Amendment_0001_-_NP-SER_PMS_FY18(1).pdf
PDF 245 KB Posted
- Attached to
- Cape Hatteras National Seashore, Fort Raleigh National Historic Site, and Wright Brothers National Memorial
- Solicitation number
- 693C73-19-B-000005
About this file
The bid opening date of January 8, 2019,at 2:00 p.m. EST remains the same.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7319B000005 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
See Block 1412/26/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/06/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project: NP-SER PMS FY18(1)
The purpose of this Amendment is to:
1) Revise the Solicitation B Pages for calendar days to include the anticipated notice to proceed (NTP) and restrictions specified in the Special Contract Requirements under the
Section 108.
The Bid Opening date remains January 8, 2019, at 2:00 p.m. EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MELVIN SLOAN
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project NP-SER PMS FY18(1)
NPS Southeast Region Pavement Preservation (CAHA, FORA, WRBR) Solicitation # 693C73-19-B-000005
The purpose of this Amendment is to:
1) Revise the Solicitation B Pages for calendar days to include the anticipated notice to proceed (NTP) and restrictions specified in the Special Contract Requirements under the Section 108.
The Bid Opening date remains January 8, 2019, at 2:00 p.m. EST.
BID SCHEDULE INSTRUCTIONS
PROJECT: NP SER PMS FY18(1)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders.
While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item.
Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items, and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The amount in Block 17 of the SF-1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
Schedule C - $ .
Schedule D - $ .
Schedule E - $ .
Schedule F - $ .
Schedule G - $ .
Schedule H - $ .
Schedule I - $ .
Schedule J - $ .
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A (Base Contract) - Pages B-1 thru B-2 Schedule B (Government Option 1) - Pages B-3 thru B-4 Schedule C (Government Option 2) - Pages B-5 thru B-6 Schedule D (Government Option 3) - Pages B-7 thru B-8 Schedule E (Government Option 4) - Pages B-9 thru B-10 Schedule F (Government Option 5) - Page B-11 Schedule G (Government Option 6) - Page B-12 Schedule H (Government Option 7) - Page B-13 Schedule I (Government Option 8) - Page B-14 Schedule J (Government Option 9) - Page B-15
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, D, E, F, G, H, I, and J (Government Options 1, 2, 3, 4, 5, 6, 7, 8, and 9); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of programmed funds and upon receipt of any additional funds required to award the contract. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B, C, D, E, F, G, H, I, or J (Government Options 1, 2, 3, 4, 5, 6, 7, 8, or 9) at that time. If additional funding is required for the award of Schedules B, C, D, E, F, G, H, I or J (Government Options 1, 2, 3, 4, 5, 6, 7, 8, or 9), and is received after the award of Schedule A (Base Contract), the Government has the right to exercise Schedules B, C, D, E, F, G, H, I, and J (Government Options 1, 2, 3, 4, 5, 6, 7, 8, and 9) at the unit prices bid no later than the completion date of Schedule A.
Schedule B (Government Option 1): No later than the contract completion date for Schedule A (Base Contract).
Schedule C (Government Option 2): No later than the contract completion date for Schedule B (Government Option 1).
Schedule D (Government Option 3): No later than the contract completion date for Schedule C (Government Option 2).
Schedule E (Government Option 4): No later than the contract completion date for Schedule D (Government Option 3).
Schedule F (Government Option 5): No later than the contract completion date for Schedule E (Government Option 4).
Schedule G (Government Option 6): No later than the contract completion date for Schedule F (Government Option 5).
Schedule H (Government Option 7): No later than the contract completion date for Schedule G (Government Option 6).
Schedule I (Government Option 8): No later than the contract completion date for Schedule H (Government Option 7).
Schedule J (Government Option 9): No later than the contract completion date for Schedule I (Government Option 8).
COMPLETION OF WORK
The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion for the various contract award scenarios. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.
If the Government awards the contract as Schedules A + B + C + D + E + F + G + H + I + J, the performance period to complete all contract work will be 340 calendar days.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 185 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 25 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 45 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 60 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 30 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.
If Schedule F (Government Option 5) is exercised after the award of the original contract, the performance period to complete all Schedule F work will be 35 calendar days and will start on the effective date of Schedule F’s Notice to Proceed.
If Schedule G (Government Option 6) is exercised after the award of the original contract, the performance period to complete all Schedule G work will be 15 calendar days and will start on the effective date of Schedule G’s Notice to Proceed.
If Schedule H (Government Option 7) is exercised after the award of the original contract, the performance period to complete all Schedule H work will be 30 calendar days and will start on the effective date of Schedule H’s Notice to Proceed.
If Schedule I (Government Option 8) is exercised after the award of the original contract, the performance period to complete all Schedule I work will be 125 calendar days and will start on the effective date of Schedule I’s Notice to Proceed.
If Schedule J (Government Option 9) is exercised after the award of the original contract, the performance period to complete all Schedule J work will be 20 calendar days and will start on the effective date of Schedule J’s Notice to Proceed.
If the contract is awarded, or any individual schedule of work is exercised, such that the work cannot be completed by the Friday before Memorial Day stated in Subsection 108.01 of the Special Contract Requirements, the Contractor will be required to complete the work after Labor Day when the restriction period ends.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc);
those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc).
The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-15) may result in the start of construction activities to be no earlier than January 2019. See Subsection
108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total + Schedule D (Government Option 3) Bid Total + Schedule E (Government Option 4) Bid Total + Schedule F (Government Option 5) Bid Total + Schedule G (Government Option 6) Bid Total + Schedule H (Government Option 7) Bid Total + Schedule I (Government Option 8) Bid Total + Schedule J (Government Option 9) Bid Total.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0060 20301-3600 REMOVAL OF RAISED PAVEMENT MARKER
625 EACH $____________ $____________
A0080 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
62 EACH $____________ $____________
A0100 20302-2600 REMOVAL OF PAVEMENT MARKINGS
156,000 LNFT $____________ $____________
A0120 41402-2000 CRACKS, CLEANING AND SEALING
14.8 MILE $____________ $____________
A0140 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
65 SQYD $____________ $____________
A0160 42001-0000 PAVEMENT PRESERVATION TREATMENT
194,000 SQYD $____________ $____________
A0180 60405-0000 MANHOLE ADJUSTMENT
15 EACH $____________ $____________
A0200 60915-1000 WHEELSTOP, CONCRETE
15 EACH $____________ $____________
A0220 60915-3000 WHEELSTOP, RECYCLED PLASTIC
2 EACH $____________ $____________
A0240 60920-0000 RESET WHEELSTOP
70 EACH $____________ $____________
A0260 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
139,000 LNFT $____________ $____________
A0280 63401-1600 PAVEMENT MARKINGS, TYPE H, BROKEN
17,700 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP SER PMS FY18(1)
Project Name:Southeast Region - Pavement Preservation
B - 2
A0300 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW
20 EACH $____________ $____________
A0320 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
14 EACH $____________ $____________
A0340 63405-3050 PAVEMENT MARKINGS, TYPE H, "ONLY" WORD MESSAGE
2 EACH $____________ $____________
A0360 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
27 EACH $____________ $____________
A0380 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
625 EACH $____________ $____________
A0400 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
A0420 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
33 EACH $____________ $____________
A0440 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
68,000 LNFT $____________ $____________
A0460 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
4 EACH $____________ $____________
A0480 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B - 3
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0060 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
22 EACH $____________ $____________
B0080 20302-2600 REMOVAL OF PAVEMENT MARKINGS
26,300 LNFT $____________ $____________
B0100 41402-2000 CRACKS, CLEANING AND SEALING
4.1 MILE $____________ $____________
B0120 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
53 SQYD $____________ $____________
B0140 42001-0000 PAVEMENT PRESERVATION TREATMENT
35,000 SQYD $____________ $____________
B0160 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
26,300 LNFT $____________ $____________
B0180 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
18 EACH $____________ $____________
B0200 63405-3000 PAVEMENT MARKINGS, TYPE H, STRAIGHT/TURN ARROW COMBINATION
1 EACH $____________ $____________
B0220 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
3 EACH $____________ $____________
B0240 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
B0260 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
19 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type: Option
B - 4
B0280 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
12,300 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type: Option
B - 5
C0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0060 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
68 EACH $____________ $____________
C0080 20302-2600 REMOVAL OF PAVEMENT MARKINGS
10,200 LNFT $____________ $____________
C0100 41402-2000 CRACKS, CLEANING AND SEALING
4.5 MILE $____________ $____________
C0120 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
12 SQYD $____________ $____________
C0140 42001-0000 PAVEMENT PRESERVATION TREATMENT
30,000 SQYD $____________ $____________
C0160 60915-1000 WHEELSTOP, CONCRETE
5 EACH $____________ $____________
C0180 60915-3000 WHEELSTOP, RECYCLED PLASTIC
1 EACH $____________ $____________
C0200 60920-0000 RESET WHEELSTOP
30 EACH $____________ $____________
C0220 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
10,200 LNFT $____________ $____________
C0240 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
49 EACH $____________ $____________
C0260 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
19 EACH $____________ $____________
C0280 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:C Schedule Type: Option
B - 6
C0300 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
49 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type: Option
B - 7
D0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
D0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
D0060 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
32 EACH $____________ $____________
D0080 20302-2600 REMOVAL OF PAVEMENT MARKINGS
20,300 LNFT $____________ $____________
D0100 41402-2000 CRACKS, CLEANING AND SEALING
4.9 MILE $____________ $____________
D0120 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
300 SQYD $____________ $____________
D0140 42001-0000 PAVEMENT PRESERVATION TREATMENT
39,000 SQYD $____________ $____________
D0160 60405-0000 MANHOLE ADJUSTMENT
5 EACH $____________ $____________
D0180 60915-1000 WHEELSTOP, CONCRETE
60 EACH $____________ $____________
D0200 60915-3000 WHEELSTOP, RECYCLED PLASTIC
12 EACH $____________ $____________
D0220 60920-0000 RESET WHEELSTOP
335 EACH $____________ $____________
D0240 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
20,300 LNFT $____________ $____________
D0260 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
11 EACH $____________ $____________
D0280 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
21 EACH $____________ $____________
Bid Schedule Schedule:D Schedule Type: Option
B - 8
D0300 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
D0320 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
11 EACH $____________ $____________
D0340 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
3,800 LNFT $____________ $____________
D0360 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:D Schedule Type: Option
B - 9
E0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
E0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
E0060 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
11 EACH $____________ $____________
E0080 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
44 EACH $____________ $____________
E0100 20302-2600 REMOVAL OF PAVEMENT MARKINGS
19,700 LNFT $____________ $____________
E0120 41402-2000 CRACKS, CLEANING AND SEALING
3.9 MILE $____________ $____________
E0140 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
17 SQYD $____________ $____________
E0160 42001-0000 PAVEMENT PRESERVATION TREATMENT
38,000 SQYD $____________ $____________
E0180 60405-0000 MANHOLE ADJUSTMENT
5 EACH $____________ $____________
E0200 60915-1000 WHEELSTOP, CONCRETE
1 EACH $____________ $____________
E0220 60920-0000 RESET WHEELSTOP
5 EACH $____________ $____________
E0240 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
19,700 LNFT $____________ $____________
E0260 63405-2890 PAVEMENT MARKINGS, TYPE H , "ONE WAY" WORD MESSAGE
2 EACH $____________ $____________
E0280 63405-2890 PAVEMENT MARKINGS, TYPE H , "OVERSIZED VEHICLES AND BUSES ONLY"
WORD MESSAGE
12 EACH $____________ $____________
Bid Schedule Schedule:E Schedule Type: Option
B - 10
E0300 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW
3 EACH $____________ $____________
E0320 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
16 EACH $____________ $____________
E0340 63405-3000 PAVEMENT MARKINGS, TYPE H, STRAIGHT/TURN ARROW COMBINATION
1 EACH $____________ $____________
E0360 63405-3050 PAVEMENT MARKINGS, TYPE H, "ONLY" WORD MESSAGE
1 EACH $____________ $____________
E0380 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
10 EACH $____________ $____________
E0400 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
E0420 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
19 EACH $____________ $____________
E0440 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
11,000 LNFT $____________ $____________
E0460 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
2 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:E Schedule Type: Option
B - 11
F0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
F0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
F0060 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
90 EACH $____________ $____________
F0080 41402-2000 CRACKS, CLEANING AND SEALING
5.2 MILE $____________ $____________
F0100 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
43 SQYD $____________ $____________
F0120 42001-0000 PAVEMENT PRESERVATION TREATMENT
44,000 SQYD $____________ $____________
F0140 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
90 EACH $____________ $____________
F0160 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
F0180 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
90 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:F Schedule Type: Option
B - 12
G0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
G0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
G0060 20302-2600 REMOVAL OF PAVEMENT MARKINGS
910 LNFT $____________ $____________
G0080 41402-2000 CRACKS, CLEANING AND SEALING
3.4 MILE $____________ $____________
G0100 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
43 SQYD $____________ $____________
G0120 42001-0000 PAVEMENT PRESERVATION TREATMENT
25,000 SQYD $____________ $____________
G0140 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
910 LNFT $____________ $____________
G0160 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:G Schedule Type: Option
B - 13
H0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
H0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
H0060 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
19 EACH $____________ $____________
H0080 20302-2600 REMOVAL OF PAVEMENT MARKINGS
2,150 LNFT $____________ $____________
H0100 41402-2000 CRACKS, CLEANING AND SEALING
2.5 MILE $____________ $____________
H0120 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
22 SQYD $____________ $____________
H0140 42001-0000 PAVEMENT PRESERVATION TREATMENT
22,000 SQYD $____________ $____________
H0160 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
2,150 LNFT $____________ $____________
H0180 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
18 EACH $____________ $____________
H0200 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
H0220 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
H0240 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND
LETTERS
18 EACH $____________ $____________
H0260 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
830 LNFT $____________ $____________
Bid Schedule Schedule:H Schedule Type: Option
Project No:NP SER PMS FY18(1)
Schedule Total:____________Submitted by:____________________________________
I0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
I0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
I0060 20301-3900 REMOVAL OF PAVEMENT MARKINGS, SYMBOLS AND WORDS
3 EACH $____________ $____________
I0080 20302-2600 REMOVAL OF PAVEMENT MARKINGS
6,700 LNFT $____________ $____________
I0100 41402-2000 CRACKS, CLEANING AND SEALING
1.4 MILE $____________ $____________
I0120 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
112 SQYD $____________ $____________
I0140 42001-0000 PAVEMENT PRESERVATION TREATMENT
14,000 SQYD $____________ $____________
I0160 60915-1000 WHEELSTOP, CONCRETE
5 EACH $____________ $____________
I0180 60915-3000 WHEELSTOP, RECYCLED PLASTIC
1 EACH $____________ $____________
I0200 60920-0000 RESET WHEELSTOP
20 EACH $____________ $____________
I0220 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
6,700 LNFT $____________ $____________
I0240 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
3 EACH $____________ $____________
I0260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
I0280 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
5,650 LNFT $____________ $____________
Bid Schedule Schedule:I Schedule Type: Option Project No:NP SER PMS FY18(1)
Schedule Total:____________Submitted by:____________________________________
J0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
J0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
J0060 20302-2600 REMOVAL OF PAVEMENT MARKINGS
310 LNFT $____________ $____________
J0080 41402-2000 CRACKS, CLEANING AND SEALING
0.7 MILE $____________ $____________
J0100 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
36 SQYD $____________ $____________
J0120 42001-0000 PAVEMENT PRESERVATION TREATMENT
4,500 SQYD $____________ $____________
J0140 60915-1000 WHEELSTOP, CONCRETE
1 EACH $____________ $____________
J0160 60920-0000 RESET WHEELSTOP
5 EACH $____________ $____________
J0180 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
310 LNFT $____________ $____________
J0200 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:J Schedule Type: Option
B-16
BID SUMMARY
Project NP SER PMS FY18(1)
(1) Schedule A (Base Contract) Bid Total (from Page B-2) = (1) $_____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-4) = (2) $_____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-6) = (3) $_____________________
(4) Schedule D (Government Option 3) Bid Total (from Page B-8) = (4) $_____________________
(5) Schedule E (Government Option 4) Bid Total (from Page B-10) = (5) $______________________
(6) Schedule F (Government Option 5) Bid Total (from Page B-11) = (6) $_____________________
(7) Schedule G (Government Option 6) Bid Total (from Page B-12) = (7) $_____________________
(8) Schedule H (Government Option 7) Bid Total (from Page B-13) (8) $_____________________
(9) Schedule I (Government Option 8) Bid Total (from Page B-14) (9) $_____________________
(10) Schedule J (Government Option 9) Bid Total (from Page B-15) (10) $_____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT (1) + (2) +(3) +(4) + (5) + (6) + (7) + (8) + (9) + (10)
Maximum Time Allowed for the Contract if all Schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C + D + E + F + G+ H + I + J, the performance period to complete all contract work will be 340 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 185 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 25 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 45 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 60 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 30 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.
If Schedule F (Government Option 5) is exercised after the award of the original contract, the performance period to complete all Schedule F work will be 35 calendar days and will start on the effective date of Schedule F’s Notice to Proceed.
If Schedule G (Government Option 6) is exercised after the award of the original contract, the performance period to complete all Schedule G work will be 15 calendar days and will start on the effective date of Schedule G’s Notice to Proceed.
If Schedule H (Government Option 7) is exercised after the award of the original contract, the performance period to complete all Schedule H work will be 30 calendar days and will start on the effective date of Schedule H’s Notice to Proceed.
If Schedule I (Government Option 8) is exercised after the award of the original contract, the performance period to complete all Schedule I work will be 125 calendar days and will start on the effective date of Schedule I’s Notice to Proceed.
If Schedule J (Government Option 9) is exercised after the award of the original contract, the performance period to complete all Schedule J work will be 20 calendar days and will start on the effective date of Schedule J’s Notice to Proceed.
If the contract is awarded, or any individual schedule of work is exercised, such that the work cannot be completed by the Friday before Memorial Day stated in Subsection 108.01 of the Special Contract Requirements, the Contractor will be required to complete the work after Labor Day when the restriction period ends.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Solicitation # 693C73-19-B-000005 |