6923G522Q0604_GLS Buoy Barge BPL 6704_ReFit_Pricing Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- GLS BUOY BARGE BPL 6704 RE-FIT
- Solicitation number
- 6923G522Q0604
About this file
This document contains a pricing schedule and statement of work for the refit of a GLS Buoy Barge. The schedule provides line item estimates for inspection, thickness gauging, administration, drawings, steelwork, piping, non-destructive testing, electrical work, mechanical work, installation, painting and coatings, and project management costs associated with the refit. The statement of work specifies that the contractor shall provide all necessary labor, materials, equipment and services to perform drydocking repairs and alterations to the vessel in accordance with the solicitation, specifications and drawings. Key details include: the work must be performed at the contractor's shipyard/facility by 07 October 2022; only GLS personnel shall deliver and retrieve the vessel; quotes are requested for work restricted to the St. Lawrence River, Lake Ontario and Lake Erie areas; and brand justifications are provided for some specified components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE by Bid Lines
| 6923G522Q0604-Shipyard Price Schedule | (USD $) | |||||||||
| Total** | $ - 0 | |||||||||
| Labor | Labor (hours) | 0 | ||||||||
| Labor (Average - Rate/Hr.) | ERROR:#DIV/0! | |||||||||
| Amount | $ - 0 | |||||||||
| Equipment | $ - 0 | |||||||||
| Materials | $ - 0 | |||||||||
| Item No. | Description*(see below note) | Labor | Equipment (USD $) | Materials | Subtotal** (USD $) | |||||
| Labor (hours) | Labor (Rate USD$) | Amount (USD $) | Quantity | Unit Price (USD $ Ea.) | Amount (USD $) | |||||
| Unit | Type | |||||||||
| 1 | Inspection | $ - 0 | ||||||||
| 2 | Thickness Gauging | $ - 0 | ||||||||
| 3 | Administration / Trials | $ - 0 | ||||||||
| 4 | Drawings | $ - 0 | ||||||||
| 5 | Steelwork Overall | $ - 0 | ||||||||
| 6 | Piping | $ - 0 | ||||||||
| 7 | Non-Destructive Testing (NDT) | $ - 0 | ||||||||
| 8 | Electrical | $ - 0 | ||||||||
| 9 | Mechanical | $ - 0 | ||||||||
| 10 | Installation | $ - 0 | ||||||||
| 11 | Painting / Coatings | $ - 0 | ||||||||
| 12 | Project Management (Shipyard) | $ - 0 | ||||||||
| *Note: Reference Specification & SOW as provided; Bid Schedule to include the following but not limited to 1. Inspection and measurement for material wastage (steel), 2. Drydocking, cleaning application of coatings outer hull, 3. Hull structure modifications, a. Buoy ports, b. Modify deckhouse, c. Addition of push knees, 4. Outfit and furnishing, a. Hold space access, b. Forward void access, c. Void tank access, d. Ladders, e. Stairs, f. Railings, g. Floorplates and gratings, h. Hold space grating, 5. Fire safety systems, a.Fire stations, 6. Life saving equipment, 7. Painting and protection, 8. Signs and markings, 9. Deck machinery and fittings, a. Winches, b. Line-handling and mooring equipment, c. Towing equipment, d. Fendering system, 10. Electrical systems, a. Shore power connection(s), b. Main switchboard, d. Lighting and power receptacles, c. Power distribution, 11. Ship services piping systems, a. Fill, vent, and sounding, b. Fuel oil systems, c. Fuel transfer pumps, d. Bilge system, e. Fire service system, f. Machinery cooling system, g. Bow thruster, h. Compressed air system, i. Domestic services, j. Heating etc. k. Machinery space ventilation and other spaces, l. Scuppers and drains, 12. Control communication, and navigation control systems, 13. Machinery alarm and monitoring, systems, 14. Fire detection, and alarm system, 15. Navigation aids, 16. Depth sounding, 17. Mechanical completion, commissioning, testing of individual equipment, systems, and integrated Systems, Stability calculations, 18. Dock trials, 19. Sea-Trials | ||||||||||
| **Note: Above pricing to include but not limited to the following: Bonding & Risk Insurance, Material & Equipment Markup, Contingencies, and Shipyard Profit |
*** Note: All work must be completed and the barge ready for retrieval NO LATER THAN 07 OCTOBER 2022.
Signature Date