The Bid Opening date has been rescheduled to July 30, 2019, at 2:00 p.m. EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_(ROBO)_-_LA_ERFO_FW_BOCH_2016-2(1).pdf | ||
| Plans_-_LA_ERFO_FW_BOCH_2016-2(1).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_-_Form_-_2018.pdf | ||
| NEPA_CE.pdf | ||
| FP14_Eng.pdf | ||
| IFB_Solicitation_-_LA_ERFO_FW_BOCH_2016-2(1).pdf | ||
| Synopsis_-_LA_ERFO_FW_BOCH_2016-2(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7319B000025 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
SEE BLOCK 1407/19/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/21/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Bogue Chitto National Wildlife Refuge Project LA ERFO FW BOCH 2016-2(1)
The purpose of this Amendment is to:
1) Revise the Plan to update the materials specifications for Timber.
2) Provide additional government furnished information.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) Reschedule the Bid Opening date to July 30, 2019, at 2:00 p.m. EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
U.S. Department of Transportation
Federal Highway Administration
Eastern Federal Lands HiQhway Division
SENT VIA ELECTRONIC CORRESPONDENCE
21400 Ridgetop Circle Sterling, VA 20166-6511
In Reply Refer To: HFPP-15
Ms. Kristin Sanders State Historic Preservation Officer Louisiana Office of Cultural Development P.O. Box 44247 Baton Rouge, LA 70804-4241
Subject: LA ERFO FW BOCH 2016-2(1) - St Tammany Parish, LA LA ERFO FW BLBA 2016-2(1) - Ouachita Parish, LA Section 106 Consultation
Dear Ms. Sanders:
The Eastern Federal Lands Highway Division, of the Federal Highway Administration (FHW A), in cooperation with the U.S. Fish and Wildlife Service, is proposing to replace existing elevated boardwalks within Bogue Chitto National Wildlife Refuge and the Black Bayou Lake National Wildlife Refuge. The work on this project is over water. The proposed design and construction will avoid where possible, impacts to the existing marshland. The damage to the sites resulted from historic rainfall and flooding between December 2015 and January 2016.
The boardwalks will be completely reconstructed. The existing piles will be cut at just below the mud line, and the remaining materials will be removed from the project site. The new boardwalk will be built in the same place using steel piles for more durability. The wood decking and guardrails will be replaced in kind to meet FWS requirements. See enclosed topographic maps and field trip report for additional information.
Bogue Chitto NWR: (30.536969/-89.812299) Remove remains of old Pearl River boardwalk and rebuild. Project is estimated at 800 feet.
Black Bayou NWR: (32.601391/-92.031786). Remove remains and rebuild the old Nature Trail, Wetlands boardwalk, and Observation Deck. Project is estimated at 6,000 feet.
FHWA reviewed the online map of historic structures and districts provided at the Division of Historic Preservation website on February 25, 2019, and determined there are no known cultural resources in either area. In addition, the proposed boardwalk replacements would be re constructed within the footprint of the existing boardwalks in areas that have already been disturbed. Therefore, the FHW A has determined that there would be no potential to affect historic properties as a result of the proposed action.
Form FHWA-201
(Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA-121 for informal correspondence.
P a g e | 1 cc: TS Reading, Highway, Bridge.
\\fhfl15fileserve.flhd.fhwa.dot.gov\data\PROJECTS\_FWS\BOCH\la2016-2(1)\Techserv\Geotech\Reports\Preliminary Memo\BOCH LA2016-2(1) MA.docx
SUBJECT: Project BOCH LA2016-2(1) –Geotechnical Findings and Recommendations
TO MESSAGE/COMMENT FROM/DATE
J. Wilson Project Manager
Through:
S.
Whittemore Project Management Branch Chief
INTRODUCTION
This Geotechnical Memorandum summarizes the results of the subsurface exploration and laboratory testing, and represents our evaluations and recommendations for the reconstruction of the Pearl River boardwalks at Bogue Chitto National Wildlife Refuge in Louisiana. Figure 1 in Appendix A shows the site location and vicinity maps.
GENERAL PROJECT INFORMATION
The boardwalks, located within the St. Tammany Parish, Louisiana were damaged during the 2016 record flooding event. This project includes the re-construction of the above-listed damaged boardwalks.
GEOLOGIC SETTING
Site Geology
Louisiana Geological Survey, Geologic Quadrangle Map (2012) indicated that project sites are located within the following geologic formations:
Hb: Backswamp deposits ‐ Fine-grained Holocene deposits of large rivers underlying the flood basins between the meander belts.
Hsm: Small river meander belt deposits – point bar and associated overbank deposits underlying the meander belts of the Pearl River.
The Geologic Map is shown in Figure 2, Appendix A.
PROCEDURES AND RESULTS
General
The Eastern Federal Lands Highway Division’s (EFLHD) Subsurface Exploration Team performed the drilling operations for this project in October 2018. Two (2) soil borings were drilled at the site. Boring BH18-01 was drilled in the parking lot next to the trail entrance and Boring HA18-01 was drilled near the boardwalk. Borings BH18-01 and HA18-01 extended to depths of 17.4 ft and 7.6 ft below existing site grades, respectively. The boreholes were laid out by EFLHD field personnel by measuring distances from mapped landmarks and using a hand-held GPS unit. BH18-01 was advanced to the termination depths using a CME 750, rotary, ATV-mounted drill rig and HA18-01 was advanced
M.
Abdelhadi, PE, Geotechnical Engineer
M.
Abouzakhm, PE
Division Geotechnical Engineer
Through:
L.
O’Brien Technical Services Engineer
5/31/2019
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained
P a g e | 2 using a hand-auger since the drilling rig was unable to reach the boring location.
A Borings Location Plan is attached in Appendix B.
Sampling
Boring BH18-01 was advanced to the termination depth using 3¾-inch (ID) hollow stem augers. Standard Penetration Testing (SPT) was performed using a 2¼-inch (OD) split-spoon sampler in accordance with AASHTO T206. SPT soil samples were typically recovered at 2.5-foot intervals. Samples were obtained by driving the split-spoon sampler a distance of 24-inches, or until auger refusal, into the undisturbed soil under the impact of a 140-lb automatic hammer free-falling 30 inches. The number of hammer blows required to advance the split-spoon sampler the middle foot of the 24-inch sample interval is designated as the “Standard Penetration Resistance” or N-value. The number of blows required to advance the sampler through each 6-in. interval was recorded on field boring logs.
Water levels, if present, were measured at the time of completion of each boring and prior to backfilling the borehole. The borings were backfilled with auger cuttings upon completion of the drilling.
Representative portions of split-spoon and hand auger samples were preserved in glass jars. All samples were later transported to EFLHD’s Materials Testing Laboratory in Sevierville, Tennessee for laboratory testing and storage.
The sampling sequence and associated jar samples for each boring are presented on its appropriate boring log in Appendix C.
Data Summary
The results of the field tests and measurements were recorded on the driller’s logs and appropriate data sheets in the field. These data sheets and logs contain information concerning the boring methods, samples attempted and recovered, indications of materials encountered. They also contain interpretations by the exploration foreman of the subsurface conditions based on the performance of the equipment and cuttings brought to the surface by the drilling tools.
Therefore, the field data represents both factual and interpretative information.
The boring logs in Appendix C represent a compilation of field and laboratory data and description of the soil samples by the geotechnical engineer.
LABORATORY TESTING
Laboratory testing was performed on representative soil samples recovered during the subsurface exploration to aid in classification and evaluation of engineering parameters of the subsurface materials. The following tests were performed on selected samples.
• Particle size analysis (AASHTO T-11 and T-27)
• Moisture content (AASHTO T-265)
• Liquid Limit (AASHTO T-89)
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained
P a g e | 3
• Plastic Limit (AASHTO T-90)
A summary of the laboratory test results is presented in Table 1. Laboratory test results are provided in Appendix D.
Table 1 – Summary of Soil Laboratory Test Results Boring
No.
Sam ple No.
Sample Depth (feet)
Gravel
Sand
Fines
Plasticity Index
Moisture Content
BH18-01 J-1 1-3 - 40.2 59.8 6 20.0
BH18-01 J-6 13-15 - 77.8 22.2 NP 21.4
NP: non-plastic soil
Subsurface Conditions
The subsurface conditions encountered during our drilling operations are listed the boring logs. The stratification lines designating the interfaces between soil types on the logs represent approximate boundaries. The transition between materials may be gradual. It should be noted that one or more of the units may be absent at specific locations.
GEOTEHNICAL EVALUATION AND DESIGN ATERNATIVES
Geotechnical Evaluation Due to the presence of shallow groundwater and loose and very loose soils, shallow foundations would be supported on soils with low bearing capacity and will likely exhibit significant settlements (differential and total) over the life time of the structure. Also, dewatering may have a major impact during the construction process due to the sensitive nature of the habitat in the wildlife.
Based on discussions with the design team we concluded that 6” by 6” driven square timber posts will represent the most economic foundation system for the proposed structure, based on the soil profile and anticipated structural loads.
General Foundation design was performed in general accordance with AASHTO LRFD Bridge Design Specifications (2017).
Design analyses were performed based on data obtained from our subsurface exploration program and laboratory test results, where available. The soil properties presented in Table 2 below were developed based on empirical correlations between available laboratory test results and SPT N-values.
Design analyses were performed using the soil profile encountered in the borings using the material properties below.
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained
P a g e | 4
Table 2 – Soil Parameters for Foundation Design Analysis
Material Type Depth, below
Existing Grade (ft)
Buoyant Unit Weight, γ
(pcf)
Friction Angle, Φ
(deg.)
Cohesion, c (psf)
Lean Clay - Silt 0-20 37.5 0 600
Scour No scour data were available at the time this memo was being prepared.
Bridge Loading Structural loads were provided by EFLHD Bridge design team are presented in the table below.
Table 3 - Structural Loads
Structure Max Axial Load (kips)/pile
Max Lateral Load (kips)/pile
Boardwalk 6.25 0.75
RECOMMENDATIONS
The bearing resistance of a recommended driven timber posts was evaluated in accordance with Section 10 of AASHTO (2017), LRFD Bridge Design Specifications. We summarized the results of our calculations in the table below:
We recommend that a hammer/blows capacity relationship analysis be performed by the successful bidder prior to mobilization of the equipment to the site. The proposed hammer should have adequate energy to efficiently install the foundation element to the specified capacities without inducing excessive stresses on the timber posts.
Table 4 – Foundation Axial Resistance
Structure Foundation Type and Size
Minimum Embedment
Length (feet)
Factored Axial
Resistance (kips)/pile
Boardwalk 6-inch square timber post 12 7.0
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained
P a g e | 5
DISCLAIMER/LIMITATIONS CLAUSE
The subsurface explorations and test described in the section Procedures and Results of this memorandum have been conducted in accordance with standard practices and procedures (except as specifically noted). The results of these exploration and test represent conditions at the specific locations indicated.
Subsurface conditions beyond these locations may vary. The Analyses Recommendations sections of this memorandum include interpretations and recommendations developed by the Government in the process of preparing the design. These interpretations are not intended as a substitute for the personal investigation, independent interpretation, and judgment of the Contractor.
REFERENCES
AASHTO, 2017. AASHTO LRFD Bridge Design Specification. 8th ed.
Washington, D.C.: American Association of State Highway and Transportation Officials.
FHWA, 2014. Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects, Washington D.C.: US Department of Transportation.
FLH, 2017. Rock Characterization Guidelines, Washington D.C.: US Department of Transportation - FHWA.
FLH, 2017. Soil Description and Identification Guidelines, Washington D.C.:
US Department of Transportation - FHWA.
Heinrich, P.V., McCulloh, R.P., and Snead, John, 2004, Gulfport 30 x 60 minute geologic quadrangle: Louisiana Geological Survey, Geologic Quadrangle Map (1:100,000) 7, scale 1:100,000
APPENDIX:
Appendix A – Figures Appendix B – Borings Location Map Appendix C – Boring Logs Appendix D – Laboratory Test Results Appendix E – Selected Photographs
Appendix A-1
APPENDIX A – FIGURES
SHEET
NO. PROJECT
STATEREG
BOCH LA2016-2(1)
TOTAL
SHEETS
2LA
FIGURE 1
Site Location and Vicinity Map
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
Appendix A-2
APPENDIX B – BORINGS LOCATION MAP
Source:
LA
FIGURE 2
GEOLOGIC MAP
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATEREG SHEET
NO. PROJECT
TOTAL
SHEETS
2BOCH LA2016-2(1)
Heinrich, P.V., McCulloh, R.P., and Snead, John, 2004, Gulfport 30 x 60 minute geologic quadrangle: Louisiana Geological Survey, Geologic Quadrangle Map (1:100,000) 7, scale 1:100,000
BOCH LA2016-2(1)
Appendix
APPENDIX C – BORING LOGS
10/04/2018
SOIL CLASSIFICATION CHART
Criteria for Assigning Group Symbols and Group Name Using Laboratory TestsA Group
Symbol Group NameB
COARSE-GRAINED
SOILS
More than 50% retained on No. 200 Sieve
GRAVELS
More than 50% of coarse fraction retained on No. 4 Sieve
Clean GRAVELS Less than 5% fines E
Cu ≥ 4 and 1 ≤ Cc ≤ 3C GW Well-graded GRAVEL D
Cu < 4 and/or 1 > Cc > 3 C GP Poorly-graded GRAVEL D
GRAVELS with fines More than 12% fines E
Fines classify as ML or MH GM Silty GRAVEL D,F Fines classify as CL or CH GC Clayey GRAVEL D,F
SANDS
Less than 50% retained on No. 4 Sieve
Clean SANDS Less than 5% fines I
Cu ≥ 6 and 1 ≤ Cc ≤ 3 C SW Well-graded SAND H
Cu < 6 and/or 1 > Cc > 3 C SP Poorly-graded SAND H
SANDS with fines More than 12% fines I
Fines classify as ML or MH SM Silty SAND F,H Fines classify as CL or CH SC Clayey SAND F,H
FINE-GRAINED
SOILS
50% or more passes the No. 200 Sieve
SILTS and CLAYS Liquid limit less than 50
Inorganic PI > 7 and plots on or above the “A” line J CL Lean CLAY K,L,M PI < 4 or plots below “A” line J ML SILT K,L,M
Organic Liquid limit – oven dried Liquid limit – not dried < 0.75 OL Organic CLAY K,L,M,N
Organic SILT K,L,M,O
SILTY and CLAYS Liquid limit 50 or more
Inorganic PI plots on or above “A” line CH Fat CLAY K,L,M PI plots below “A” line MH Elastic SILT K,L,M
Organic Liquid limit – oven dried Liquid limit – not dried < 0.75 OH Organic CLAY K,L,M,P
Organic SILT K,L,M,Q
HIGHLY ORGANIC
SOILS Primarily organic matter, dark in color, and organic odor PT PEAT A Based on material passing the 3-inch sieve.
B If field sample contains cobbles or boulders, add “with cobbles” or “boulders” or both, to group name.
C Cu = D60/D10 Cc = (D30)2 / (D10 x D60) D If soil contains ≥15% sand, add “with sand” to group name.
E Gravels with 5 to 12% fines require dual symbols:
GW-GM well-graded GRAVEL with silt GW-GC well-graded GRAVEL with clay GP-GM poorly-graded GRAVEL with silt GP-GC poorly-graded GRAVEL with clay
F If fines classify as CL-ML, use dual symbol GC-GM or SC-SM G If fines are organic, add “with organic fines” to group name.
H If soil contains ≥15% gravel, add “with gravel” to group name.
I Sand with 5 to 12% fines require dual symbols:
SW-SM well-graded SAND with silt SW-SC well-graded SAND with clay SP-SM poorly-graded SAND with silt SP-SC poorly-graded SAND with clay J If Atterberg limits plot in hatched area, soil is a CL-ML, silty
CLAY.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel”, whichever is predominant.
L If soil contains ≥ 30% plus No. 200, predominantly sand, add “sandy” to beginning of group name.
M If soil contains ≥ 30% plus No. 200, predominantly gravel, add “gravelly” to beginning of group name.
N PI ≥ 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
APPARENT DENSITY OF COARSE-
GRAINED SOIL
SPT N-value (blows per foot) Apparent Density
0 to 4 Very Loose
5 to 10 Loose
11 to 30 Medium Dense
31 to 50 Dense
> 50 Very Dense
CONSISTENCY OF
FINE-GRAINED SOIL
SPT N-value (blows per foot) Consistency
0 to 1 Very Soft
2 to 4 Soft
5 to 8 Firm
9 to 15 Stiff
16 to 30 Very Stiff
> 30 Hard
SOIL STRUCTURE TERMS
Stratified Alternating layers of varying material or color with layers > 1/4 inch (6 mm), note thickness and inclination.
Laminated(1) Alternating layers of varying material or color with layers < 1/4 inch (6 mm), note thickness and inclination.
Fissured(1) Breaks along definite planes of fracture with little resistance to fracturing.
Slickensided(1) Fracture planes appear polished or glossy, sometimes striated.
Blocky(1) Cohesive soil that can be broken down into smaller angular lumps which resists further breakdown.
Disrupted Soil structure is broken and mixed. Infers that material has moved substantially -landslide debris.
Homogeneous Same color and appearance throughout.
Lensed Inclusion of small pockets of different soil, such as small lenses of sand scattered through a mass of clay; < 1/4 inch (6 mm) note thickness.
(1) Do not use laminated, fissured, slickensided, or blocky for coarse-grained soils.
Descriptive Terminology for Boring Logs
Field descriptions of borings are based on the FLH Soil and Rock Description and Identification Guidelines that generally follow the Visual-Manual Procedure (ASTM D 2488). The soil classifications shown on the boring logs are based on laboratory tests (ASTM D 2487) when the two-letter group symbol follows the group name in parenthesis.
Standard Penetration Test (SPT): the SPT consists of driving a 2 in (50 mm) O.D. split barrel sampler a depth of 18 in (450 mm) or 24 in (600 mm) using a 140 lb (63.6 kg) hammer with a 30 in (750 mm) drop. The blow count is the number of blows recorded for each 6 inch (50 mm) increment.
The N-value is the total number of blows for the second and third increments. Note that the N-values shown on the boring logs do not include any corrections for non-standard sampler size, hammers, drill rods, etc.
ANGULARITY OF
COARSE-GRAINED SOILS
Angular
Sharp edges and relatively plane sides with unpolished surfaces
Subangular
Similar to angular description, but with rounded edges
Subrounded
Nearly plane sides, but will have well-rounded corners and edges.
Rounded
Smoothly curved sides and no edges
PARTICLE SIZE OF COARSE-GRAINED SOILS
Component Grain Size Limits
Boulders > 12” (> 300 mm)
Cobbles 3 – 12” (75 – 300 mm)
Coarse Gravel 3/4 - 3" (19 - 75 mm)
Fine Gravel #4 Sieve - 3/4" (4.75 - 19 mm)
Coarse Sand #10 - #4 Sieve (2.00 - 4.75 mm)
Medium Sand #40 - #10 Sieve (0.425 - 2.00 mm)
Fine Sand #200 - #40 Sieve (0.075 - 0.425 mm)
10/04/2018
GRAIN/CRYSTAL SIZE FOR ROCKS (MODIFIED AFTER WENTWORTH, 1972)
Grain Size Description Criteria Less than 0.003 inches (<0.075 mm)
Very fine grained Cannot be distinguished by unaided eye. Few to no mineral grains are visible with a hand lens.
0.003 to 0.02 inches (0.075 to 0.425 mm) Fine grained
Few grain/crystal boundaries are visible; grains can be distinguished with difficulty by the unaided eye but can be somewhat distinguished by hand lens.
0.02 to 0.08 inches (0.425 to 2 mm) Medium grained Most grain/crystal boundaries are visible; grains distinguishable by eye and with the aid of a hand lens.
0.08 to 0.2 inches
(2 to 4.75 mm) Coarse grained Grain/crystal boundaries are visible; grains distinguishable with the naked eye and hand lens.
Greater than 0.2 inches
(>4.75 mm)
Very coarse grained
Grain/crystal boundaries are Clearly visible; grains are distinguishable with the naked eye.
GRAIN SHAPE (FOR SEDIMENTARY ROCKS)
Description Characteristic
Angular Showing very little evidence of wear. Grain edges and corners are sharp. Secondary corners are numerous and sharp.
Subangular
Showing definite effects of wear. Grain edges and corners are slightly rounded off. Secondary corners are slightly less numerous and slightly less sharp than in angular grains.
Subrounded Showing considerable wear. Grain edges and corners are rounded to smooth curves. Secondary corners are reduced greatly in number and highly rounded.
Rounded Showing extreme wear. Grain edges and corners are smoothed off the broad curves. Secondary corner are few in number and rounded.
Well-rounded Completely worn. Grain edges or corners are not present. No secondary edges or corners are present. DEGREE OF WEATHERING
Term Description Grade
Fresh No visible sign of rock material weathering; slight discoloration on major discontinuity surface is possible. I
Slightly Weathered
Discoloration indicates weathering of rock material and discontinuity surfaces. All rock material may be discolored by weathering and the external surface may be somewhat weaker than in its fresh condition.
II
Moderately Weathered
Less than half the rock material is decomposed and/or disintegrated to a soil.
Fresh or discolored rock is present either as a discontinuous framework or as corestones. A minimum 2-inch (50 mm) diameter sample cannot be broken readily by hand across the rock fabric.
III
Highly Weathered
More than half of the rock is decomposed and/or disintegrated to soil. Fresh or discolored rock is present either as a discontinuous framework or as corestones.
A minimum 2-inch (50 mm) diameter sample can be broken readily by hand across the rock fabric.
IV
Completely Weathered
All rock material is decomposed and/or disintegrated to soil. The original mass structure is still largely intact. Material can be granulated by hand. If rock is considered to be completely weathered, use FLH Soil Description and Identification Guidelines to describe the residual soil material.
V
Residual Soil
All rock material is converted to soil. The mass structure and material fabric are destroyed but the apparent structure remains intact. There may be a large change in volume, but the soil has not been significantly transported. Material can be easily broken-down by hand. If rock is considered to be completely weathered, use FLH Soil Description and Identification Guidelines to describe the residual soil material.
VI
RELATIVE STRENGTH OF SOIL INFILLING (ISRM, 1978 & 1981)
Grade Description Field Identification Approximate
Uniaxial Compressive
Strength
S1 Very Soft Easily penetrated several inches by fist
<3.5 psi (<25 kPa)
S2 Soft Easily penetrated severl inches by thumb
3.5 - 7 psi (25 - 50 kPa)
S3 Firm
Can be penetrated several inches by thumb with moderate effort
7 - 14.5 psi (50 - 100 kPa)
S4 Stiff
Readily indented by thumb but penetrated only with great effort
14.5 - 36 psi (100 - 250 kPa)
S5 Very Stiff Readily indented by thumbnail
36 - 72.5 psi (250 - 500 kPa)
S6 Hard Indented with difficulty by thumbnail
>72 psi (>500 kPa)
RELATIVE STRENGTH OF INTACT ROCK SPECIMENS (ISRM, 1978 &1981)
Grade Description Field Indentificaiton Approximate Uniaxial Compressive Strength
R0 Extremely Weak Rock Specimen can be indented by thumbnail 35 - 150 psi
(250 - 1,000 kPa)
R1 Very Weak Rock
Specimen crumbles under sharp blow with point of geological hammer, and can be peeled with a pocket knife.
150 - 725 psi (1,000 - 5,000 kPa)
R2 Weak Rock Shallow cuts or scrapes can be made in a specimen with a pocket knife. A firm blow with a geological hammer point creates shallow indents.
725 - 3,500 psi (5,000 - 25,000 kPa)
R3 Medium Strong Rock
Specimen cannot be scraped or cut with a pocket knife.
Specimen can be fractured with a single firm blow with a geologic hammer point.
3,500 - 7,250 psi (25,000 - 50,000 kPa)
R4 Strong Rock Specimen requires more than one firm blow of the geologic hammer point to fracture.
7,250 - 14,500 psi (50,000 - 100,000 kPa)
R5 Very Strong Rock
Specimen requires many firm blows from the hammer end of the geologic hammer to fracture.
14,500 - 36,250 psi (100,000 - 250,000 kPa)
R6 Extremely Strong Rock
Specimen can only be chipped with firm blows from the hammer end of the geologic hammer.
>36,250 psi (>250,000 kPa)
JRC RANGES (ISRM, 1978 &1981)
DISCONTINUITY CONDITION (ISRM, 1978, 1981)
Condition Description
Excellent Condition
Very rough surfaces, no separation, hard discontinuity wall (>R2).
Good Condition
Slightly rough surfaces, separation less than ~0.04 inches (1 mm), hard discontinuity wall (>R2).
Fair Condition
Slightly rough surface, separation greater than ~0.04 inches (1 mm), soft discontinuity wall (<R3).
Poor Condition
Slickensided surfaces, or soft gouge less than ~0.2 inches (5 mm) thick, or open discontinuities between ~0.4 and 0.2 inches (1 to 5 mm).
Very Poor Condition
Soft gouge greater than ~0.2 inches (5 mm), or open discontinuities greater than ~0.2 inches (5 mm).
DISCONTINUITY SPACING (INCLUDES
JOINTS/FRACTURES, BEDDING, AND FAULTS
Description Spacing of Discontinuity Extremely Widely
Spaced >20 feet (>6 m)
Very Widely Spaced
~6 to 20 feet (2 to 6 m)
Widely Spaced ~2 to 6 feet (600 mm to 2 m)
Moderately Spaced
~8 inches to 2 feet (200 to 600 mm)
Closely Spaced ~2 to 8 inches (60 to 200 mm)
Very Closely Spaced
~3/4 to 2 inches (20 to 60 mm)
Extremely Closely Spaced
<3/4 inches (<20 mm)
𝑅𝑅𝑅𝑅𝑅𝑅 (%) =
𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿ℎ 𝑜𝑜𝑜𝑜 𝑆𝑆𝑜𝑜𝑆𝑆𝐿𝐿𝑆𝑆 𝐶𝐶𝑜𝑜𝐶𝐶𝐿𝐿 𝑖𝑖𝐿𝐿 𝑝𝑝𝑖𝑖𝐿𝐿𝑝𝑝𝐿𝐿𝑝𝑝 > 4 𝑖𝑖𝐿𝐿𝑝𝑝ℎ𝐿𝐿𝑝𝑝 (100 𝑚𝑚𝑚𝑚)
𝑇𝑇𝑜𝑜𝐿𝐿𝑇𝑇𝑇𝑇 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿ℎ 𝑜𝑜𝑜𝑜 𝐶𝐶𝑜𝑜𝐶𝐶𝐿𝐿 𝑅𝑅𝑆𝑆𝐿𝐿
𝑥𝑥 100
𝐹𝐹𝐹𝐹 =
𝑁𝑁𝑆𝑆𝑚𝑚𝑁𝑁𝐿𝐿𝐶𝐶 𝑜𝑜𝑜𝑜 𝐿𝐿𝑇𝑇𝐿𝐿𝑆𝑆𝐶𝐶𝑇𝑇𝑇𝑇 𝑜𝑜𝐶𝐶𝑇𝑇𝑝𝑝𝐿𝐿𝑆𝑆𝐶𝐶𝐿𝐿𝑝𝑝
𝑇𝑇𝑜𝑜𝐿𝐿𝑇𝑇𝑇𝑇 𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿ℎ 𝑜𝑜𝑜𝑜 𝑝𝑝𝑜𝑜𝐶𝐶𝐿𝐿 𝐶𝐶𝐿𝐿𝑝𝑝𝑜𝑜𝑟𝑟𝐿𝐿𝐶𝐶𝐿𝐿𝑆𝑆 (𝑜𝑜𝐿𝐿𝐿𝐿𝐿𝐿)
𝐶𝐶𝑅𝑅 (%) = �
𝑇𝑇𝑜𝑜𝐿𝐿𝑇𝑇𝑇𝑇 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿ℎ 𝑜𝑜𝑜𝑜 𝐶𝐶𝑜𝑜𝐶𝐶𝐿𝐿 𝑅𝑅𝐿𝐿𝑝𝑝𝑜𝑜𝑟𝑟𝐿𝐿𝐶𝐶𝐿𝐿𝑆𝑆
𝑇𝑇𝑜𝑜𝐿𝐿𝑇𝑇𝑇𝑇 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿ℎ 𝑜𝑜𝑜𝑜 𝐶𝐶𝑜𝑜𝐶𝐶𝐿𝐿 𝑅𝑅𝑆𝑆𝐿𝐿 𝑅𝑅𝐶𝐶𝑖𝑖𝑇𝑇𝑇𝑇𝐿𝐿𝑆𝑆
� ∗ 100
1.4
0.6
0.6
2.0
1.7
1.5
1.6
3-4-3-3
1-2-2-2
1-1-1-1
1-0-0-0
0-0-0-0
1-1-3-4
0-2-2-3
Gravel road base
Sandy SILTY CLAY (CL-ML), firm, tan, moist, low plasticity. Fill. A-4(2)
Silty SAND (SM), very loose, light gray, wet, fine to medium. A-2-4(0)
11'-13': lean clay layer
Bottom of boring 17.4 feet
J-1
J-2
J-3
J-4
J-5
J-6
J-7
0.6
7.0
17.0
Project Location:
Encountered at:
After
Northing: 712278.28 Easting: 3794219.24
Caved at:
Hammer Drop:
Rock Core (RQD in %) hrs
6.5 ft
Remarks:
Auger Cuttings
G ra ph ic
L og
Bogue Chitto National Wildlife Refuge
Density, Color, Plasticity, Size, Proportions, Moisture
D ep th S ca le ft)
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
9/14/18 Moody
HutchinsOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
Boring was backfilled with soil cuttings.
Standard Penetration Test Data
Project Datum:
17.4 ft
(Blows / ft)
Undisturbed (UD)
9/14/18
R ec
(f t)
Project Name:
Surface Elevation:
6.3 ft
Boring Location:
La ye r
D ep th ft)
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
N o.
St Tammany Parish
E le va tio n (f ee t)
3.8 in.
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Auto
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
HSA
BH18-01
Hammer Wt. & Type:
Sunny
Parking lot
S P
T B lo w s pe r in
P P
B O
R
IN
G L
O G
/7
/1
:5
M
P R
O
JE
C T
S
F W
S \B
O C
H \L
A
-2
(1
T E
C H
S E
R V
\G E
O T
E C
H \S
U B
S U
R F
A C
E
IN
V E
S T
IG
A
T
IO
N \B
O R
IN
G
L O
G S
\B O
C H
L A
-2 (1
G
P J
Sheet: 1 of 1
0.6
0.6
0.6
Silty SAND, loose, tan, moist, fine to medium.
Lean Clay with Sand, soft, gray, wet, medium plasticity.
J-1
J-2
J-3
J-4
J-5
3.0
7.6
Project Location:
Encountered at:
After
Northing: Easting:
Caved at:
Hammer Drop:
Rock Core (RQD in %) hrs
4.0 ft
Remarks:
Auger Cuttings
G ra ph ic
L og
Bogue Chitto National Wildlife Refuge
Density, Color, Plasticity, Size, Proportions, Moisture
D ep th S ca le ft)
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
9/14/18 Farley
HutchinsOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
Boring was backfilled with soil cuttings.
Standard Penetration Test Data
Project Datum:
(Blows / ft)
Undisturbed (UD)
9/14/18
R ec
(f t)
Project Name:
Surface Elevation:
4.0 ft
Boring Location:
La ye r
D ep th ft)
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
N o.
St Tammany Parish
E le va tio n (f ee t)
2.0 in.
Boring Method:
Rock Core Diam:
Vane Shear
N/A
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
Hand Auger
HA18-01
Hammer Wt. & Type:
Sunny
Boardwalk
S P
T B lo w s pe r in
P P
B O
R
IN
G L
O G
/7
/1
:5
M
P R
O
JE
C T
S
F W
S \B
O C
H \L
A
-2
(1
T E
C H
S E
R V
\G E
O T
E C
H \S
U B
S U
R F
A C
E
IN
V E
S T
IG
A
T
IO
N \B
O R
IN
G
L O
G S
\B O
C H
L A
-2 (1
G
P J
Sheet: 1 of 1
APPENDIX D – LABORATORY TEST RESULTS
Sample # E-19- Jar # Wet Wt (g) Dry Wt (g) Jat Wt (g)
Total Sample Wt (g)
T-265 MC
E-19-0025 BH18-01/J-1 1111.8 998.8 435.0 563.8 20.0
E-19-0026 BH18-01/J-6 1454.9 1275.1 435.0 840.1 21.4
SOIL DATA
INDEXLIMITLIMITCONTENTNO.
PLASTICITYLIQUIDPLASTICWATERDEPTHSAMPLE
NATURAL
SOURCESYMBOL
Project No.:
Project:
Client:
LIQUID AND PLASTIC LIMITS TEST REPORT
(ft.)
AASHTO
BOCH LA2016-2(1)
BOGUE CHITTO BOARDWALK
FHWA/EFLHD
A-4(2)6272120.01-3BH18-01/J-1 BDW
LIQUID AND PLASTIC LIMITS TEST REPORT
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
A-2-4(0)NPNVNP21.413-15BH18-01/J-6 BDW
10 30 50 70 90 110
LIQUID LIMIT
P
LA
S T
IC
IT
Y
IN
D E
X
PI
=L
L-
A-4 or A-2-4 A-5 or A-2-5
A-7-6
A-6 or A-2-6
A-7-5 or A-2-7
SOIL DATA
NO.
USCSDESCRIPTION
DEPTHSAMPLE
SOURCESYMBOL
Project No.:
Project:
Client:
Particle Size Distribution Report
P E
R C
E N
T F
IN
E
R
100 10 1 0.1 0.01 0.001200 GRAIN SIZE - mm
% COBBLES
% GRAVEL
CRS. FINE
% SAND
CRS. MEDIUM FINE
% FINES
SILT CLAY
in in in
1- 1/ in in
3/ in
1/ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
13.0 3.1 22.4 59.8
(ft.)
BOCH LA2016-2(1)
BOGUE CHITTO BOARDWALK
FHWA/EFLHD
BDW BH18-01/J-1 1-3 Sandy silty clay CL-ML
Particle Size Distribution Report
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
7.3 9.7 56.2 22.2
BDW BH18-01/J-6 13-15 Silty sand SM
APPENDIX E – SELECTED PHOTOGRAPHS
Photograph 1: Drill setup at boring BH18-01 at the Trail Entrance – looking north
Photograph 2: Hand auger at boring HA18-01 at the Trail – looking north
Amendment No. 0001
Info Page 1 of 2
Questions/Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. Are the pilings to be steel or wood?
Response: The pilings are to be timber. Furnish pressure treated timber meeting the material requirements noted on sheet R01, steel piles are not an acceptable alternative.
2. Is information on the existing soil conditions available? How deep will the piles be driven?
Response: Additional information can be found in the attached BOCH LA2016-2(1) – Geotechnical Findings and Recommendations Memorandum. The pile embedment length is shown as 12’-0” on sheet R02. Additional information on the installation of Driven Piles can be located in the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
3. Where will the new piles be located?
Response: In accordance with Sheet R02, Note 2, mark the existing pile locations prior to removal and install timber piles at the same location as the existing timber piles.
4. What treatment method will be used on the timber?
Response: In accordance with Sheet R01, pressure treat all timber in accordance with the latest AWPA Standard U1. Provide use category UC5C timber for all piles, headers, and stringers, and use category UC4C for all other timber. Use treatment that does not contain arsenic and/or chromium compounds for UC4C. Use waterborne copper-based solution or suspensions for all timber. Obtain from a single approved source.
5. Will project specific substitutions be considered? i.e. The project plans specify the use of 6-inch x 6-inch square piling, can 8-inch round piling be used? The plans specify #12 screws, can #10 screws be used as an alternative? Dome head bolts are not readily available in stainless steel, can hex-head bolts be used as an alternative?
Response: The Contractor has the option to propose a change to the plan subject to approval of the CO. However, proposed changes will not be considered during mailto:eflhd.contracts@dot.gov
Amendment No. 0001
Info Page 2 of 2 advertisement. Alternative proposals can be submitted to the CO for approval after contract award.
| Govt_Info_Geotech-Memorandum_Amendment 1.pdf |
| INTRODUCTION |
| GENERAL PROJECT INFORMATION |
| GEOLOGIC SETTING |
| Site Geology |
| PROCEDURES AND RESULTS |
| General |
| Sampling |
| Data Summary |
| LABORATORY TESTING |
| DISCLAIMER/LIMITATIONS CLAUSE |
| REFERENCES |
| Heinrich, P.V., McCulloh, R.P., and Snead, John, 2004, Gulfport 30 x 60 minute geologic quadrangle: Louisiana Geological Survey, Geologic Quadrangle Map (1:100,000) 7, scale 1:100,000 |
| APPENDIX: |
| Appendix A – Figures |
| Appendix B – Borings Location Maps |
| Appendix C – Boring Logs |
| Appendix D – Laboratory Test Results |
| Appendix E – Selected Photographs |
| Figure 2 - Geologic Map.pdf |
| Geologic Map |
| Figure 1 - Location Map.pdf |
| Location Map |
File details come from the government source that posted it.