Vendor_quote_sheet_Attach_1.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Drydock of the Maritime Ship TV Kings Pointer
- Solicitation number
- 6933A217Q00030
About this file
Attachment 1 - Vendor quote sheet
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor quote sheet
| QUOTE SHEET | |||||
| Section B | |||||
| T.V. KINGS POINTER - ABS SPECIAL PERIODICAL SURVEYS DRYDOCKING | |||||
| ITEM | DESCRIPTION OF SERVICES | Quanity | Unit | Unit Price | Total |
| 0100 | SECTION 100: GENERAL SERVICES REQUIREMENTS | NSP | |||
| 0101 | APPLICABILITY OF RULES AND REGULATION | NSP | |||
| 0102 | ACCURACY OF INFORMATION | NSP | |||
| 0103 | SECURITY | - 0 | - 0 | ||
| 0104 | FIRE PROTECTION AND SAFETY | - 0 | - 0 | ||
| 0105 | OFFICE AND ADMINISTRATIVE SERVICES | - 0 | - 0 | ||
| 0106 | WHARFAGE | - 0 | - 0 | ||
| 0107 | SURVEYS AND INSPECTIONS | NSP | |||
| 0108 | ON-SITE CONTRACTOR'S REPRESENTATIVE | NSP | |||
| 0109 | DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS | - 0 | - 0 | ||
| 0110 | ALLOWANCE FOR SCRAP MATERIAL | NSP | |||
| 0111 | MAINTAIN SHIP'S LIGHTING | - 0 | - 0 | ||
| 0112 | HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL | - 0 | - 0 | ||
| 0113 | USE OF SHIP'S PARTS AND EQUIPMENT | NSP | |||
| 0114 | PROVIDE SHORE POWER | 61250 | kWh | - 0 | |
| 0115 | DISABLE CO2 AND HALON SYSTEMS. | - 0 | - 0 | ||
| 0116 | MAINTAINING SHIP'S CLEANLINESS | - 0 | - 0 | ||
| 0117 | MAINTAIN CLEAN BILGES AND DRAIN WELLS | - 0 | - 0 | ||
| 0118 | PROTECTIVE FLOOR COVERING | - 0 | - 0 | ||
| 0119 | SURFACE PREPARATION AND PAINTING/COATING GUIDELINE | NSP | |||
| 0120 | SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES | - 0 | - 0 | ||
| 0121 | PRODUCTION REPORTING | - 0 | - 0 | ||
| 0122 | CRANE SERVICE | 100 | HRS | - 0 | |
| 0123 | STAGING | - 0 | - 0 | ||
| 0124 | OIL BOOM | - 0 | - 0 | ||
| 0125 | WELDING / BRAZING PROCEDURES | NSP | |||
| 0126 | SOUNDINGS | - 0 | - 0 | ||
| 0127 | SANITARY SYSTEM | - 0 | - 0 | ||
| 0128 | WASTE WATER AND OILS | 1092 | GAL | - 0 | |
| 0129 | PORTABLE TOILETS/TEMPORARY FACILITIES | - 0 | - 0 | ||
| 0130 | COMPRESSED AIR | - 0 | - 0 | ||
| 0200 | SECTION 200: DRYDOCKING REQUIREMENTS | - 0 | |||
| 0201 | DRY DOCK SHIP | - 0 | - 0 | ||
| 0202 | TAILSHAFT EXAMINATION AND REMOVAL; AND REMOVAL OF CPP ASSEMBLIES | - 0 | - 0 | ||
| 0203 | RUDDER PINTLE CLEARANCES | - 0 | - 0 | ||
| 0204 | SEA CHESTS | - 0 | - 0 | ||
| 0205 | SEA VALVES | - 0 | - 0 | ||
| 0206 | BLASTING & COATING OF HULL | - 0 | |||
| 0207 | ULTRASONIC THICKNESS GAUGINGS | - 0 | - 0 | ||
| 0208 | PROPELLER CLEANING AND INSPECTION | - 0 | - 0 | ||
| 0209 | INTERNAL STRUCTURAL EXAMS AND TESTING OF FUEL TANKS. | - 0 | |||
| 0210 | INTERNAL STRUCTURAL EXAMS OF BALLAST, VOIDS, COFFERDAMS, and POTABLE & WASH WATER TANKS. | - 0 | |||
| 0211 | ANCHOR CHAINS & LOCKERS | - 0 | - 0 | ||
| 0212 | ZINC ANODES | - 0 | - 0 | ||
| 0213 | SPECIAL HULL MARKING FOR 5-YEAR DRYDOCKING CYCLE | - 0 | - 0 | ||
| 0214 | HULL MODIFICATIONS FOR 5 YEAR DRYDOCKING CYCLE | - 0 | - 0 | ||
| 0215 | REPAIR BUCKLED BULKHEAD IN TANK | - 0 | - 0 | ||
| 0216 | BOW THRUSTER MAINTENANCE | - 0 | - 0 | ||
| 0217 | KEEL COOLER | - 0 | - 0 | ||
| 0218 | STERN THRUSTER MAINTENANCE | - 0 | - 0 | ||
| 0219 | SHIP SERVICE GENERATORS: CLEANING OF GENERATORS | - 0 | - 0 | ||
| 0220 | ELECTRIC CABLE RENEWAL | - 0 | - 0 | ||
| 0221 | SEWAGE DISCHARGE PUMP | - 0 | - 0 | ||
| 0222 | REPLACE ENGINE ROOM ESCAPE HATCH | - 0 | - 0 | ||
| 0223 | SHIP'S SERVICE ELECTRO-HYDRAULIC CRANE | - 0 | - 0 | ||
| 0224 | ENGINE ROOM EXHAUST FAN and MOTOR | - 0 | - 0 | ||
| 0225 | STEERING GEAR PUMPS and MOTORS | - 0 | - 0 | ||
| 0226 | MN. ENGINE LUBE OIL PIPING REPAIRS | - 0 | - 0 | ||
| 0227 | CONTROLLABLE PITCH PROPELLER COOLERS | - 0 | - 0 | ||
| 0228 | FLUME TANK COATING AND REPAIRS | - 0 | - 0 | ||
| 0229 | REPAIRS TO STERN THRUSTER BILGE AREA | - 0 | - 0 | ||
| 0300 | SECTION 300: OPTIONAL AND UNIT PRICED ITEMS | - 0 | |||
| 0301 | OPTION - PROVIDE WET LAY BERTH | - 0 | - 0 | ||
| 0302 | OPTION - SUPPLEMENTAL LABOR | 4500 | HRS | - 0 | |
| 0303 | OPTION - SUPPLEMENTAL MATERIAL | - 0 | |||
| 0304 | OPTION - SUPPLEMENTAL STEEL | 180,000.00 | |||
| 304a | KTR Provide A Quote for Estimated 1,000 lbs of Flat Steel | 1000 | LB | - 0 | |
| 304b | KTR Provide A Quote for Estimated 1,000 lbs of Rolled Steel | 1000 | LB | - 0 | |
| 304c | KTR provide a quotation to prep and re-weld external hull weld seams, of an estimated length of 100 feet of weld. | 100 | FT | - 0 | |
| 0305 | OPTION - AUDIO GAUGINGS ADDITIONAL (Est. 1000 Readings) | 1000 | EA | ERROR:#VALUE! | ERROR:#VALUE! |
| - 0 | - 0 | ||||
| Total | ERROR:#VALUE! | ||||
| Complete the following information: | |||||
| Firm: | |||||
| Mailing Address: | |||||
| Point of Contact (Name, Phone, Email Address): |
File details come from the government source that posted it. Updated .