Bid Tabulation Report Summary
This is a Bid Tabulation Report for the Little Pend Oreille National Wildlife Refuge Culvert Improvements project (Project No. WA FWS LPO MULTI(1), Solicitation No. 69056726B000007). The project involves construction of culvert improvements and stream restoration work at a federal wildlife refuge in Pend Oreille County, Washington, managed by the Western Federal Lands Highway Division. Bids were opened on October 20, 2026, and the report presents pricing across three base schedule options with varying scope. Five contractors submitted bids: Central Southern Construction Corp. (Jacksonville, FL), Conway Construction Co. (Vancouver, WA), Cascade Civil Corp (Redmond, OR), BRUMFIELD CONSTRUCTION, INC. (Aberdeen, WA), and Versatile Industries, Inc. (Cusick, WA). For Schedule A (base scope), bids ranged from $1,845,211.10 to $4,660,016.00 against an engineer's estimate of $1,628,000.00; Schedule B ranged from $2,449,931.00 to $6,317,876.00 against an estimate of $2,327,000.00; Schedule C ranged from $2,888,693.80 to $7,265,026.00 against an estimate of $2,589,000.00.
The scope encompasses mobilization, surveying, quality control, testing, erosion control, roadway excavation, placement of riprap and aggregate, precast reinforced concrete box culverts (multiple sizes), structural plate pipe-arch culverts, removal and reset of gates, equipment rentals, turf establishment, willow pole cuttings, erosion control fabric installation, temporary traffic control, signage, and mitigation measures including rock weirs, log barriers, root wads, fish passage boulders, streambed material placement, and channel realignment. Line item pricing details show individual cost breakdowns for each contractor across all pay items. The report was generated October 22, 2026, by Haydar Mohammad and includes certification language for bid tabulation accuracy, though signature and award information fields remain incomplete in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : WA FWS LPO MULTI(1) Project Name: Little Pend Oreille NWR Culvert Improvements
Contractor Responsive? Base Schedule A Central Southern Construction Corp. $4,660,016.00
Conway Construction Co $3,539,975.00 Cascade Civil Corp $2,870,330.00
BRUMFIELD CONSTRUCTION, INC. $2,474,326.00
Versatile Industries, Inc. $1,845,211.10 Engineer's Estimate $1,628,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Haydar Mohammad
Contractor Responsive? Base Schedule B Central Southern Construction Corp. $6,317,876.00
Conway Construction Co $5,336,497.00 Cascade Civil Corp $3,922,350.00
BRUMFIELD CONSTRUCTION, INC. $3,264,444.00
Versatile Industries, Inc. $2,449,931.00 Engineer's Estimate $2,327,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Contractor Responsive? Base Schedule C Central Southern Construction Corp. $7,265,026.00
Conway Construction Co $5,957,340.00 Cascade Civil Corp $4,478,360.00
BRUMFIELD CONSTRUCTION, INC. $3,772,716.00
Versatile Industries, Inc. $2,888,693.80 Engineer's Estimate $2,589,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : WA FWS LPO MULTI (1)
Project Name: Little Pend Oreille NWR Culvert Improvements
Division: Western Federal Lands
Schedule: A Schedule Type: Base Lead Designer: Emily King Solicitation No. : 69056726B000007 Opened at: WFLHD Opened by: Marino Chea State: WA County: Pend Oreille Federal Land: Little Pend Oreille
National Wildlife Refuge
Bid Open Date and Time: 10/20/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$4,660,016.00
Conway Construction Co, 6620 NW Whitney Rd. Suite 100, Vancouver, WA, 98665
$3,539,975.00
Cascade Civil Corp, 255 SE Black Butte Blvd., Redmond, OR, 97756
$2,870,330.00
BRUMFIELD CONSTRUCTION,
INC.,
2007 westport rd, Aberdeen, WA, 98520
$2,474,326.00
Versatile Industries, Inc., 390351 Highway 20, Cusick, WA, 99119
$1,845,211.10
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Engineer's Estimate $1,628,000.00
Project No. : WA FWS LPO MULTI(1) Project Name: Little Pend Oreille NWR Culvert Improvements
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION Central Southern Construction Corp. $575,000.00
Conway Construction Co $402,950.00
Cascade Civil Corp $287,000.00
BRUMFIELD
CONSTRUCTION, INC. $244,960.00
Versatile Industries, Inc. $162,341.00
Engineer's Estimate ALL LPSM LPSM $157,210.00
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Cascade Civil Corp $190,000.00 Central Southern Construction Corp. $175,000.00
Conway Construction Co $40,000.00
BRUMFIELD
CONSTRUCTION, INC. $16,260.00
Versatile Industries, Inc. $13,627.00
Engineer's Estimate ALL LPSM LPSM $41,000.00
A0060 15301-0000 CONTRACTOR
QUALITY CONTROL
Central Southern Construction Corp. $175,000.00
Cascade Civil Corp $153,000.00
BRUMFIELD
CONSTRUCTION, INC. $135,490.00
Conway Construction Co $25,000.00
Versatile Industries, Inc. $23,053.00
Engineer's Estimate ALL LPSM LPSM $27,000.00
A0080 15401-0000 CONTRACTOR
TESTING
Central Southern Construction Corp. $125,000.00
Cascade Civil Corp $71,000.00 Conway Construction Co $65,000.00
BRUMFIELD
CONSTRUCTION, INC. $27,100.00
Versatile Industries, Inc. $11,130.00
Engineer's Estimate ALL LPSM LPSM $27,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0100 15501-0000 CONSTRUCTION
SCHEDULE
Conway Construction Co $25,000.00
Central Southern Construction Corp. $19,200.00
BRUMFIELD
CONSTRUCTION, INC. $12,200.00
Cascade Civil Corp $5,000.00 Versatile Industries, Inc. $3,185.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
A0120 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION
Conway Construction Co $400,000.00
Central Southern Construction Corp. $266,000.00
Cascade Civil Corp $200,000.00
BRUMFIELD
CONSTRUCTION, INC. $138,650.00
Versatile Industries, Inc. $92,338.00
Engineer's Estimate ALL LPSM LPSM $100,000.00
A0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Cascade Civil Corp 1,300.000 $13.00 $16,900.00 Central Southern Construction Corp. 1,300.000 $12.00 $15,600.00
BRUMFIELD
CONSTRUCTION, INC. 1,300.000 $7.00 $9,100.00
Versatile Industries, Inc. 1,300.000 $6.50 $8,450.00
Conway Construction Co 1,300.000 $6.00 $7,800.00
Engineer's Estimate 1,300.000 LNFT $6.50 $8,450.00
A0160 15802-0000 WATERING FOR
DUST CONTROL
Cascade Civil Corp $150,000.00 Central Southern Construction Corp. $78,800.00
Conway Construction Co $45,000.00
Versatile Industries, Inc. $37,272.00
BRUMFIELD
CONSTRUCTION, INC. $17,610.00
Engineer's Estimate ALL LPSM LPSM $4,000.00
A0180 20101-0000 CLEARING AND
GRUBBING
Cascade Civil Corp 1.100 $55,000.00 $60,500.00 Conway Construction Co 1.100 $50,000.00 $55,000.00
Central Southern Construction Corp. 1.100 $42,400.00 $46,640.00
BRUMFIELD
CONSTRUCTION, INC. 1.100 $21,060.00 $23,166.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0180 20101-0000 CLEARING AND
GRUBBING
Versatile Industries, Inc. 1.100 $9,183.00 $10,101.30
Engineer's Estimate 1.100 ACRE $30,000.00 $33,000.00
A0200 20301-0600 REMOVAL OF
CATTLE GUARD
Cascade Civil Corp 2.000 $3,000.00 $6,000.00 Central Southern Construction Corp. 2.000 $3,000.00 $6,000.00
Versatile Industries, Inc. 2.000 $2,525.00 $5,050.00
BRUMFIELD
CONSTRUCTION, INC. 2.000 $1,600.00 $3,200.00
Conway Construction Co 2.000 $1,500.00 $3,000.00
Engineer's Estimate 2.000 EACH $3,900.00 $7,800.00
A0220 20401-0000 ROADWAY
EXCAVATION
Central Southern Construction Corp. 500.000 $700.00 $350,000.00
Conway Construction Co 500.000 $85.00 $42,500.00
Cascade Civil Corp 500.000 $35.00 $17,500.00
BRUMFIELD
CONSTRUCTION, INC. 500.000 $15.00 $7,500.00
Versatile Industries, Inc. 500.000 $14.20 $7,100.00
Engineer's Estimate 500.000 CUYD $70.00 $35,000.00
A0240 25101-0300 PLACED RIPRAP,
METHOD A, CLASS
Cascade Civil Corp 600.000 $280.00 $168,000.00 Central Southern Construction Corp. 600.000 $250.00 $150,000.00
Conway Construction Co 600.000 $180.00 $108,000.00
Versatile Industries, Inc. 600.000 $144.00 $86,400.00
BRUMFIELD
CONSTRUCTION, INC. 600.000 $125.00 $75,000.00
Engineer's Estimate 600.000 CUYD $211.00 $126,600.00
A0260 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
Cascade Civil Corp 600.000 $190.00 $114,000.00 Central Southern Construction Corp. 600.000 $150.00 $90,000.00
Conway Construction Co 600.000 $125.00 $75,000.00
Versatile Industries, Inc. 600.000 $102.50 $61,500.00
BRUMFIELD
CONSTRUCTION, INC. 600.000 $85.00 $51,000.00
Engineer's Estimate 600.000 CUYD $110.00 $66,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0280 60220-0000 PRECAST
REINFORCED
CONCRETE BOX
CULVERT (18 FEET
SPAN, 9 FEET RISE,
SINGLE BARREL)
Conway Construction Co 22.000 $19,500.00 $429,000.00
Central Southern Construction Corp. 22.000 $17,500.00 $385,000.00
BRUMFIELD
CONSTRUCTION, INC. 22.000 $15,760.00 $346,720.00
Cascade Civil Corp 22.000 $12,800.00 $281,600.00 Versatile Industries, Inc. 22.000 $11,308.00 $248,776.00
Engineer's Estimate 22.000 LNFT $5,900.00 $129,800.00
A0300 60220-0000 PRECAST
REINFORCED
CONCRETE BOX
CULVERT (20 FEET
SPAN, 9 FEET RISE,
SINGLE BARREL)
Central Southern Construction Corp. 65.000 $19,500.00 $1,267,500.00
Conway Construction Co 65.000 $17,500.00 $1,137,500.00
BRUMFIELD
CONSTRUCTION, INC. 65.000 $12,360.00 $803,400.00
Versatile Industries, Inc. 65.000 $9,591.00 $623,415.00
Cascade Civil Corp 65.000 $9,500.00 $617,500.00 Engineer's Estimate 65.000 LNFT $5,800.00 $377,000.00
A0320 60220-3700 11 FEET SPAN, 9
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Conway Construction Co 22.000 $17,500.00 $385,000.00
BRUMFIELD
CONSTRUCTION, INC. 22.000 $14,570.00 $320,540.00
Central Southern Construction Corp. 22.000 $13,000.00 $286,000.00
Versatile Industries, Inc. 22.000 $9,969.00 $219,318.00
Cascade Civil Corp 22.000 $9,300.00 $204,600.00 Engineer's Estimate 22.000 LNFT $4,600.00 $101,200.00
A0340 61920-2000 REMOVE AND
RESET GATE
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Conway Construction Co 1.000 $5,000.00 $5,000.00
Versatile Industries, Inc. 1.000 $4,113.00 $4,113.00
Cascade Civil Corp 1.000 $3,200.00 $3,200.00
BRUMFIELD
CONSTRUCTION, INC. 1.000 $2,140.00 $2,140.00
Engineer's Estimate 1.000 EACH $2,000.00 $2,000.00
A0360 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
BRUMFIELD
CONSTRUCTION, INC. 30.000 $230.00 $6,900.00
Versatile Industries, Inc. 30.000 $196.00 $5,880.00
Cascade Civil Corp 30.000 $190.00 $5,700.00 Conway Construction Co 30.000 $175.00 $5,250.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0360 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
Central Southern Construction Corp. 30.000 $150.00 $4,500.00
Engineer's Estimate 30.000 HOUR $200.00 $6,000.00
A0380 62201-2800 MOTOR GRADER, 8
FOOT MINIMUM
BLADE
Cascade Civil Corp 10.000 $400.00 $4,000.00
BRUMFIELD
CONSTRUCTION, INC. 10.000 $240.00 $2,400.00
Versatile Industries, Inc. 10.000 $227.50 $2,275.00
Central Southern Construction Corp. 10.000 $204.00 $2,040.00
Conway Construction Co 10.000 $170.00 $1,700.00
Engineer's Estimate 10.000 HOUR $220.00 $2,200.00
A0400 62201-3400 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
Versatile Industries, Inc. 20.000 $283.00 $5,660.00
Central Southern Construction Corp. 20.000 $252.00 $5,040.00
BRUMFIELD
CONSTRUCTION, INC. 20.000 $240.00 $4,800.00
Cascade Civil Corp 20.000 $220.00 $4,400.00 Conway Construction Co 20.000 $150.00 $3,000.00
Engineer's Estimate 20.000 HOUR $310.00 $6,200.00 A0420 62201-3750 CHAIN SAW Cascade Civil Corp 20.000 $135.00 $2,700.00
BRUMFIELD
CONSTRUCTION, INC. 20.000 $125.00 $2,500.00
Versatile Industries, Inc. 20.000 $99.80 $1,996.00
Conway Construction Co 20.000 $95.00 $1,900.00
Central Southern Construction Corp. 20.000 $90.00 $1,800.00
Engineer's Estimate 20.000 HOUR $90.00 $1,800.00
A0440 62301-0000 GENERAL LABOR BRUMFIELD
CONSTRUCTION, INC. 24.000 $115.00 $2,760.00
Cascade Civil Corp 24.000 $115.00 $2,760.00 Versatile Industries, Inc. 24.000 $90.20 $2,164.80
Conway Construction Co 24.000 $85.00 $2,040.00
Central Southern Construction Corp. 24.000 $84.00 $2,016.00
Engineer's Estimate 24.000 HOUR $90.00 $2,160.00
A0460 62502-0000 TURF
ESTABLISHMENT
Central Southern Construction Corp. 4,200.000 $10.00 $42,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0460 62502-0000 TURF
ESTABLISHMENT
Versatile Industries, Inc. 4,200.000 $4.70 $19,740.00
Conway Construction Co 4,200.000 $4.50 $18,900.00
BRUMFIELD
CONSTRUCTION, INC. 4,200.000 $3.00 $12,600.00
Cascade Civil Corp 4,200.000 $3.00 $12,600.00 Engineer's Estimate 4,200.000 SQYD $2.00 $8,400.00
A0500 62635-3000 CUTTINGS,
WILLOW POLE
(AND BLACK
COTTONWOOD
POLE)
Central Southern Construction Corp. 790.000 $70.00 $55,300.00
Conway Construction Co 790.000 $30.00 $23,700.00
BRUMFIELD
CONSTRUCTION, INC. 790.000 $18.00 $14,220.00
Cascade Civil Corp 790.000 $18.00 $14,220.00 Versatile Industries, Inc. 790.000 $8.00 $6,320.00
Engineer's Estimate 790.000 EACH $35.00 $27,650.00
A0520 62901-0000 ROLLED EROSION
CONTROL
PRODUCT (WOVEN
COIR FABRIC)
Central Southern Construction Corp. 1,310.000 $18.00 $23,580.00
Cascade Civil Corp 1,310.000 $15.00 $19,650.00 Conway Construction Co 1,310.000 $13.50 $17,685.00
BRUMFIELD
CONSTRUCTION, INC. 1,310.000 $11.00 $14,410.00
Versatile Industries, Inc. 1,310.000 $6.50 $8,515.00
Engineer's Estimate 1,310.000 SQYD $13.00 $17,030.00 A0540 63301-0000 SIGN SYSTEM Cascade Civil Corp 30.000 $700.00 $21,000.00
Versatile Industries, Inc. 30.000 $676.00 $20,280.00
Central Southern Construction Corp. 30.000 $600.00 $18,000.00
Conway Construction Co 30.000 $600.00 $18,000.00
BRUMFIELD
CONSTRUCTION, INC. 30.000 $530.00 $15,900.00
Engineer's Estimate 30.000 EACH $650.00 $19,500.00
A0560 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
Central Southern Construction Corp. 10.000 $1,500.00 $15,000.00
BRUMFIELD
CONSTRUCTION, INC. 10.000 $690.00 $6,900.00
Versatile Industries, Inc. 10.000 $405.00 $4,050.00
Conway Construction Co 10.000 $250.00 $2,500.00
Cascade Civil Corp 10.000 $200.00 $2,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0560 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
Engineer's Estimate 10.000 EACH $200.00 $2,000.00
A0580 63502-3900 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
Central Southern Construction Corp. 16.000 $780.00 $12,480.00
Versatile Industries, Inc. 16.000 $676.00 $10,816.00
Cascade Civil Corp 16.000 $550.00 $8,800.00
BRUMFIELD
CONSTRUCTION, INC. 16.000 $510.00 $8,160.00
Conway Construction Co 16.000 $250.00 $4,000.00
Engineer's Estimate 16.000 EACH $450.00 $7,200.00
A0600 63507-0700 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC CONTROL
SUPERVISOR
Conway Construction Co 100.000 $900.00 $90,000.00
Versatile Industries, Inc. 100.000 $896.00 $89,600.00
Central Southern Construction Corp. 100.000 $850.00 $85,000.00
Cascade Civil Corp 100.000 $750.00 $75,000.00
BRUMFIELD
CONSTRUCTION, INC. 100.000 $340.00 $34,000.00
Engineer's Estimate 100.000 DAY $1,100.00 $110,000.00
A0620 64703-3010 MITIGATION, ROCK
WEIR
Central Southern Construction Corp. 4.000 $4,800.00 $19,200.00
Conway Construction Co 4.000 $3,500.00 $14,000.00
BRUMFIELD
CONSTRUCTION, INC. 4.000 $2,520.00 $10,080.00
Cascade Civil Corp 4.000 $1,700.00 $6,800.00 Versatile Industries, Inc. 4.000 $261.50 $1,046.00
Engineer's Estimate 4.000 EACH $1,400.00 $5,600.00
A0640 64703-4000 MITIGATION, LOG
BARRIER
Central Southern Construction Corp. 3.000 $9,600.00 $28,800.00
BRUMFIELD
CONSTRUCTION, INC. 3.000 $3,790.00 $11,370.00
Conway Construction Co 3.000 $3,000.00 $9,000.00
Cascade Civil Corp 3.000 $1,700.00 $5,100.00 Versatile Industries, Inc. 3.000 $998.50 $2,995.50
Engineer's Estimate 3.000 EACH $4,000.00 $12,000.00
A0660 64703-5000 MITIGATION, ROOT
WAD
Central Southern Construction Corp. 7.000 $8,400.00 $58,800.00
BRUMFIELD
CONSTRUCTION, INC. 7.000 $2,120.00 $14,840.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0660 64703-5000 MITIGATION, ROOT
WAD
Conway Construction Co 7.000 $1,800.00 $12,600.00
Cascade Civil Corp 7.000 $1,500.00 $10,500.00 Versatile Industries, Inc. 7.000 $855.50 $5,988.50
Engineer's Estimate 7.000 EACH $4,000.00 $28,000.00
A0680 64703-6000 MITIGATION, FISH
PASSAGE BOULDER
Central Southern Construction Corp. 70.000 $720.00 $50,400.00
Cascade Civil Corp 70.000 $450.00 $31,500.00
BRUMFIELD
CONSTRUCTION, INC. 70.000 $190.00 $13,300.00
Versatile Industries, Inc. 70.000 $82.50 $5,775.00
Conway Construction Co 70.000 $60.00 $4,200.00
Engineer's Estimate 70.000 EACH $260.00 $18,200.00
A0700 64704-1000 MITIGATION,
STREAMBED
MATERIAL
Central Southern Construction Corp. 520.000 $316.00 $164,320.00
Cascade Civil Corp 520.000 $140.00 $72,800.00
BRUMFIELD
CONSTRUCTION, INC. 520.000 $120.00 $62,400.00
Conway Construction Co 520.000 $100.00 $52,000.00
Versatile Industries, Inc. 520.000 $62.00 $32,240.00
Engineer's Estimate 520.000 CUYD $175.00 $91,000.00
A0720 64704-1500 MITIGATION,
STREAMBED
CHANNEL
REALIGNMENT
Central Southern Construction Corp. 250.000 $204.00 $51,000.00
Cascade Civil Corp 250.000 $100.00 $25,000.00 Conway Construction Co 250.000 $35.00 $8,750.00
BRUMFIELD
CONSTRUCTION, INC. 250.000 $11.00 $2,750.00
Versatile Industries, Inc. 250.000 $10.80 $2,700.00
Engineer's Estimate 250.000 CUYD $40.00 $10,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
(1)
Project Name: Little Pend Oreille NWR Culvert Improvements
Division: Western Federal Lands
Schedule: B Schedule Type: Base Lead Designer: Emily King Solicitation No. : 69056726B000007 Opened at: WFLHD Opened by: Marino Chea State: WA County: Pend Oreille Federal Land: Little Pend Oreille
National Wildlife Refuge
Bid Open Date and Time: 10/20/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$6,317,876.00
Conway Construction Co, 6620 NW Whitney Rd. Suite 100, Vancouver, WA, 98665
$5,336,497.00
Cascade Civil Corp, 255 SE Black Butte Blvd., Redmond, OR, 97756
$3,922,350.00
BRUMFIELD CONSTRUCTION,
INC.,
2007 westport rd, Aberdeen, WA, 98520
$3,264,444.00
Versatile Industries, Inc., 390351 Highway 20, Cusick, WA, 99119
$2,449,931.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Engineer's Estimate $2,327,000.00
Project No. : WA FWS LPO MULTI(1) Project Name: Little Pend Oreille NWR Culvert Improvements
Schedule: B Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION Conway Construction Co $891,837.00
Central Southern Construction Corp. $575,000.00
Cascade Civil Corp $392,000.00
BRUMFIELD
CONSTRUCTION, INC. $323,180.00
Versatile Industries, Inc. $203,465.00
Engineer's Estimate ALL LPSM LPSM $197,830.00
B0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Cascade Civil Corp $200,000.00 Central Southern Construction Corp. $175,000.00
Conway Construction Co $50,000.00
BRUMFIELD
CONSTRUCTION, INC. $20,010.00
Versatile Industries, Inc. $17,034.00
Engineer's Estimate ALL LPSM LPSM $59,000.00
B0060 15301-0000 CONTRACTOR
QUALITY CONTROL
Cascade Civil Corp $188,000.00 Central Southern Construction Corp. $175,000.00
BRUMFIELD
CONSTRUCTION, INC. $133,380.00
Conway Construction Co $50,000.00
Versatile Industries, Inc. $30,737.00
Engineer's Estimate ALL LPSM LPSM $40,000.00
B0080 15401-0000 CONTRACTOR
TESTING
Central Southern Construction Corp. $125,000.00
Cascade Civil Corp $84,000.00 Conway Construction Co $80,000.00
BRUMFIELD
CONSTRUCTION, INC. $33,350.00
Versatile Industries, Inc. $13,912.00
Engineer's Estimate ALL LPSM LPSM $40,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0100 15501-0000 CONSTRUCTION
SCHEDULE
Conway Construction Co $50,000.00
Central Southern Construction Corp. $26,400.00
BRUMFIELD
CONSTRUCTION, INC. $13,340.00
Cascade Civil Corp $8,500.00 Versatile Industries, Inc. $4,247.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
B0120 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION
Conway Construction Co $600,000.00
Central Southern Construction Corp. $288,000.00
Cascade Civil Corp $245,000.00
BRUMFIELD
CONSTRUCTION, INC. $163,900.00
Versatile Industries, Inc. $112,039.00
Engineer's Estimate ALL LPSM LPSM $110,000.00
B0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Cascade Civil Corp 1,600.000 $13.00 $20,800.00 Central Southern Construction Corp. 1,600.000 $12.00 $19,200.00
BRUMFIELD
CONSTRUCTION, INC. 1,600.000 $7.00 $11,200.00
Versatile Industries, Inc. 1,600.000 $6.50 $10,400.00
Conway Construction Co 1,600.000 $6.00 $9,600.00
Engineer's Estimate 1,600.000 LNFT $6.00 $9,600.00
B0160 15802-0000 WATERING FOR
DUST CONTROL
Cascade Civil Corp $175,000.00 Central Southern Construction Corp. $78,800.00
Conway Construction Co $70,000.00
Versatile Industries, Inc. $37,272.00
BRUMFIELD
CONSTRUCTION, INC. $21,670.00
Engineer's Estimate ALL LPSM LPSM $5,000.00
B0180 20101-0000 CLEARING AND
GRUBBING
Cascade Civil Corp 1.400 $55,000.00 $77,000.00 Conway Construction Co 1.400 $50,000.00 $70,000.00
Central Southern Construction Corp. 1.400 $42,400.00 $59,360.00
BRUMFIELD
CONSTRUCTION, INC. 1.400 $21,060.00 $29,484.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0180 20101-0000 CLEARING AND
GRUBBING
Versatile Industries, Inc. 1.400 $9,183.00 $12,856.20
Engineer's Estimate 1.400 ACRE $30,000.00 $42,000.00
B0200 20301-0600 REMOVAL OF
CATTLE GUARD
Cascade Civil Corp 2.000 $3,000.00 $6,000.00 Central Southern Construction Corp. 2.000 $3,000.00 $6,000.00
Versatile Industries, Inc. 2.000 $2,525.00 $5,050.00
BRUMFIELD
CONSTRUCTION, INC. 2.000 $1,600.00 $3,200.00
Conway Construction Co 2.000 $1,500.00 $3,000.00
Engineer's Estimate 2.000 EACH $3,900.00 $7,800.00
B0220 20401-0000 ROADWAY
EXCAVATION
Central Southern Construction Corp. 700.000 $700.00 $490,000.00
Conway Construction Co 700.000 $85.00 $59,500.00
Cascade Civil Corp 700.000 $35.00 $24,500.00
BRUMFIELD
CONSTRUCTION, INC. 700.000 $15.00 $10,500.00
Versatile Industries, Inc. 700.000 $14.20 $9,940.00
Engineer's Estimate 700.000 CUYD $50.00 $35,000.00
B0240 25101-0300 PLACED RIPRAP,
METHOD A, CLASS
Cascade Civil Corp 700.000 $280.00 $196,000.00 Central Southern Construction Corp. 700.000 $250.00 $175,000.00
Conway Construction Co 700.000 $180.00 $126,000.00
Versatile Industries, Inc. 700.000 $144.50 $101,150.00
BRUMFIELD
CONSTRUCTION, INC. 700.000 $125.00 $87,500.00
Engineer's Estimate 700.000 CUYD $210.00 $147,000.00
B0260 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
Cascade Civil Corp 800.000 $190.00 $152,000.00 Central Southern Construction Corp. 800.000 $150.00 $120,000.00
Conway Construction Co 800.000 $125.00 $100,000.00
Versatile Industries, Inc. 800.000 $97.30 $77,840.00
BRUMFIELD
CONSTRUCTION, INC. 800.000 $85.00 $68,000.00
Engineer's Estimate 800.000 CUYD $90.00 $72,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0280 60220-0000 PRECAST
REINFORCED
CONCRETE BOX
CULVERT (18 FEET
SPAN, 9 FEET RISE,
SINGLE BARREL)
Conway Construction Co 22.000 $19,500.00 $429,000.00
Central Southern Construction Corp. 22.000 $17,500.00 $385,000.00
BRUMFIELD
CONSTRUCTION, INC. 22.000 $15,760.00 $346,720.00
Cascade Civil Corp 22.000 $12,800.00 $281,600.00 Versatile Industries, Inc. 22.000 $11,192.00 $246,224.00
Engineer's Estimate 22.000 LNFT $5,900.00 $129,800.00
B0300 60220-0000 PRECAST
REINFORCED
CONCRETE BOX
CULVERT (20 FEET
SPAN, 9 FEET RISE,
SINGLE BARREL)
Central Southern Construction Corp. 65.000 $19,500.00 $1,267,500.00
Conway Construction Co 65.000 $17,500.00 $1,137,500.00
BRUMFIELD
CONSTRUCTION, INC. 65.000 $12,360.00 $803,400.00
Versatile Industries, Inc. 65.000 $9,512.00 $618,280.00
Cascade Civil Corp 65.000 $9,500.00 $617,500.00 Engineer's Estimate 65.000 LNFT $5,800.00 $377,000.00
B0320 60220-3700 11 FEET SPAN, 9
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Conway Construction Co 22.000 $17,500.00 $385,000.00
BRUMFIELD
CONSTRUCTION, INC. 22.000 $14,570.00 $320,540.00
Central Southern Construction Corp. 22.000 $13,000.00 $286,000.00
Versatile Industries, Inc. 22.000 $9,853.00 $216,766.00
Cascade Civil Corp 22.000 $9,300.00 $204,600.00 Engineer's Estimate 22.000 LNFT $4,600.00 $101,200.00
B0340 60302-0000 STRUCTURAL
PLATE PIPE-ARCH
Central Southern Construction Corp. 80.000 $15,000.00 $1,200,000.00
Conway Construction Co 80.000 $10,000.00 $800,000.00
Cascade Civil Corp 80.000 $7,500.00 $600,000.00
BRUMFIELD
CONSTRUCTION, INC. 80.000 $6,770.00 $541,600.00
Versatile Industries, Inc. 80.000 $4,966.00 $397,280.00
Engineer's Estimate 80.000 LNFT $5,300.00 $424,000.00
B0360 61920-2000 REMOVE AND
RESET GATE
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Conway Construction Co 1.000 $5,000.00 $5,000.00
Versatile Industries, Inc. 1.000 $4,113.00 $4,113.00
Cascade Civil Corp 1.000 $3,200.00 $3,200.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0360 61920-2000 REMOVE AND
RESET GATE
BRUMFIELD
CONSTRUCTION, INC. 1.000 $2,140.00 $2,140.00
Engineer's Estimate 1.000 EACH $2,000.00 $2,000.00
B0380 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
BRUMFIELD
CONSTRUCTION, INC. 30.000 $230.00 $6,900.00
Versatile Industries, Inc. 30.000 $196.00 $5,880.00
Cascade Civil Corp 30.000 $190.00 $5,700.00 Conway Construction Co 30.000 $175.00 $5,250.00
Central Southern Construction Corp. 30.000 $150.00 $4,500.00
Engineer's Estimate 30.000 HOUR $200.00 $6,000.00
B0400 62201-2800 MOTOR GRADER, 8
FOOT MINIMUM
BLADE
Cascade Civil Corp 10.000 $400.00 $4,000.00
BRUMFIELD
CONSTRUCTION, INC. 10.000 $240.00 $2,400.00
Versatile Industries, Inc. 10.000 $227.50 $2,275.00
Central Southern Construction Corp. 10.000 $204.00 $2,040.00
Conway Construction Co 10.000 $170.00 $1,700.00
Engineer's Estimate 10.000 HOUR $220.00 $2,200.00
B0420 62201-3400 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
Versatile Industries, Inc. 20.000 $283.00 $5,660.00
Central Southern Construction Corp. 20.000 $252.00 $5,040.00
BRUMFIELD
CONSTRUCTION, INC. 20.000 $240.00 $4,800.00
Cascade Civil Corp 20.000 $220.00 $4,400.00 Conway Construction Co 20.000 $150.00 $3,000.00
Engineer's Estimate 20.000 HOUR $310.00 $6,200.00 B0440 62201-3750 CHAIN SAW Cascade Civil Corp 20.000 $135.00 $2,700.00
BRUMFIELD
CONSTRUCTION, INC. 20.000 $125.00 $2,500.00
Versatile Industries, Inc. 20.000 $99.80 $1,996.00
Conway Construction Co 20.000 $95.00 $1,900.00
Central Southern Construction Corp. 20.000 $90.00 $1,800.00
Engineer's Estimate 20.000 HOUR $90.00 $1,800.00
B0460 62301-0000 GENERAL LABOR BRUMFIELD
CONSTRUCTION, INC. 24.000 $115.00 $2,760.00
Cascade Civil Corp 24.000 $115.00 $2,760.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0460 62301-0000 GENERAL LABOR Versatile Industries, Inc. 24.000 $90.20 $2,164.80
Conway Construction Co 24.000 $85.00 $2,040.00
Central Southern Construction Corp. 24.000 $84.00 $2,016.00
Engineer's Estimate 24.000 HOUR $90.00 $2,160.00
B0480 62502-0000 TURF
ESTABLISHMENT
Central Southern Construction Corp. 5,600.000 $10.00 $56,000.00
Versatile Industries, Inc. 5,600.000 $4.70 $26,320.00
Conway Construction Co 5,600.000 $4.50 $25,200.00
BRUMFIELD
CONSTRUCTION, INC. 5,600.000 $3.00 $16,800.00
Cascade Civil Corp 5,600.000 $3.00 $16,800.00 Engineer's Estimate 5,600.000 SQYD $1.50 $8,400.00
B0520 62635-3000 CUTTINGS,
WILLOW POLE
(AND BLACK
COTTONWOOD
POLE)
Central Southern Construction Corp. 830.000 $70.00 $58,100.00
Conway Construction Co 830.000 $30.00 $24,900.00
BRUMFIELD
CONSTRUCTION, INC. 830.000 $18.00 $14,940.00
Cascade Civil Corp 830.000 $18.00 $14,940.00 Versatile Industries, Inc. 830.000 $8.00 $6,640.00
Engineer's Estimate 830.000 EACH $35.00 $29,050.00
B0540 62901-0000 ROLLED EROSION
CONTROL
PRODUCT (WOVEN
COIR FABRIC)
Central Southern Construction Corp. 1,820.000 $18.00 $32,760.00
Cascade Civil Corp 1,820.000 $15.00 $27,300.00 Conway Construction Co 1,820.000 $13.50 $24,570.00
BRUMFIELD
CONSTRUCTION, INC. 1,820.000 $11.00 $20,020.00
Versatile Industries, Inc. 1,820.000 $6.50 $11,830.00
Engineer's Estimate 1,820.000 SQYD $13.00 $23,660.00 B0560 63301-0000 SIGN SYSTEM Cascade Civil Corp 40.000 $700.00 $28,000.00
Versatile Industries, Inc. 40.000 $676.00 $27,040.00
Central Southern Construction Corp. 40.000 $600.00 $24,000.00
Conway Construction Co 40.000 $600.00 $24,000.00
BRUMFIELD
CONSTRUCTION, INC. 40.000 $530.00 $21,200.00
Engineer's Estimate 40.000 EACH $650.00 $26,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0580 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
Central Southern Construction Corp. 14.000 $1,500.00 $21,000.00
BRUMFIELD
CONSTRUCTION, INC. 14.000 $690.00 $9,660.00
Versatile Industries, Inc. 14.000 $405.00 $5,670.00
Conway Construction Co 14.000 $250.00 $3,500.00
Cascade Civil Corp 14.000 $200.00 $2,800.00 Engineer's Estimate 14.000 EACH $200.00 $2,800.00
B0600 63502-3900 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
Central Southern Construction Corp. 25.000 $780.00 $19,500.00
Versatile Industries, Inc. 25.000 $676.00 $16,900.00
Cascade Civil Corp 25.000 $550.00 $13,750.00
BRUMFIELD
CONSTRUCTION, INC. 25.000 $510.00 $12,750.00
Conway Construction Co 25.000 $250.00 $6,250.00
Engineer's Estimate 25.000 EACH $450.00 $11,250.00
B0620 63507-0700 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC CONTROL
SUPERVISOR
Conway Construction Co 170.000 $900.00 $153,000.00
Versatile Industries, Inc. 170.000 $896.00 $152,320.00
Central Southern Construction Corp. 170.000 $850.00 $144,500.00
Cascade Civil Corp 170.000 $750.00 $127,500.00
BRUMFIELD
CONSTRUCTION, INC. 170.000 $340.00 $57,800.00
Engineer's Estimate 170.000 DAY $1,100.00 $187,000.00
B0640 64703-3010 MITIGATION, ROCK
WEIR
Central Southern Construction Corp. 10.000 $4,800.00 $48,000.00
Conway Construction Co 10.000 $3,500.00 $35,000.00
BRUMFIELD
CONSTRUCTION, INC. 10.000 $2,520.00 $25,200.00
Cascade Civil Corp 10.000 $1,700.00 $17,000.00 Versatile Industries, Inc. 10.000 $261.50 $2,615.00
Engineer's Estimate 10.000 EACH $1,300.00 $13,000.00
B0660 64703-4000 MITIGATION, LOG
BARRIER
Central Southern Construction Corp. 3.000 $9,600.00 $28,800.00
BRUMFIELD
CONSTRUCTION, INC. 3.000 $3,790.00 $11,370.00
Conway Construction Co 3.000 $3,000.00 $9,000.00
Cascade Civil Corp 3.000 $1,700.00 $5,100.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0660 64703-4000 MITIGATION, LOG
BARRIER
Versatile Industries, Inc. 3.000 $998.50 $2,995.50
Engineer's Estimate 3.000 EACH $4,000.00 $12,000.00
B0680 64703-5000 MITIGATION, ROOT
WAD
Central Southern Construction Corp. 9.000 $8,400.00 $75,600.00
BRUMFIELD
CONSTRUCTION, INC. 9.000 $2,120.00 $19,080.00
Conway Construction Co 9.000 $1,800.00 $16,200.00
Cascade Civil Corp 9.000 $1,500.00 $13,500.00 Versatile Industries, Inc. 9.000 $855.50 $7,699.50
Engineer's Estimate 9.000 EACH $4,000.00 $36,000.00
B0700 64703-6000 MITIGATION, FISH
PASSAGE BOULDER
Central Southern Construction Corp. 80.000 $720.00 $57,600.00
Cascade Civil Corp 80.000 $450.00 $36,000.00
BRUMFIELD
CONSTRUCTION, INC. 80.000 $190.00 $15,200.00
Versatile Industries, Inc. 80.000 $82.50 $6,600.00
Conway Construction Co 80.000 $60.00 $4,800.00
Engineer's Estimate 80.000 EACH $200.00 $16,000.00
B0720 64704-1000 MITIGATION,
STREAMBED
MATERIAL
Central Southern Construction Corp. 710.000 $316.00 $224,360.00
Cascade Civil Corp 710.000 $140.00 $99,400.00
BRUMFIELD
CONSTRUCTION, INC. 710.000 $120.00 $85,200.00
Conway Construction Co 710.000 $100.00 $71,000.00
Versatile Industries, Inc. 710.000 $62.00 $44,020.00
Engineer's Estimate 710.000 CUYD $175.00 $124,250.00
B0740 64704-1500 MITIGATION,
STREAMBED
CHANNEL
REALIGNMENT
Central Southern Construction Corp. 250.000 $204.00 $51,000.00
Cascade Civil Corp 250.000 $100.00 $25,000.00 Conway Construction Co 250.000 $35.00 $8,750.00
BRUMFIELD
CONSTRUCTION, INC. 250.000 $11.00 $2,750.00
Versatile Industries, Inc. 250.000 $10.80 $2,700.00
Engineer's Estimate 250.000 CUYD $40.00 $10,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
(1)
Project Name: Little Pend Oreille NWR Culvert Improvements
Division: Western Federal Lands
Schedule: C Schedule Type: Base Lead Designer: Emily King Solicitation No. : 69056726B000007 Opened at: WFLHD Opened by: Marino Chea State: WA County: Pend Oreille Federal Land: Little Pend Oreille
National Wildlife Refuge
Bid Open Date and Time: 10/20/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$7,265,026.00
Conway Construction Co, 6620 NW Whitney Rd. Suite 100, Vancouver, WA, 98665
$5,957,340.00
Cascade Civil Corp, 255 SE Black Butte Blvd., Redmond, OR, 97756
$4,478,360.00
BRUMFIELD CONSTRUCTION,
INC.,
2007 westport rd, Aberdeen, WA, 98520
$3,772,716.00
Versatile Industries, Inc., 390351 Highway 20, Cusick, WA, 99119
$2,888,693.80
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Engineer's Estimate $2,589,000.00
Project No. : WA FWS LPO MULTI(1) Project Name: Little Pend Oreille NWR Culvert Improvements
Schedule: C Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
C0020 15101-0000 MOBILIZATION Conway Construction Co $693,230.00
Central Southern Construction Corp. $575,000.00
Cascade Civil Corp $447,000.00
BRUMFIELD
CONSTRUCTION, INC. $373,500.00
Versatile Industries, Inc. $240,828.00
Engineer's Estimate ALL LPSM LPSM $220,155.00
C0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Cascade Civil Corp $220,000.00 Central Southern Construction Corp. $175,000.00
Conway Construction Co $55,000.00
BRUMFIELD
CONSTRUCTION, INC. $23,730.00
Versatile Industries, Inc. $20,440.00
Engineer's Estimate ALL LPSM LPSM $66,000.00
C0060 15301-0000 CONTRACTOR
QUALITY CONTROL
Cascade Civil Corp $200,000.00 Central Southern Construction Corp. $175,000.00
BRUMFIELD
CONSTRUCTION, INC. $131,790.00
Conway Construction Co $50,000.00
Versatile Industries, Inc. $38,421.00
Engineer's Estimate ALL LPSM LPSM $44,000.00
C0080 15401-0000 CONTRACTOR
TESTING
Central Southern Construction Corp. $125,000.00
Cascade Civil Corp $95,000.00 Conway Construction Co $95,000.00
BRUMFIELD
CONSTRUCTION, INC. $39,540.00
Versatile Industries, Inc. $16,694.00
Engineer's Estimate ALL LPSM LPSM $44,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0100 15501-0000 CONSTRUCTION
SCHEDULE
Conway Construction Co $50,000.00
Central Southern Construction Corp. $30,000.00
BRUMFIELD
CONSTRUCTION, INC. $14,500.00
Cascade Civil Corp $9,300.00 Versatile Industries, Inc. $5,308.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
C0120 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION
Conway Construction Co $650,000.00
Central Southern Construction Corp. $348,000.00
Cascade Civil Corp $282,000.00
BRUMFIELD
CONSTRUCTION, INC. $189,440.00
Versatile Industries, Inc. $142,662.00
Engineer's Estimate ALL LPSM LPSM $120,000.00
C0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Cascade Civil Corp 1,900.000 $13.00 $24,700.00 Central Southern Construction Corp. 1,900.000 $12.00 $22,800.00
BRUMFIELD
CONSTRUCTION, INC. 1,900.000 $7.00 $13,300.00
Versatile Industries, Inc. 1,900.000 $6.50 $12,350.00
Conway Construction Co 1,900.000 $6.00 $11,400.00
Engineer's Estimate 1,900.000 LNFT $6.00 $11,400.00
C0160 15802-0000 WATERING FOR
DUST CONTROL
Cascade Civil Corp $190,000.00 Conway Construction Co $80,000.00
Central Southern Construction Corp. $78,800.00
Versatile Industries, Inc. $37,272.00
BRUMFIELD
CONSTRUCTION, INC. $23,550.00
Engineer's Estimate ALL LPSM LPSM $6,000.00
C0180 20101-0000 CLEARING AND
GRUBBING
Cascade Civil Corp 1.600 $55,000.00 $88,000.00 Conway Construction Co 1.600 $50,000.00 $80,000.00
Central Southern Construction Corp. 1.600 $42,400.00 $67,840.00
BRUMFIELD
CONSTRUCTION, INC. 1.600 $21,060.00 $33,696.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0180 20101-0000 CLEARING AND
GRUBBING
Versatile Industries, Inc. 1.600 $9,470.00 $15,152.00
Engineer's Estimate 1.600 ACRE $30,000.00 $48,000.00
C0200 20301-0600 REMOVAL OF
CATTLE GUARD
Cascade Civil Corp 2.000 $3,000.00 $6,000.00 Central Southern Construction Corp. 2.000 $3,000.00 $6,000.00
Versatile Industries, Inc. 2.000 $2,525.00 $5,050.00
BRUMFIELD
CONSTRUCTION, INC. 2.000 $1,600.00 $3,200.00
Conway Construction Co 2.000 $1,500.00 $3,000.00
Engineer's Estimate 2.000 EACH $3,900.00 $7,800.00
C0220 20401-0000 ROADWAY
EXCAVATION
Central Southern Construction Corp. 1,000.000 $700.00 $700,000.00
Conway Construction Co 1,000.000 $85.00 $85,000.00
Cascade Civil Corp 1,000.000 $35.00 $35,000.00
BRUMFIELD
CONSTRUCTION, INC. 1,000.000 $15.00 $15,000.00
Versatile Industries, Inc. 1,000.000 $14.20 $14,200.00
Engineer's Estimate 1,000.000 CUYD $45.00 $45,000.00
C0240 25101-0300 PLACED RIPRAP,
METHOD A, CLASS
Cascade Civil Corp 800.000 $280.00 $224,000.00 Central Southern Construction Corp. 800.000 $250.00 $200,000.00
Conway Construction Co 800.000 $180.00 $144,000.00
Versatile Industries, Inc. 800.000 $144.50 $115,600.00
BRUMFIELD
CONSTRUCTION, INC. 800.000 $125.00 $100,000.00
Engineer's Estimate 800.000 CUYD $200.00 $160,000.00
C0260 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
Cascade Civil Corp 900.000 $190.00 $171,000.00 Central Southern Construction Corp. 900.000 $150.00 $135,000.00
Conway Construction Co 900.000 $130.00 $117,000.00
Versatile Industries, Inc. 900.000 $94.90 $85,410.00
BRUMFIELD
CONSTRUCTION, INC. 900.000 $85.00 $76,500.00
Engineer's Estimate 900.000 CUYD $90.00 $81,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0280 60220-0000 PRECAST
REINFORCED
CONCRETE BOX
CULVERT (18 FEET
SPAN, 9 FEET RISE,
SINGLE BARREL)
Conway Construction Co 22.000 $19,500.00 $429,000.00
Central Southern Construction Corp. 22.000 $17,500.00 $385,000.00
BRUMFIELD
CONSTRUCTION, INC. 22.000 $15,760.00 $346,720.00
Cascade Civil Corp 22.000 $12,800.00 $281,600.00 Versatile Industries, Inc. 22.000 $11,308.00 $248,776.00
Engineer's Estimate 22.000 LNFT $5,900.00 $129,800.00
C0300 60220-0000 PRECAST
REINFORCED
CONCRETE BOX
CULVERT (20 FEET
SPAN, 9 FEET RISE,
SINGLE BARREL)
Central Southern Construction Corp. 65.000 $19,500.00 $1,267,500.00
Conway Construction Co 65.000 $17,500.00 $1,137,500.00
BRUMFIELD
CONSTRUCTION, INC. 65.000 $12,360.00 $803,400.00
Versatile Industries, Inc. 65.000 $9,636.00 $626,340.00
Cascade Civil Corp 65.000 $9,500.00 $617,500.00 Engineer's Estimate 65.000 LNFT $5,800.00 $377,000.00
C0320 60220-3700 11 FEET SPAN, 9
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Conway Construction Co 22.000 $17,500.00 $385,000.00
BRUMFIELD
CONSTRUCTION, INC. 22.000 $14,570.00 $320,540.00
Central Southern Construction Corp. 22.000 $13,000.00 $286,000.00
Versatile Industries, Inc. 22.000 $10,011.00 $220,242.00
Cascade Civil Corp 22.000 $9,300.00 $204,600.00 Engineer's Estimate 22.000 LNFT $4,600.00 $101,200.00
C0340 60220-4100 12 FEET SPAN, 9
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Conway Construction Co 39.000 $16,000.00 $624,000.00
Central Southern Construction Corp. 39.000 $14,000.00 $546,000.00
BRUMFIELD
CONSTRUCTION, INC. 39.000 $9,140.00 $356,460.00
Cascade Civil Corp 39.000 $7,700.00 $300,300.00 Versatile Industries, Inc. 39.000 $7,529.00 $293,631.00
Engineer's Estimate 39.000 LNFT $3,700.00 $144,300.00
C0360 60302-0000 STRUCTURAL
PLATE PIPE-ARCH
Central Southern Construction Corp. 80.000 $15,000.00 $1,200,000.00
Conway Construction Co 80.000 $10,000.00 $800,000.00
Cascade Civil Corp 80.000 $7,500.00 $600,000.00
BRUMFIELD
CONSTRUCTION, INC. 80.000 $6,770.00 $541,600.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0360 60302-0000 STRUCTURAL
PLATE PIPE-ARCH
Versatile Industries, Inc. 80.000 $4,966.00 $397,280.00
Engineer's Estimate 80.000 LNFT $5,300.00 $424,000.00
C0380 61920-2000 REMOVE AND
RESET GATE
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Conway Construction Co 1.000 $5,000.00 $5,000.00
Versatile Industries, Inc. 1.000 $4,113.00 $4,113.00
Cascade Civil Corp 1.000 $3,200.00 $3,200.00
BRUMFIELD
CONSTRUCTION, INC. 1.000 $2,140.00 $2,140.00
Engineer's Estimate 1.000 EACH $2,000.00 $2,000.00
C0400 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
BRUMFIELD
CONSTRUCTION, INC. 30.000 $230.00 $6,900.00
Versatile Industries, Inc. 30.000 $196.00 $5,880.00
Cascade Civil Corp 30.000 $190.00 $5,700.00 Conway Construction Co 30.000 $175.00 $5,250.00
Central Southern Construction Corp. 30.000 $150.00 $4,500.00
Engineer's Estimate 30.000 HOUR $200.00 $6,000.00
C0420 62201-2800 MOTOR GRADER, 8
FOOT MINIMUM
BLADE
Cascade Civil Corp 10.000 $400.00 $4,000.00
BRUMFIELD
CONSTRUCTION, INC. 10.000 $240.00 $2,400.00
Versatile Industries, Inc. 10.000 $227.50 $2,275.00
Central Southern Construction Corp. 10.000 $204.00 $2,040.00
Conway Construction Co 10.000 $170.00 $1,700.00
Engineer's Estimate 10.000 HOUR $220.00 $2,200.00
C0440 62201-3400 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
Versatile Industries, Inc. 20.000 $283.00 $5,660.00
Central Southern Construction Corp. 20.000 $252.00 $5,040.00
BRUMFIELD
CONSTRUCTION, INC. 20.000 $240.00 $4,800.00
Cascade Civil Corp 20.000 $220.00 $4,400.00 Conway Construction Co 20.000 $150.00 $3,000.00
Engineer's Estimate 20.000 HOUR $310.00 $6,200.00 C0460 62201-3750 CHAIN SAW Cascade Civil Corp 20.000 $135.00 $2,700.00
BRUMFIELD
CONSTRUCTION, INC. 20.000 $125.00 $2,500.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0460 62201-3750 CHAIN SAW Versatile Industries, Inc. 20.000 $99.80 $1,996.00
Conway Construction Co 20.000 $95.00 $1,900.00
Central Southern Construction Corp. 20.000 $90.00 $1,800.00
Engineer's Estimate 20.000 HOUR $90.00 $1,800.00
C0480 62301-0000 GENERAL LABOR BRUMFIELD
CONSTRUCTION, INC. 24.000 $115.00 $2,760.00
Cascade Civil Corp 24.000 $115.00 $2,760.00 Versatile Industries, Inc. 24.000 $90.20 $2,164.80
Conway Construction Co 24.000 $85.00 $2,040.00
Central Southern Construction Corp. 24.000 $84.00 $2,016.00
Engineer's Estimate 24.000 HOUR $90.00 $2,160.00
C0500 62502-0000 TURF
ESTABLISHMENT
Central Southern Construction Corp. 6,600.000 $10.00 $66,000.00
Versatile Industries, Inc. 6,600.000 $4.70 $31,020.00
Conway Construction Co 6,600.000 $4.50 $29,700.00
BRUMFIELD
CONSTRUCTION, INC. 6,600.000 $3.00 $19,800.00
Cascade Civil Corp 6,600.000 $3.00 $19,800.00 Engineer's Estimate 6,600.000 SQYD $1.50 $9,900.00
C0540 62635-3000 CUTTINGS,
WILLOW POLE
(AND BLACK
COTTONWOOD
POLE)
Central Southern Construction Corp. 900.000 $70.00 $63,000.00
Conway Construction Co 900.000 $30.00 $27,000.00
BRUMFIELD
CONSTRUCTION, INC. 900.000 $18.00 $16,200.00
Cascade Civil Corp 900.000 $18.00 $16,200.00 Versatile Industries, Inc. 900.000 $8.00 $7,200.00
Engineer's Estimate 900.000 EACH $35.00 $31,500.00
C0560 62901-0000 ROLLED EROSION
CONTROL
PRODUCT (WOVEN
COIR FABRIC)
Central Southern Construction Corp. 2,120.000 $18.00 $38,160.00
Cascade Civil Corp 2,120.000 $15.00 $31,800.00 Conway Construction Co 2,120.000 $13.50 $28,620.00
BRUMFIELD
CONSTRUCTION, INC. 2,120.000 $11.00 $23,320.00
Versatile Industries, Inc. 2,120.000 $6.50 $13,780.00
Engineer's Estimate 2,120.000 SQYD $13.00 $27,560.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0580 63301-0000 SIGN SYSTEM Cascade Civil Corp 40.000 $700.00 $28,000.00 Versatile Industries, Inc. 40.000 $676.00 $27,040.00
Central Southern Construction Corp. 40.000 $600.00 $24,000.00
Conway Construction Co 40.000 $600.00 $24,000.00
BRUMFIELD
CONSTRUCTION, INC. 40.000 $530.00 $21,200.00
Engineer's Estimate 40.000 EACH $650.00 $26,000.00
C0600 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
Central Southern Construction Corp. 14.000 $1,500.00 $21,000.00
BRUMFIELD
CONSTRUCTION, INC. 14.000 $690.00 $9,660.00
Versatile Industries, Inc. 14.000 $405.00 $5,670.00
Conway Construction Co 14.000 $250.00 $3,500.00
Cascade Civil Corp 14.000 $200.00 $2,800.00 Engineer's Estimate 14.000 EACH $200.00 $2,800.00
C0620 63502-3900 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
Central Southern Construction Corp. 25.000 $780.00 $19,500.00
Versatile Industries, Inc. 25.000 $676.00 $16,900.00
Cascade Civil Corp 25.000 $550.00 $13,750.00
BRUMFIELD
CONSTRUCTION, INC. 25.000 $510.00 $12,750.00
Conway Construction Co 25.000 $250.00 $6,250.00
Engineer's Estimate 25.000 EACH $425.00 $10,625.00
C0640 63507-0700 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC CONTROL
SUPERVISOR
Conway Construction Co 175.000 $900.00 $157,500.00
Versatile Industries, Inc. 175.000 $896.00 $156,800.00
Central Southern Construction Corp. 175.000 $850.00 $148,750.00
Cascade Civil Corp 175.000 $750.00 $131,250.00
BRUMFIELD
CONSTRUCTION, INC. 175.000 $340.00 $59,500.00
Engineer's Estimate 175.000 DAY $1,100.00 $192,500.00
C0660 64703-3010 MITIGATION, ROCK
WEIR
Central Southern Construction Corp. 16.000 $4,800.00 $76,800.00
Conway Construction Co 16.000 $3,500.00 $56,000.00
BRUMFIELD
CONSTRUCTION, INC. 16.000 $2,520.00 $40,320.00
Cascade Civil Corp 16.000 $1,700.00 $27,200.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0660 64703-3010 MITIGATION, ROCK
WEIR
Versatile Industries, Inc. 16.000 $261.50 $4,184.00
Engineer's Estimate 16.000 EACH $1,200.00 $19,200.00
C0680 64703-4000 MITIGATION, LOG
BARRIER
Central Southern Construction Corp. 3.000 $9,600.00 $28,800.00
BRUMFIELD
CONSTRUCTION, INC. 3.000 $3,790.00 $11,370.00
Conway Construction Co 3.000 $3,000.00 $9,000.00
Cascade Civil Corp 3.000 $1,700.00 $5,100.00 Versatile Industries, Inc. 3.000 $998.50 $2,995.50
Engineer's Estimate 3.000 EACH $4,000.00 $12,000.00
C0700 64703-5000 MITIGATION, ROOT
WAD
Central Southern Construction Corp. 9.000 $8,400.00 $75,600.00
BRUMFIELD
CONSTRUCTION, INC. 9.000 $2,120.00 $19,080.00
Conway Construction Co 9.000 $1,800.00 $16,200.00
Cascade Civil Corp 9.000 $1,500.00 $13,500.00 Versatile Industries, Inc. 9.000 $855.50 $7,699.50
Engineer's Estimate 9.000 EACH $4,000.00 $36,000.00
C0720 64703-6000 MITIGATION, FISH
PASSAGE BOULDER
Central Southern Construction Corp. 80.000 $720.00 $57,600.00
Cascade Civil Corp 80.000 $450.00 $36,000.00
BRUMFIELD
CONSTRUCTION, INC. 80.000 $190.00 $15,200.00
Versatile Industries, Inc. 80.000 $82.50 $6,600.00
Conway Construction Co 80.000 $60.00 $4,800.00
Engineer's Estimate 80.000 EACH $180.00 $14,400.00
C0740 64704-1000 MITIGATION,
STREAMBED
MATERIAL
Central Southern Construction Corp. 780.000 $316.00 $246,480.00
Cascade Civil Corp 780.000 $140.00 $109,200.00
BRUMFIELD
CONSTRUCTION, INC. 780.000 $120.00 $93,600.00
Conway Construction Co 780.000 $100.00 $78,000.00
Versatile Industries, Inc. 780.000 $62.00 $48,360.00
Engineer's Estimate 780.000 CUYD $175.00 $136,500.00
C0760 64704-1500 MITIGATION,
STREAMBED
CHANNEL
REALIGNMENT
Central Southern Construction Corp. 250.000 $204.00 $51,000.00
Cascade Civil Corp 250.000 $100.00 $25,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
C0760 64704-1500 MITIGATION,
STREAMBED
CHANNEL
REALIGNMENT
Conway Construction Co 250.000 $35.00 $8,750.00
BRUMFIELD
CONSTRUCTION, INC. 250.000 $11.00 $2,750.00
Versatile Industries, Inc. 250.000 $10.80 $2,700.00
Engineer's Estimate 250.000 CUYD $40.00 $10,000.00
Report Generated on 10/22/2026 11:11 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]