Project Description OR FS OCHOC607 22(1)_Updated.pdf

PDF 138 KB Posted

Attached to
OR FS OCHOC607 22(1), Road 22 Repairs MP 0. 0 to 8. 0
Solicitation number
69056724B000003
Issued by

About this file

This document appears to be a project description for federal contract opportunity OR FS OCHOC607 22(1), Road 22 Repairs MP 0.0 to 8.0. The project will consist of spot improvements including asphalt removal, aggregate, asphalt pavement, asphalt milling, and grading along a 0.64-mile stretch of road located 24 miles west of Pineville, Oregon. The estimated price range for the project is between $500,000 and $1,000,000, with a tentative fixed completion date of Winter 2025. The project is divided into three schedules, each with various required construction activities such as survey and staking, quality control, sampling and testing, construction schedules, erosion control, clearing and grubbing, pavement removal, excavation and embankment, geosynthetics, riprap, aggregate, asphalt concrete pavement, and temporary traffic control.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR FS OCHOC607 22(1), Road 22 Repairs MP 0.0 to 8.0

This project will consist of spot improvements including asphalt removal, aggregate, asphalt pavement, asphalt milling and grading.

Project Location: 24 miles W of Pineville, OR

Project Length: .64 Miles

Estimated Price Range: Between $500,000 and $1,000,000

Tentative Fixed Completion Date: Winter 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

O n e

S ch ed u le

S ch

N am e

A

A d d it io n al

N am e

B

A d d it io n al

N am e

C

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes

157 Soil Erosion & Sediment Control (erosion control devices) LPSM LPSM LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 0.10 ACRE 0.10 ACRE 0.40 ACRE

203 Removal of Structures & Obstructions (structures, demolition) Removal of Pavement, Asphalt 3,500 SQYD 3,500 SQYD 4,600 SQYD

204 Excavation & Embankment Roadway excavation Subexcavation Backfill, select granular

100 CUYD

1,000 CUYD

500 CUYD

100 CUYD

1,000 CUYD

500 CUYD

500 CUYD

1,000 CUYD

500 CUYD

207 Earthwork Geosynthetics Separation-stabilization geotextile, class 1, type D (woven) 6,000 SQYD 6,000 SQYD 7,000 SQYD

O n e S ch ed u le

N am e

A

A d d it io n al

N am e

B

A d d it io n al

N am e

C

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap Placed riprap, method A, class 1 450 CUYD 450 CUYD 450 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate Roadway aggregate, method 2 600 TON 600 TON 1,200 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete Asphalt concrete pavement, type 1 1,000 TON 1,400 TON 1,700 TON

412 Asphalt Tack Coat (asphalt surface treatment) 2 TON 3 TON 3 TON

413 Asphalt Pavement Milling, 3-inch depth 2,410 SQYD 2,410 SQYD

DIVISION 600 – Incidental Construction

635 Temporary Traffic Control LPSM LPSM LPSM