Results_of_Bid_Opening_-_Schedules_A&B_-_NP-GWMP_1(1),_2(1).pdf
PDF 25 KB Posted
- Attached to
- George Washington Memorial Parkway
- Solicitation number
- 693C73-18-B-000007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis_-_NP-GWMP_1(1),_2(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
George Washington Memorial Parkway
PROJECT: NP-GWMP 1(1), 2(1)
SOLICITATION NO. 693C73-18-B-000007
November 30, 2017 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-18-B-000007
PROJECT NUMBER: NP-GWMP 1(1), 2(1)
November 30, 2017, 2:00 p.m. local time
BIDDER BID TOTAL DAYS TOTAL PRICE
Milani Construction, LLC Schedule A $3,784,695.00 Schedule B $184,200.00
Calendar Days Schedule A + B $3,968,895.00
Martins Construction Corp Schedule A $2,536,274.00 Schedule B $296,250.00
Calendar Days Schedule A + B $2,832,524.00
Corman Construction Schedule A $3,196,738.00 Schedule B $303,165.00
Calendar Days Schedule A + B $3,499,903.00
Schedule A Schedule B
Calendar Days Schedule A + B
Maximum time allowed for the contract if Schedules A and B are awarded at the same time will be 225 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-18-B-000007
PROJECT NUMBER: NP-GWMP 1(1), 2(1)
November 30, 2017, 2:00 p.m. local time
BIDDER BID TOTAL DAYS TOTAL PRICE
Fort Myer Construction Corp. Schedule A $2,667,105.78 Schedule B $319,840.00
Calendar Days Schedule A + B $2,986,945.78
Sagres Construction Corp. Schedule A $2,762,130.00 Schedule B $353,875.00
Calendar Days Schedule A + B $3,116,005.00
Schedule A Schedule B
Calendar Days
Engineer’s Estimate Schedule A $3,425,000.00 Schedule B $455,000.00
Calendar Days Schedule A + B $3,880,000.00
Maximum time allowed for the contract if Schedules A and B are awarded at the same time will be 225 calendar days.
| Slide Number 1 |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-18-B-000007� PROJECT NUMBER: NP-GWMP 1(1), 2(1)�November 30, 2017, 2:00 p.m. local time |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-18-B-000007� PROJECT NUMBER: NP-GWMP 1(1), 2(1)�November 30, 2017, 2:00 p.m. local time |
File details come from the government source that posted it.