This is a Bid Tabulation Report for a federal highway construction project issued by the Western Federal Lands Highway Division. The project, ID FLAP ADA 2019(1), concerns the Western Heritage Byway - Swan Falls Road located in Ada County, Idaho on the Morley Nelson Snake River Birds of Prey federal land. The solicitation number is 69056726R000010, with bids opened on 10/20/2026. The contract was awarded to Granite Construction Company on 11/20/2026 for Schedule D (the awarded bid schedule) at a bid amount of $5,920,920.00, compared to the engineer's estimate of $7,552,389.00.
The report presents bid tabulations for four schedules (A through D), each representing different scope levels or phasing options. Schedule A base bids ranged from $4,009,589.20 (Granite Construction Company, lowest) to $4,791,047.60 (MJ Hughes Construction). Schedule B base bids ranged from $4,371,712.00 to $5,348,218.00. Schedule C base bids ranged from $5,274,942.80 to $6,314,349.00. Schedule D (the awarded schedule) base bids ranged from $5,920,920.00 (Granite Construction Company, lowest and awarded) to $6,947,701.00 (MJ Hughes Construction). Three contractors submitted responsive bids: Granite Construction Company (16821 SW McGillivray Blvd Suite 210B, Vancouver, WA 98683), M.A. DeAtley Construction, Inc. (829 Evans Rd., Clarkston, WA 99403), and MJ Hughes Construction (11510 NE 87th Ave, Vancouver, WA 98662). The project includes roadway construction, asphalt paving, concrete work, culverts, drainage, erosion control, landscaping, traffic control, and miscellaneous site improvements across multiple line items with quantities and unit pricing detailed throughout the report.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : ID FLAP ADA 2019(1) Project Name: Western Heritage Byway - Swan Falls Road
Contractor Responsive? Base Schedule A MJ Hughes Construction $4,791,047.60 M.A. DeAtley Construction, Inc. $4,041,968.95 Granite Construction Company $4,009,589.20 Engineer's Estimate $4,572,784.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Schedule D Awarded
Contractor Responsive? Base Schedule B MJ Hughes Construction $5,348,218.00 M.A. DeAtley Construction, Inc. $4,434,938.75 Granite Construction Company $4,371,712.00 Engineer's Estimate $5,085,215.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Contractor Responsive? Base Schedule C MJ Hughes Construction $6,314,349.00 M.A. DeAtley Construction, Inc. $5,359,950.55 Granite Construction Company $5,274,942.80 Engineer's Estimate $6,366,051.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Contractor Responsive? Base Schedule D MJ Hughes Construction $6,947,701.00 M.A. DeAtley Construction, Inc. $6,096,172.95 Granite Construction Company $5,920,920.00 Engineer's Estimate $7,552,389.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Awarded Bid Schedule: Schedule D Awarded
Project No. : ID FLAP ADA 2019(1) Project Name: Western Heritage Byway - Swan Falls Road
Division: Western Federal Lands
Schedule: A Schedule Type: Base Lead Designer: Misbah Afshari Solicitation No. : 69056726R000010 Opened at: WFLHD Vancouver, WA
Opened by: Rebekah Webb
State: ID County: Ada Federal Land: Morley Nelson Snake
River Birds of Prey Bid Open Date and Time: 10/20/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662
$4,791,047.60
M.A. DeAtley Construction, Inc., 829 Evans Rd., Clarkston, WA, 99403
$4,041,968.95
Granite Construction Company, 16821 SW McGillivray Blvd Suite 210B, Vancouver, WA, 98683
$4,009,589.20
Engineer's Estimate $4,572,784.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Project No. : ID FLAP ADA 2019(1) Project Name: Western Heritage Byway - Swan Falls Road
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION M.A. DeAtley Construction, Inc. $600,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
MARINO
CHEA
Digitally signed by
MARINO CHEA
Date: 2026.10.21 06:58:55 -07'00'
A0020 15101-0000 MOBILIZATION MJ Hughes Construction $471,000.00
Granite Construction Company $400,000.00
Engineer's Estimate ALL LPSM LPSM $385,000.00
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Granite Construction Company $175,000.00
MJ Hughes Construction $114,000.00
M.A. DeAtley Construction, Inc. $100,000.00
Engineer's Estimate ALL LPSM LPSM $97,000.00
A0060 15301-0000 CONTRACTOR
QUALITY CONTROL
MJ Hughes Construction $410,000.00
Granite Construction Company $250,000.00
M.A. DeAtley Construction, Inc. $210,000.00
Engineer's Estimate ALL LPSM LPSM $97,000.00
A0080 15401-0000 CONTRACTOR
TESTING
MJ Hughes Construction $175,000.00
Granite Construction Company $150,000.00
M.A. DeAtley Construction, Inc. $130,000.00
Engineer's Estimate ALL LPSM LPSM $97,000.00
A0100 15501-0000 CONSTRUCTION
SCHEDULE
Granite Construction Company $55,000.00
MJ Hughes Construction $27,000.00
M.A. DeAtley Construction, Inc. $5,000.00
Engineer's Estimate ALL LPSM LPSM $20,000.00
A0120 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Granite Construction Company 10,500.000 $4.00 $42,000.00
M.A. DeAtley Construction, Inc. 10,500.000 $4.00 $42,000.00
MJ Hughes Construction 10,500.000 $3.75 $39,375.00
Engineer's Estimate 10,500.000 LNFT $6.00 $63,000.00
A0140 15802-0000 WATERING FOR
DUST CONTROL
MJ Hughes Construction $125,000.00
Granite Construction Company $100,000.00
M.A. DeAtley Construction, Inc. $20,000.00
Engineer's Estimate ALL LPSM LPSM $50,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
A0160 20101-0000 CLEARING AND
GRUBBING
MJ Hughes Construction 9.000 $15,000.00 $135,000.00
M.A. DeAtley Construction, Inc. 9.000 $3,500.00 $31,500.00
Granite Construction Company 9.000 $2,500.00 $22,500.00
Engineer's Estimate 9.000 ACRE $12,000.00 $108,000.00
A0180 20301-0600 REMOVAL OF
CATTLE GUARD
Granite Construction Company 1.000 $10,000.00 $10,000.00
MJ Hughes Construction 1.000 $6,000.00 $6,000.00
M.A. DeAtley Construction, Inc. 1.000 $1,800.00 $1,800.00
Engineer's Estimate 1.000 EACH $6,500.00 $6,500.00 A0200 20301-1100 REMOVAL OF GATE Granite Construction
Company 1.000 $1,500.00 $1,500.00
M.A. DeAtley Construction, Inc. 1.000 $300.00 $300.00
MJ Hughes Construction 1.000 $270.00 $270.00
Engineer's Estimate 1.000 EACH $650.00 $650.00
A0220 20301-2100 REMOVAL OF
RESTROOM
FACILITY
Granite Construction Company 2.000 $10,000.00 $20,000.00
M.A. DeAtley Construction, Inc. 2.000 $9,000.00 $18,000.00
MJ Hughes Construction 2.000 $7,000.00 $14,000.00
Engineer's Estimate 2.000 EACH $40,000.00 $80,000.00 A0240 20301-2400 REMOVAL OF SIGN Granite Construction
Company 4.000 $500.00 $2,000.00
M.A. DeAtley Construction, Inc. 4.000 $150.00 $600.00
MJ Hughes Construction 4.000 $100.00 $400.00
Engineer's Estimate 4.000 EACH $250.00 $1,000.00
A0260 20301-3300 REMOVAL OF
VAULT (CONCRETE
TANK)
Granite Construction Company 4.000 $5,000.00 $20,000.00
MJ Hughes Construction 4.000 $3,000.00 $12,000.00
M.A. DeAtley Construction, Inc. 4.000 $1,600.00 $6,400.00
Engineer's Estimate 4.000 EACH $5,000.00 $20,000.00
A0280 20302-0700 REMOVAL OF
FENCE
MJ Hughes Construction 55.000 $15.00 $825.00
M.A. DeAtley Construction, Inc. 55.000 $10.00 $550.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0280 20302-0700 REMOVAL OF
FENCE
Granite Construction Company 55.000 $4.00 $220.00
Engineer's Estimate 55.000 LNFT $10.00 $550.00
A0300 20315-0000 SAWCUTTING
PAVEMENT
MJ Hughes Construction 33,880.000 $2.00 $67,760.00
M.A. DeAtley Construction, Inc. 33,880.000 $0.80 $27,104.00
Granite Construction Company 33,880.000 $0.50 $16,940.00
Engineer's Estimate 33,880.000 LNFT $4.00 $135,520.00
A0320 20401-0000 ROADWAY
EXCAVATION
M.A. DeAtley Construction, Inc. 13,000.000 $42.00 $546,000.00
MJ Hughes Construction 13,000.000 $40.00 $520,000.00
Granite Construction Company 13,000.000 $30.00 $390,000.00
Engineer's Estimate 13,000.000 CUYD $30.00 $390,000.00 A0340 20421-0000 ROCK EXCAVATION MJ Hughes
Construction 420.000 $155.00 $65,100.00
M.A. DeAtley Construction, Inc. 420.000 $85.00 $35,700.00
Granite Construction Company 420.000 $50.00 $21,000.00
Engineer's Estimate 420.000 CUYD $200.00 $84,000.00
A0360 20425-1000 DITCH,
EXCAVATION
(REGRADING)
MJ Hughes Construction 90.000 $95.00 $8,550.00
M.A. DeAtley Construction, Inc. 90.000 $32.00 $2,880.00
Granite Construction Company 90.000 $10.00 $900.00
Engineer's Estimate 90.000 LNFT $25.00 $2,250.00
A0380 20471-0000 REMOVE AND
RESET BOULDER
M.A. DeAtley Construction, Inc. 35.000 $175.00 $6,125.00
Granite Construction Company 35.000 $100.00 $3,500.00
MJ Hughes Construction 35.000 $100.00 $3,500.00
Engineer's Estimate 35.000 EACH $200.00 $7,000.00
A0400 25101-0200 PLACED RIPRAP,
CLASS 2
M.A. DeAtley Construction, Inc. 5.000 $500.00 $2,500.00
MJ Hughes Construction 5.000 $320.00 $1,600.00
Granite Construction Company 5.000 $250.00 $1,250.00
Engineer's Estimate 5.000 CUYD $500.00 $2,500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0420 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
MJ Hughes Construction 17,000.000 $50.00 $850,000.00
M.A. DeAtley Construction, Inc. 17,000.000 $48.00 $816,000.00
Granite Construction Company 17,000.000 $35.00 $595,000.00
Engineer's Estimate 17,000.000 TON $50.00 $850,000.00
A0440 30202-2100 ROADWAY
AGGREGATE,
METHOD 2,
SURFACE COURSE
(6-INCH DEPTH)
M.A. DeAtley Construction, Inc. 650.000 $72.00 $46,800.00
Granite Construction Company 650.000 $65.00 $42,250.00
MJ Hughes Construction 650.000 $50.00 $32,500.00
Engineer's Estimate 650.000 TON $150.00 $97,500.00
A0460 40301-0000 ASPHALT
CONCRETE
PAVEMENT
Granite Construction Company 3,600.000 $150.00 $540,000.00
MJ Hughes Construction 3,600.000 $137.00 $493,200.00
M.A. DeAtley Construction, Inc. 3,600.000 $113.00 $406,800.00
Engineer's Estimate 3,600.000 TON $180.00 $648,000.00 A0480 41201-0000 TACK COAT MJ Hughes
Construction 1.500 $5,700.00 $8,550.00
M.A. DeAtley Construction, Inc. 1.500 $4,650.00 $6,975.00
Granite Construction Company 1.500 $2,000.00 $3,000.00
Engineer's Estimate 1.500 TON $3,000.00 $4,500.00
A0500 41301-1000 ASPHALT
PAVEMENT
MILLING, 4-INCH
DEPTH
MJ Hughes Construction 1,200.000 $17.00 $20,400.00
M.A. DeAtley Construction, Inc. 1,200.000 $14.00 $16,800.00
Granite Construction Company 1,200.000 $9.00 $10,800.00
Engineer's Estimate 1,200.000 SQYD $10.00 $12,000.00
A0520 41402-2000 CRACKS, CLEANING
AND SEALING (AND
FILLING)
MJ Hughes Construction 3.200 $15,000.00 $48,000.00
M.A. DeAtley Construction, Inc. 3.200 $14,260.00 $45,632.00
Granite Construction Company 3.200 $10,000.00 $32,000.00
Engineer's Estimate 3.200 MILE $13,000.00 $41,600.00
A0540 50101-2600 MINOR CONCRETE
PAVEMENT, PLAIN,
6-INCH DEPTH
MJ Hughes Construction 70.000 $210.00 $14,700.00
Granite Construction Company 70.000 $180.00 $12,600.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0540 50101-2600 MINOR CONCRETE
PAVEMENT, PLAIN,
6-INCH DEPTH
M.A. DeAtley Construction, Inc. 70.000 $180.00 $12,600.00
Engineer's Estimate 70.000 SQYD $300.00 $21,000.00
A0560 60201-0600 18-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 210.000 $245.00 $51,450.00
Granite Construction Company 210.000 $200.00 $42,000.00
MJ Hughes Construction 210.000 $125.00 $26,250.00
Engineer's Estimate 210.000 LNFT $220.00 $46,200.00
A0580 60201-0800 24-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 270.000 $280.00 $75,600.00
Granite Construction Company 270.000 $250.00 $67,500.00
MJ Hughes Construction 270.000 $140.00 $37,800.00
Engineer's Estimate 270.000 LNFT $230.00 $62,100.00
A0600 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
MJ Hughes Construction 3.000 $9,800.00 $29,400.00
M.A. DeAtley Construction, Inc. 3.000 $6,000.00 $18,000.00
Granite Construction Company 3.000 $5,000.00 $15,000.00
Engineer's Estimate 3.000 EACH $2,500.00 $7,500.00
A0620 60704-0000 CLEANING
CULVERT IN PLACE
MJ Hughes Construction 2.000 $3,590.00 $7,180.00
Granite Construction Company 2.000 $2,000.00 $4,000.00
M.A. DeAtley Construction, Inc. 2.000 $2,000.00 $4,000.00
Engineer's Estimate 2.000 EACH $2,000.00 $4,000.00
A0640 60915-1000 WHEELSTOP,
CONCRETE
M.A. DeAtley Construction, Inc. 2.000 $500.00 $1,000.00
MJ Hughes Construction 2.000 $300.00 $600.00
Granite Construction Company 2.000 $200.00 $400.00
Engineer's Estimate 2.000 EACH $250.00 $500.00
A0660 61001-0100 SIDEWALK,
CONCRETE (6-INCH
DEPTH)
MJ Hughes Construction 240.000 $160.00 $38,400.00
M.A. DeAtley Construction, Inc. 240.000 $120.00 $28,800.00
Granite Construction Company 240.000 $100.00 $24,000.00
Engineer's Estimate 240.000 SQYD $200.00 $48,000.00
A0680 61401-0000 FLOWABLE
BACKFILL
Granite Construction Company 13.000 $500.00 $6,500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0680 61401-0000 FLOWABLE
BACKFILL
M.A. DeAtley Construction, Inc. 13.000 $500.00 $6,500.00
MJ Hughes Construction 13.000 $240.00 $3,120.00
Engineer's Estimate 13.000 CUYD $550.00 $7,150.00
A0700 61903-1100 CATTLE GUARD, 32
FEET
Granite Construction Company 1.000 $60,000.00 $60,000.00
M.A. DeAtley Construction, Inc. 1.000 $45,000.00 $45,000.00
MJ Hughes Construction 1.000 $37,600.00 $37,600.00
Engineer's Estimate 1.000 EACH $60,000.00 $60,000.00
A0720 61921-1000 REMOVE AND
RESET FENCE
MJ Hughes Construction 30.000 $100.00 $3,000.00
Granite Construction Company 30.000 $35.00 $1,050.00
M.A. DeAtley Construction, Inc. 30.000 $20.00 $600.00
Engineer's Estimate 30.000 LNFT $55.00 $1,650.00
A0740 62201-0300 DUMP TRUCK, 12
CUBIC YARD
MINIMUM
CAPACITY
Granite Construction Company 40.000 $200.00 $8,000.00
M.A. DeAtley Construction, Inc. 40.000 $185.00 $7,400.00
MJ Hughes Construction 40.000 $160.00 $6,400.00
Engineer's Estimate 40.000 HOUR $200.00 $8,000.00
A0760 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
Granite Construction Company 40.000 $200.00 $8,000.00
MJ Hughes Construction 40.000 $200.00 $8,000.00
M.A. DeAtley Construction, Inc. 40.000 $185.00 $7,400.00
Engineer's Estimate 40.000 HOUR $190.00 $7,600.00 A0780 62301-0000 GENERAL LABOR Granite Construction
Company 40.000 $100.00 $4,000.00
MJ Hughes Construction 40.000 $80.00 $3,200.00
M.A. DeAtley Construction, Inc. 40.000 $65.00 $2,600.00
Engineer's Estimate 40.000 HOUR $110.00 $4,400.00
A0800 62302-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
MJ Hughes Construction 350.000 $165.00 $57,750.00
Granite Construction Company 350.000 $100.00 $35,000.00
M.A. DeAtley Construction, Inc. 350.000 $70.00 $24,500.00
Engineer's Estimate 350.000 HOUR $190.00 $66,500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0820 62402-0300 PROVIDING AND
PLACING TOPSOIL,
4-INCH DEPTH
Granite Construction Company 7.000 $30,000.00 $210,000.00
MJ Hughes Construction 7.000 $28,500.00 $199,500.00
M.A. DeAtley Construction, Inc. 7.000 $15,000.00 $105,000.00
Engineer's Estimate 7.000 ACRE $18,000.00 $126,000.00
A0840 62501-0000 TURF
ESTABLISHMENT
MJ Hughes Construction 7.500 $4,320.00 $32,400.00
M.A. DeAtley Construction, Inc. 7.500 $3,600.00 $27,000.00
Granite Construction Company 7.500 $2,700.00 $20,250.00
Engineer's Estimate 7.500 ACRE $4,000.00 $30,000.00 A0860 63302-0000 SIGN SYSTEM M.A. DeAtley
Construction, Inc. 235.000 $81.25 $19,093.75
Granite Construction Company 235.000 $80.00 $18,800.00
MJ Hughes Construction 235.000 $75.00 $17,625.00
Engineer's Estimate 235.000 SQFT $180.00 $42,300.00
A0880 63308-3000 OBJECT MARKER,
TYPE 3
M.A. DeAtley Construction, Inc. 4.000 $380.00 $1,520.00
Granite Construction Company 4.000 $300.00 $1,200.00
MJ Hughes Construction 4.000 $250.00 $1,000.00
Engineer's Estimate 4.000 EACH $550.00 $2,200.00 A0900 63313-0000 RUMBLE STRIP Granite Construction
Company 32,950.000 $1.00 $32,950.00
MJ Hughes Construction 32,950.000 $0.65 $21,417.50
M.A. DeAtley Construction, Inc. 32,950.000 $0.50 $16,475.00
Engineer's Estimate 32,950.000 LNFT $2.50 $82,375.00
A0920 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (WHITE)
Granite Construction Company 69,000.000 $0.12 $8,280.00
M.A. DeAtley Construction, Inc. 69,000.000 $0.12 $8,280.00
MJ Hughes Construction 69,000.000 $0.11 $7,590.00
Engineer's Estimate 69,000.000 LNFT $0.40 $27,600.00
A0940 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (YELLOW)
Granite Construction Company 51,210.000 $0.12 $6,145.20
M.A. DeAtley Construction, Inc. 51,210.000 $0.12 $6,145.20
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0940 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (YELLOW)
MJ Hughes Construction 51,210.000 $0.11 $5,633.10
Engineer's Estimate 51,210.000 LNFT $0.40 $20,484.00
A0960 63401-0400 PAVEMENT
MARKINGS, TYPE B,
BROKEN (YELLOW)
Granite Construction Company 15,700.000 $0.12 $1,884.00
M.A. DeAtley Construction, Inc. 15,700.000 $0.12 $1,884.00
MJ Hughes Construction 15,700.000 $0.11 $1,727.00
Engineer's Estimate 15,700.000 LNFT $0.40 $6,280.00
A0980 63405-0850 PAVEMENT
MARKINGS, TYPE B,
ACCESSIBILITY
SYMBOL
Granite Construction Company 4.000 $500.00 $2,000.00
MJ Hughes Construction 4.000 $150.00 $600.00
M.A. DeAtley Construction, Inc. 4.000 $50.00 $200.00
Engineer's Estimate 4.000 EACH $450.00 $1,800.00
A1000 63502-0400 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 1
MJ Hughes Construction 5.000 $60.00 $300.00
Granite Construction Company 5.000 $35.00 $175.00
M.A. DeAtley Construction, Inc. 5.000 $35.00 $175.00
Engineer's Estimate 5.000 EACH $400.00 $2,000.00
A1020 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
MJ Hughes Construction 2.000 $100.00 $200.00
Granite Construction Company 2.000 $75.00 $150.00
M.A. DeAtley Construction, Inc. 2.000 $75.00 $150.00
Engineer's Estimate 2.000 EACH $1,000.00 $2,000.00
A1040 63502-1300 TEMPORARY
TRAFFIC CONTROL,
DRUM
Granite Construction Company 230.000 $15.00 $3,450.00
M.A. DeAtley Construction, Inc. 230.000 $15.00 $3,450.00
MJ Hughes Construction 230.000 $6.00 $1,380.00
Engineer's Estimate 230.000 EACH $100.00 $23,000.00
A1060 63502-2000 TEMPORARY
TRAFFIC CONTROL,
PORTABLE
CHANGEABLE
MESSAGE SIGN
MJ Hughes Construction 2.000 $15,000.00 $30,000.00
Granite Construction Company 2.000 $6,000.00 $12,000.00
M.A. DeAtley Construction, Inc. 2.000 $5,000.00 $10,000.00
Engineer's Estimate 2.000 EACH $20,000.00 $40,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1080 63503-0700 TEMPORARY
TRAFFIC CONTROL,
PAVEMENT
MARKINGS
MJ Hughes Construction 430.000 $2.50 $1,075.00
Granite Construction Company 430.000 $1.50 $645.00
M.A. DeAtley Construction, Inc. 430.000 $1.00 $430.00
Engineer's Estimate 430.000 LNFT $2.50 $1,075.00
A1100 63504-1000 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
MJ Hughes Construction 150.000 $35.00 $5,250.00
Granite Construction Company 150.000 $5.00 $750.00
M.A. DeAtley Construction, Inc. 150.000 $5.00 $750.00
Engineer's Estimate 150.000 SQFT $50.00 $7,500.00
A1120 63506-0500 TEMPORARY
TRAFFIC CONTROL,
FLAGGER
MJ Hughes Construction 3,000.000 $67.00 $201,000.00
M.A. DeAtley Construction, Inc. 3,000.000 $40.00 $120,000.00
Granite Construction Company 3,000.000 $38.00 $114,000.00
Engineer's Estimate 3,000.000 HOUR $65.00 $195,000.00
A1140 63506-0600 TEMPORARY
TRAFFIC CONTROL,
PILOT CAR
M.A. DeAtley Construction, Inc. 600.000 $75.00 $45,000.00
MJ Hughes Construction 600.000 $75.00 $45,000.00
Granite Construction Company 600.000 $55.00 $33,000.00
Engineer's Estimate 600.000 HOUR $100.00 $60,000.00
A1160 63507-0700 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC CONTROL
SUPERVISOR
MJ Hughes Construction 105.000 $980.00 $102,900.00
Granite Construction Company 105.000 $600.00 $63,000.00
M.A. DeAtley Construction, Inc. 105.000 $500.00 $52,500.00
Engineer's Estimate 105.000 DAY $1,000.00 $105,000.00
A1180 64603-0700 FIXTURE, PICNIC
TABLE
Granite Construction Company 2.000 $6,000.00 $12,000.00
MJ Hughes Construction 2.000 $3,660.00 $7,320.00
M.A. DeAtley Construction, Inc. 2.000 $3,500.00 $7,000.00
Engineer's Estimate 2.000 EACH $5,000.00 $10,000.00
A1200 64603-1000 FIXTURE, VAULT
TOILET
Granite Construction Company 1.000 $225,000.00 $225,000.00
M.A. DeAtley Construction, Inc. 1.000 $150,000.00 $150,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1200 64603-1000 FIXTURE, VAULT
TOILET
MJ Hughes Construction 1.000 $118,200.00 $118,200.00
Engineer's Estimate 1.000 EACH $100,000.00 $100,000.00
A1220 64603-1500 FIXTURE, SHELTER
(SHADE
STRUCTURE)
MJ Hughes Construction 1.000 $68,000.00 $68,000.00
M.A. DeAtley Construction, Inc. 1.000 $55,000.00 $55,000.00
Granite Construction Company 1.000 $50,000.00 $50,000.00
Engineer's Estimate 1.000 EACH $40,000.00 $40,000.00
A1240 64620-0600 REMOVE AND
RESET TRASH
RECEPTACLE
(ASSEMBLY)
Granite Construction Company 1.000 $1,000.00 $1,000.00
M.A. DeAtley Construction, Inc. 1.000 $1,000.00 $1,000.00
MJ Hughes Construction 1.000 $500.00 $500.00
Engineer's Estimate 1.000 EACH $3,000.00 $3,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Byway - Swan Falls Road
Division: Western Federal Lands
Schedule: B Schedule Type: Base Lead Designer: Misbah Afshari Solicitation No. : 69056726R000010 Opened at: WFLHD Vancouver, WA
Opened by: Rebekah Webb
State: ID County: Ada Federal Land: Morley Nelson Snake
River Birds of Prey Bid Open Date and Time: 10/20/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662
$5,348,218.00
M.A. DeAtley Construction, Inc., 829 Evans Rd., Clarkston, WA, 99403
$4,434,938.75
Granite Construction Company, 16821 SW McGillivray Blvd Suite 210B, Vancouver, WA, 98683
$4,371,712.00
Engineer's Estimate $5,085,215.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Project No. : ID FLAP ADA 2019(1) Project Name: Western Heritage Byway - Swan Falls Road
Schedule: B Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION MJ Hughes Construction $650,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
MARINO
CHEA
Digitally signed by
MARINO CHEA
Date: 2026.10.21 06:59:16 -07'00'
B0020 15101-0000 MOBILIZATION M.A. DeAtley Construction, Inc. $605,000.00
Granite Construction Company $436,000.00
Engineer's Estimate ALL LPSM LPSM $430,000.00
B0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Granite Construction Company $175,000.00
MJ Hughes Construction $114,000.00
M.A. DeAtley Construction, Inc. $110,000.00
Engineer's Estimate ALL LPSM LPSM $108,000.00
B0060 15301-0000 CONTRACTOR
QUALITY CONTROL
MJ Hughes Construction $410,000.00
Granite Construction Company $250,000.00
M.A. DeAtley Construction, Inc. $220,000.00
Engineer's Estimate ALL LPSM LPSM $108,000.00
B0080 15401-0000 CONTRACTOR
TESTING
MJ Hughes Construction $175,000.00
Granite Construction Company $150,000.00
M.A. DeAtley Construction, Inc. $140,000.00
Engineer's Estimate ALL LPSM LPSM $108,000.00
B0100 15501-0000 CONSTRUCTION
SCHEDULE
Granite Construction Company $55,000.00
MJ Hughes Construction $27,000.00
M.A. DeAtley Construction, Inc. $5,000.00
Engineer's Estimate ALL LPSM LPSM $22,000.00
B0120 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Granite Construction Company 10,700.000 $4.00 $42,800.00
M.A. DeAtley Construction, Inc. 10,700.000 $4.00 $42,800.00
MJ Hughes Construction 10,700.000 $3.50 $37,450.00
Engineer's Estimate 10,700.000 LNFT $6.00 $64,200.00
B0140 15802-0000 WATERING FOR
DUST CONTROL
MJ Hughes Construction $125,000.00
Granite Construction Company $100,000.00
M.A. DeAtley Construction, Inc. $20,000.00
Engineer's Estimate ALL LPSM LPSM $50,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0160 20101-0000 CLEARING AND
GRUBBING
MJ Hughes Construction 9.500 $15,000.00 $142,500.00
M.A. DeAtley Construction, Inc. 9.500 $3,500.00 $33,250.00
Granite Construction Company 9.500 $2,500.00 $23,750.00
Engineer's Estimate 9.500 ACRE $12,000.00 $114,000.00
B0180 20301-0600 REMOVAL OF
CATTLE GUARD
Granite Construction Company 1.000 $10,000.00 $10,000.00
MJ Hughes Construction 1.000 $6,000.00 $6,000.00
M.A. DeAtley Construction, Inc. 1.000 $1,800.00 $1,800.00
Engineer's Estimate 1.000 EACH $6,500.00 $6,500.00 B0200 20301-1100 REMOVAL OF GATE Granite Construction
Company 1.000 $1,500.00 $1,500.00
M.A. DeAtley Construction, Inc. 1.000 $300.00 $300.00
MJ Hughes Construction 1.000 $270.00 $270.00
Engineer's Estimate 1.000 EACH $650.00 $650.00
B0220 20301-2100 REMOVAL OF
RESTROOM
FACILITY
Granite Construction Company 2.000 $10,000.00 $20,000.00
M.A. DeAtley Construction, Inc. 2.000 $9,000.00 $18,000.00
MJ Hughes Construction 2.000 $7,000.00 $14,000.00
Engineer's Estimate 2.000 EACH $40,000.00 $80,000.00 B0240 20301-2400 REMOVAL OF SIGN Granite Construction
Company 4.000 $500.00 $2,000.00
M.A. DeAtley Construction, Inc. 4.000 $150.00 $600.00
MJ Hughes Construction 4.000 $100.00 $400.00
Engineer's Estimate 4.000 EACH $250.00 $1,000.00
B0260 20301-3300 REMOVAL OF
VAULT (CONCRETE
TANK)
Granite Construction Company 4.000 $5,000.00 $20,000.00
MJ Hughes Construction 4.000 $3,000.00 $12,000.00
M.A. DeAtley Construction, Inc. 4.000 $1,600.00 $6,400.00
Engineer's Estimate 4.000 EACH $5,000.00 $20,000.00
B0280 20302-0700 REMOVAL OF
FENCE
MJ Hughes Construction 55.000 $15.00 $825.00
M.A. DeAtley Construction, Inc. 55.000 $10.00 $550.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0280 20302-0700 REMOVAL OF
FENCE
Granite Construction Company 55.000 $4.00 $220.00
Engineer's Estimate 55.000 LNFT $10.00 $550.00
B0300 20315-0000 SAWCUTTING
PAVEMENT
MJ Hughes Construction 39,900.000 $2.00 $79,800.00
M.A. DeAtley Construction, Inc. 39,900.000 $0.80 $31,920.00
Granite Construction Company 39,900.000 $0.50 $19,950.00
Engineer's Estimate 39,900.000 LNFT $4.00 $159,600.00
B0320 20401-0000 ROADWAY
EXCAVATION
M.A. DeAtley Construction, Inc. 15,000.000 $42.00 $630,000.00
MJ Hughes Construction 15,000.000 $40.00 $600,000.00
Granite Construction Company 15,000.000 $30.00 $450,000.00
Engineer's Estimate 15,000.000 CUYD $30.00 $450,000.00 B0340 20421-0000 ROCK EXCAVATION MJ Hughes
Construction 420.000 $155.00 $65,100.00
M.A. DeAtley Construction, Inc. 420.000 $85.00 $35,700.00
Granite Construction Company 420.000 $50.00 $21,000.00
Engineer's Estimate 420.000 CUYD $200.00 $84,000.00
B0360 20425-1000 DITCH,
EXCAVATION
(REGRADING)
MJ Hughes Construction 90.000 $95.00 $8,550.00
M.A. DeAtley Construction, Inc. 90.000 $32.00 $2,880.00
Granite Construction Company 90.000 $10.00 $900.00
Engineer's Estimate 90.000 LNFT $25.00 $2,250.00
B0380 20471-0000 REMOVE AND
RESET BOULDER
M.A. DeAtley Construction, Inc. 35.000 $175.00 $6,125.00
Granite Construction Company 35.000 $100.00 $3,500.00
MJ Hughes Construction 35.000 $100.00 $3,500.00
Engineer's Estimate 35.000 EACH $200.00 $7,000.00
B0400 25101-0200 PLACED RIPRAP,
CLASS 2
M.A. DeAtley Construction, Inc. 5.000 $500.00 $2,500.00
MJ Hughes Construction 5.000 $320.00 $1,600.00
Granite Construction Company 5.000 $250.00 $1,250.00
Engineer's Estimate 5.000 CUYD $500.00 $2,500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0420 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
MJ Hughes Construction 20,000.000 $50.00 $1,000,000.00
M.A. DeAtley Construction, Inc. 20,000.000 $48.00 $960,000.00
Granite Construction Company 20,000.000 $35.00 $700,000.00
Engineer's Estimate 20,000.000 TON $50.00 $1,000,000.00
B0440 30202-2100 ROADWAY
AGGREGATE,
METHOD 2,
SURFACE COURSE
(6-INCH DEPTH)
M.A. DeAtley Construction, Inc. 650.000 $72.00 $46,800.00
Granite Construction Company 650.000 $65.00 $42,250.00
MJ Hughes Construction 650.000 $50.00 $32,500.00
Engineer's Estimate 650.000 TON $150.00 $97,500.00
B0460 40301-0000 ASPHALT
CONCRETE
PAVEMENT
Granite Construction Company 4,200.000 $150.00 $630,000.00
MJ Hughes Construction 4,200.000 $137.00 $575,400.00
M.A. DeAtley Construction, Inc. 4,200.000 $113.00 $474,600.00
Engineer's Estimate 4,200.000 TON $180.00 $756,000.00 B0480 41201-0000 TACK COAT M.A. DeAtley
Construction, Inc. 1.500 $4,650.00 $6,975.00
MJ Hughes Construction 1.500 $3,790.00 $5,685.00
Granite Construction Company 1.500 $2,000.00 $3,000.00
Engineer's Estimate 1.500 TON $3,000.00 $4,500.00
B0500 41301-1000 ASPHALT
PAVEMENT
MILLING, 4-INCH
DEPTH
MJ Hughes Construction 1,200.000 $15.00 $18,000.00
M.A. DeAtley Construction, Inc. 1,200.000 $14.00 $16,800.00
Granite Construction Company 1,200.000 $9.00 $10,800.00
Engineer's Estimate 1,200.000 SQYD $10.00 $12,000.00
B0520 41402-2000 CRACKS, CLEANING
AND SEALING (AND
FILLING)
M.A. DeAtley Construction, Inc. 3.800 $14,260.00 $54,188.00
MJ Hughes Construction 3.800 $13,000.00 $49,400.00
Granite Construction Company 3.800 $10,000.00 $38,000.00
Engineer's Estimate 3.800 MILE $13,000.00 $49,400.00
B0540 50101-2600 MINOR CONCRETE
PAVEMENT, PLAIN,
6-INCH DEPTH
MJ Hughes Construction 70.000 $210.00 $14,700.00
Granite Construction Company 70.000 $180.00 $12,600.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0540 50101-2600 MINOR CONCRETE
PAVEMENT, PLAIN,
6-INCH DEPTH
M.A. DeAtley Construction, Inc. 70.000 $180.00 $12,600.00
Engineer's Estimate 70.000 SQYD $300.00 $21,000.00
B0560 60201-0400 12-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 50.000 $225.00 $11,250.00
MJ Hughes Construction 50.000 $225.00 $11,250.00
Granite Construction Company 50.000 $175.00 $8,750.00
Engineer's Estimate 50.000 LNFT $200.00 $10,000.00
B0580 60201-0600 18-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 210.000 $245.00 $51,450.00
Granite Construction Company 210.000 $200.00 $42,000.00
MJ Hughes Construction 210.000 $120.00 $25,200.00
Engineer's Estimate 210.000 LNFT $220.00 $46,200.00
B0600 60201-0800 24-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 270.000 $280.00 $75,600.00
Granite Construction Company 270.000 $250.00 $67,500.00
MJ Hughes Construction 270.000 $138.00 $37,260.00
Engineer's Estimate 270.000 LNFT $230.00 $62,100.00
B0620 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
MJ Hughes Construction 3.000 $9,800.00 $29,400.00
M.A. DeAtley Construction, Inc. 3.000 $6,000.00 $18,000.00
Granite Construction Company 3.000 $5,000.00 $15,000.00
Engineer's Estimate 3.000 EACH $2,500.00 $7,500.00
B0640 60704-0000 CLEANING
CULVERT IN PLACE
MJ Hughes Construction 2.000 $3,590.00 $7,180.00
Granite Construction Company 2.000 $2,000.00 $4,000.00
M.A. DeAtley Construction, Inc. 2.000 $2,000.00 $4,000.00
Engineer's Estimate 2.000 EACH $2,000.00 $4,000.00
B0660 60915-1000 WHEELSTOP,
CONCRETE
M.A. DeAtley Construction, Inc. 2.000 $500.00 $1,000.00
MJ Hughes Construction 2.000 $300.00 $600.00
Granite Construction Company 2.000 $200.00 $400.00
Engineer's Estimate 2.000 EACH $250.00 $500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0680 61001-0100 SIDEWALK,
CONCRETE (6-INCH
DEPTH)
MJ Hughes Construction 240.000 $160.00 $38,400.00
M.A. DeAtley Construction, Inc. 240.000 $120.00 $28,800.00
Granite Construction Company 240.000 $100.00 $24,000.00
Engineer's Estimate 240.000 SQYD $200.00 $48,000.00
B0700 61401-0000 FLOWABLE
BACKFILL
Granite Construction Company 13.000 $500.00 $6,500.00
M.A. DeAtley Construction, Inc. 13.000 $500.00 $6,500.00
MJ Hughes Construction 13.000 $240.00 $3,120.00
Engineer's Estimate 13.000 CUYD $550.00 $7,150.00
B0720 61903-1100 CATTLE GUARD, 32
FEET
Granite Construction Company 1.000 $60,000.00 $60,000.00
M.A. DeAtley Construction, Inc. 1.000 $45,000.00 $45,000.00
MJ Hughes Construction 1.000 $37,600.00 $37,600.00
Engineer's Estimate 1.000 EACH $60,000.00 $60,000.00
B0740 61921-1000 REMOVE AND
RESET FENCE
MJ Hughes Construction 30.000 $100.00 $3,000.00
Granite Construction Company 30.000 $35.00 $1,050.00
M.A. DeAtley Construction, Inc. 30.000 $20.00 $600.00
Engineer's Estimate 30.000 LNFT $55.00 $1,650.00
B0760 62201-0300 DUMP TRUCK, 12
CUBIC YARD
MINIMUM
CAPACITY
Granite Construction Company 40.000 $200.00 $8,000.00
M.A. DeAtley Construction, Inc. 40.000 $185.00 $7,400.00
MJ Hughes Construction 40.000 $160.00 $6,400.00
Engineer's Estimate 40.000 HOUR $200.00 $8,000.00
B0780 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
Granite Construction Company 40.000 $200.00 $8,000.00
MJ Hughes Construction 40.000 $200.00 $8,000.00
M.A. DeAtley Construction, Inc. 40.000 $185.00 $7,400.00
Engineer's Estimate 40.000 HOUR $190.00 $7,600.00 B0800 62301-0000 GENERAL LABOR Granite Construction
Company 40.000 $100.00 $4,000.00
MJ Hughes Construction 40.000 $80.00 $3,200.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0800 62301-0000 GENERAL LABOR M.A. DeAtley Construction, Inc. 40.000 $65.00 $2,600.00
Engineer's Estimate 40.000 HOUR $110.00 $4,400.00
B0820 62302-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
MJ Hughes Construction 350.000 $165.00 $57,750.00
Granite Construction Company 350.000 $100.00 $35,000.00
M.A. DeAtley Construction, Inc. 350.000 $70.00 $24,500.00
Engineer's Estimate 350.000 HOUR $190.00 $66,500.00
B0840 62402-0300 PROVIDING AND
PLACING TOPSOIL,
4-INCH DEPTH
Granite Construction Company 8.000 $30,000.00 $240,000.00
MJ Hughes Construction 8.000 $27,500.00 $220,000.00
M.A. DeAtley Construction, Inc. 8.000 $15,000.00 $120,000.00
Engineer's Estimate 8.000 ACRE $18,000.00 $144,000.00
B0860 62501-0000 TURF
ESTABLISHMENT
MJ Hughes Construction 8.500 $4,320.00 $36,720.00
M.A. DeAtley Construction, Inc. 8.500 $3,600.00 $30,600.00
Granite Construction Company 8.500 $2,700.00 $22,950.00
Engineer's Estimate 8.500 ACRE $4,000.00 $34,000.00 B0880 63302-0000 SIGN SYSTEM M.A. DeAtley
Construction, Inc. 235.000 $81.25 $19,093.75
Granite Construction Company 235.000 $80.00 $18,800.00
MJ Hughes Construction 235.000 $75.00 $17,625.00
Engineer's Estimate 235.000 SQFT $180.00 $42,300.00
B0900 63308-3000 OBJECT MARKER,
TYPE 3
M.A. DeAtley Construction, Inc. 4.000 $380.00 $1,520.00
Granite Construction Company 4.000 $300.00 $1,200.00
MJ Hughes Construction 4.000 $100.00 $400.00
Engineer's Estimate 4.000 EACH $550.00 $2,200.00 B0920 63313-0000 RUMBLE STRIP Granite Construction
Company 38,780.000 $1.00 $38,780.00
MJ Hughes Construction 38,780.000 $0.60 $23,268.00
M.A. DeAtley Construction, Inc. 38,780.000 $0.50 $19,390.00
Engineer's Estimate 38,780.000 LNFT $2.50 $96,950.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0940 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (WHITE)
Granite Construction Company 81,100.000 $0.12 $9,732.00
M.A. DeAtley Construction, Inc. 81,100.000 $0.12 $9,732.00
MJ Hughes Construction 81,100.000 $0.10 $8,110.00
Engineer's Estimate 81,100.000 LNFT $0.40 $32,440.00
B0960 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (YELLOW)
Granite Construction Company 58,100.000 $0.12 $6,972.00
M.A. DeAtley Construction, Inc. 58,100.000 $0.12 $6,972.00
MJ Hughes Construction 58,100.000 $0.10 $5,810.00
Engineer's Estimate 58,100.000 LNFT $0.40 $23,240.00
B0980 63401-0400 PAVEMENT
MARKINGS, TYPE B,
BROKEN (YELLOW)
Granite Construction Company 19,900.000 $0.12 $2,388.00
M.A. DeAtley Construction, Inc. 19,900.000 $0.12 $2,388.00
MJ Hughes Construction 19,900.000 $0.10 $1,990.00
Engineer's Estimate 19,900.000 LNFT $0.40 $7,960.00
B1000 63405-0850 PAVEMENT
MARKINGS, TYPE B,
ACCESSIBILITY
SYMBOL
Granite Construction Company 4.000 $500.00 $2,000.00
MJ Hughes Construction 4.000 $150.00 $600.00
M.A. DeAtley Construction, Inc. 4.000 $50.00 $200.00
Engineer's Estimate 4.000 EACH $450.00 $1,800.00
B1020 63502-0400 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 1
MJ Hughes Construction 5.000 $60.00 $300.00
Granite Construction Company 5.000 $35.00 $175.00
M.A. DeAtley Construction, Inc. 5.000 $35.00 $175.00
Engineer's Estimate 5.000 EACH $400.00 $2,000.00
B1040 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
MJ Hughes Construction 2.000 $100.00 $200.00
Granite Construction Company 2.000 $75.00 $150.00
M.A. DeAtley Construction, Inc. 2.000 $75.00 $150.00
Engineer's Estimate 2.000 EACH $1,000.00 $2,000.00
B1060 63502-1300 TEMPORARY
TRAFFIC CONTROL,
DRUM
Granite Construction Company 260.000 $15.00 $3,900.00
M.A. DeAtley Construction, Inc. 260.000 $15.00 $3,900.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B1060 63502-1300 TEMPORARY
TRAFFIC CONTROL,
DRUM
MJ Hughes Construction 260.000 $6.00 $1,560.00
Engineer's Estimate 260.000 EACH $100.00 $26,000.00
B1080 63502-2000 TEMPORARY
TRAFFIC CONTROL,
PORTABLE
CHANGEABLE
MESSAGE SIGN
MJ Hughes Construction 2.000 $15,000.00 $30,000.00
Granite Construction Company 2.000 $6,000.00 $12,000.00
M.A. DeAtley Construction, Inc. 2.000 $5,000.00 $10,000.00
Engineer's Estimate 2.000 EACH $20,000.00 $40,000.00
B1100 63503-0700 TEMPORARY
TRAFFIC CONTROL,
PAVEMENT
MARKINGS
MJ Hughes Construction 430.000 $2.50 $1,075.00
Granite Construction Company 430.000 $1.50 $645.00
M.A. DeAtley Construction, Inc. 430.000 $1.00 $430.00
Engineer's Estimate 430.000 LNFT $2.50 $1,075.00
B1120 63504-1000 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
MJ Hughes Construction 150.000 $35.00 $5,250.00
Granite Construction Company 150.000 $5.00 $750.00
M.A. DeAtley Construction, Inc. 150.000 $5.00 $750.00
Engineer's Estimate 150.000 SQFT $50.00 $7,500.00
B1140 63506-0500 TEMPORARY
TRAFFIC CONTROL,
FLAGGER
MJ Hughes Construction 3,100.000 $67.00 $207,700.00
M.A. DeAtley Construction, Inc. 3,100.000 $40.00 $124,000.00
Granite Construction Company 3,100.000 $38.00 $117,800.00
Engineer's Estimate 3,100.000 HOUR $65.00 $201,500.00
B1160 63506-0600 TEMPORARY
TRAFFIC CONTROL,
PILOT CAR
M.A. DeAtley Construction, Inc. 650.000 $75.00 $48,750.00
MJ Hughes Construction 650.000 $75.00 $48,750.00
Granite Construction Company 650.000 $55.00 $35,750.00
Engineer's Estimate 650.000 HOUR $100.00 $65,000.00
B1180 63507-0700 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC CONTROL
SUPERVISOR
MJ Hughes Construction 110.000 $980.00 $107,800.00
Granite Construction Company 110.000 $600.00 $66,000.00
M.A. DeAtley Construction, Inc. 110.000 $500.00 $55,000.00
Engineer's Estimate 110.000 DAY $1,000.00 $110,000.00
B1200 64603-0700 FIXTURE, PICNIC
TABLE
Granite Construction Company 2.000 $6,000.00 $12,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B1200 64603-0700 FIXTURE, PICNIC
TABLE
MJ Hughes Construction 2.000 $3,660.00 $7,320.00
M.A. DeAtley Construction, Inc. 2.000 $3,500.00 $7,000.00
Engineer's Estimate 2.000 EACH $5,000.00 $10,000.00
B1220 64603-1000 FIXTURE, VAULT
TOILET
Granite Construction Company 1.000 $225,000.00 $225,000.00
M.A. DeAtley Construction, Inc. 1.000 $150,000.00 $150,000.00
MJ Hughes Construction 1.000 $118,200.00 $118,200.00
Engineer's Estimate 1.000 EACH $100,000.00 $100,000.00
B1240 64603-1500 FIXTURE, SHELTER
(SHADE
STRUCTURE)
MJ Hughes Construction 1.000 $68,000.00 $68,000.00
M.A. DeAtley Construction, Inc. 1.000 $55,000.00 $55,000.00
Granite Construction Company 1.000 $50,000.00 $50,000.00
Engineer's Estimate 1.000 EACH $40,000.00 $40,000.00
B1260 64620-0600 REMOVE AND
RESET TRASH
RECEPTACLE
(ASSEMBLY)
Granite Construction Company 1.000 $1,000.00 $1,000.00
M.A. DeAtley Construction, Inc. 1.000 $1,000.00 $1,000.00
MJ Hughes Construction 1.000 $500.00 $500.00
Engineer's Estimate 1.000 EACH $3,000.00 $3,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Byway - Swan Falls Road
Division: Western Federal Lands
Schedule: C Schedule Type: Base Lead Designer: Misbah Afshari Solicitation No. : 69056726R000010 Opened at: WFLHD Vancouver, WA
Opened by: Rebekah Webb
State: ID County: Ada Federal Land: Morley Nelson Snake
River Birds of Prey Bid Open Date and Time: 10/20/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662
$6,314,349.00
M.A. DeAtley Construction, Inc., 829 Evans Rd., Clarkston, WA, 99403
$5,359,950.55
Granite Construction Company, 16821 SW McGillivray Blvd Suite 210B, Vancouver, WA, 98683
$5,274,942.80
Engineer's Estimate $6,366,051.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Project No. : ID FLAP ADA 2019(1) Project Name: Western Heritage Byway - Swan Falls Road
Schedule: C Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
C0020 15101-0000 MOBILIZATION MJ Hughes Construction $650,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
MARINO
CHEA
Digitally signed by
MARINO CHEA
Date: 2026.10.21 07:00:00 -07'00'
C0020 15101-0000 MOBILIZATION M.A. DeAtley Construction, Inc. $625,000.00
Granite Construction Company $527,000.00
Engineer's Estimate ALL LPSM LPSM $540,000.00
C0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Granite Construction Company $175,000.00
M.A. DeAtley Construction, Inc. $120,000.00
MJ Hughes Construction $114,000.00
Engineer's Estimate ALL LPSM LPSM $135,000.00
C0060 15301-0000 CONTRACTOR
QUALITY CONTROL
MJ Hughes Construction $410,000.00
Granite Construction Company $250,000.00
M.A. DeAtley Construction, Inc. $240,000.00
Engineer's Estimate ALL LPSM LPSM $135,000.00
C0080 15401-0000 CONTRACTOR
TESTING
MJ Hughes Construction $175,000.00
M.A. DeAtley Construction, Inc. $160,000.00
Granite Construction Company $150,000.00
Engineer's Estimate ALL LPSM LPSM $135,000.00
C0100 15501-0000 CONSTRUCTION
SCHEDULE
Granite Construction Company $55,000.00
MJ Hughes Construction $27,000.00
M.A. DeAtley Construction, Inc. $5,000.00
Engineer's Estimate ALL LPSM LPSM $27,000.00
C0120 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Granite Construction Company 17,500.000 $4.00 $70,000.00
M.A. DeAtley Construction, Inc. 17,500.000 $4.00 $70,000.00
MJ Hughes Construction 17,500.000 $3.50 $61,250.00
Engineer's Estimate 17,500.000 LNFT $6.00 $105,000.00
C0140 15802-0000 WATERING FOR
DUST CONTROL
MJ Hughes Construction $125,000.00
Granite Construction Company $100,000.00
M.A. DeAtley Construction, Inc. $20,000.00
Engineer's Estimate ALL LPSM LPSM $50,000.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0160 20101-0000 CLEARING AND
GRUBBING
MJ Hughes Construction 13.000 $15,000.00 $195,000.00
M.A. DeAtley Construction, Inc. 13.000 $3,500.00 $45,500.00
Granite Construction Company 13.000 $2,500.00 $32,500.00
Engineer's Estimate 13.000 ACRE $12,000.00 $156,000.00
C0180 20301-0600 REMOVAL OF
CATTLE GUARD
Granite Construction Company 1.000 $10,000.00 $10,000.00
MJ Hughes Construction 1.000 $6,000.00 $6,000.00
M.A. DeAtley Construction, Inc. 1.000 $1,800.00 $1,800.00
Engineer's Estimate 1.000 EACH $6,500.00 $6,500.00 C0200 20301-1100 REMOVAL OF GATE Granite Construction
Company 1.000 $1,500.00 $1,500.00
M.A. DeAtley Construction, Inc. 1.000 $300.00 $300.00
MJ Hughes Construction 1.000 $270.00 $270.00
Engineer's Estimate 1.000 EACH $650.00 $650.00
C0220 20301-2100 REMOVAL OF
RESTROOM
FACILITY
Granite Construction Company 2.000 $10,000.00 $20,000.00
M.A. DeAtley Construction, Inc. 2.000 $9,000.00 $18,000.00
MJ Hughes Construction 2.000 $7,000.00 $14,000.00
Engineer's Estimate 2.000 EACH $40,000.00 $80,000.00 C0240 20301-2400 REMOVAL OF SIGN Granite Construction
Company 4.000 $500.00 $2,000.00
M.A. DeAtley Construction, Inc. 4.000 $150.00 $600.00
MJ Hughes Construction 4.000 $100.00 $400.00
Engineer's Estimate 4.000 EACH $250.00 $1,000.00
C0260 20301-3300 REMOVAL OF
VAULT (CONCRETE
TANK)
Granite Construction Company 4.000 $5,000.00 $20,000.00
MJ Hughes Construction 4.000 $3,000.00 $12,000.00
M.A. DeAtley Construction, Inc. 4.000 $1,600.00 $6,400.00
Engineer's Estimate 4.000 EACH $5,000.00 $20,000.00
C0280 20302-0700 REMOVAL OF
FENCE
MJ Hughes Construction 55.000 $15.00 $825.00
M.A. DeAtley Construction, Inc. 55.000 $10.00 $550.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0280 20302-0700 REMOVAL OF
FENCE
Granite Construction Company 55.000 $4.00 $220.00
Engineer's Estimate 55.000 LNFT $10.00 $550.00
C0300 20315-0000 SAWCUTTING
PAVEMENT
MJ Hughes Construction 49,000.000 $2.00 $98,000.00
M.A. DeAtley Construction, Inc. 49,000.000 $0.80 $39,200.00
Granite Construction Company 49,000.000 $0.50 $24,500.00
Engineer's Estimate 49,000.000 LNFT $4.00 $196,000.00
C0320 20401-0000 ROADWAY
EXCAVATION
M.A. DeAtley Construction, Inc. 18,400.000 $42.00 $772,800.00
MJ Hughes Construction 18,400.000 $40.00 $736,000.00
Granite Construction Company 18,400.000 $30.00 $552,000.00
Engineer's Estimate 18,400.000 CUYD $30.00 $552,000.00 C0340 20421-0000 ROCK EXCAVATION MJ Hughes
Construction 420.000 $155.00 $65,100.00
M.A. DeAtley Construction, Inc. 420.000 $85.00 $35,700.00
Granite Construction Company 420.000 $50.00 $21,000.00
Engineer's Estimate 420.000 CUYD $200.00 $84,000.00
C0360 20425-1000 DITCH,
EXCAVATION
(REGRADING)
MJ Hughes Construction 90.000 $95.00 $8,550.00
M.A. DeAtley Construction, Inc. 90.000 $32.00 $2,880.00
Granite Construction Company 90.000 $10.00 $900.00
Engineer's Estimate 90.000 LNFT $25.00 $2,250.00
C0380 20471-0000 REMOVE AND
RESET BOULDER
M.A. DeAtley Construction, Inc. 35.000 $175.00 $6,125.00
Granite Construction Company 35.000 $100.00 $3,500.00
MJ Hughes Construction 35.000 $100.00 $3,500.00
Engineer's Estimate 35.000 EACH $200.00 $7,000.00
C0400 25101-0200 PLACED RIPRAP,
CLASS 2
M.A. DeAtley Construction, Inc. 5.000 $500.00 $2,500.00
MJ Hughes Construction 5.000 $320.00 $1,600.00
Granite Construction Company 5.000 $250.00 $1,250.00
Engineer's Estimate 5.000 CUYD $500.00 $2,500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0420 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
MJ Hughes Construction 24,000.000 $50.00 $1,200,000.00
M.A. DeAtley Construction, Inc. 24,000.000 $48.00 $1,152,000.00
Granite Construction Company 24,000.000 $35.00 $840,000.00
Engineer's Estimate 24,000.000 TON $50.00 $1,200,000.00
C0440 30202-2100 ROADWAY
AGGREGATE,
METHOD 2,
SURFACE COURSE
(6-INCH DEPTH)
M.A. DeAtley Construction, Inc. 650.000 $72.00 $46,800.00
Granite Construction Company 650.000 $65.00 $42,250.00
MJ Hughes Construction 650.000 $50.00 $32,500.00
Engineer's Estimate 650.000 TON $150.00 $97,500.00
C0460 40301-0000 ASPHALT
CONCRETE
PAVEMENT
Granite Construction Company 6,500.000 $150.00 $975,000.00
MJ Hughes Construction 6,500.000 $135.00 $877,500.00
M.A. DeAtley Construction, Inc. 6,500.000 $113.00 $734,500.00
Engineer's Estimate 6,500.000 TON $180.00 $1,170,000.00 C0480 41201-0000 TACK COAT M.A. DeAtley
Construction, Inc. 5.000 $4,650.00 $23,250.00
MJ Hughes Construction 5.000 $3,790.00 $18,950.00
Granite Construction Company 5.000 $2,000.00 $10,000.00
Engineer's Estimate 5.000 TON $3,000.00 $15,000.00
C0500 41301-1000 ASPHALT
PAVEMENT
MILLING, 4-INCH
DEPTH
MJ Hughes Construction 6,800.000 $15.00 $102,000.00
M.A. DeAtley Construction, Inc. 6,800.000 $14.00 $95,200.00
Granite Construction Company 6,800.000 $9.00 $61,200.00
Engineer's Estimate 6,800.000 SQYD $10.00 $68,000.00
C0520 41402-2000 CRACKS, CLEANING
AND SEALING (AND
FILLING)
M.A. DeAtley Construction, Inc. 4.900 $14,260.00 $69,874.00
MJ Hughes Construction 4.900 $13,000.00 $63,700.00
Granite Construction Company 4.900 $10,000.00 $49,000.00
Engineer's Estimate 4.900 MILE $13,000.00 $63,700.00
C0540 50101-2600 MINOR CONCRETE
PAVEMENT, PLAIN,
6-INCH DEPTH
MJ Hughes Construction 70.000 $210.00 $14,700.00
Granite Construction Company 70.000 $180.00 $12,600.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0540 50101-2600 MINOR CONCRETE
PAVEMENT, PLAIN,
6-INCH DEPTH
M.A. DeAtley Construction, Inc. 70.000 $180.00 $12,600.00
Engineer's Estimate 70.000 SQYD $300.00 $21,000.00
C0560 60201-0400 12-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 50.000 $225.00 $11,250.00
MJ Hughes Construction 50.000 $225.00 $11,250.00
Granite Construction Company 50.000 $175.00 $8,750.00
Engineer's Estimate 50.000 LNFT $200.00 $10,000.00
C0580 60201-0600 18-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 210.000 $245.00 $51,450.00
Granite Construction Company 210.000 $200.00 $42,000.00
MJ Hughes Construction 210.000 $120.00 $25,200.00
Engineer's Estimate 210.000 LNFT $220.00 $46,200.00
C0600 60201-0800 24-INCH PIPE
CULVERT
M.A. DeAtley Construction, Inc. 370.000 $280.00 $103,600.00
Granite Construction Company 370.000 $250.00 $92,500.00
MJ Hughes Construction 370.000 $138.00 $51,060.00
Engineer's Estimate 370.000 LNFT $230.00 $85,100.00
C0620 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
MJ Hughes Construction 3.000 $9,800.00 $29,400.00
M.A. DeAtley Construction, Inc. 3.000 $6,000.00 $18,000.00
Granite Construction Company 3.000 $5,000.00 $15,000.00
Engineer's Estimate 3.000 EACH $2,500.00 $7,500.00
C0640 60704-0000 CLEANING
CULVERT IN PLACE
MJ Hughes Construction 2.000 $3,590.00 $7,180.00
Granite Construction Company 2.000 $2,000.00 $4,000.00
M.A. DeAtley Construction, Inc. 2.000 $2,000.00 $4,000.00
Engineer's Estimate 2.000 EACH $2,000.00 $4,000.00
C0660 60915-1000 WHEELSTOP,
CONCRETE
M.A. DeAtley Construction, Inc. 2.000 $500.00 $1,000.00
MJ Hughes Construction 2.000 $300.00 $600.00
Granite Construction Company 2.000 $200.00 $400.00
Engineer's Estimate 2.000 EACH $250.00 $500.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0680 61001-0100 SIDEWALK,
CONCRETE (6-INCH
DEPTH)
MJ Hughes Construction 240.000 $160.00 $38,400.00
M.A. DeAtley Construction, Inc. 240.000 $120.00 $28,800.00
Granite Construction Company 240.000 $100.00 $24,000.00
Engineer's Estimate 240.000 SQYD $200.00 $48,000.00
C0700 61401-0000 FLOWABLE
BACKFILL
Granite Construction Company 13.000 $500.00 $6,500.00
M.A. DeAtley Construction, Inc. 13.000 $500.00 $6,500.00
MJ Hughes Construction 13.000 $240.00 $3,120.00
Engineer's Estimate 13.000 CUYD $550.00 $7,150.00
C0720 61903-1100 CATTLE GUARD, 32
FEET
Granite Construction Company 1.000 $60,000.00 $60,000.00
M.A. DeAtley Construction, Inc. 1.000 $45,000.00 $45,000.00
MJ Hughes Construction 1.000 $37,600.00 $37,600.00
Engineer's Estimate 1.000 EACH $60,000.00 $60,000.00
C0740 61921-1000 REMOVE AND
RESET FENCE
MJ Hughes Construction 30.000 $100.00 $3,000.00
Granite Construction Company 30.000 $35.00 $1,050.00
M.A. DeAtley Construction, Inc. 30.000 $20.00 $600.00
Engineer's Estimate 30.000 LNFT $55.00 $1,650.00
C0760 62201-0300 DUMP TRUCK, 12
CUBIC YARD
MINIMUM
CAPACITY
Granite Construction Company 40.000 $200.00 $8,000.00
M.A. DeAtley Construction, Inc. 40.000 $185.00 $7,400.00
MJ Hughes Construction 40.000 $160.00 $6,400.00
Engineer's Estimate 40.000 HOUR $200.00 $8,000.00
C0780 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
Granite Construction Company 40.000 $200.00 $8,000.00
MJ Hughes Construction 40.000 $200.00 $8,000.00
M.A. DeAtley Construction, Inc. 40.000 $185.00 $7,400.00
Engineer's Estimate 40.000 HOUR $190.00 $7,600.00 C0800 62301-0000 GENERAL LABOR Granite Construction
Company 40.000 $100.00 $4,000.00
MJ Hughes Construction 40.000 $80.00 $3,200.00
Report Generated on 10/20/2026 8:43 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0800 62301-0000 GENERAL LABOR M.A. DeAtley Construction, Inc. 40.000 $65.00 $2,600.00
Engineer's Estimate 40.000 HOUR $110.00 $4,400.00
C0820 62302-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
MJ Hughes Construction 350.000 $165.00 $57,750.00
Granite Construction Company 350.000 $100.00 $35,000.00
M.A. DeAtley Construction, Inc. 350.000 $70.00 $24,500.00
Engineer's Estimate 350.000 HOUR $190.00 $66,500.00
C0840 62402-0300 PROVIDING AND
PLACING TOPSOIL,
4-INCH DEPTH
Granite Construction Company 9.000 $30,000.00 $270,000.00
MJ Hughes Construction 9.000 $27,500.00 $247,500.00
M.A. DeAtley Construction, Inc. 9.000 $15,000.00 $135,000.00
Engineer's Estimate 9.000 ACRE $18,000.00 $162,000.00
C0860 62501-0000 TURF
ESTABLISHMENT
MJ Hughes Construction 10.000 $4,320.00 $43,200.00
M.A. DeAtley Construction, Inc. 10.000 $3,600.00 $36,000.00
Granite Construction Company 10.000 $2,700.00 $27,000.00
Engineer's Estimate 10.000 ACRE $4,000.00 $40,000.00 C0880 63302-0000 SIGN SYSTEM M.A. DeAtley
Construction, Inc. 235.000 $81.25 $19,093.75
Granite Construction Company 235.000 $80.00 $18,800.00