This document is a bid tabulation report for solicitation number 69056724C000002 to repair two viaducts at Multnomah Falls. HP Civil Inc. provided the lowest bid of $9,200,364.44 for the base schedule. The project involves mobilization, surveying, quality control, testing, schedule development, erosion control, excavation, base grading, paving, concrete repair, painting, overlay, minor bridge work including shear strengthening and deck dowels, curb and wall reconstruction, fencing, signage, and extensive temporary traffic control including flaggers, portable message signs, and crash cushions. The Department of Transportation Federal Highway Administration will award the contract to HP Civil Inc. on November 17, 2023. The report provides unit pricing for over 160 line items for the base schedule and engineers estimate for comparison purposes.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 10/06/23
1 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Solcitation No: 69056723B000019
Division: Western Federal Lands
State: OR County: Multnomah
Federal Land: Columbia River Gorge National Scenic Area Opened at: FHWA Vancouver, WA Office
Opened by: Marino Chea
Date: 10/06/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
HP Civil Inc $9,200,364.44 8795 Aumsville HWY SE Salem, OR 97317
MJ Hughes Construction $13,110,303.00 11510 NE 87th Ave Vancouver, WA 98662
Conway Construction, Inc. $13,149,397.00 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665
STG Pacific, LLC $22,630,057.50 3700 Centerpoint Drive, Suite 8155 Anchorage, AK 99503
Engineer's Estimate $6,945,130.00
MICHAEL
ANDREW KENDRO
Digitally signed by MICHAEL
ANDREW KENDRO
Date: 2023.10.06 09:54:55 -07'00'
HP Civil Inc. 11/17/2023
2 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
HP Civil Inc Lump Sum $920,036.44 MJ Hughes Construction Lump Sum $1,250,000.00 Conway Construction, Inc. Lump Sum $2,970,000.00 STG Pacific, LLC Lump Sum $1,765,990.00 Engineer's Estimate ALL LPSM Lump Sum $1,343,700.00
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
HP Civil Inc Lump Sum $150,000.00 MJ Hughes Construction Lump Sum $5,000.00 Conway Construction, Inc. Lump Sum $25,000.00 STG Pacific, LLC Lump Sum $52,000.00 Engineer's Estimate ALL LPSM Lump Sum $26,000.00
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
HP Civil Inc Lump Sum $435,000.00 MJ Hughes Construction Lump Sum $375,000.00 Conway Construction, Inc. Lump Sum $400,000.00 STG Pacific, LLC Lump Sum $675,225.00 Engineer's Estimate ALL LPSM Lump Sum $260,000.00
A0080 15401-0000 CONTRACTOR TESTING
HP Civil Inc Lump Sum $485,000.00 MJ Hughes Construction Lump Sum $325,000.00 Conway Construction, Inc. Lump Sum $150,000.00 STG Pacific, LLC Lump Sum $128,000.00 Engineer's Estimate ALL LPSM Lump Sum $130,000.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
HP Civil Inc Lump Sum $175,000.00 MJ Hughes Construction Lump Sum $19,000.00 Conway Construction, Inc. Lump Sum $100,000.00 STG Pacific, LLC Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $26,000.00
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
HP Civil Inc $3.00 $7,050.00 MJ Hughes Construction $6.00 $14,100.00 Conway Construction, Inc. $5.00 $11,750.00 STG Pacific, LLC $13.25 $31,137.50 Engineer's Estimate 2,350 LNFT $6.00 $14,100.00
3 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0140 15706-0200 SOIL EROSION CONTROL, CHECK DAM
HP Civil Inc $300.00 $1,200.00 MJ Hughes Construction $275.00 $1,100.00 Conway Construction, Inc. $125.00 $500.00 STG Pacific, LLC $1,650.00 $6,600.00 Engineer's Estimate 4 EACH $350.00 $1,400.00
A0160 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
HP Civil Inc $250.00 $500.00 MJ Hughes Construction $120.00 $240.00 Conway Construction, Inc. $100.00 $200.00 STG Pacific, LLC $470.00 $940.00 Engineer's Estimate 2 EACH $150.00 $300.00
A0180 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
HP Civil Inc $6,000.00 $18,000.00 MJ Hughes Construction $2,000.00 $6,000.00 Conway Construction, Inc. $184,347.00 $553,041.00 STG Pacific, LLC $23,000.00 $69,000.00 Engineer's Estimate 3 EACH $4,000.00 $12,000.00
A0200 20101-0000 CLEARING AND GRUBBING
HP Civil Inc $50,000.00 $25,000.00 MJ Hughes Construction $30,000.00 $15,000.00 Conway Construction, Inc. $130,000.00 $65,000.00 STG Pacific, LLC $64,000.00 $32,000.00 Engineer's Estimate 0.50 ACRE $15,000.00 $7,500.00
A0220 20301-2300 REMOVAL OF SIGN/MARKER
HP Civil Inc $200.00 $800.00 MJ Hughes Construction $300.00 $1,200.00 Conway Construction, Inc. $100.00 $400.00 STG Pacific, LLC $1,900.00 $7,600.00 Engineer's Estimate 4 EACH $200.00 $800.00
A0240 20302-0500 REMOVAL OF CURB, CONCRETE
HP Civil Inc $75.00 $4,500.00 MJ Hughes Construction $40.00 $2,400.00 Conway Construction, Inc. $30.00 $1,800.00 STG Pacific, LLC $120.00 $7,200.00 Engineer's Estimate 60 LNFT $20.00 $1,200.00
4 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (CONTAMINATED SOIL)
HP Civil Inc Lump Sum $100,000.00 MJ Hughes Construction Lump Sum $22,500.00 Conway Construction, Inc. Lump Sum $52,000.00 STG Pacific, LLC Lump Sum $32,500.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0280 20401-0000 ROADWAY EXCAVATION
HP Civil Inc $90.00 $14,400.00 MJ Hughes Construction $130.00 $20,800.00 Conway Construction, Inc. $95.00 $15,200.00 STG Pacific, LLC $260.00 $41,600.00 Engineer's Estimate 160 CUYD $50.00 $8,000.00
A0300 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B (TEMPORARY)
HP Civil Inc $2.75 $3,575.00 MJ Hughes Construction $3.00 $3,900.00 Conway Construction, Inc. $2.50 $3,250.00 STG Pacific, LLC $10.00 $13,000.00 Engineer's Estimate 1,300 SQYD $7.00 $9,100.00
A0320 20801-0000 STRUCTURE EXCAVATION (WEST VIADUCT)
HP Civil Inc $7,500.00 $15,000.00 MJ Hughes Construction $1,650.00 $3,300.00 Conway Construction, Inc. $5,000.00 $10,000.00 STG Pacific, LLC $4,500.00 $9,000.00 Engineer's Estimate 2 CUYD $1,500.00 $3,000.00
A0340 20801-0000 STRUCTURE EXCAVATION (EAST VIADUCT)
HP Civil Inc $815.00 $25,265.00 MJ Hughes Construction $3,000.00 $93,000.00 Conway Construction, Inc. $450.00 $13,950.00 STG Pacific, LLC $1,400.00 $43,400.00 Engineer's Estimate 31 CUYD $200.00 $6,200.00
A0360 25105-0100 KEYED RIPRAP, METHOD A, CLASS 1
HP Civil Inc $450.00 $6,300.00 MJ Hughes Construction $450.00 $6,300.00 Conway Construction, Inc. $245.00 $3,430.00 STG Pacific, LLC $1,500.00 $21,000.00 Engineer's Estimate 14 CUYD $400.00 $5,600.00
5 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 30103-1000 AGGREGATE BASE GRADING C (RAILROAD BALLAST)
HP Civil Inc $200.00 $28,000.00 MJ Hughes Construction $150.00 $21,000.00 Conway Construction, Inc. $380.00 $53,200.00 STG Pacific, LLC $700.00 $98,000.00 Engineer's Estimate 140 CUYD $170.00 $23,800.00
A0400 30201-2000 ROADWAY AGGREGATE, METHOD 2 (TEMPORARY)
HP Civil Inc $200.00 $20,000.00 MJ Hughes Construction $150.00 $15,000.00 Conway Construction, Inc. $150.00 $15,000.00 STG Pacific, LLC $250.00 $25,000.00 Engineer's Estimate 100 CUYD $100.00 $10,000.00
A0420 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
HP Civil Inc $270.00 $54,000.00 MJ Hughes Construction $235.00 $47,000.00 Conway Construction, Inc. $230.00 $46,000.00 STG Pacific, LLC $450.00 $90,000.00 Engineer's Estimate 200 TON $200.00 $40,000.00
A0440 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (TEMPORARY)
HP Civil Inc $315.00 $31,500.00 MJ Hughes Construction $400.00 $40,000.00 Conway Construction, Inc. $230.00 $23,000.00 STG Pacific, LLC $450.00 $45,000.00 Engineer's Estimate 100 TON $230.00 $23,000.00
A0460 41201-0000 TACK COAT
HP Civil Inc $1,900.00 $5,700.00 MJ Hughes Construction $235.00 $705.00 Conway Construction, Inc. $1.00 $3.00 STG Pacific, LLC $4,000.00 $12,000.00 Engineer's Estimate 3 TON $700.00 $2,100.00
A0480 41301-0000 ASPHALT PAVEMENT MILLING
HP Civil Inc $18.00 $28,800.00 MJ Hughes Construction $15.00 $24,000.00 Conway Construction, Inc. $13.50 $21,600.00 STG Pacific, LLC $15.00 $24,000.00 Engineer's Estimate 1,600 SQYD $15.00 $24,000.00
6 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 41301-1000 ASPHALT PAVEMENT MILLING, 4-INCH DEPTH (WEST VIADUCT)
HP Civil Inc $17.00 $13,600.00 MJ Hughes Construction $29.00 $23,200.00 Conway Construction, Inc. $25.00 $20,000.00 STG Pacific, LLC $17.00 $13,600.00 Engineer's Estimate 800 SQYD $35.00 $28,000.00
A0520 41301-1200 ASPHALT PAVEMENT MILLING, 5-INCH DEPTH (EAST VIADUCT)
HP Civil Inc $19.50 $35,100.00 MJ Hughes Construction $22.00 $39,600.00 Conway Construction, Inc. $25.00 $45,000.00 STG Pacific, LLC $17.00 $30,600.00 Engineer's Estimate 1,800 SQYD $35.00 $63,000.00
A0540 55220-0000 REPAIR CONCRETE (PATCHING & CATHODIC PROTECTION, WEST VIADUCT)
HP Civil Inc $3,300.00 $247,500.00 MJ Hughes Construction $4,200.00 $315,000.00 Conway Construction, Inc. $5,000.00 $375,000.00 STG Pacific, LLC $13,600.00 $1,020,000.00 Engineer's Estimate 75 SQYD $3,000.00 $225,000.00
A0560 55220-0000 REPAIR CONCRETE (PATCHING & CATHODIC PROTECTION, EAST VIADUCT)
HP Civil Inc $3,200.00 $1,088,000.00 MJ Hughes Construction $4,200.00 $1,428,000.00 Conway Construction, Inc. $5,000.00 $1,700,000.00 STG Pacific, LLC $12,300.00 $4,182,000.00 Engineer's Estimate 340 SQYD $3,000.00 $1,020,000.00
A0580 55220-0000 REPAIR CONCRETE (RAIL PATCHING, EAST VIADUCT)
HP Civil Inc $5,000.00 $30,000.00 MJ Hughes Construction $5,250.00 $31,500.00 Conway Construction, Inc. $10,000.00 $60,000.00 STG Pacific, LLC $14,975.00 $89,850.00 Engineer's Estimate 6 SQYD $2,000.00 $12,000.00
A0600 55220-0000 REPAIR CONCRETE (RAIL PATCHING, WEST VIADUCT)
HP Civil Inc $4,750.00 $71,250.00 MJ Hughes Construction $3,250.00 $48,750.00 Conway Construction, Inc. $6,250.00 $93,750.00 STG Pacific, LLC $13,300.00 $199,500.00 Engineer's Estimate 15 SQYD $2,000.00 $30,000.00
7 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0620 55223-0000 REPAIR CONCRETE (EPOXY COATING, WEST VIADUCT)
HP Civil Inc $1,200.00 $10,800.00 MJ Hughes Construction $750.00 $6,750.00 Conway Construction, Inc. $152.00 $1,368.00 STG Pacific, LLC $240.00 $2,160.00 Engineer's Estimate 9 LNFT $150.00 $1,350.00
A0640 55223-0000 REPAIR CONCRETE (EPOXY COATING, EAST VIADUCT)
HP Civil Inc $850.00 $29,750.00 MJ Hughes Construction $750.00 $26,250.00 Conway Construction, Inc. $152.00 $5,320.00 STG Pacific, LLC $225.00 $7,875.00 Engineer's Estimate 35 LNFT $150.00 $5,250.00
A0660 55223-0000 REPAIR CONCRETE (RAIL EPOXY COATING, EAST VIADUCT)
HP Civil Inc $200.00 $18,000.00 MJ Hughes Construction $750.00 $67,500.00 Conway Construction, Inc. $152.00 $13,680.00 STG Pacific, LLC $225.00 $20,250.00 Engineer's Estimate 90 LNFT $150.00 $13,500.00
A0680 55223-0000 REPAIR CONCRETE (RAIL EPOXY COATING, WEST VIADUCT)
HP Civil Inc $200.00 $16,000.00 MJ Hughes Construction $750.00 $60,000.00 Conway Construction, Inc. $172.00 $13,760.00 STG Pacific, LLC $135.00 $10,800.00 Engineer's Estimate 80 LNFT $150.00 $12,000.00
A0700 55227-0000 CLEAN CONCRETE SURFACE (WEST VIADUCT)
HP Civil Inc Lump Sum $350,000.00 MJ Hughes Construction Lump Sum $75,000.00 Conway Construction, Inc. Lump Sum $75,000.00 STG Pacific, LLC Lump Sum $725,500.00 Engineer's Estimate ALL LPSM Lump Sum $6,000.00
A0720 55227-0000 CLEAN CONCRETE SURFACE (EAST VIADUCT)
HP Civil Inc Lump Sum $600,000.00 MJ Hughes Construction Lump Sum $175,000.00 Conway Construction, Inc. Lump Sum $166,000.00 STG Pacific, LLC Lump Sum $1,765,200.00 Engineer's Estimate ALL LPSM Lump Sum $18,000.00
8 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0740 55240-0000 GROUT (EAST VIADUCT)
HP Civil Inc $192.50 $90,475.00 MJ Hughes Construction $135.00 $63,450.00 Conway Construction, Inc. $300.00 $141,000.00 STG Pacific, LLC $505.00 $237,350.00 Engineer's Estimate 470 CUFT $75.00 $35,250.00
A0760 55240-0000 GROUT (WEST VIADUCT)
HP Civil Inc $165.00 $33,000.00 MJ Hughes Construction $200.00 $40,000.00 Conway Construction, Inc. $250.00 $50,000.00 STG Pacific, LLC $505.00 $101,000.00 Engineer's Estimate 200 CUFT $75.00 $15,000.00
A0780 55401-1000 REINFORCING STEEL (EAST VIADUCT)
HP Civil Inc $3.00 $64,500.00 MJ Hughes Construction $2.00 $43,000.00 Conway Construction, Inc. $2.75 $59,125.00 STG Pacific, LLC $3.50 $75,250.00 Engineer's Estimate 21,500 LB $2.50 $53,750.00
A0800 55401-1000 REINFORCING STEEL (WEST VIADUCT)
HP Civil Inc $3.00 $69,000.00 MJ Hughes Construction $2.00 $46,000.00 Conway Construction, Inc. $2.75 $63,250.00 STG Pacific, LLC $3.50 $80,500.00 Engineer's Estimate 23,000 LB $2.50 $57,500.00
A0820 56101-0000 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR (WEST VIADUCT)
HP Civil Inc $110.00 $60,500.00 MJ Hughes Construction $95.00 $52,250.00 Conway Construction, Inc. $75.00 $41,250.00 STG Pacific, LLC $73.00 $40,150.00 Engineer's Estimate 550 LNFT $100.00 $55,000.00
A0840 56101-0000 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR (EAST VIADUCT)
HP Civil Inc $110.00 $25,300.00 MJ Hughes Construction $115.00 $26,450.00 Conway Construction, Inc. $75.00 $17,250.00 STG Pacific, LLC $86.00 $19,780.00 Engineer's Estimate 230 LNFT $100.00 $23,000.00
9 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0860 56202-0000 TEMPORARY SUPPORT STRUCTURE (TEMPORARY ACCESS EXCAVATION, WEST VIADUCT)
HP Civil Inc Lump Sum $75,000.00 MJ Hughes Construction Lump Sum $1,800,000.00 Conway Construction, Inc. Lump Sum $50,000.00 STG Pacific, LLC Lump Sum $326,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0880 56302-1000 PAINTING, CONCRETE STRUCTURE (EAST VIADUCT)
HP Civil Inc $13.65 $112,203.00 MJ Hughes Construction $4.00 $32,880.00 Conway Construction, Inc. $25.00 $205,500.00 STG Pacific, LLC $13.00 $106,860.00 Engineer's Estimate 8,220 SQFT $10.00 $82,200.00
A0900 56302-1000 PAINTING, CONCRETE STRUCTURE (WEST VIADUCT)
HP Civil Inc $10.50 $58,695.00 MJ Hughes Construction $4.00 $22,360.00 Conway Construction, Inc. $25.00 $139,750.00 STG Pacific, LLC $13.00 $72,670.00 Engineer's Estimate 5,590 SQFT $10.00 $55,900.00
A0920 56901-1500 CONCRETE OVERLAY, CLASS HPC (O) (EAST VIADUCT)
HP Civil Inc $265.00 $445,200.00 MJ Hughes Construction $350.00 $588,000.00 Conway Construction, Inc. $300.00 $504,000.00 STG Pacific, LLC $820.00 $1,377,600.00 Engineer's Estimate 1,680 SQYD $140.00 $235,200.00
A0940 56901-1500 CONCRETE OVERLAY, CLASS HPC (O) (WEST VIADUCT)
HP Civil Inc $300.00 $237,000.00 MJ Hughes Construction $350.00 $276,500.00 Conway Construction, Inc. $340.00 $268,600.00 STG Pacific, LLC $885.00 $699,150.00 Engineer's Estimate 790 SQYD $180.00 $142,200.00
A0960 57501-0000 MINOR BRIDGE WORK (BEAM SHEAR STRENGTHENING, WEST VIADUCT)
HP Civil Inc Lump Sum $250,000.00 MJ Hughes Construction Lump Sum $215,000.00 Conway Construction, Inc. Lump Sum $345,000.00 STG Pacific, LLC Lump Sum $220,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
10 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0980 57501-0000 MINOR BRIDGE WORK (DECK DOWELS, WEST VIADUCT)
HP Civil Inc Lump Sum $175,000.00 MJ Hughes Construction Lump Sum $80,000.00 Conway Construction, Inc. Lump Sum $300,000.00 STG Pacific, LLC Lump Sum $475,000.00 Engineer's Estimate ALL LPSM Lump Sum $66,000.00
A1000 57501-0000 MINOR BRIDGE WORK (DECK DOWELS, EAST VIADUCT)
HP Civil Inc Lump Sum $350,000.00 MJ Hughes Construction Lump Sum $160,000.00 Conway Construction, Inc. Lump Sum $638,000.00 STG Pacific, LLC Lump Sum $1,020,000.00 Engineer's Estimate ALL LPSM Lump Sum $141,000.00
A1020 60901-1000 CURB, CONCRETE, 12-INCH DEPTH (18-INCH WIDE)
HP Civil Inc $100.00 $6,000.00 MJ Hughes Construction $200.00 $12,000.00 Conway Construction, Inc. $200.00 $12,000.00 STG Pacific, LLC $265.00 $15,900.00 Engineer's Estimate 60 LNFT $150.00 $9,000.00
A1040 60911-0500 RECONDITION CURB (EAST VIADUCT)
HP Civil Inc $100.00 $13,000.00 MJ Hughes Construction $90.00 $11,700.00 Conway Construction, Inc. $100.00 $13,000.00 STG Pacific, LLC $170.00 $22,100.00 Engineer's Estimate 130 LNFT $30.00 $3,900.00
A1060 60911-0500 RECONDITION CURB (WEST VIADUCT)
HP Civil Inc $160.00 $5,600.00 MJ Hughes Construction $90.00 $3,150.00 Conway Construction, Inc. $110.00 $3,850.00 STG Pacific, LLC $200.00 $7,000.00 Engineer's Estimate 35 LNFT $30.00 $1,050.00
A1080 61901-2000 FENCE, CHAIN LINK, 72-INCH HEIGHT (TEMPORARY)
HP Civil Inc $20.00 $5,000.00 MJ Hughes Construction $25.00 $6,250.00 Conway Construction, Inc. $50.00 $12,500.00 STG Pacific, LLC $70.00 $17,500.00 Engineer's Estimate 250 LNFT $60.00 $15,000.00
11 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1100 61902-3700 GATE, CHAIN LINK, 20 FEET WIDTH (TEMPORARY)
HP Civil Inc $2,500.00 $2,500.00 MJ Hughes Construction $1,750.00 $1,750.00 Conway Construction, Inc. $1,200.00 $1,200.00 STG Pacific, LLC $965.00 $965.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
A1120 61921-1000 REMOVE AND RESET FENCE
HP Civil Inc $50.00 $1,000.00 MJ Hughes Construction $150.00 $3,000.00 Conway Construction, Inc. $100.00 $2,000.00 STG Pacific, LLC $705.00 $14,100.00 Engineer's Estimate 20 LNFT $50.00 $1,000.00
A1140 62027-2000 REMOVE AND RESET DRY LAID WALL (EAST VIADUCT)
HP Civil Inc $360.00 $57,600.00 MJ Hughes Construction $6,500.00 $1,040,000.00 Conway Construction, Inc. $1,300.00 $208,000.00 STG Pacific, LLC $7,150.00 $1,144,000.00 Engineer's Estimate 160 LNFT $360.00 $57,600.00
A1160 62027-2000 REMOVE AND RESET DRY LAID WALL (WEST VIADUCT)
HP Civil Inc $360.00 $18,000.00 MJ Hughes Construction $6,500.00 $325,000.00 Conway Construction, Inc. $1,300.00 $65,000.00 STG Pacific, LLC $7,150.00 $357,500.00 Engineer's Estimate 50 LNFT $360.00 $18,000.00
A1180 62035-0000 CLEAN STONE MASONRY SURFACES (RE-CHINKING, EAST VIADUCT)
HP Civil Inc $210.00 $147,000.00 MJ Hughes Construction $1,950.00 $1,365,000.00 Conway Construction, Inc. $600.00 $420,000.00 STG Pacific, LLC $2,725.00 $1,907,500.00 Engineer's Estimate 700 SQYD $130.00 $91,000.00
A1200 62035-0000 CLEAN STONE MASONRY SURFACES (RE-CHINKING, WEST VIADUCT)
HP Civil Inc $210.00 $31,500.00 MJ Hughes Construction $1,950.00 $292,500.00 Conway Construction, Inc. $600.00 $90,000.00 STG Pacific, LLC $2,725.00 $408,750.00 Engineer's Estimate 150 SQYD $130.00 $19,500.00
12 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1220 62502-0000 TURF ESTABLISHMENT
HP Civil Inc $1.75 $3,500.00 MJ Hughes Construction $3.50 $7,000.00 Conway Construction, Inc. $2.00 $4,000.00 STG Pacific, LLC $1.80 $3,600.00 Engineer's Estimate 2,000 SQYD $3.00 $6,000.00
A1240 63316-1000 REMOVE AND RESET SIGN
HP Civil Inc $350.00 $5,250.00 MJ Hughes Construction $600.00 $9,000.00 Conway Construction, Inc. $650.00 $9,750.00 STG Pacific, LLC $950.00 $14,250.00 Engineer's Estimate 15 EACH $600.00 $9,000.00
A1260 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID
HP Civil Inc $2.15 $27,950.00 MJ Hughes Construction $2.50 $32,500.00 Conway Construction, Inc. $2.25 $29,250.00 STG Pacific, LLC $2.60 $33,800.00 Engineer's Estimate 13,000 LNFT $1.00 $13,000.00
A1280 63403-0800 PAVEMENT MARKINGS, TYPE H ("SHUTTLE LOADING" WORD MESSAGE WITH DECAL)
HP Civil Inc $85.00 $17,000.00 MJ Hughes Construction $99.50 $19,900.00 Conway Construction, Inc. $90.00 $18,000.00 STG Pacific, LLC $100.00 $20,000.00 Engineer's Estimate 200 SQFT $50.00 $10,000.00
A1300 63405-0150 PAVEMENT MARKINGS, TYPE A, STRAIGHT ARROW
HP Civil Inc $200.00 $1,000.00 MJ Hughes Construction $234.00 $1,170.00 Conway Construction, Inc. $200.00 $1,000.00 STG Pacific, LLC $225.00 $1,125.00 Engineer's Estimate 5 EACH $300.00 $1,500.00
A1320 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
HP Civil Inc $350.00 $2,100.00 MJ Hughes Construction $410.00 $2,460.00 Conway Construction, Inc. $350.00 $2,100.00 STG Pacific, LLC $390.00 $2,340.00 Engineer's Estimate 6 EACH $600.00 $3,600.00
13 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1340 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
HP Civil Inc $90.00 $540.00 MJ Hughes Construction $50.00 $300.00 Conway Construction, Inc. $50.00 $300.00 STG Pacific, LLC $65.00 $390.00 Engineer's Estimate 6 EACH $80.00 $480.00
A1360 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
HP Civil Inc $150.00 $1,200.00 MJ Hughes Construction $75.00 $600.00 Conway Construction, Inc. $250.00 $2,000.00 STG Pacific, LLC $230.00 $1,840.00 Engineer's Estimate 8 EACH $150.00 $1,200.00
A1380 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH
HP Civil Inc $50.00 $1,500.00 MJ Hughes Construction $25.00 $750.00 Conway Construction, Inc. $25.00 $750.00 STG Pacific, LLC $70.00 $2,100.00 Engineer's Estimate 30 EACH $35.00 $1,050.00
A1400 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
HP Civil Inc $75.00 $3,750.00 MJ Hughes Construction $50.00 $2,500.00 Conway Construction, Inc. $70.00 $3,500.00 STG Pacific, LLC $95.00 $4,750.00 Engineer's Estimate 50 EACH $50.00 $2,500.00
A1420 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN (PCMS)
HP Civil Inc $14,500.00 $43,500.00 MJ Hughes Construction $15,000.00 $45,000.00 Conway Construction, Inc. $25,000.00 $75,000.00 STG Pacific, LLC $22,700.00 $68,100.00 Engineer's Estimate 3 EACH $6,500.00 $19,500.00
A1440 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION (INERTIAL BARREL SYSTEM)
HP Civil Inc $3,000.00 $3,000.00 MJ Hughes Construction $3,000.00 $3,000.00 Conway Construction, Inc. $2,600.00 $2,600.00 STG Pacific, LLC $6,875.00 $6,875.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00
14 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1460 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION (NARROW SITE SYSTEM REPAIR)
HP Civil Inc $50.00 $150.00 MJ Hughes Construction $6.00 $18.00 Conway Construction, Inc. $5.00 $15.00 STG Pacific, LLC $13,990.00 $41,970.00 Engineer's Estimate 3 EACH $300.00 $900.00
A1480 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION (NARROW SITE SYSTEM)
HP Civil Inc $500.00 $1,500.00 MJ Hughes Construction $4,000.00 $12,000.00 Conway Construction, Inc. $3,500.00 $10,500.00 STG Pacific, LLC $14,010.00 $42,030.00 Engineer's Estimate 3 EACH $3,500.00 $10,500.00
A1500 63502-2800 TEMPORARY TRAFFIC CONTROL, REPLACEMENT BARRELS FOR CRASH CUSHION (INERTIAL BARREL
SYSTEM)
HP Civil Inc $5.00 $25.00 MJ Hughes Construction $6.00 $30.00 Conway Construction, Inc. $5.00 $25.00 STG Pacific, LLC $2,225.00 $11,125.00 Engineer's Estimate 5 EACH $50.00 $250.00
A1520 63502-3000 TEMPORARY TRAFFIC CONTROL, RAISED PAVEMENT MARKER (REFLECTIVE)
HP Civil Inc $12.00 $2,400.00 MJ Hughes Construction $14.00 $2,800.00 Conway Construction, Inc. $12.00 $2,400.00 STG Pacific, LLC $15.00 $3,000.00 Engineer's Estimate 200 EACH $6.00 $1,200.00
A1540 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (FLAGGER STATION LIGHT)
HP Civil Inc $3,000.00 $12,000.00 MJ Hughes Construction $5,000.00 $20,000.00 Conway Construction, Inc. $4,000.00 $16,000.00 STG Pacific, LLC $785.00 $3,140.00 Engineer's Estimate 4 EACH $1,500.00 $6,000.00
15 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1560 63503-0380 TEMPORARY TRAFFIC CONTROL, CROWD CONTROL BARRICADE (PEDESTRIAN CHANNELIZING DEVICE)
HP Civil Inc $25.00 $11,250.00 MJ Hughes Construction $30.00 $13,500.00 Conway Construction, Inc. $40.00 $18,000.00 STG Pacific, LLC $31.00 $13,950.00 Engineer's Estimate 450 LNFT $50.00 $22,500.00
A1580 63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
HP Civil Inc $11.00 $13,200.00 MJ Hughes Construction $15.00 $18,000.00 Conway Construction, Inc. $12.00 $14,400.00 STG Pacific, LLC $24.00 $28,800.00 Engineer's Estimate 1,200 LNFT $10.00 $12,000.00
A1600 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
HP Civil Inc $1.75 $5,250.00 MJ Hughes Construction $2.10 $6,300.00 Conway Construction, Inc. $1.80 $5,400.00 STG Pacific, LLC $2.20 $6,600.00 Engineer's Estimate 3,000 LNFT $0.50 $1,500.00
A1620 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
HP Civil Inc $1.50 $7,200.00 MJ Hughes Construction $1.80 $8,640.00 Conway Construction, Inc. $1.60 $7,680.00 STG Pacific, LLC $1.90 $9,120.00 Engineer's Estimate 4,800 LNFT $1.00 $4,800.00
A1640 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
HP Civil Inc $28.00 $43,400.00 MJ Hughes Construction $45.00 $69,750.00 Conway Construction, Inc. $40.00 $62,000.00 STG Pacific, LLC $27.50 $42,625.00 Engineer's Estimate 1,550.0 SQFT $24.00 $37,200.00
A1660 63504-2000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS AND LETTERS (LEGEND REMOVAL)
HP Civil Inc $2.75 $6,875.00 MJ Hughes Construction $3.20 $8,000.00 Conway Construction, Inc. $3.00 $7,500.00 STG Pacific, LLC $3.50 $8,750.00 Engineer's Estimate 2,500 SQFT $8.00 $20,000.00
16 out of 16 Project No: OR FLAP DOT CRGNSA 100(8)
Project Name: Multnomah Falls Viaducts Repairs
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1680 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
HP Civil Inc $77.50 $178,250.00 MJ Hughes Construction $70.00 $161,000.00 Conway Construction, Inc. $65.00 $149,500.00 STG Pacific, LLC $87.50 $201,250.00 Engineer's Estimate 2,300 HOUR $75.00 $172,500.00
A1700 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
HP Civil Inc $175.00 $140,875.00 MJ Hughes Construction $350.00 $281,750.00 Conway Construction, Inc. $850.00 $684,250.00 STG Pacific, LLC $875.00 $704,375.00 Engineer's Estimate 805 DAY $800.00 $644,000.00
A1720 63511-0100 TEMPORARY TRAFFIC CONTROL, RAILROAD FLAGGER (24-HOUR, 7-DAYS/WEEK)
HP Civil Inc Lump Sum $765,000.00 MJ Hughes Construction Lump Sum $765,000.00 Conway Construction, Inc. Lump Sum $765,000.00 STG Pacific, LLC Lump Sum $765,000.00 Engineer's Estimate ALL CTSM Lump Sum $765,000.00
A1740 63511-0100 TEMPORARY TRAFFIC CONTROL, RAILROAD FLAGGER (DAYTIME)
HP Civil Inc Lump Sum $505,000.00 MJ Hughes Construction Lump Sum $505,000.00 Conway Construction, Inc. Lump Sum $505,000.00 STG Pacific, LLC Lump Sum $505,000.00 Engineer's Estimate ALL CTSM Lump Sum $505,000.00
Total Schedule - All Items
HP Civil Inc $9,200,364.44 MJ Hughes Construction $13,110,303.00 Conway Construction, Inc. $13,149,397.00 STG Pacific, LLC $22,630,057.50 Engineer's Estimate $6,945,130.00