Attachment_1_Price_Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 6933A217Q00001
About this file
Solicitation Attachment 1 - Price Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sheer_Bar_Rail.pdf | ||
| 6933A217Q00001-0003.pdf | ||
| Shaft_log_Sea_Chest_DWGS.zip | ZIP file | |
| 6933A217Q00001-0002.pdf | ||
| 41'_UTB_Drawings.zip | ZIP file | |
| PF-205_Lines_and_Offsets.tif | TIF image | |
| PF-205_Outboard_Profile_(003).tif | TIF image | |
| PF-205_Inboard_Profile.tif | TIF image | |
| 6933A217Q00001-0001.pdf | ||
| PF-205_Rub_Rail.tif | TIF image | |
| 6933A217Q00001_Aluminum_Patrol_Boat_DD_and_Repairs.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PF-205 Dry Dock 2017 PRICE SHEET | ||
| Work Item | Description | Cost |
| 1 | Welding Repairs – Flat Plate Renewal (1/8” Aluminum) | |
| 2 | Welding Repairs – Flat Plate Renewal (3/16" Aluminum) | |
| 3 | Welding Repairs – Flat Plate Renewal (1/4” Aluminum) | |
| 4 | Welding Repairs – Flat Plate Renewal (5/16” Aluminum) | |
| 5 | Welding Repairs, Crack Repair (Aluminum) | |
| 6 | Welding Repairs, Crack Repair (Stainless Steel) | |
| 7 | Welding Repairs, Overlay Welding (Aluminum) | |
| 8 | Ultrasonic Thickness (UT) Shot Inspection | |
| 9 | Air Test Inaccessible Voids | |
| 10 | Remove, Inspect, and Reinstall Rub Rail System | |
| 11 | Renew Rub Rail Section | |
| 12 | Renew Rub Rail Backer Strip | |
| 13 | Renew Shear Bar Rail Section | |
| 14 | Clean and Inspect Fuel Tanks (Includes Disposal) | |
| 15 | Remove, Inspect and Reinstall Both Propeller Shafts | |
| 16 | Renew Port and Starboard Water-Lubricated Shaft Bearings | |
| 17 | Remove, Inspect, and Reinstall Port and Starboard Propellers | |
| 18 | Clean and Inspect Port and Starboard Engine Exhaust Piping Systems | |
| 19 | Renew Port and Starboard Exhaust Mufflers | |
| 20 | Renew Sea Valves | |
| 21 | Renew Fuel Oil Root Valves | |
| 22 | Inspect and Overhaul Duplex Sea Strainers | |
| 23 | Remove, Inspect, and Reinstall Rudders | |
| 24 | Routine Drydocking | |
| 25 | Preserve Underwater Body – “100%” | |
| 26 | Renew Forward Cabin Hull Plate | |
| 27 | Renew Main Deck Plating | |
| Total: |
NOTE TO QUOTER: PLEASE COMPLETE THE FOLLOWING:
1. COMPANY BUSINESS SIZE
2. DUNS NUMBER
3. TAX IDENTIFICATION NUMBER
4. PAYMENT TERMS
| 5. PERIOD OF PERFORMANCE AFTER RECEIPT OF ORDER |
| (Start date - completion date) |
File details come from the government source that posted it. Updated .