SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
MARAD-MAR-615
BUILDING 19 SUITE 300
7737 HAMPTON BLVD
US DOTMARITIME ADMINISTRATION
DIV OF ATLANTIC OPERATIONS
MARAD-00092-KENEDY CODE 16. ADMINISTERED BYCODE
X
X
X
336611
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED ORMARAD-00092
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
11/26/2019 1200 ET
11/12/2019
757-322-5820Monique Leake (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
6933A220Q000003
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 79 MAPR61520000054OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
NORFOLK VA 23505-1204
TELEPHONE NO.
17a. CONTRACTOR/
BUZZARDS BAY MA 2532
101 ACADEMY DRIVE
MASSACHUSETTS MARITIME ACADEMY
TS KENNEDY
15. DELIVER TO
NORFOLK VA 23505-1204
BUILDING 19 SUITE 300
7737 HAMPTON BLVD
MAR-380-2
ATLANTIC ACQUISITION OFFICE
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
1,250
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
US DOT MARITIME ADMINISTRATION
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
T.S. KENNEDY - FY20 Inspection and Assessment of the Forward and After Peak Ballast Tanks
The purpose of the Request for Quotation is for Potential Offerors to perform inspections and internal structural exams on the salt water ballast tanks aboard the ship in accordance with the attached Statement of Work and ABS Rules, Part 7, Chapter 3, Sections 1 and 2.
IT Related Pur: NO Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Monique Leake
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 12/02/2019 to 12/16/2019
00001 KDY - Inspection and Assessment of the Forward and After Peak Ballast Tanks
Issued for the services as per the attached
Statement of Work and Line Item Pricing sheet.
In order for an invoice to be processed for payment, it must include your Federal ID Number, Purchase Order Number, and Invoice Number.
Without these numbers, your invoice will be returned and payment will be delayed.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
792 of
DEPARTMENT OF TRANSPORTATION
STATEMENT OF WORK (SOW)
U.S. DOT - MARITIME ADMINISTRATION TRAINING SHIP
“KENNEDY” INSPECTION AND ASSESSMENT OF THE FORWARD
AND AFTER PEAK BALLAST TANKS.
11/1/2019
Table of Contents The primary purposes of this Statement of Work is to accomplish an inspection and assessment of the forward and after peak ballast tanks
Table of Contents
GENERAL PROVISIONS
ABBREVIATIONS/DEFINITIONS
EXPANDED DEFINITIONS
CONFLICTS - SPECIFICATIONS/DRAWINGS
INTENT AND GENERAL SPECIFICATION REQUIREMENTS
GENERAL VESSEL DESCRIPTION
DRAWING, CORRESPONDENCE, AND COMMUNICATION PROCEDURES
LAWS, CLASSIFICATION, RULES, REGULATIONS, STANDARDS, CERTIFICATES
PROGRESS MEETINGS AND PROGRESS REPORT
CONTRACT AND GUIDANCE DRAWINGS
HEADROOM
ACCESS & MAINTENANCE REQUIREMENTS
ASBESTOS /VENDORS /SUBCONTRACTORS
ACCESS TO YARD/VESSEL/DOCUMENTS (IF APPLICABLE)
INSPECTIONS
PROSECUTION OF WORK
INTEGRATED MASTER SCHEDULE (IMS)
CRITICAL PATH METHOD (CPM) SCHEDULE
PROGRESS REVIEW MEETINGS
GUARANTEES
MATERIALS AND WORKMANSHIP
CONTRACTOR'S OBLIGATION
COMMUNICATIONS (YARD)
HULL PROTECTION
GENERAL INFORMATION
AVAILABILITY AND PERFORMANCE PERIOD
INTERNAL STRUCTURAL EXAMS OF SALT WATER BALLAST TANKS
GENERAL PROVISIONS
General
The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (hereinafter called MARAD). It shall be clearly understood that all below specified work and services, as well as additional work and services ordered through this solicitation, shall be for, and on behalf of, MARAD.
Attending the vessel for the Owner will be the owner’s representative, who is also the MARAD Marine Surveyor, Port Engineer and Contracting Officer's Representative (COR). The Contractor will be informed in writing of the designated individuals and their authority upon award of contract.
Note: This GENERAL section applies to all ITEMS within this SOW and therefore is Not Separately Priced. To the extent that efforts to comply with the requirements stated in this GENERAL section present a cost impact, the cost is to be allocated to the priced ITEMS
ABBREVIATIONS/DEFINITIONS
As used throughout this statement of work, the following terms and abbreviations shall have the meaning stated:
ABS American Bureau of Shipping
ANSI American National Standards Institute
ASME American Society of Mechanical Engineers
CFR Code of Federal Regulations substitute for (USCG Requirements)
CONTRACTOR Contractor (same as YARD or SHIPYARD if applicable)
CONTRACT The agreement between the Owner and the Contractor, including these Specifications and the accompanying Contract Drawings. These Specifications are "senior" to Drawings in cases of potential conflict.
CRES Stainless steel (Grade should be specified)
COR Contracting Officer's Representative is responsible for monitoring the contractor's progress in fulfilling the technical requirements specified in the contract. The COR ensures that all required documentation and data are submitted in accordance with the procurement deliverable schedule. Should the contractor fail to fulfill the contractual requirements, the COR must inform the contractor of such failure. The COR informs the contracting officer of any technical or contractual problems or delays. The COR maintains administration records, approves invoices, and performs final inspection and acceptance of work performed under the contract. The COR is not authorized to make any commitments or obligations on behalf of the government. The COR may not grant the contractor permission to deviate from the requirements stated in the contract, nor direct the contractor to perform any work outside that stated in the contract.
DWG or DWGS Contract Drawing or Drawings
EOS Engineer's Operating Station
GF Government Furnished
GFE Government Furnished Equipment
LT Long Ton (2240 LBS) All weights in this Specification are expressed in LT or pounds
MARAD Maritime Administration, U.S. Department of Transportation
MAY This word, or the adjective "OPTIONAL," means that an item is truly optional. One vendor may choose to include the item because a particular marketplace requires it or because the vendor feels that it enhances the product while another vendor may omit the same item.
MUST This word, or the terms "REQUIRED" or "SHALL," mean that the definition is an absolute requirement of the specification.
MUST NOT This phrase, or the phrase "SHALL NOT," mean that the definition is an absolute prohibition of the specification.
OWNER U.S. Department of Transportation Maritime Administration West Building 1200 New Jersey Avenue, SE Washington, DC 20590
QA Quality Assurance
RENEW Whenever the term "renew" is used, it is understood to mean "remove the old or defective material and replace it with new material of the same design, specification, or standard" unless otherwise stated.
SEAL WELD Structure, which is double continuously welded.
SHOULD This word, or the adjective "RECOMMENDED," mean that there may exist valid reasons in particular circumstances to ignore a particular item, but the full implications must be understood and carefully weighed before choosing a different course.
SHOULD NOT This phrase, or the phrase "NOT RECOMMENDED" mean that there may exist valid reasons in particular circumstances when the particular behavior is acceptable or even useful, but the full implications should be understood and the case carefully weighed before implementing any behavior described with this label.
SPECIFICATION The specification is an explicit set of requirements to be satisfied by a material, product, or service.
STATEMENT OF WORK (SOW)
A statement of work (SOW) is a formal document that captures and defines the work activities, deliverables, and timeline a Contractor will execute against in performance of specified work for the OWNER. In this document the Specification is generally synonymous with the words statement of work (SOW)
USCG (CG) United States Coast Guard
VESSEL T/S Kennedy
YARD Contracting Shipyard as applicable (same as CONTRACTOR)
EXPANDED DEFINITIONS
GOVERNMENT FURNISHED
All equipment herein specified as GOVERNMENT FURNISHED (GF) or GOVERNMENT FURNISHED EQUIPMENT (GFE) is to be installed by the CONTRACTOR in such condition that it is completely serviceable under normal conditions of vessel operations. Such installations are to adhere to all applicable specifications of Regulatory Agencies and are to be to the satisfaction of the COR. This includes, but is not limited to, the following:
1. Time and materials for assembly.
2. Time and materials for positioning and proper securing
3. Time and materials for connections of piping, wiring, etc.
4. Time and materials for operational testing
All equipment, which is not herein, specified as either GOVERNMENT FURNISHED (GF) or EXISTING shall be provided and installed as detailed above by the CONTRACTOR (CONTRACTOR).
CONTRACTING OFFICER'S REPRESENTATIVE (COR)
Contracting Officer's Representative is responsible for monitoring the contractor's progress in fulfilling the technical requirements specified in the contract. The COR ensures that all required documentation and data are submitted in accordance with the procurement deliverable schedule. Should the contractor fail to fulfill the contractual requirements, the COR must inform the contractor of such failure. The COR informs the contracting officer of any technical or contractual problems or delays. The COR maintains administration records, approves invoices, and performs final inspection and acceptance of work performed under the contract. The COR is not authorized to make any commitments or obligations on behalf of the government. The COR may not grant the contractor permission to deviate from the requirements stated in the contract, nor direct the contractor to perform any work outside that stated in the contract.
GOOD SHIPBUILDING PRACTICE
The term "good shipbuilding practice" means construction practices, which are in accordance with soundly engineered and approved processes. These processes are to meet the requirements contained within this document of SPECIFICATIONS. Construction and testing shall conform to the regulatory agency and industry-accepted standards to ensure that the vessel will meet the general and particular design requirements.
ABS/USCG APPROVED MATERIALS/EQUIPMENT
Contractor-furnished materials and equipment used for repairs to, or replacement of, existing shipboard materials or equipment must comply with all applicable American Bureau of Shipping/U.S. Coast Guard (ABS/USCG) requirements. Certificates will be provided for all certified materials.
ACCESSING OF REPAIR/RENEWALS/ADDITIONS
All removals and replacements required to gain access shall be accomplished, as necessary, in order to effect the repairs, renewals, and additions enumerated herein and be considered as part of the basic specification.
QUALITY ASSURANCE
Inspections by the COR are for the purpose of verifying the CONTRACTOR’s Quality Assurance Program.
COR inspections are not to be used as a substitute for in-process control of quality by the CONTRACTOR.
SOLE SOURCE/BID SUBSTITUTIONS
It is not necessary to offer all material and equipment as "sole source" unless expressly stated in these Specifications. The CONTRACTOR will be permitted to submit bids containing substitutions as long as such substitutions are clearly stated and detailed. Any bid substitution must be equal to the specified model, must be sufficiently documented to prove equality, and must meet the performance requirements of the vessel.
The CONTRACTOR is responsible for all additional costs associated with proposed substitutions, including, but not limited to, required engineering expenses. In this regard, the specifications herein are guidelines for minimum performance requirements. If those specifications are not offered by a particular manufacturer, product, or model, the CONTRACTOR will be expected to include a separate list of all discrepancies. Substituted manufacturers, products, or models will not be considered unless they have been demonstrated to be equal to or exceeding the quality, durability and design and the minimum performance functions of the specified equipment. Any proposed substitution must conform substantially to the specified requirements for the machinery and equipment.
CONFLICTS - SPECIFICATIONS/DRAWINGS
Where Specifications and Drawings are not in agreement, it is the responsibility of the CONTRACTOR to notify the COR in writing that such disagreement does exist and request resolution of same. Generally, the Specifications are to be considered senior to the Contract Drawings; however, there may be instances where, by mutual agreement, this priority may be reversed. Written notification, therefore, is essential and required.
INTENT AND GENERAL SPECIFICATION REQUIREMENTS
GENERAL
The primary purpose of this Statement of Work (SOW) is to accomplish the following:
INSPECTION AND ASSESSMENT OF THE FORWARD AND AFTER PEAK BALAST TANKS.
ERRORS/OMISSIONS
In the event that there are found to be errors or omissions in these Specifications or in the accompanying Drawings that would have an adverse effect upon the completion of this contract and/or delivery to the OWNER of a product that is complete, functional, and seaworthy, the CONTRACTOR shall call attention to such errors or omissions in his bid package.
Minor design errors or omissions shall be properly addressed by the CONTRACTOR in the normal course of the contract performance. Major design errors or omissions shall be resolved by Change Orders.
SPECIFICATIONS IN EXCESS
Although the Drawings & Specifications contemplate a project, which will be completed in accordance with the requirements of the several regulatory bodies referred to herein, in certain respects, the Contract Drawings and Specifications may be in excess of such requirements and must not be changed except on written approval of the OWNER.
If the CONTRACTOR is of the opinion that any aspect of the Contract Drawings and Specifications are so stringent, that his Company is unwilling or incapable of completing the Project within those parameters;
it is the CONTRACTOR's obligation to provide written notification of such a conflict to the OWNER in his bid package. If such notification is not included with the bid package, it is held that the CONTRACTOR agrees with and will complete the project in compliance with the specifications as set forth.
MANUFACTURER'S REPS
Whether or not it is specifically stated in these Specifications, when it is required by the equipment manufacturer or by the specialized technical nature of the installation, and/or when work is outside the normal scope of the CONTRACTOR workforce, the CONTRACTOR is to provide the services of Manufacturers' Reps for such assistance and expertise as is required for the proper installation, on-line testing, calibration, adjustments, etc. of CONTRACTOR Furnished and GF equipment.
CERTIFICATION/DOCUMENTATION
The CONTRACTOR shall, promptly, provide the OWNER with information and certifications as may be required for the re-documentation and re-certification of the vessel.
The latest amendments to all laws, regulations, rules, and conventions, which are in force at the time of Bid Closing, are to be considered as part of the CONTRACT. Any amendment to such requirements or any new laws, regulations, rules, or conventions that come into force after Bid Closing, shall be treated as a change to the CONTRACT if not otherwise covered by these Specifications and Drawings.
GENERAL VESSEL DESCRIPTION
The TS Kennedy is a U.S. Government-owned “Public Nautical School Ship” provided to the Massachusetts Maritime Academy for the purpose of training young men and women for a career in the U.S. Maritime Industry.
Name/ KENNEDY Primary VIN/ 509652 Call/ KVMU Flag/ US
Alt VIN's Type
509652 Official Number (U.S.)
6621662 IMO Number
6704200 ABS Number
1069 Hull Number
338919000 MMSI Number
11270 GMDSS
Length overall 536 ft-11 in Breadth, molded 76 ft 0 in Depth, molded 42 ft-6 in Full Load Draft 28 ft-6 in Propulsion Plant Steam Geared Turbines Propulsion Rated BHP, Normal 12,500 Propulsion Rated BHP, Maximum 15,500 Fuel Consumption, Max Power 594 Bbl/Day Fuel Consumption, Normal Power 490 Bbl/Day Fuel Consumption, In Port 40 Bbl/Day Trial Speed, Normal HP @ 29’0” Draft 20 Kts Cruising Radius @ 20 Kts 10,000 N. M.
Light Ship Weight: 12,891.54 LT With fixed ballast 12,891.54 LT Without fixed ballast 8,540.29 LT U.S. Gross Tonnage 13,886 LT U.S. Net Tonnage 4,165 LT Displacement, Full Load 18,550.49 LT Deadweight 1,431 LT Classification ABS/USCG (Subchapter R) IMO
SOLAS
Class notation Unrestricted service, A1 E, AMS, and applicable Passenger Vessel Rules
Fuel Oil Storage Capacity, 98% Full 11793.95 Bbls Fuel Oil Settling Capacity, 98% Full 1472.72 Bbls Diesel Oil – Emergency Generator Tank 896 Gallons Fresh Water, 100% Full 31731 Gallons Distilled Water, 100% Full 5730 Gallons
Reserve Feed Water 38896 Gallons Lube Oil – Gravity, 100% 1234 Gallons Lube Oil – Storage, 100% 1314 Gallons SW Clean Ballast, 100% Full 998.36 Tons Permanent Fixed Ballast 3546 LT Liquid Mud Fixed Ballast, 100% Full 873.3 LT Heavy Fuel Oil (for Aux Diesel Gen) 4036 Gallons Diesel Oil (for Aux Diesel Gen) 971 Gallons Clean Lube Oil (for Aux Diesel Gen) 207 Gallons Sludge/Dirty Oil (for Aux Diesel Gen) 412 Gallons
DRAWING, CORRESPONDENCE, AND COMMUNICATION PROCEDURES
The CONTRACTOR shall provide the COR with a copy of all correspondence relating to this vessel, which the CONTRACTOR has with Regulatory Bodies, in particular, the ABS or USCG (MSC) Washington and the Local OCMI.
The CONTRACTOR shall invite the COR to be present during all discussions relating to this vessel, which he may have with the Representatives of Regulatory Bodies, in particular, with the Local ABS representative, OCMI, or representatives of those offices.
These documents and discussions may include but are not limited to, the design, construction of modules, ripouts, and relocations, installation of equipment and machinery, testing, sea trials, delivery, and operation of the vessel.
LAWS, CLASSIFICATION, RULES, REGULATIONS, STANDARDS, CERTIFICATES
COMPLIANCE
The vessel, as delivered, shall comply with the requirements of relevant State and Federal Regulatory Agencies. These shall include:
• USCG: 46 CFR Subchapter “R” PART 167—PUBLIC NAUTICAL SCHOOL SHIPS.
• USPHS: Publication No.393, "Handbook on Sanitation of Vessel Construction"
• USCG: "International Rules of the Road"
• Institute of Electrical & Electronics Engineers Standards #45
• Federal Communications Commission
• Classification: ABS/USCG (Subchapter R) IMO & SOLAS
• Class notation: Unrestricted service, A1 E, AMS, and applicable Passenger Vessel
DOCUMENTATION
All necessary certifications and documents covering the approval of and indicating compliance with subject regulations shall be obtained by the CONTRACTOR and supplied to the OWNER.
SUBSEQUENT REGULATORY CHANGES
IF: CONTRACT changes are required by modifications or additions to the Laws or Regulations of the Commonwealth of Massachusetts, the United States, the Regulatory Agencies listed in 1.9.1, or any governmental body or board thereafter organized or created;
AND: Such changes require an increase or decrease in the cost of the vessel, and occur within a period of 30 days following the Bid Opening;
THEN: It is agreed by the CONTRACTOR and OWNER to re-negotiate the CONTRACT PRICE and DELIVERY DATE in light of such changes.
PROGRESS MEETINGS AND PROGRESS REPORT
A weekly progress meeting shall be attended by the Contractor, COR, and the ship’s Captain/Chief Engineer/Chief Mate to discuss individual ITEM and Delivery Order progress. A Progress Report shall be delivered to the COR one day prior to the progress meeting. This report shall list each contract ITEM and Delivery Order, their awarded dollar value, the Contractor’s estimate of their percent completion, and the resulting earned value (which will be the awarded amount x the percent completion). This Progress Report shall be examined by the COR along with the Contractor’s Production Chart. A percent completion shall be negotiated, and the report signed for by both parties. This document shall be the ONLY document requiring signature of the COR. In order to avoid conflicting and erroneous information, NO OTHER document delivered to the COR (such as a condition report) which makes a statement regarding ITEM and Delivery Order progress and/or percent completion shall be signed as being agreed to by the COR.
CONTRACT AND GUIDANCE DRAWINGS
GENERAL
The Contractor shall submit DWGS, permits, or other correspondence required by regulation for review and approval. Submittals will commence upon signing a contract with the successful bidder. The Contractor is tasked to keep the Owner and the operator apprised of the status of such submittals.
EXISTING VESSEL INFORMATIONAL DRAWINGS
Existing vessel informational drawings are available from the Chief Engineer and should be requested in writing if required. It should be understood that the vessel has been in service for a number of years and had a number of conversions; therefore, interested bidders should be cautioned that the accuracy of the existing vessel drawings cannot be verified, and bidders should be specific about what information they are seeking from the existing drawings. Requested drawings will be forward to all interested bidders upon request. Drawings will be provided in electronic format when available. The OWNER does not warrant the accuracy of these plans and requires the CONTRACTOR to verify by physical ship check any and all of the existing plans prior to submitting their bid.
INTERFERENCES/ACCESS
The elimination of all equipment interferences; and the location or relocation of machinery, pumps, piping, wiring, ductwork, and misc. Equipment so that proper access for operation and maintenance can be readily achieved is the CONTRACTOR responsibility. It is essential that the CONTRACTOR is aware of his obligation in this regard. The CONTRACTOR is responsible for seeing that ALL INSTALLATIONS are arranged, constructed, and relocated in "good shipbuilding practice" and that they adhere to the requirements of the CFR. The CONTRACTOR and the COR are mutually responsible for the maintenance of ongoing communications, inspections, and approvals as construction progress.
HEADROOM
Clear headroom in accommodations, working spaces, public spaces, passageways, and toilet and shower spaces shall be as high as possible but shall not be less than 7 feet 0 inches. Clear headroom under local points such as ducts, piping, lights, girders, etc. shall not be less than 6 feet 8 inches in the above spaces and will be the subject of individual, case by case, written approval from the COR. In way of double berths, clear headroom (ceiling height) shall be not less than 7 feet 0 inches above the finished deck.
ACCESS & MAINTENANCE REQUIREMENTS
GENERAL
The structure and layout of any added machinery and equipment shall be designed and constructed to permit ready access to all parts for operation, inspection, maintenance and repair without removal or disturbance of other structure or equipment. Ladders, doors, manholes, scuttles, bolted plates, etc. shall be provided as required for access. If conversion structure or installations affect access to existing machinery and equipment, satisfactory steps shall be taken to re-route reasonable access.
ASBESTOS /VENDORS /SUBCONTRACTORS
ASBESTOS ABATEMENT
The CONTRACTOR shall, as part of this Contract, remove and dispose of all asbestos removed or disturbed for the performance of this contract. In addition, CONTRACTOR shall comply with the most current edition of all federal, state, county, and city codes and ordinances as they apply to the location(s) in which the work is performed.
Note: The OWNER hereby informs the CONTRACTOR that the existing vessel does contain asbestos and that the CONTRACTOR is specifically required to provide certification that the CONTRACTOR is a certified asbestos abatement contractor or that the CONTRACTOR has engaged a certified asbestos abatement subcontractor.
VENDOR LISTING
The CONTRACTOR shall provide the COR with a listing of major Vendors and Subcontractors being employed on the contract. The list shall include name; address; telephone and fax numbers; e-mail address; purchase order or contract number; and an equipment or service description. This list will give a baseline for the entry of the vessel as converted into the OWNER electronic contact system.
An initial Vendor/Contractor List shall be provided not more than 10 days after contract signing and shall be updated, as required, every 10 days thereafter over the course of the contract.
ACCESS TO YARD/VESSEL/DOCUMENTS (IF APPLICABLE)
ACCESS TO YARD/VESSEL
The Government Representatives (COR) shall be afforded access to the CONTRACTOR Shipyard, the COR’s offices, and the vessel 24 hours a day for the duration of the Contract and for a reasonable time after delivery or until such time as the vessel departs the CONTRACTOR facility for her home port (if applicable)
ACCESS TO DOCUMENTS
The OWNER and/or COR shall have ready access during normal working hours to all documentation concerning the vessel including but not necessarily limited to: Drawings; Specifications; Technical Information; Engineering Calculations; Schedules; Test & Inspection Reports; Relevant Subcontractor Documents; Regulatory Body Reports; Approvals; Recommendations; and the Contractor’s Detailed Contract Estimate.
INSPECTIONS
GENERAL
All materials and workmanship shall be subject to inspection by the COR, ABS, the USCG and other regulatory bodies having jurisdiction. All inspection and observation of tests by the COR will be performed in such a manner as not to unnecessarily delay the contract work.
The COR shall promptly approve all work and material conforming to the requirements of this Specification and shall promptly reject all work and materials, which do not conform. Such rejected work or material shall be satisfactorily corrected.
SCHEDULING & ATTENDANCE
The CONTRACTOR is responsible for scheduling and presenting all completed work for Acceptance Inspections and for giving written ADEQUATE NOTICE of 24 HOURS to the COR and other required inspection agencies that such work is complete, has been passed by the CONTRACTOR QA, and is ready for such inspection. Inspections shall, when possible, be scheduled and accomplished during normal workdays on the CONTRACTOR day shift.
The COR will make every effort to maintain communications with the parties involved and to report to the inspection site per agreed schedule. If the COR is unable to keep the schedule, he shall notify the CONTRACTOR as soon as possible and reschedule for a mutually agreeable time. Failure of the COR to attend an inspection does not constitute an acceptance of the work. Inspections by ABS, the Coast Guard, or other agencies do not eliminate these requirements for inspection and acceptance by the COR.
PREPARATIONS
Work presented for inspection shall be complete in all respects, clean, free of debris, scrap, lines, welding wire ends, and all temporary gear. Reasonable accommodations shall have been made for access, lighting, and fresh air supply in advance of the inspection party.
COVERINGS
Prior to the application/installation of paint, deck covering, insulation, sheathing, joiner work, ceilings, etc., all structure and weld that is to be covered will be given final inspection and will be signed off on by the COR. It must be clearly understood by the CONTRACTOR that the COR has the right and option to require removal of any or all coverings for inspection in areas that have not been previously inspected and passed. This requirement makes it essential that weekend and night shift foremen, for both CONTRACTOR and Subcontractors, be in close communication with the QA Department and Project Manager.
RE-INSPECTIONS
Any welding, burning, heat shrinking, etc. which is performed as rework, repair, or on change orders after an inspection has been completed, may require (at the COR's option) the removal of any or all coverings for re-inspection of the plate, welds, etc. This requirement will further emphasize the necessity of a formal QA Inspection process and the necessity for close communications between CONTRACTOR and COR. An initial inspection in no way negates the requirement for re-inspection if an area is reworked in any manner.
COMPARTMENT COMPLETIONS
Living spaces, workspaces, tanks, voids, cofferdams, and control/machinery spaces shall be inspected and certified, complete by the COR and the CONTRACTOR representative. A compartment shall not be considered accepted until the inspection is complete, deficiencies are corrected, and the COR and CONTRACTOR have signed off on the space. At this time, so far as is possible, the compartment shall be secured, and no further work shall be conducted within the space unless approved by the mutual consent of the COR and CONTRACTOR.
The intent of the foregoing paragraph is to guarantee that the OWNER will receive, at delivery, a fully operational vessel that is immediately capable of entering service. Any pre-existing deficiencies not covered in these Specifications or Drawings will be subject to correction at the OWNER expense.
PROSECUTION OF WORK
STARTING DATE FOR PROJECTS
The Notification of Award will stipulate the date on which it is expected the Contractor will begin contract work and from which date contract time will be charged. No work shall begin on the project until the contract has been fully executed.
SCHEDULE REQUIREMENTS
Unless otherwise specified in the contract, the Contractor is required to furnish the COR with the following schedules at or before the pre-drydocking conference: Integrated Master Schedule (IMS) and CPM Schedule.
The COR will independently review the initial schedule, and then meet with the Contractor for a joint review and make necessary corrections and adjustments. These specifications require this meeting to take place within ten calendar days of the contract award. After this meeting, but within ten calendar days, the Contractor shall make the necessary changes and then resubmit the schedule to the COR. If necessary, this process shall be repeated. However, the schedule must be finalized within seven calendar days of the scheduled vessel delivery.
The schedule shall show contract milestones, intermediate contract completion dates, and the contract completion date. The schedule shall show the Contractor’s scheduled completion date and the substantial completion date when applicable.
Should the prosecution of the work be discontinued or changed for any reason, these specifications require the Contractor to notify the COR at least two days in advance of changing or resuming operations. Through the life of the project, the COR should verify that activities, durations, start and finish dates, etc. shown on the schedule represent the actual status of work.
The COR may request in writing a supplemental schedule if the actual prosecution of work differs significantly from that represented on the schedule. The Contractor must provide the requested supplemental schedule within three calendar days of the request and at no cost to the Government.
Jobsite progress meetings shall be held weekly or as specified for the purpose of updating the schedule.
Progress will be reviewed to verify the actual start and finish dates of completed activities, remaining duration and percent complete of uncompleted activities, and any proposed revisions to the schedule. It is the Contractor's responsibility to provide the COR with the status of activities at the progress meetings and prepare schedule updates based on this information once it has been verified and agreed upon. A written narrative describing the schedule status, the critical path and any revisions to the schedule shall be included with the updated schedule. The updated schedule will be resubmitted should it not contain the agreed-upon information.
The COR must have a schedule that accurately represents the prosecution of work and activities at all times. A current schedule is essential for evaluating requests for adjustments and determining how delays, extra work, interruptions, suspensions, etc. will impact the contract completion date or the
Contractor’s scheduled completion date. These specifications allow the COR to withhold progress payments if the Contractor fails to provide the schedules and updates as required.
INTEGRATED MASTER SCHEDULE (IMS)
An Integrated Master Schedule (IMS) is another name for a Gantt or bar chart. The IMS provides a graphical representation of the project plan that includes the activities that make up the project, the estimated duration of each activity, and the planned sequence of activity performance. The critical path must be identified on the IMS. The total float must be identified on IMS developed from CPM schedules.
Total float is not required to be identified on IMS developed without CPM schedules. The IMS must conform to the specifications as set forth in the contract.
CRITICAL PATH METHOD (CPM) SCHEDULE
A CPM schedule is one that forecasts the amount of time required from the project start to finish by arranging all project activities in their logical sequence and calculating all possible path lengths through the project. CPM schedules are used to ensure adequate project planning and provide a tool to quickly and accurately evaluate project changes. The CPM schedule may also be used to determine when and what activities need to be accelerated to meet contract milestones, completion dates, etc.
Two copies of the Time-Scaled Logic Diagram, Network Report, and Schedule Report must be submitted by the Contractor.
The Network Report shall completely define the schedule logic. It will indicate all logical relationships and constraints.
The Schedule Report shall be sorted by activity number and shall provide the following information for each activity: activity number, activity description, activity calendar, original duration, remaining duration, percent complete, scheduled or actual start and finish dates, late start and finish dates, free float and total float.
PROGRESS REVIEW MEETINGS
The CONTRACTOR and COR shall hold progress review meetings every (1) week to be held at the CONTRACTOR facility or such other location as approved by both parties beginning (1) week after the delivery of the vessel to the CONTRACTOR facility. The purpose of the meetings is to discuss, report, and resolve problems relative to progress, anticipated delays, cost experience in relation to budget and projected end costs, staffing, schedules, receipt of GFE (if any), CONTRACTOR furnished material, production problems (including Subcontractor problems), and other related matters.
GUARANTEES
All guarantees or warranties shall begin at the completion of final acceptance the completed work detailed in the specification by the COR.
MATERIALS AND WORKMANSHIP
MATERIAL GENERAL
All material unless otherwise specified herein shall be of commercial quality, suitable for marine environment, and shall conform to ASTM, Federal, Military, SAE, ABS, and USCG (CFR) requirements. This material shall be so designated on Bills of Material and Construction Drawings. All materials shall be free from imperfections of manufacture and from defects, which adversely affect appearance or serviceability.
WORKMANSHIP GENERAL
All workmanship shall be first-class in all respects. All material, machinery, equipment, pieces, and/or parts specified herein and installed in the converted vessel shall be suitable for the marine service intended.
MATERIAL MILITARY SPECS
Where Military or Federal Specifications are referred to herein, they are referenced solely to indicate the degree of quality of the material required. The furnishing of material or items in strict compliance with the detailed requirements of these Military/Federal Specs is not intended.
STORAGE/PROTECTION
All material and equipment intended for the vessel in any form, whether CONTRACTOR or GF, shall be adequately stored and protected from the elements and shall be given appropriate security by the CONTRACTOR. Due consideration shall be given to the nature of particular equipment or material with storage and security mutually agreed upon by COR and CONTRACTOR. Inside storage shall be required for all equipment and material that will be located on the interior of the vessel.
The CONTRACTOR shall be responsible during construction and prior to vessel delivery for the protection of all items installed with finished surfaces such as joiner panels, door frames, deck coverings, joiner ceilings, countertops, furniture, etc.
CONTRACTOR'S OBLIGATION
The CONTRACTOR is to provide all plant infrastructure, labor, and transportation for employees, supplies as required, fuel for vehicles and machinery, water, sewage disposal, power, lighting, air, steam, crane and forklift services, CONTRACTOR communications, line handling, wharfage, towing and shifting services.
COMMUNICATIONS (YARD)
The CONTRACTOR is to provide radios (walkie-talkies), one for the Owner's Representative's office, and one each for Owner's Representatives for a total of three. Radios to have chargers and extra batteries and at a minimum of two channels, one to communicate with Contractor and one to communicate with office.
Radios will be returned to Contractor upon completion of contract
HULL PROTECTION
WELDING
Rigid control of welding and grounding shall be maintained for the protection of hull and hull appendages.
Care shall be taken that the welding polarity and ground connections of welding machines used on this vessel, other vessels in the immediate vicinity, or on the dock to which the vessel is moored shall be such as not to damage any parts of the vessel. The CONTRACTOR shall adequately protect, in all respects, the underwater part of the hull prior to delivery.
GENERAL INFORMATION
Note: This GENERAL section applies to all ITEMS within this SOW and therefore is Not Separately Priced. To the extent that efforts to comply with the requirements stated in this GENERAL section present a cost impact, the cost is to be allocated to the priced ITEMS
DRAWING REFERENCES AND SITE VISIT
The following Shipbuilder's Drawings (Avondale Shipyard) and conversion drawings (Bender Shipyard) will be available on board at the Site Visit and Pre-Proposal Conference on 09:00 November 19, 2019 at the Massachusetts Maritime Academy, 101 Academy Drive, Buzzards Bay, MA 02532. Point of Contact: COR, Jeffrey Brown at (757) 694-5505.
DRAWING NUMBER TITLE
540TV-001-997-01 rev 4 DOCKING PLAN (BENDER SHIP REPAIR) C3-100S7-0-1BC rev 3 DOCKING PLAN (AVONDALE SHIPYARD)
GMD KENNEDY DOCKING PLAN GMD KENNEDY DOCKING PLAN
552-106-4000-900-001 and 552-106-4000-
900-002 ALT B
UWILD, HULL MARKINGS PLAN
540TV-001-583-01 rev E FIRE AND SAFETY PLAN (BENDER SHIP REPAIR) 540TV-001-801-01 rev K GENERAL ARRANGEMENT (BENDER SHIP REPAIR) C3-100S11-1-2 rev 28 SHELL EXPANSION AFT (AVONDALE SHIPYARD) C3-100S11-1-1A rev 12 SHELL EXPANSION FWD (AVONDALE SHIPYARD) C3-100S29-1-3 BC rev 1 TANK CAPACITY CURVES (AVONDALE SHIPYARD) 540TV-001-835-09 rev A TANK SOUNDING TABLES (BENDER SHIP REPAIR) C3-100S29-6-3 rev 3 WELDING SEQUENCE (AVONDALE SHIPYARD) 540TV-001-100-05 rev B WELDING SEQUENCE (BENDER SHIP REPAIR)
C3-100S48-23-1 rev 4 SEA CHESTS (AVONDALE SHIPYARD) C3-100-S43-2-1 rev 4 STERN TUBE BEARING AND SEAL ARRANGEMENT C3-100S22-1-3 rev 6 RUDDER STOCK, CARRIER & BEARING
ARRANGEMENT
C3-100S43-1-1 rev 6 ARRANGEMENT OF SHAFTING C3-100S43-1-3 rev 4 SHAFTING DETAILS COUPLING BOLTS &
PROPELLER NUT
540TV-001-583-01 (F) FIRE AND SAFETY PLAN
540TV-001-528-04(A) AFT INTERIOR DECK DRAINS
540TV-001-500-11E AMR ARRANGEMENT
540TV-001-524-20(E) AUX MACH RM SW SERVICE SYS DIA
540TV-001-302-03 BILGE VALVE REMOTE CONTROL
3228-002-02 NEW LADDERS IN NO.1 & NO.2 HOLDS
SEAPRESS SELL SHEET USA SEAPRESS SELL SHEET USA
540TV-001-500-11E AMR ARRANGEMENT
540TV-001-150-03(A) EXPANSION JOINT INSTALTION DET
3228-002-01 FM PIPING MODS
TSK ASBESTOS ABATEMENT ENCL TSK ASBESTOS ABATEMENT ENCL
SUGGESTED SOURCES AB REMOVAL SUGGESTED SOURCES AB REMOVAL
540TV-001-167-02 SCHEDULE OF MH & HATCHES
AS-BUILT PLAN LIST BENDER CONVERSION AS-BUILT PLAN LIST BENDER CONVERSION
CAPE B-SCANNED DRW’s (ex-VELMA LIKES) CAPE B-SCANNED DRW’s (ex-VELMA LIKES)
Additional DRW’s and Technical Manuals are available from the Port Engineer
AVAILABILITY AND PERFORMANCE PERIOD
Work will commence as soon as permission to proceed is given by the Contraction officer and all work shall be completed no later than 15 Dec 2010.
INTERNAL STRUCTURAL EXAMS OF SALT WATER BALLAST TANKS.
ABSTRACT
It is the intent of this ITEM to perform inspections and internal structural exams on the salt water ballast tanks aboard the ship in accordance with the requirements of ABS Rules, Part 7, Chapter 3, Sections 1 and 2.
The contractor shall employ a recognized third-party expert to perform the inspections. The inspection shall include at a minimum, the coating system (by a certified NACE or SSPC coatings inspector), structural integrity of the steel, and gaging (by an ABS recognized gaging company) to provide an overall assessment of the tank conditions.
The offer shall include the following: Empty, open, clean, examine internally and refill with fresh water (as per the original level) the salt water ballast tanks listed in this ITEM.
REFERENCES
ABS Rules, Part 7, Chapter 3, Sections 1 and 2.
LOCATION
The salt water ballast tanks are as follows:
Salt Water Ballast Tank Frame Location Tank Capacity in Tons Fresh / Distilled Water Ballast Onboard Tons
Forepeak Stem-14 150.54 63.13 Fresh Water Aftpeak 196-212 264.16 54.95 Fresh Water
NOTES
The Salt Water Ballast Tanks contain fresh water.
The Government recommends the following 3rd party consultants to support this effort:
Brian J. Streb, C.R. CUSHING & CO., INC, 30 Vesey St, New York, NY 10007, USA, (734) 358-3180, bstreb@crcco.com.
Louis Steinbrecher, ABSG CONSULTING INC., 1525 Wilson Boulevard, Suite 625, Arlington, VA 22209-2451 USA, Tel: (860) 859-7106, lsteinbrecher@absconsulting.com.
The Government recommends the following Gaging company to support this effort:
WINDWARD MARINE-INDUSTRIAL, INC., 39 Franklin Lane, Kinnelon, New Jersey 07405, Office- 973-492-1217, Fax- 973-492-1218, email- info@marinendt.com
The Government recommends the following Paint inspector to support this effort:
Erik Roberts, MEC Roberts, 736 Rolling Hill Dr., River Vale, NJ 07675, 757-403-1447.
The above recommended consultants have produced a work product that has been proven acceptable to the government. It is not necessary to offer the service of the above consultants. The CONTRACTOR will be permitted to submit bids containing substitutions as long as such mailto:bstreb@crcco.com mailto:lsteinbrecher@absconsulting.com mailto:info@marinendt.com substitutions are clearly stated and detailed. The COR shall approve any substitutions to the recommended consultants. The approval shall be based on an evaluation of the reports produced for work similar to the scope and complexity of the requirements of this SOW. The CONTRACTOR is responsible for all additional costs associated with proposed substitutions. In this regard, the specifications herein are guidelines for minimum performance requirements.
STATEMENT OF WORK
In accordance with all regulatory body requirements, the Contractor shall provide all labor, materials and services to accomplish the intent of this ITEM. In addition, and at a minimum, the Contractor shall:
Remove all water from the tanks listed in the table above. (water must be pumped to a suitable shore facility for disposal).
Where permissible, open at least two manholes per tank, ventilate the tank and provide a certified Marine Chemist's "Safe for Entry" certificate.
Wash all inner tank surfaces using a fresh water hose in order to remove any slime, dirt or silt that may be inside the tank. Provide portable, intrinsically safe lighting sufficient to exam the tank internals.
Maintain ventilation throughout the internal inspection.
Provide lighting and staging within the tank to support a through inspection.
Employ recognized third-party expert consultants to perform the inspections. These inspections shall include, the coating system (paint inspector), scantling and structure inspections (third-party steel expert/surveyor), gaging (ABS recognized) to determine the overall wastage and localized.
Provide a separate, detailed report on all findings and recommendations. This report shall also include a statement of work (SOW) and a detailed cost estimate for any recommended corrective actions. In addition, the contractor shall provide a list of potential options to defer or minimize costs while ensuring the vessel remains in class. The report shall be completed no later than 15 days after the tank closeout and successful air test.
Following the inspection, remove the old manhole gasket, clean all gasketed surfaces, clean and chase all manhole studs/bolt threads and apply a liberal coat of anti-seize, install a new gasket, re-install the plug (also with a liberal coat of anti-seize) and close up the tank.
Install blanks and fittings, as required, for each tank and perform an air pressure drop test to 2 psi to determine the integrity of the tank boundaries to USCG/ABS. Provide a manometer, regulator and 2.1 psi relief valve in the air source to avoid over pressurization. (A calibrated gage can be used instead of a manometer; the gage shall have a range of 0-5psig)
Remove all blanks and fittings and return the tank and its vents to a normal condition following the test.
Fill the tank to its original volume using clean fresh water or distilled water as per the original volumes and in accordance with the table below after all inspections have been performed.
Provide the report from the third party on the condition of the tanks and include a cost estimate for the repair or maintenance required.
PERFORMANCE CRITERIA / DELIVERABLES
Certified Marine Chemist's "Safe for Entry" certificate for each tank.
Third-party assessment reports.
Satisfactory tank pressure test
6933A220Q000003 TS KENNEDY – FY20 Inspection and Assessment of Forward and After Peak Balance Tanks Applicable Provisions and Clauses
FAC 2020-01 / 11-12-2019
The following FAR provisions apply to this solicitation
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address:
https://www.acquisition.gov/?q=browsefar
SITE VISIT
A site visit will be conducted onboard the T.S. KENNEDY at 9:00 a.m. Eastern Standard Time on Tuesday, November 19, 2019 at 101 Academy Drive, Buzzards Bay, MA 02532. POC: Jeff Brown, Marine Surveyor, USDOT- Maritime Administration (MARAD), Division of Atlantic Operations-New England Office; phone (757) 694-5505; e-mail: Jeffrey.H.Brown@dot.gov.
All potential offerors intending to submit an offer should plan to attend site…