This is a Statement of Work (SOW) for Request for Quote No. 6913G627Q300007 issued by the Federal Railroad Administration (FRA) through the Volpe National Transportation Systems Center for the procurement of rail propulsion battery energy storage systems.
The Government seeks to procure three identical new Battery Energy Storage Systems (BESS) representative of commercially available rail vehicle propulsion batteries to support safety research on fire resistance and crashworthiness. The contractor must deliver functional BESS units including battery packs, protective enclosures, structural components, mounting brackets, and attachment hardware. Each BESS must utilize a commercially deployed rail propulsion battery chemistry including lithium-iron phosphate (LFP), lithium-ion titanate (LTO), nickel-manganese cobalt (NMC), or other approved chemistries, and must have at least 75% capacity. The contractor shall provide the energy capacity in kilowatt-hours, voltage specifications, and manufacturer operating limits for each unit. All three systems must be identical and configured as freestanding battery stacks independently mounted to railcar structures with their designed protective structures intact.
The contractor must deliver detailed engineering documentation within three weeks of award, including BESS design specifications, weight, testing certifications, installation/mounting drawings, and CAD-formatted engineering drawings of enclosure structures and mounting hardware with material specifications. Physical delivery of all three BESS units must occur within 18 calendar weeks of award to Transportation Technology Center, 55500 DOT Road, Boone, CO 81025. The contractor is responsible for all packaging, loading, transportation, and handling. The Government will conduct inspection and acceptance at the delivery location within thirty calendar days of receipt, with rejected items to be corrected per applicable contract clauses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6913G627Q300007 Attachment 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quote no. 6913G627Q300007
Rail Propulsion Battery Energy Storage Systems (BESS) for Safety Research
Statement of Work
1. Background
The Federal Railroad Administration's (FRA's) Office of Research, Development and Innovation is conducting research into battery energy storage systems (BESS) fire safety and crashworthiness. Volpe National Transportation Systems Center (Volpe Center) is planning and conducting battery protection research under the FRA's Equipment Safety Research Program. In accidents batteries used on rail vehicles will be subjected to dynamic and mechanical loading from derailments or severe accident conditions, such as impacts from various components of the rolling stock or track bed; fire; submersion in water. The research will include impact and fire testing of BESS and BESS enclosure test articles. Volpe will develop analytical modeling of battery enclosures or protective structures to evaluate battery protection under relevant impact conditions.
2. Scope:
The Volpe Center requires the purchase of three (3) Battery Energy Storage Systems (BESS) representative of battery systems used for rail vehicle propulsion. The Government intends to acquire commercially available rail propulsion BESS, including associated battery packs, protective enclosures, structural components, mounting brackets, and attachment hardware. The Contractor shall provide the required BESS, associated components, technical documentation, and delivery services in accordance with this Statement of Work (SOW).
The Government intends to use the delivered BESS and associated documentation to support alternative propulsion rail equipment safety research sponsored by FRA, including development of finite element models and testing of impact and fire conditions.
3. BESS Specifications:
The contractor shall provide three (3) identical new propulsion BESS meeting the minimum requirements identified in this statement of work. The contractor shall identify the battery chemistry configuration, characteristics, mounting interfaces, and available engineering data and known limitations relevant for the intended research.
Battery System Configuration:
A battery system used as primary or supplemental energy source for propulsion of intercity, regional or long-distance passenger service under FRA purview or freight rail equipment used on the U.S. freight rail network.
● BESS shall include a functional battery system used for rail vehicle propulsion, electrical connections, structural components, including protective casing and/or enclosure, and mounting brackets or hardware used for affixing the battery to a railcar. The Contractor shall identify all components included in the delivered configuration and disclose any components that are missing, substituted or not included in the delivered configuration.
● BESS shall be at a minimum a unit battery pack as used for rail vehicle propulsion, as built for operation. This is defined as a freestanding battery stack or tower that is independently mounted to the existing railcar structure, i.e. railcar floor, roof, underframe. It can be multiple battery packs or single battery pack, so long as it has the specific protective structure as designed for operation.
● BESS shall utilize a battery chemistry commercially used for rail vehicle propulsion. The contractor shall identify the battery chemistry and the specific cathode and electroyte technology.
Acceptable chemistries include lithium-iron phosphate (LFP), lithium-ion titanate (LTO), or nickel-manganese cobalt (NMC) and other commercially deployed rail propulsion chemistries.
• The contractor shall identify the energy capacity of each BESS in kilowatt-hours(kWh), voltage and manufacture specified operating limits. The Government will evaluate the proposed battery capacity based on the technical requirements and the suitability of the proposed BESS for the intended research.
• Each battery must have at least 75% capacity.
4. Engineering Drawings:
The Volpe Center requires detailed drawings and supporting documentation of the BESS enclosure to be used in support of finite element model development and installation instructions to support mounting the test article for testing. Therefore, the contractor shall provide a list of BESS design specifications, weight, BESS testing certifications, installation/mounting drawings and instructions for the battery stack, detailed engineering drawings (in CAD) of the battery enclosure structure and mounting hardware, including all relevant material specifications for the battery enclosures (Word, Excel and/or PDF). The above must be provided via electronic copies to the Volpe Center within three weeks of award of the procurement.
5. Delivery:
The contractor shall deliver three (3) propulsion BESS and their protective structures within 18 calendar weeks after award date to Transportation Technology Center, 55500 DOT Road, Boone, CO, 81025 USA. The contractor is responsible for packaging, loading, transportation, handling of materials to the delivery destination.
The contractor shall coordinate delivery with the designated Government Point of Contact (POC):TBA upon award.
6. Government Inspection and Acceptance:
The designated Government Point of Contact will be responsible for inspecting the delivered BESS and associated protective structures upon delivery. Technical inspection and acceptance of all deliverables under this order shall be performed at the location identified in the Delivery section. Award deliverable items rejected shall be corrected in accordance with the applicable clauses. Unless otherwise stated in the order, the Government requires a period not to exceed thirty (30) calendar days after receipt of the deliverable item(s) for inspection and acceptance or rejection.