PROJECT DESCRIPTION Pavement Preservation New Mexico Revised 10-2.pdf
PDF 179 KB Posted
- Attached to
- NM NP MULTI PMS(1), Pavement Preservation New Mexico Federal contract opportunity
- Solicitation number
- 69056724R000026
About this file
This document appears to be a "Project Description" for the "Pavement Preservation New Mexico" federal contract opportunity. The work consists of crack sealing, patching, application of chip seal and micro surface treatments, pavement marking, and other small items of work across various National Park Service sites in New Mexico. The contract is approximately 33.49 miles in length, with a tentative completion date of Winter 2025. The estimated price range is between $5 million and $10 million. This will be a negotiated contract solicited through the Western Region Pavement Preservation MATOC. The document provides a detailed description of the required work by division and quantity. This project will have a base schedule plus two optional schedules.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised PROJECT DESCRIPTION Pavement Preservation New Mexico Revised 11-14.pdf | ||
| Prelim Letter_NM NP MULTI PMS(1) - no Option X.pdf | ||
| 01_NM NP MULTI PMS(1) Pre-Solicitation Plans 10.01.24 v5 - no Option X.pdf | ||
| PROJECT DESCRIPTION Pavement Preservation New Mexico.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NM NP MULTI PMS(1), Pavement Preservation New Mexico; National Park Service – Sites - Aztec Ruins NM, Carlsbad Caverns NP, Capulin Volcano NM, Chaco Culture NHP, El Malpais NM, El Morror NM, Fort Union NM, Gila Cliff Dwellings NM, , Pecos NHP, Petroglyph NM, Salinas Pueblo Mission NM, White Sands NP; Following Counties - Bernalillo, Catron, Cibola, Eddy, Mora, Otero, San Juan, San Miguel, , Socorro Torrance and Union; New Mexico
The work consists of Crack sealing, patching, application of chip seal and micro surface treatments and pavement marking and other small items of work.
Project length: 33.49 Miles
Tentative Fixed Completion Date: Winter, 2025 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $10 million
Locations: Aztec Ruins National Monument (1.4 miles N Aztec, NM), Carlsbad Caverns National Park (20 miles SW Carlsbad, NM), Capulin Volcano National Monument (14 miles W Des Moines, NM), Chaco Culture National Historic Park (24 miles SW Nageezi, NM), El Malpais National Monument (4 miles Grants, NM), El Morror National Monument (13 miles SE Ramah, NM), Fort Union National Monument (9 miles N Watrous, NM), Gila Cliff Dwellings National Monument (45 miles N Silver City, NM), , Pecos National Historical Park (27 miles SE Santa Fe, NM), Petroglyph National Monument (8 Miles W Albuquerque, NM), Salinas Pueblo Mission National Monument (66 Miles S Albuquerque, NM), White Sands National Park (52 miles NE Las Cruces, NM).
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
B as e
O pt io n
Y
DIVISION 150 – Project Requirements 152 Mobilization (yes/no) Yes Yes 152 Construction Survey & Staking (yes/no) No Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes No 157 Soil Erosion & Sediment Control (erosion control devices) No Yes e
O pt io
DIVISION 200 – Earthwork 203 Removal of Pavement, Asphalt 3-inch depth 1200 SQYD 203 Removal of Sidewalk, Stone 203 Removal Curb, Concrete 200 LNFT 204 Roadway Excavation 550 CUYD 204 Backfill, Permeable 400 CUYD 207 Separation-Stabilization Geotextile, Class 1, Type A 2,400 SQYD DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Placed Riprap, Method B, Class 1 DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 13 TON 240 SQYD 304 Ful Depth Reclamation, Method 2 (4-inch Depth) 4,000 SQYD DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete Pavement, Type 1 670 TON 190 TON 406 Fog Seal 280 TON 1 TON 407 Chip Seal, Type 1C 440,000
SQYD
407 Emulsified Asphalt 770 TON 407 Blotter 40 TON 409 Micro Surfacing, Type 2 136,000
SQYD
411 Asphalt Prime Coat, Method 1 1 TON 414 Asphalt Pavement Crack Filling 1,600 LNFT 414 Asphalt Pavement Crack Sealing 41 MILE 418 Asphalt Concrete Pavement Patching, Type 1 530 SQYD 418 Asphalt Concrete Pavement Patching, Type 2 9,000 SQYD DIVISION 550 – Bridge Construction 575 Minor Bridge Work Yes DIVISION 600 – Incidental Construction 608 Paved Waterway, Type 4 609 Curb, Concrete, 12-inch Depth e
O pt io
609 Reset Curb (stone) 609 Curb, Concrete, 18-inch Depth (colored) 200 LNFT 622 Rental Equipment (yes/no) Yes No 623 General Labor (yes/no) Yes Yes 624 Placing Conserved Topsoil, 4-inch Depth 130 SQYD 633 Rumble Strip 120 SQYD 634 Pavement Markings (type B) 1,070,000
LNFT
634 Pavement Markings Symbols (type B) 300 EACH 635 Temporary Traffic Control, Cone 440 EACH 635 Temporary Traffic Control, Portable Changeable Message Sign 2 EACH 635 Temporary Traffic Control, Pavement Markings
165,000
LNFT
635 Temporary Traffic Control, Construction Sign 330 SQFT 635 Temporary Traffic Control, Flagger 6,800 HOUR 635 Temporary Traffic Control, Pilot Car 500 HOUR 635 Temporary Traffic Control – Traffic Control Supervisor 180 DAY 635 Temporary Traffic Control Yes
File details come from the government source that posted it. Updated .