PROJECT DESCRIPTION_WY NP GRTE 13(1).pdf
PDF 139 KB Posted
- Solicitation number
- 69056726R000006
About this file
This document is a Base Schedule for a federal solicitation to repair North Park Road at Milepost 15.8 in Grand Teton National Park, Teton County, Wyoming. The project will be advertised under the Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract, with an anticipated solicitation date in Spring 2026 and a tentative fixed completion date in Fall 2026. The estimated price range is $700,000 to $2,000,000, and the project is located 15 miles north of Jackson, Wyoming.
The work scope includes asphalt surface repair, deep patch, roadway excavation, geotechnical stabilization, and underdrain system installation over 0.2 miles. Key project elements involve construction survey, quality control, soil erosion control, earthwork, aggregate base courses, asphalt pavement, and traffic control. Specific tasks include roadway excavation (1,380 cubic yards), select borrow (800 cubic yards), stabilization geotextile (2,800 square yards), roadway aggregate (580 tons), asphalt concrete pavement (260 tons), and comprehensive temporary and permanent traffic control measures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8
Grand Teton National Park
Teton County, Wyoming
This solicitation will be advertised against the Yellowstone, Grand Teton, and
Surrounding Area Multiple Award Task Order Contract.
The work consists of asphalt surface repair, deep patch, roadway excavation, geotechnical stabilization, and underdrain system.
Project length: 0.2 miles
Tentative Fixed Completion Date: Fall 2026
(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.)
Anticipated Solicitation Date: Spring 2026
Estimated Price Range: $700,000 to $2,000,000
Location: 15 miles N of Jackson, WY
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-24
B as e S ch ed u le
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control (erosion control devices)
SOIL EROSION CONTROL, FIBER ROLL 840 LNFT
DIVISION 200 – Earthwork
201 Clearing & Grubbing 0.5 ACRE
203 Removal of Structures & Obstructions (structures, demolition)
REMOVAL OF PIPE CULVERT 1 EACH
B as e S ch ed u le
204 Excavation & Embankment Roadway Excavation Select Borrow
1,380 CUYD
800 CUYD
207 Earthwork Geosynthetics Stabilization Geotextile 2,800 SQYD
DIVISION 300 – Aggregate and Base Courses
302 Crushed Aggregate Roadway Aggregate, Method 2
580 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete Pavement, Type 1 260 TON
DIVISION 600 – Incidental Construction
622 Rental Equipment (yes/no) YES
623 General Labor (yes/no) YES
633 Permanent Traffic Control (traffic control devices)
REMOVE AND RESET SIGN SYSTEM
REMOVE AND RESET DELINEATOR
2 EACH
2 EACH
634 Permanent Pavement Markings (traffic pavement markings) Pavement Markings, Type B, Solid
3,200 LNFT
635 Temporary Traffic Control
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR
LPSM
50 EACH
50 EACH
850LNFT
90SQFT
700 HOUR
60 DAY