Bidders Questions 1.pdf

PDF 100 KB Posted

Attached to
James River Reserve Fleet_Drydocking TD 207 PUSH BOAT Federal contract opportunity
Solicitation number
6933A224Q000017
Issued by
Department of Transportation Maritime Administration

About this file

This document contains questions and answers related to a federal solicitation for the drydocking of the TD-207 Push Boat owned by the Maritime Administration (MARAD), Department of Transportation.

The key details are:

  • The solicitation number is 6933A224Q000017 and the project is for drydocking the TD-207 Push Boat.
  • MARAD will deliver the vessel to the contractor's facility in the Hampton Roads area within 3 working days of the notice to proceed. The dry-docking period will be 60 days.
  • The contractor is to provide all labor and materials required per the Statement of Work. MARAD will provide paint for the hull cleaning and painting.
  • The contractor is asked to provide pictures and dimensions for various repair items such as the plate renewals, rudders, shafting, and fenders.
  • The targeted start date for this project is the 4th quarter of 2024, with an approximate start date of 60 days or less post award.

View the file

Other files for this federal contract opportunity

Other files attached to James River Reserve Fleet_Drydocking TD 207 PUSH BOAT, newest first.
File Type Posted
JRRF TD-207 Push Boat Drydocking Solicitation.docx DOCX document
JRRF TD-207 Push Boat Drydocking Solicitation.docx DOCX document
JRRF TD-207 Push Boat Drydocking Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: 3. Plate renewals. 3.6.1.3 Is it possible to get a picture of the repair items?

Answer: See attached references 0291a and 0294a

Question: 6. Hull Cleaning and Painting. Will the paint be provided by the shipyard or Gov?

Answer: 6. The paint will be provided by the shipyard.

Question: 9 & 10 Main and Flanking Rudders. Could we get a couple of pictures of the topside steering gear arrangement?

Answer: See attached references 0451, 0452 and 0453.

Question: 12. Shafting. What is the shaft diameter and approx. length?

Answer: shaft: 3” diameter, approx. 7 feet.

Question: 15.1 Please provide picture and dimension for fenders as needed for pricing.

Answer: See reference 0292 and Duramax .pdf, code #: DB-1909

Question: 15.3 Please provide picture of hatches.

Answer: See reference 0294. There are 2 each and fore/aft hatches are identical.

What is the targeted start date?

4th quarter 2024 with an approximate start date of 60 or less days post award.

File details come from the government source that posted it. Updated .