park boundary line for West
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D A g r s m lo c .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
B01
TYPICAL SECTIONS
SCHEDULE A
NO SCALE
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURE
CL
Roadway exist.
Match exist.
Match
Existing ground
2'-0"
Shldr
Aggregate base, unknown depth
Asphalt concrete pavement, unknown depth
Asphalt tack coat varies
WEST DEEP CREEK ROAD
MP 0.40 to MP 0.58
Existing Concrete Curb and Sidewalk
WEST DEEP CREEK ROAD
Various locations
Flush Concrete Curb and Sidewalk Areas
Do not disturb existing concrete curb
Do not disturb existing concrete sidewalk
Proposed pavement
See Note 9
3'-0"
SCHEDULE A ROADS
See Paving Summary for locations varies
15'-0" min.
Pull-off or parking area
Existing ground exist.
Match
PARKING AREAS AND PULL-OFFS
Pave to face of existing wheelstop exist.
Match s ei r a v
Do not disturb wood bollard and railing
Concrete curb and sidewalk, 9'-6" to 10'-0"
Travel lane
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURE
Asphalt concrete pavement, unknown depth
Aggregate base, unknown depth
Asphalt tack coat type 2 (FDP-2), see detail Sheet B04
Asphalt concrete pavement patching, Proposed pavement
Width varies by road (see below)
Travel way
18'-0" to 19'-0"MP 0.00 to MP 0.12Deep Creek Campground Entrance Road to Park Boundary East Deep Creek Road
25'-0" to 27'-0"MP 0.00 to MP 0.14West Deep Creek Road to End of Loop Deep Creek Campground Entrance Road
19'-0" to 20'-0"MP 0.00 to MP 0.63Park Boundary to End of Road West Deep Creek Road
Travel Way WidthMP to MPDescriptionRoad Name
Asphalt Concrete Overlay:
Travel laneTravel lane
3'-0"
Ditch
8% max.
8% max.
2'-0"
Shldr
Recondition ditch, see
Notes 6 and 7 (Schedule D)
Aggregate-topsoil course, 2-inch depth, see Notes 5 and 7
2-inch depth, see Notes 5 and 7
Aggregate-topsoil course, Travel lane
Wood bollard
Wood railing
Do not disturb existing concrete wheelstop
Tom Branch Road Bridge
Entrance at Horse Trailer Parking and
Varies
12'-0"
Limits of disturbance
Asphalt concrete pavement, Type 2, 4-inch depth
Excavate existing material, depth varies
10'-0"
Asphalt apron
V :1
H
Roadway aggregate, Method 2, 4-inch depth variable depth
Roadway aggregate, Method 2, or bridge deck (Tom Branch Road Bridge)
End of paved entrance (Horse Trailer Parking)
-inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, Existing aggregate parking or road
Existing ground
ASPHALT CONCRETE TRANSITION APRON
protective sheeting as directed by the CO.
during all asphalt concrete operations with plastic or other features (i.e., decks, approach slabs, and concrete backwalls) concrete islands, concrete wheelstops, manholes, and bridge
11. Protect roadside elements such as stone curb, concrete curb, Branch Road Bridge.
Parking and to transition from the timber bridge deck of Tom paved entrance to the aggregate surface at Horse Trailer
10. Construct asphalt concrete apron to transition from the proposed asphalt pavement.
pavement overlay thickness to these features. Do not feather positive drainage. Provide for full depth of proposed asphalt drainage features (i.e., inlets, trench drains, etc.) to maintain
Also, perform variable depth milling adjacent to any fixed sidewalk flush with top of pavement to maintain existing grade.
9. Perform variable depth milling adjacent to concrete curb and existing bridge decks.
for begin and end of paving limits and to tie new paving into
8. Construct pavement transitions according to Detail E401-01
Section 625.
7. Apply turf establishment to disturbed areas according to tie into existing ground with minimal disturbance.
Reshape ditches as necessary to achieve positive drainage and at locations designated in the plans or as directed by the CO.
6. Perform ditch reconditioning according to Subsection 303.03 shoulders. Round hinge points as directed by the CO.
shoulder rollover is 8 percent for aggregate-topsoil course
½-inch below the finished top edge of pavement. Maximum a final shoulder elevation adjacent to the pavement edge, at by the CO. Place 2 inches of aggregate-topsoil course. Maintain
303.04 at locations designated in the plans or as directed
5. Perform shoulder reconditioning according to Subsection prior to placing asphalt overlay.
4. Seal all cracks according to Section 414 and Detail E414-01A
3. Limit asphalt overlay to within existing edge of pavements.
existing field conditions.
2. Match roadway cross slopes and superelevations to borings were performed for this project.
1. Existing pavement depths are unknown. No pavement
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D B g r s m ty p .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
B02
SCHEDULE B
NO SCALE
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURE
CL
Roadway exist.
Match exist.
Match
2'-0"
Shldr
Aggregate base, unknown depth
Asphalt concrete pavement, unknown depth
Asphalt tack coat
See Paving Summary for locations
15'-0" min.
Pull-off or parking area
Existing ground
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURE
exist.
Match
Asphalt concrete pavement, unknown depth
Aggregate base, unknown depth
DEEP CREEK PICNIC AREA ROAD
varies
17'-0" to 18'-0"
Travel lane
17'-0" to 18'-0"
Travel lane
Asphalt tack coat type 1 (FDP-1), see detail Sheet B04
Asphalt concrete pavement patching, 3'-0"
Ditch
8% max.
Aggregate-topsoil course, 2-inch depth, see Notes 5 and 7
Recondition ditch, see
Notes 6 and 7 (Schedule D)
-inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, Existing ground existing concrete wheelstop(s), see Note 10
Pave to face of existing wheelstop. Do not disturb
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURECL
Roadway exist.
Match exist.
Match
Aggregate base, unknown depth
Asphalt concrete pavement, unknown depth
Asphalt tack coat
17'-0" to 18'-0"
Travel lane type 1 (FDP-1), see detail Sheet B04
Asphalt concrete pavement patching, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, Existing ground
PROPOSED PAVEMENT STRUCTURE
exist.
Match
10'-0" to 12'-0"
Pull-off
Asphalt tack coat variable width
Existing grass median
-inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, 8% max.
2-inch depth, see Notes 5 and 7
Aggregate-topsoil course, See Paving Summary for locations
PICNIC AREA PULL-OFFS
(Do not disturb) concrete wheelstop
Do not disturb existing
DEEP CREEK PICNIC AREA PARKING #1 to #8
DEEP CREEK PICNIC AREA ROAD
West Deep Creek Road at MP 0.00 to MP 0.22
Asphalt Concrete Overlay:
MP 0.22 to End of Loop at MP 0.39
Asphalt Concrete Overlay:
1038CZ, respectively.
Creek Picnic Area Parking #2 and #3, Routes 1038BZ and
10. Remove and reset existing concrete wheelstops in Deep protective sheeting as directed by the CO.
during all asphalt concrete operations with plastic or other features (i.e., decks, approach slabs, and concrete backwalls) concrete islands, concrete wheelstops, manholes, and bridge
9. Protect roadside elements such as stone curb, concrete curb, existing bridge decks.
for begin and end of paving limits and to tie new paving into
8. Construct pavement transitions according to Detail E401-01
Section 625.
7. Apply turf establishment to disturbed areas according to tie into existing ground with minimal disturbance.
Reshape ditches as necessary to achieve positive drainage and at locations designated in the plans or as directed by the CO.
6. Perform ditch reconditioning according to Subsection 303.03 shoulders. Round hinge points as directed by the CO.
shoulder rollover is 8 percent for aggregate-topsoil course
½-inch below the finished top edge of pavement. Maximum a final shoulder elevation adjacent to the pavement edge, at by the CO. Place 2 inches of aggregate-topsoil course. Maintain
303.04 at locations designated in the plans or as directed
5. Perform shoulder reconditioning according to Subsection prior to placing asphalt overlay.
4. Seal all cracks according to Section 414 and Detail E414-01A
3. Limit asphalt overlay to within existing edge of pavements.
existing field conditions.
2. Match roadway cross slopes and superelevations to borings were performed for this project.
1. Existing pavement depths are unknown. No pavement
NOTES:
2'-0"
Shldr
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D B g r s m ty p .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
B03
SCHEDULE C
NO SCALE
EXISTING PAVEMENT STRUCTURE PROPOSED PAVEMENT STRUCTURE
CL
Roadway exist.
Match
Existing ground
2'-0"
Shldr
Aggregate base, unknown depth
Asphalt concrete pavement, unknown depth
Asphalt tack coat varies
Existing groundexist.
Match
Pave to face of existing wheelstop
Do not disturb existing concrete wheelstop varies
11'-0" to 13'-0"
Travel lane
9'-0" to 9'-6"
Travel lane
9'-0" to 9'-6"
Travel lane
EXISTING PAVEMENT STRUCTURE
PROPOSED PAVEMENT STRUCTURE
CL
Roadway exist.
Match exist.
Match
Aggregate base, unknown depth
Asphalt concrete pavement, unknown depth Asphalt tack coat
DEEP CREEK CAMPGROUND / TENT / GROUP ACCESS ROAD
Deep Creek Campground Entrance Road to End of Pavement, MP 0.00 to MP 0.27
Asphalt Concrete Overlay:
DEEP CREEK CAMPGROUND LOOP 2
DEEP CREEK CAMPGROUND LOOP 1 AND
Existing ground
10'-0" min.
Pull-off
CAMPGROUND SITE PULL-OFFS
exist.
Match
Existing ground
DEEP CREEK CAMPGROUND PARKING AREAS
See Paving Summary for locations
9'-0" to 9'-6"
Travel lane
30'-0" typ.
Parking area
Concrete curb
Asphalt tack coat
Asphalt tack coat type 2 (FDP-2), see detail Sheet B04
Asphalt concrete pavement patching, type 2 (FDP-2), see detail Sheet B04
Asphalt concrete pavement patching, 3'-0"
Ditch
2'-0"
Shldr
8% max.
2-inch depth, see Notes 5 and 7
Aggregate-topsoil course, Notes 6 and 7 (Schedule D)
Recondition ditch, see
Aggregate-topsoil course, 2-inch depth, see Notes 5 and 7
Recondition ditch, see
Notes 6 and 7 (Schedule D)
3'-0"
Ditch
11'-0" to 12'-0"MP 0.00 to MP 0.20Deep Creek Campground Loop 1 to Deep Creek Campground Loop 1Deep Creek Campground Loop 2
12'-0" to 13'-0"MP 0.00 to MP 0.41Deep Creek Campground Entrance Road to End of LoopDeep Creek Campground Loop 1
Travel Way WidthMP to MPDescriptionRoad Name
Asphalt Concrete Overlay:
Width varies by road (see below)
Travel way
(Do not disturb) and sidewalk
See Paving Summary
-inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, protective sheeting as directed by the CO.
during all asphalt concrete operations with plastic or other features (i.e., decks, approach slabs, and concrete backwalls) concrete islands, concrete wheelstops, manholes, and bridge
10. Protect roadside elements such as stone curb, concrete curb, proposed asphalt pavement.
pavement overlay thickness to these features. Do not feather positive drainage. Provide for full depth of proposed asphalt drainage features (i.e., inlets, trench drains, etc.) to maintain
Also, perform variable depth milling adjacent to any fixed ramps flush with top of pavement to maintain existing grade.
9. Perform variable depth milling adjacent to concrete curb existing bridge decks.
for begin and end of paving limits and to tie new paving into
8. Construct pavement transitions according to Detail E401-01
Section 625.
7. Apply turf establishment to disturbed areas according to tie into existing ground with minimal disturbance.
Reshape ditches as necessary to achieve positive drainage and at locations designated in the plans or as directed by the CO.
6. Perform ditch reconditioning according to Subsection 303.03 shoulders. Round hinge points as directed by the CO.
shoulder rollover is 8 percent for aggregate-topsoil course
½-inch below the finished top edge of pavement. Maximum a final shoulder elevation adjacent to the pavement edge, at by the CO. Place 2 inches of aggregate-topsoil course. Maintain
303.04 at locations designated in the plans or as directed
5. Perform shoulder reconditioning according to Subsection prior to placing asphalt overlay.
4. Seal all cracks according to Section 414 and Detail E414-01A
3. Limit asphalt overlay to within existing edge of pavements.
existing field conditions.
2. Match roadway cross slopes and superelevations to borings were performed for this project.
1. Existing pavement depths are unknown. No pavement
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D B g r s m ty p .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
B04
NO SCALE
CL ROAD
12"
12"
AREA
DISTRESSED
to distress area
Saw cut parallel/perpendicular o r f u ll l a n e m a x o r ½ l a n e m in s e e N o te
Plan Detail
PATCHING LIMITS
ASPHALT PAVEMENT
Geotextile, Class 2, Type E
FULL DEPTH PATCH, TYPE 1 (FDP-1):
Section Detail
FULL DEPTH PATCH, TYPE 1 (FDP-1)
ASPHALT PAVEMENT, BASE, AND SUBGRADE
patching area (see Note 4) min. = ½ lane width
Existing aggregate base
Existing asphalt pavement pavement and aggregate base
Remove existing asphalt
ALL SCHEDULES
Asphalt concrete pavement, Type 2, see Note 3
Roadway aggregate, Method 2, 6-inch depth
Asphalt tack coat
Asphalt tack coat
FULL DEPTH PATCH, TYPE 2 (FDP-2):
patching area (see Note 4) min. = ½ lane width
Existing aggregate base
Existing asphalt pavement
Asphalt tack coat
Asphalt tack coat
Section Detail
FULL DEPTH PATCH, TYPE 2 (FDP-2)
ASPHALT PAVEMENT
Asphalt concrete pavement, Type 2, see Note 3
Asphalt tack coat
Asphalt tack coat pavement
Remove existing asphalt by the CO (see Note 1)
Length as determined
-inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, -inch depth4 1<0.3M ESALs, Type IV roughness, 1
-inch NMSA,8 3Asphalt concrete pavement, Gyratory Mix, protective sheeting as directed by the CO.
during all asphalt concrete operations with plastic or other features (i.e., decks, approach slabs, and concrete backwalls) concrete islands, concrete wheelstops, manholes, and bridge
5. Protect roadside elements such as stone curb, concrete curb, pavement.
if patching limits are less than 24 inches from the edge of
4. Extend asphalt pavement patching limits to edge of pavement pavement patching areas. Place asphalt in 2 lifts.
4 inches for asphalt concrete pavement depths in asphalt
3. Match adjacent existing pavement depths, to a minimum of pavements.
to Section 418. Do not saw cut newly applied asphalt concrete asphalt overlay. Perform asphalt pavement patching according
2. Perform asphalt pavement patching prior to placing final roadway prior to beginning asphalt pavement patching activities.
1. Coordinate with the CO to identify patching limits along the
NOTES:
Saw cut existing pavement Saw cut existing pavement
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D B g r s m ty p .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C01
SCHEDULE A
TABULATION OF QUANTITIES
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C02
SCHEDULE B
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C03
SCHEDULE C
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C04
EROSION AND SEDIMENT CONTROL
SUMMARIES AND SCHEDULES
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
DRAINAGE SUMMARY
C05
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C06 detectors. Install new pull box for each new set of loop detectors.
2. Locate and abandon the existing loop detectors in place. Install the new loop detectors 10 to 20 feet from the existing loop existing conduit and loop detector configurations.
1. Traffic Count Station Inspection Reports are available from the CO for all count stations. Refer to Inspection Reports for
NOTES:
TRAFFIC DETECTOR LOOPS
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C07
6. Pavement patching quantities are estimated at 1 to 2% of the total surface area for all roads.
parking areas (SQFT/11/5280) in miles.
5. Crack cleaning and sealing quantities are estimated at the roadway length and equivalent length for inventoried
Tack coat is estimated at 0.10 gallons per square yard of asphalt pavement surface area.4.
(2.05 tons per cubic yard).
3. Asphalt concrete pavement quantities are estimated using an asphalt concrete unit weight of 152 pounds per cubic foot are assumed as 2-feet for all roads.
2. Shoulder reconditioning quantities are estimated at 5% of the total shoulder lengths (roadway length x2). Shoulder widths width at the specified location.
pavement milling quantities are based on providing a pavement transition according to Detail E401-01 and the actual roadway
1. Pavement widths are the average of pavement width measurements taken during the RIP Cycle 5 data collection. Aspahlt
NOTES:
PAVING
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C08
6. Pavement patching quantities are estimated at 2% of the total surface area for all roads.
parking areas (SQFT/11/5280) in miles.
Crack cleaning and sealing quantities are estimated at the roadway length and equivalent length for inventoried5.
4. Tack coat is estimated at 0.10 gallons per square yard of asphalt pavement surface area.
(2.05 tons per cubic yard).
3. Asphalt concrete pavement quantities are estimated using an asphalt concrete unit weight of 152 pounds per cubic foot by the CO.
are assumed as 2-feet for all roads. Perform additional shoulder reconditioning along the Picnic Area pull-offs as directed
2. Shoulder reconditioning quantities are estimated at 5% of the total shoulder lengths (roadway length x2). Shoulder widths
1. Pavement widths are the average of pavement width measurements taken during the RIP Cycle 5 data collection.
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C09
6. Pavement patching quantities are estimated at 2% of the total surface area for all roads.
parking areas (SQFT/11/5280) in miles.
5. Crack cleaning and sealing quantities are estimated at the roadway length and equivalent length for inventoried
Tack coat is estimated at 0.10 gallons per square yard of asphalt pavement surface area.4.
(2.05 tons per cubic yard).
Asphalt concrete pavement quantities are estimated using an asphalt concrete unit weight of 152 pounds per cubic foot3.
are assumed as 2-feet for all roads.
2. Shoulder reconditioning quantities are estimated at 5% of the total shoulder lengths (roadway length x2). Shoulder widths
1. Pavement widths are the average of pavement width measurements taken during the RIP Cycle 5 data collection.
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C10
Obtain CO approval for final sign location prior to installation.4.
See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.
Provide aluminum sign panels and wood sign posts according to Section 633.2.
and Detail E633-01.
Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.
NOTES:
PERMANENT SIGNING
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C11
See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.
Provide aluminum sign panels and wood sign posts according to Section 633.2.
and Detail E633-01.
Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C12
See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.
Provide aluminum sign panels and wood sign posts according to Section 633.2.
and Detail E633-01.
Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.
NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C13
PERMANENT PAVEMENT MARKINGS
Provide Accessibility Parking Space Marking w/ Symbol & blue background.5.
proposed locations of all pavement markings for review and approval of the CO prior to installation.
4. Match proposed pavement markings to existing pavement markings, gaps, and breaks unless otherwise directed by the CO. Layout
3. For line widths wider than 4 inches, the measured length of a line is adjusted to a ratio of the required width to 4 inches.
lines, gore areas for both lane separation and accessible parking, stop lines, and stall lines for parking areas and pull-offs.
2. Centerline quantities are estimated assuming a double yellow centerline. Other solid line markings may include edge (fog)
E634-A, and E634-B.
1. Place permanent pavement markings according to the latest edition of the MUTCD and Details E634-01A, E634-04A, E634-05A, NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C14
Provide Accessibility Parking Space Marking w/ Symbol & blue background.5.
proposed locations of all pavement markings for review and approval of the CO prior to installation.
4. Match proposed pavement markings to existing pavement markings, gaps, and breaks unless otherwise directed by the CO. Layout
3. For line widths wider than 4 inches, the measured length of a line is adjusted to a ratio of the required width to 4 inches.
lines, gore areas for both lane separation and accessible parking, stop lines, and stall lines for parking areas and pull-offs.
2. Centerline quantities are estimated assuming a double yellow centerline. Other solid line markings may include edge (fog)
E634-A, and E634-B.
1. Place permanent pavement markings according to the latest edition of the MUTCD and Details E634-01A, E634-04A, E634-05A, NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C15
Provide Accessibility Parking Space Marking w/ Symbol & blue background.5.
proposed locations of all pavement markings for review and approval of the CO prior to installation.
4. Match proposed pavement markings to existing pavement markings, gaps, and breaks unless otherwise directed by the CO. Layout
3. For line widths wider than 4 inches, the measured length of a line is adjusted to a ratio of the required width to 4 inches.
lines, gore areas for both lane separation and accessible parking, stop lines, and stall lines for parking areas and pull-offs.
2. Centerline quantities are estimated assuming a double yellow centerline. Other solid line markings may include edge (fog)
E634-A, and E634-B.
1. Place permanent pavement markings according to the latest edition of the MUTCD and Details E634-01A, E634-04A, E634-05A, NOTES:
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C16 signs, and portable changeable message signs. Obtain CO approval for sign location prior to installation.
See Temporary Traffic Control Advanced Signing and Closure Plan for approximate location of warning lights, construction5.
Mount signs on single 4-inch by 4-inch wood post unless otherwise noted.4.
See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend and colors.3.
Provide aluminum sign panels according to Section 635.2.
Install signs and supports in accordance with the latest edition of the MUTCD and Detail E635-01.1.
TEMPORARY TRAFFIC CONTROL SIGNING
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C17 portable changeable message signs. Obtain CO approval for sign location prior to installation.
See Temporary Traffic Control Advanced Signing Plan for approximate location of warning lights, construction signs, and5.
Mount signs on single 4-inch by 4-inch wood post unless otherwise noted.4.
See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend and colors.3.
Provide aluminum sign panels according to Section 635.2.
Install signs and supports in accordance with the latest edition of the MUTCD and Detail E635-01.1.
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
C18 portable changeable message signs. Obtain CO approval for sign location prior to installation.
See Temporary Traffic Control Advanced Signing Plan for approximate location of warning lights, construction signs, and5.
Mount signs on single 4-inch by 4-inch wood post unless otherwise noted.4.
See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend and colors.3.
Provide aluminum sign panels according to Section 635.2.
Install signs and supports in accordance with the latest edition of the MUTCD and Detail E635-01.1.
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D C g r s m q ty .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
M01
CONTROL NARRATIVE
EROSION AND SEDIMENT
Wood fiber
0.33 acres
24 hours of completing a site inspection.
Record the inspection date and summary of findings within
Clean clogged inlet protections or replace clogged or damaged inlet protection as necessary.
Inlet protection - Inspect to ensure that inlet protections remain firmly in place and are not damaged or clogged.
reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspections.
Fiber roll - Inspect weekly and after each runoff event. Remove sediment deposits from the fiber roll when it
MAINTENANCE AND INSPECTION PROCEDURES
Remove all other perimeter controls when directed by the CO.
Remove fiber rolls only after areas are stabilized and vegetation is well established.
vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas where
Apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction do the following as directed by the CO:
PHASE III- Final Construction / Stabilization
Provide fiber roll around all stockpiled excavated roadway material.
Do not allow ponded water to encroach into the travel lanes.
shoulder areas according to Section 625.
As soon as practical, but not to exceed 7 calendar days, apply permanent turf establishment to the finished problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing erosion
PHASE II- Intermediate Controls measures outside the construction limits.
does not leave the project site. Perimeter controls include fiber rolls, inlet protection, and other approved
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment
PHASE I Establish Perimeter Controls
EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
4,000
Rate (pounds per acre)Mulch
In accordance with the Subsection 625.08, apply mulch at the following rates:
230Total Seed
50Fescue, Red
40NPS as available)
Native Seed (provided by
40Annual Ryegrass
40Fescue, Chewings
60Fescue, Hard
(Year Round)Name of Seed
Season
Seeding Rate (Pounds per Acre) below:
accordance with Section 625. Apply seed at the rates according to Subsection 625.07 for each season as stated as a result of this project. Disturbed areas will be prepared for turf establishment in Stabilize
VEGETATIVE STABILIZATION
unchanged after construction.
No new impervious surfaces will be created by the work specified under this project. The Runoff Coefficient will remain more than one acre, notify the CO because a NPDES permit will be required.
Due to the nature of the work specified, the project should not disturb more than one acre. If the disturbed area is
0.33 acres.
Deep Creek, Durham Branch, and Juney Whank Branch
3.29 miles vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas where-
Stabilize all areas that are disturbed due to the removal of sediment control devices, and -
After the completion of roadway construction, perform the following as directed by the CO:
or 1-202-267-2675.
Report spills large enough to discharge to surface water to the National Response Center (NRC) at 1-800-424-8802 -
Provide a spill containment kit according to Subsection 107.08(q).-materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
appropriate and clearly marked containers away from other non-waste materials. Do not dispose of hazardous waste these activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct
Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could -according to Subsection 107.08.
and store this waste in dumpsters, or in metal or plastic drums as appropriate. Store food and beverage related trash
Solid waste resulting from the construction will consist of construction debris, garbage, and empty containers. Collect -
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.-
In general, preserve existing vegetation and shrubs. Do not disturb existing trees.-stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain regularly all mechanized equipment used in or near surface waters to prevent contamination of -measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control -
Do not allow construction vehicles to track sediment outside the project limits.-
Do not drive construction equipment across flowing waterways.-type, size, or location of any control or practice without prior approval from the CO.
Install all erosion and sediment control measures as directed by the Contracting Officer (CO). Do not modify the -conjunction with the construction of this project. These include the following:
Temporary Best Management Practices (BMP) to reduce erosion as a result of project work will be implemented in
Requirements. This narrative provides details regarding the installation of the erosion and sediment controls.
Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 and in the Special Contract
Erosion Control and Turf Establishment measures listed in this narrative are defined and outlined in the Standard
EROSION AND SEDIMENT CONTROLS
reconditioning, and replacement of a pipe culvert. The total disturbed area for the project is approximately
Soil disturbing activities include excavation associated with pavement patching, shoulder reconditioning, ditch
SUMMARY
.The receiving water are and sealing, permanent pavement markings, and other miscellaneous work.
asphalt concrete overlay of the Deep Creek area roads, parking areas, and pull-offs, pavement patching, crack cleaning and pull-offs within the Great Smoky Mountains National Park in Swain County, North Carolina. This work includes of the Deep Creek area roads, parking areas, This project consists of applying an asphalt concrete overlay on
PROJECT DESCRIPTION
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D
M g r s m e s c .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
Edge of waterway
Limits of disturbance
Inlet protection, see Note 2
M02
Fiber roll, see Note 1
Fiber roll, see Note 1
Limits of disturbance
NO SCALE
reconditioningShoulder
PARTIAL OR FULL-LANE WIDTH
PAVEMENT PATCHING
culvert, typ.
Existing pipe
Edge of pavement, typ.
CONTROL PLAN
EROSION AND SEDIMENT
RECONDITIONING
SHOULDER
RECONDITIONING
SHOULDER AND DITCH
Fiber roll, see Note 1
Limits of disturbance
Inlet protection, see Note 2
Shoulder and ditch reconditioning saw cut, typ.
Pavement traffic.
full road width, patch one-half at a time to maintain
For sections of roadway that require patching for the3.
adjacent to pavement patching.
roll according to Detail E157-04A around inlets located
Install inlet protection using 12-inch diameter fiber2.
aggregate-topsoil has been directed by the CO.
ditches where reconditioning and placing of
Install fiber roll along the outside of shoulders and untrenched fiber roll according to Detail E157-04A.
Install perimeter control using 8-inch diameter1.
NOTES:
Asphalt pavement patching, type 1 or 2
M a y
A
M M P
R O J E
C T S g r s m P r o j_
D e v C
A D
D
M g r s m e s c .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
SHEET
157219
No.
PMIS
No.
NPS
NP-GRSM 116(1)
N01
CONTROL NARRATIVE
TEMPORARY TRAFFIC
3,500 feet
4. Post messages to portable changeable message signs to provide public notice.
3. During periods of inactivity, re-open the roads and parking areas to traffic unless approved otherwise by the CO; and
2. Notify the CO at least 10 days in advance of the start of construction activities in this area;
1. Close the roads by placing Type 3 barricades and appropriate signing at the start of construction activities;
applying the following:
Deep Creek Campground Loop 1, Deep Creek Campground Loop 2, and Deep Creek Maintenance and Residence Road while
In addition to the restrictions under General Notes, perform work on Deep Creek Campground / Tent / Group Access Road, SCHEDULE C:
4. Post messages to portable changeable message signs to provide public notice.
3. During periods of inactivity, re-open the road and parking areas to traffic unless approved otherwise by the CO; and
2. Notify the CO at least 10 days in advance of the start of construction activities in this area;
1. Close the road by placing Type 3 barricades and appropriate signing at the start of construction activities;
In addition to the restrictions under General Notes, perform work on Deep Creek Picnic Area Road while applying the following:
SCHEDULE B:
to provide public notice.3. Post messages to portable changeable message signs
2. Close the Deep Creek Falls and Trail Parking for a maximum of 1 day to perform construction activities in this area; and
Re-open all closed parking areas unless approved otherwise by the CO.
d) During periods of inactivity, re-open the roads to two-way, two lane traffic unless approved otherwise by the CO.
c) Lane closures are permitted weekdays and weeknights, except for the periods listed in General Note #5; and for all activities for each road;b) The maximum length of a lane closure is
a) A maximum of one single lane temporary closure is permitted at any one time;
follows:
1. Maintain two-way, one lane of traffic using flaggers according to Detail ET 635-6 through active construction zones as
Entrance Road, and East Deep Creek Road while applying the following:
In addition to the restrictions under General Notes, perform work on West Deep Creek Road, Deep Creek Campground
SCHEDULE A:
Easter Sunday
Friday and Saturday before Easter Sunday
11. Place temporary pavement markings according to Subsection 635.13.
area for staging or stockpiling. Staging is not permitted in the areas listed in General Note #9.
10. Stage or stockpile material in areas approved by the CO. Obtain approval from the CO at least 10 days before using any
e) Deep Creek Ranger Station.
d) Deep Creek Campground Kiosk; and
c) Deep Creek Falls and Trail Parking;
b) Deep Creek Picnic Shelter Parking;
a) Horse Trailer Parking;
restrict access to the following areas:
9. Maintain access to the areas listed below at all times unless noted otherwise. Coordinate any work with the CO that will
24 hours a day, including inputting and changing the message…