This document contains an amendment to a solicitation for shipboard repair services on the Training Ship State of Maine. The Maritime Administration intends to solicit offers to perform repairs including removal and overhaul of pump assemblies, emptying of waste and media tanks, repairing a fuel oil tank containment and pinhole, replacing kick pipes and wiring runs, modifying fire stations, and relocating duplex strainers. Offerors must acknowledge receipt of the amendment by the closing date of March 1, 2021. The amendment provides additional clarification on technical requirements such as permitted materials, reusing components, and relocating equipment. The total number of kick pipes to be replaced is confirmed as eleven. The Maritime Administration and Maine Maritime Academy are the contracting parties.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
6933A220Q000010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NORFOLK VA 23505-1204
BUILDING 19 SUITE 300
MARAD-00092
7737 HAMPTON BLVD
MAR-380-2
ATLANTIC ACQUISITION OFFICE
US DOT MARITIME ADMINISTRATION
01/27/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/15/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Training Ship State of Maine FY 20 Pierside Repairs
This amendment is issued to answer questions received in response to the solicitation and site visit of 22 January 2020.
All other terms and conditions remain unchanged.
IT Related Pur: NO
Period of Performance: 02/10/2020 to 03/01/2021
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TINA M. GILLESPIE-LUCAS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1/27/2020
Solicitation 6933A220Q000010 Amendment 00001
Question 1: Item 10. In the removal of the pump assemblies, will it be satisfactory to leave the pumps in their general location vs. moving up to the machine shop?
Answer: Yes, providing a clean and proper overhaul is performed.
Question 2: Item 18. Can the effluent pumps line up to the rail for overboard discharge to a truck to empty the MSD?
Answer: There is hard piping which can permit discharge of the effluent pumps (which also serve to evacuate the media tank) to discharge to a shore-side truck (via the ship’s rail). However, this procedure has not been tried in some years and so it’s success cannot be guaranteed, especially if an obstruction in the media tank or discharge piping is present/encountered. If the procedure cannot be successfully performed, a CFR should be submitted to accomplish emptying of the tanks (effluent and media) via portable pumps and hoses.
Question 3: Item 24. Please identify the containment with a pin hole to be repaired.
Answer: The containment serves fuel oil tank 5-47-0 and is located at frame 65, starboard side, 01 deck.
Question 4 A: Item 25. Is the intent to reuse the existing deck compensators and weld a new pipe at the top of these?
Answer: The intent of this Item is to repair the kick pipe assemblies (pipe, gland, compensator) to a “like-new” condition. Any components which can be cleaned and made to look like new can be re-used. The Contractor should be aware that many of the compensators are screwed couplings and that corrosion of the kick pipe threads inside the compensator may require that the compensator also be replaced (if replacing with a threaded kick pipe). An alternate means of making the repair is to clean up and/or drill out the compensator sufficiently to weld a new kick pipe into it. Schedule 80 pipe will provide sufficient compensation and rigidity on its own if inserted far enough into a cleaned/drilled out compensator.
Question 4 B: And can you verify the quantity of kick pipes as 6 or 11. 23.9.3.2 has 6 in its description plus the others?
Answer: The following line items in the SOW are corrected to read:
25.2.1 It is the intent of this Item to crop and renew eleven (11) “kick pipes” and their stuffing boxes/strain reliefs installed on eleven (11) different wire runs.
25.9.3 Disconnect all wiring (at the nearest terminal connection point) and pull all wiring through the following eleven (11) kick pipes:
25.9.3.2 03 reception deck at aft railing (Total of 6 kick pipes).
25.9.4 Crop and scrap the eleven (11) kick pipes and their stuffing boxes.
A corrected Statement of Work will be provided during subsequent contract award.
Question 5A: A general question on supplemental. What amount of administrative labor is allowed on delivery orders that have procurement only?
Answer: In accordance with MARAD clause MCH.H-2, Supplemental Work Requests, which is included by reference in this solicitation, any supplies or subcontracts required to complete supplemental work will be charged as a direct cost reimbursable under the applicable supplemental work CLIN; additional indirect charges for materials and subcontracts will not be allowed. Please review the MARAD clause link of:
https://voa.marad.dot.gov/Solicitation_Awards/docs/mar- 380/MARAD%20Clauses%20MCL%20for%20HTML.htm for details.
Question 5B: And when we fill out the pricing sheet. Will our hourly labor number be added in with the rest of the line items?
Answer: The hourly labor rate will not be added into the total for work items 1 – 25. The hours negotiated for services against supplemental CLIN 26 will be invoiced/paid at the Contractor’s quoted hourly rate.
Question 6: WI # 9, Duplex strainer, due the size of the additional flange and lug valve, is it possible to move each strainer Aft between 4-6 inches to better accommodate the flange/valve installation? This may entail adding an offset to one 4” CuNi pipe and one vent line.
Answer: Yes, the strainer may be moved to accommodate the new valve. All modifications required to the strainer foundation, piping interferences, etc., as a result of moving the strainer, shall be the responsibility of the Contractor.
Question 7: WI # 9, Duplex Strainer, from the following reference drawing, NAVSEA Dwg 524-6251458 Rev E, Piping Diagram for Mn and Aux Sea Water Piping. The list of Materials identifies the valve trim as ASTM B-164, Monel. Whereas, WI # 9 identifies the valve and trim as B-62 (bronze). Please clarify?
Answer: A Bronze valve body of ASTM B61 or B62 is permitted as is nickel aluminum bronze.
Disc shall be stainless steel 316 or nickel aluminum bronze. Stem shall be Stainless steel 316 or Monel K500. Seat shall be bonded BUNA-N. Valve operator shall be lever or wheel/gear operated.
Question 8: WI # 22, Fire Stations, the fittings identified in the item call out 3000# fittings, can fittings rated for 600 lbs be used instead as the pressure for this line is less than 225 psi?
Answer: No. The SOW requires schedule 80 pipe and socket weld fittings. Socket weld fittings are only available in 3 pressure ratings; Class 3,000, 6,000 and 9,000. Class 3,000 corresponds to schedule 80.
Question 9: WI # 24, Containments, on the Stbd side of the 01 deck, Aft house, there are two vents adjacent to each other. Can the vents be modified to go into the same tank? If so, does the tank have to 42 USG or 84 USG capacity?
https://voa.marad.dot.gov/Solicitation_Awards/docs/mar-380/MARAD%20Clauses%20MCL%20for%20HTML.htm https://voa.marad.dot.gov/Solicitation_Awards/docs/mar-380/MARAD%20Clauses%20MCL%20for%20HTML.htm
Answer: The two vents can share the same containment providing the total volume of the containment is not less than 84 gallons (2 barrels). The new containment must not impede into the walkway more than any of the other existing containments.
Question 10: WI # 25, Kick pipes, request clarification as to the number of kick pipes that will need to be renewed 6 or 11?
Answer: See answer to question 4B
| 2020-01-27T16:28:36-0500 | |
| TINA M GILLESPIE-LUCAS |