BidTabs OR FS OCHOC607 22(1).pdf

PDF 691 KB Posted

Attached to
OR FS OCHOC607 22(1), Road 22 Repairs MP 0. 0 to 8. 0
Solicitation number
69056724B000003
Issued by

About this file

This document is a Tabulation of Bids for a federal highway construction project involving Road 22 Repairs in the Ochoco National Forest, located in Crook County, Oregon. The solicitation (No. 69056724B000003) covers road repairs from mile post 0.0 to 8.0, with three separate bid schedules (A, B, and C) and multiple line items including mobilization, excavation, pavement work, traffic control, and signage.

Five contractors submitted bids: JAL Construction, Marcum & Son LLC, Moreno and Nelson Construction Corp, Construction Solutions Group, and Stimpel Webelhaus Associates. Bid totals varied significantly across schedules, with JAL Construction consistently offering the lowest bids: Schedule A at $518,577, Schedule B at $588,037, and Schedule C at $720,072, compared to the highest bidder Stimpel Webelhaus Associates at $1,351,853, $1,447,288, and $1,814,588 respectively. The project was opened on 05/13/25 in Vancouver, WA, by Marino Chea, with the Engineer's Estimate ranging from $1,149,445 to $1,623,445 across the three schedules.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 05/14/25

1 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Contractor Responsive?

Engineer's Estimate

Construction Solutions Group, LLC

JAL CONSTRUCTION, INC.

Marcum & Son LLC

Moreno and Nelson Construction Corp

Stimpel Webelhaus Associates, INC

Alternate Schedule A

$1,149,445.00

$1,031,398.80

$518,577.00

$529,505.60

$850,560.45

$1,351,853.00

Alternate Schedule B

$1,324,445.00

$1,164,244.80

$588,037.00

$615,915.60

$943,418.65

$1,447,288.00

Alternate Schedule C

$1,623,445.00

$1,408,708.80

$720,072.00

$748,175.60

$1,059,215.40

$1,814,588.00

2 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Solcitation No: 69056724B000003

Division: Western Federal Lands

State: OR County: Crook

Federal Land: Ochoco National Forest Opened at: Vancouver, WA

Opened by: Marino Chea

Date: 05/13/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

JAL CONSTRUCTION, INC. $518,577.00

PO Box 6269 Bend, OR 97708

Marcum & Son LLC $529,505.60 336 SW Black Butte Blvd Redmond, OR 97756

Moreno and Nelson Construction Corp $850,560.45

665 STINSEN AVE

Walla Walla, WA 99362

Construction Solutions Group, LLC $1,031,398.80 425 Highland Ave St. Louis, MO 63122

Stimpel Webelhaus Associates, INC $1,351,853.00

PO BOX 492335

Redding, CA 96049

Engineer's Estimate $1,149,445.00

3 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

JAL CONSTRUCTION, INC. Lump Sum $50,000.00 Marcum & Son LLC Lump Sum $28,500.00 Moreno and Nelson Construction Corp Lump Sum $17,450.00 Construction Solutions Group, LLC Lump Sum $393,600.00 Stimpel Webelhaus Associates, INC Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $113,268.40

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

JAL CONSTRUCTION, INC. Lump Sum $15,000.00 Marcum & Son LLC Lump Sum $10,000.00 Moreno and Nelson Construction Corp Lump Sum $19,900.00 Construction Solutions Group, LLC Lump Sum $18,000.00 Stimpel Webelhaus Associates, INC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $28,000.00

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

JAL CONSTRUCTION, INC. Lump Sum $10,000.00 Marcum & Son LLC Lump Sum $7,000.00 Moreno and Nelson Construction Corp Lump Sum $17,180.00 Construction Solutions Group, LLC Lump Sum $110,000.00 Stimpel Webelhaus Associates, INC Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $28,000.00

A0080 15401-0000 CONTRACTOR TESTING

JAL CONSTRUCTION, INC. Lump Sum $15,000.00 Marcum & Son LLC Lump Sum $10,000.00 Moreno and Nelson Construction Corp Lump Sum $19,900.00 Construction Solutions Group, LLC Lump Sum $19,000.00 Stimpel Webelhaus Associates, INC Lump Sum $12,500.00 Engineer's Estimate ALL LPSM Lump Sum $19,000.00

A0100 15501-0000 CONSTRUCTION SCHEDULE

JAL CONSTRUCTION, INC. Lump Sum $1,500.00 Marcum & Son LLC Lump Sum $5,500.00 Moreno and Nelson Construction Corp Lump Sum $2,320.00 Construction Solutions Group, LLC Lump Sum $29,000.00 Stimpel Webelhaus Associates, INC Lump Sum $2,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

4 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

JAL CONSTRUCTION, INC. $5.00 $3,300.00

Marcum & Son LLC $6.00 $3,960.00 Moreno and Nelson Construction Corp $2.25 $1,485.00 Construction Solutions Group, LLC $5.40 $3,564.00 Stimpel Webelhaus Associates, INC $12.00 $7,920.00 Engineer's Estimate 660 LNFT $20.00 $13,200.00

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

JAL CONSTRUCTION, INC. $6.00 $480.00

Marcum & Son LLC $8.00 $640.00 Moreno and Nelson Construction Corp $3.75 $300.00 Construction Solutions Group, LLC $4.20 $336.00 Stimpel Webelhaus Associates, INC $10.00 $800.00 Engineer's Estimate 80 LNFT $9.25 $740.00

A0160 20101-0000 CLEARING AND GRUBBING

JAL CONSTRUCTION, INC. $15,000.00 $4,500.00

Marcum & Son LLC $8,500.00 $2,550.00 Moreno and Nelson Construction Corp $64,090.00 $19,227.00 Construction Solutions Group, LLC $18,000.00 $5,400.00 Stimpel Webelhaus Associates, INC $50,000.00 $15,000.00 Engineer's Estimate 0.30 ACRE $50,000.00 $15,000.00

A0180 20301-2400 REMOVAL OF SIGN

JAL CONSTRUCTION, INC. $250.00 $500.00

Marcum & Son LLC $250.00 $500.00 Moreno and Nelson Construction Corp $560.00 $1,120.00 Construction Solutions Group, LLC $300.00 $600.00 Stimpel Webelhaus Associates, INC $260.00 $520.00 Engineer's Estimate 2 EACH $280.00 $560.00

A0200 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (8-INCH DEPTH)

JAL CONSTRUCTION, INC. $5.00 $16,500.00

Marcum & Son LLC $10.85 $35,805.00 Moreno and Nelson Construction Corp $46.00 $151,800.00 Construction Solutions Group, LLC $3.60 $11,880.00 Stimpel Webelhaus Associates, INC $22.00 $72,600.00 Engineer's Estimate 3,300 SQYD $34.00 $112,200.00

5 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 20401-0000 ROADWAY EXCAVATION

JAL CONSTRUCTION, INC. $110.00 $2,750.00

Marcum & Son LLC $97.00 $2,425.00 Moreno and Nelson Construction Corp $330.00 $8,250.00 Construction Solutions Group, LLC $48.00 $1,200.00 Stimpel Webelhaus Associates, INC $810.00 $20,250.00 Engineer's Estimate 25 CUYD $230.00 $5,750.00

A0240 20402-0000 SUBEXCAVATION

JAL CONSTRUCTION, INC. $70.00 $7,000.00

Marcum & Son LLC $97.00 $9,700.00 Moreno and Nelson Construction Corp $199.00 $19,900.00 Construction Solutions Group, LLC $60.00 $6,000.00 Stimpel Webelhaus Associates, INC $190.00 $19,000.00 Engineer's Estimate 100 CUYD $130.00 $13,000.00

A0260 20435-1000 BACKFILL, SELECT GRANULAR

JAL CONSTRUCTION, INC. $135.00 $13,500.00

Marcum & Son LLC $132.00 $13,200.00 Moreno and Nelson Construction Corp $158.00 $15,800.00 Construction Solutions Group, LLC $78.00 $7,800.00 Stimpel Webelhaus Associates, INC $430.00 $43,000.00 Engineer's Estimate 100 CUYD $220.00 $22,000.00

A0280 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D (WOVEN)

JAL CONSTRUCTION, INC. $5.00 $27,500.00

Marcum & Son LLC $2.75 $15,125.00 Moreno and Nelson Construction Corp $5.00 $27,500.00 Construction Solutions Group, LLC $1.80 $9,900.00 Stimpel Webelhaus Associates, INC $17.00 $93,500.00 Engineer's Estimate 5,500 SQYD $7.50 $41,250.00

A0300 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

JAL CONSTRUCTION, INC. $135.00 $60,750.00

Marcum & Son LLC $193.00 $86,850.00 Moreno and Nelson Construction Corp $220.00 $99,000.00 Construction Solutions Group, LLC $90.00 $40,500.00 Stimpel Webelhaus Associates, INC $260.00 $117,000.00 Engineer's Estimate 450 CUYD $300.00 $135,000.00

6 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0320 30201-2000 ROADWAY AGGREGATE, METHOD 2

JAL CONSTRUCTION, INC. $125.00 $43,750.00

Marcum & Son LLC $127.00 $44,450.00 Moreno and Nelson Construction Corp $160.00 $56,000.00 Construction Solutions Group, LLC $68.40 $23,940.00 Stimpel Webelhaus Associates, INC $435.00 $152,250.00 Engineer's Estimate 350 CUYD $130.00 $45,500.00

A0340 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

JAL CONSTRUCTION, INC. $120.00 $114,000.00

Marcum & Son LLC $155.00 $147,250.00 Moreno and Nelson Construction Corp $210.00 $199,500.00 Construction Solutions Group, LLC $192.00 $182,400.00 Stimpel Webelhaus Associates, INC $322.00 $305,900.00 Engineer's Estimate 950 TON $320.00 $304,000.00

A0360 41201-0000 TACK COAT

JAL CONSTRUCTION, INC. $600.00 $1,200.00

Marcum & Son LLC $850.00 $1,700.00 Moreno and Nelson Construction Corp $1,720.00 $3,440.00 Construction Solutions Group, LLC $1,560.00 $3,120.00 Stimpel Webelhaus Associates, INC $2,000.00 $4,000.00 Engineer's Estimate 2.00 TON $1,500.00 $3,000.00

A0380 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $125.00 $1,250.00 Moreno and Nelson Construction Corp $250.00 $2,500.00 Construction Solutions Group, LLC $138.00 $1,380.00 Stimpel Webelhaus Associates, INC $230.00 $2,300.00 Engineer's Estimate 10 HOUR $190.00 $1,900.00

A0400 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $150.00 $1,500.00 Moreno and Nelson Construction Corp $260.00 $2,600.00 Construction Solutions Group, LLC $102.00 $1,020.00 Stimpel Webelhaus Associates, INC $165.00 $1,650.00 Engineer's Estimate 10 HOUR $250.00 $2,500.00

7 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $190.00 $1,900.00 Moreno and Nelson Construction Corp $380.00 $3,800.00 Construction Solutions Group, LLC $102.00 $1,020.00 Stimpel Webelhaus Associates, INC $235.00 $2,350.00 Engineer's Estimate 10 HOUR $240.00 $2,400.00

A0440 62301-0000 GENERAL LABOR

JAL CONSTRUCTION, INC. $100.00 $1,000.00

Marcum & Son LLC $105.00 $1,050.00 Moreno and Nelson Construction Corp $154.00 $1,540.00 Construction Solutions Group, LLC $73.56 $735.60 Stimpel Webelhaus Associates, INC $90.00 $900.00 Engineer's Estimate 10 HOUR $110.00 $1,100.00

A0460 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

JAL CONSTRUCTION, INC. $25.00 $1,125.00

Marcum & Son LLC $45.00 $2,025.00 Moreno and Nelson Construction Corp $14.00 $630.00 Construction Solutions Group, LLC $120.00 $5,400.00 Stimpel Webelhaus Associates, INC $225.00 $10,125.00 Engineer's Estimate 45 SQYD $75.00 $3,375.00

A0480 62502-0000 TURF ESTABLISHMENT

JAL CONSTRUCTION, INC. $80.00 $3,600.00

Marcum & Son LLC $8.00 $360.00 Moreno and Nelson Construction Corp $4.25 $191.25 Construction Solutions Group, LLC $48.00 $2,160.00 Stimpel Webelhaus Associates, INC $225.00 $10,125.00 Engineer's Estimate 45 SQYD $85.00 $3,825.00

A0500 63302-0000 SIGN SYSTEM

JAL CONSTRUCTION, INC. $115.00 $24,610.00

Marcum & Son LLC $103.00 $22,042.00 Moreno and Nelson Construction Corp $143.00 $30,602.00 Construction Solutions Group, LLC $123.60 $26,450.40 Stimpel Webelhaus Associates, INC $225.00 $48,150.00 Engineer's Estimate 214 SQFT $250.00 $53,500.00

8 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0520 63308-3000 OBJECT MARKER, TYPE 3

JAL CONSTRUCTION, INC. $450.00 $900.00

Marcum & Son LLC $450.00 $900.00 Moreno and Nelson Construction Corp $270.00 $540.00 Construction Solutions Group, LLC $108.00 $216.00 Stimpel Webelhaus Associates, INC $600.00 $1,200.00 Engineer's Estimate 2 EACH $490.00 $980.00

A0540 63309-0200 DELINEATOR, TYPE 2 (WHITE)

JAL CONSTRUCTION, INC. $100.00 $6,900.00

Marcum & Son LLC $90.00 $6,210.00 Moreno and Nelson Construction Corp $270.00 $18,630.00 Construction Solutions Group, LLC $108.00 $7,452.00 Stimpel Webelhaus Associates, INC $240.00 $16,560.00 Engineer's Estimate 69 EACH $100.00 $6,900.00

A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)

JAL CONSTRUCTION, INC. $0.35 $57,008.00

Marcum & Son LLC $0.25 $40,720.00 Moreno and Nelson Construction Corp $0.17 $27,689.60 Construction Solutions Group, LLC $0.30 $48,864.00 Stimpel Webelhaus Associates, INC $0.15 $24,432.00 Engineer's Estimate 162,880 LNFT $0.24 $39,091.20

A0580 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW)

JAL CONSTRUCTION, INC. $0.30 $3,714.00

Marcum & Son LLC $0.22 $2,723.60 Moreno and Nelson Construction Corp $0.27 $3,342.60 Construction Solutions Group, LLC $0.26 $3,218.80 Stimpel Webelhaus Associates, INC $0.20 $2,476.00 Engineer's Estimate 12,380 LNFT $0.18 $2,228.40

A0600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

JAL CONSTRUCTION, INC. $125.00 $750.00

Marcum & Son LLC $185.00 $1,110.00 Moreno and Nelson Construction Corp $280.00 $1,680.00 Construction Solutions Group, LLC $240.00 $1,440.00 Stimpel Webelhaus Associates, INC $275.00 $1,650.00 Engineer's Estimate 6 EACH $220.00 $1,320.00

9 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

JAL CONSTRUCTION, INC. $30.00 $690.00

Marcum & Son LLC $20.00 $460.00 Moreno and Nelson Construction Corp $21.00 $483.00 Construction Solutions Group, LLC $42.00 $966.00 Stimpel Webelhaus Associates, INC $65.00 $1,495.00 Engineer's Estimate 23 EACH $29.00 $667.00

A0640 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

JAL CONSTRUCTION, INC. $2,500.00 $5,000.00

Marcum & Son LLC $2,500.00 $5,000.00 Moreno and Nelson Construction Corp $1,830.00 $3,660.00 Construction Solutions Group, LLC $2,880.00 $5,760.00 Stimpel Webelhaus Associates, INC $3,750.00 $7,500.00 Engineer's Estimate 2 EACH $11,000.00 $22,000.00

A0660 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

JAL CONSTRUCTION, INC. $40.00 $9,800.00

Marcum & Son LLC $40.00 $9,800.00 Moreno and Nelson Construction Corp $36.00 $8,820.00 Construction Solutions Group, LLC $48.00 $11,760.00 Stimpel Webelhaus Associates, INC $220.00 $53,900.00 Engineer's Estimate 245 SQFT $62.00 $15,190.00

A0680 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

JAL CONSTRUCTION, INC. $100.00 $1,000.00

Marcum & Son LLC $85.00 $850.00 Moreno and Nelson Construction Corp $143.00 $1,430.00 Construction Solutions Group, LLC $87.60 $876.00 Stimpel Webelhaus Associates, INC $130.00 $1,300.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00

A0700 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

JAL CONSTRUCTION, INC. $250.00 $10,750.00

Marcum & Son LLC $150.00 $6,450.00 Moreno and Nelson Construction Corp $1,450.00 $62,350.00 Construction Solutions Group, LLC $1,080.00 $46,440.00 Stimpel Webelhaus Associates, INC $1,500.00 $64,500.00 Engineer's Estimate 43 DAY $2,000.00 $86,000.00

10 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

JAL CONSTRUCTION, INC. $518,577.00

Marcum & Son LLC $529,505.60 Moreno and Nelson Construction Corp $850,560.45 Construction Solutions Group, LLC $1,031,398.80 Stimpel Webelhaus Associates, INC $1,351,853.00 Engineer's Estimate $1,149,445.00

11 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Solcitation No: 69056724B000003

Division: Western Federal Lands

State: OR County: Crook

Federal Land: Ochoco National Forest Opened at: Vancouver, WA

Opened by: Marino Chea

Date: 05/13/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

JAL CONSTRUCTION, INC. $588,037.00

PO Box 6269 Bend, OR 97708

Marcum & Son LLC $615,915.60 336 SW Black Butte Blvd Redmond, OR 97756

Moreno and Nelson Construction Corp $943,418.65

665 STINSEN AVE

Walla Walla, WA 99362

Construction Solutions Group, LLC $1,164,244.80 425 Highland Ave St. Louis, MO 63122

Stimpel Webelhaus Associates, INC $1,447,288.00

PO BOX 492335

Engineer's Estimate $1,324,445.00

12 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

JAL CONSTRUCTION, INC. Lump Sum $60,000.00 Marcum & Son LLC Lump Sum $30,000.00 Moreno and Nelson Construction Corp Lump Sum $16,180.00 Construction Solutions Group, LLC Lump Sum $393,600.00 Stimpel Webelhaus Associates, INC Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $130,080.90

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

JAL CONSTRUCTION, INC. Lump Sum $15,000.00 Marcum & Son LLC Lump Sum $12,000.00 Moreno and Nelson Construction Corp Lump Sum $19,580.00 Construction Solutions Group, LLC Lump Sum $18,000.00 Stimpel Webelhaus Associates, INC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

B0060 15301-0000 CONTRACTOR QUALITY CONTROL

JAL CONSTRUCTION, INC. Lump Sum $10,000.00 Marcum & Son LLC Lump Sum $10,000.00 Moreno and Nelson Construction Corp Lump Sum $17,000.00 Construction Solutions Group, LLC Lump Sum $110,000.00 Stimpel Webelhaus Associates, INC Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

B0080 15401-0000 CONTRACTOR TESTING

JAL CONSTRUCTION, INC. Lump Sum $15,000.00 Marcum & Son LLC Lump Sum $12,000.00 Moreno and Nelson Construction Corp Lump Sum $19,580.00 Construction Solutions Group, LLC Lump Sum $19,000.00 Stimpel Webelhaus Associates, INC Lump Sum $12,500.00 Engineer's Estimate ALL LPSM Lump Sum $22,000.00

B0100 15501-0000 CONSTRUCTION SCHEDULE

JAL CONSTRUCTION, INC. Lump Sum $1,500.00 Marcum & Son LLC Lump Sum $5,500.00 Moreno and Nelson Construction Corp Lump Sum $2,290.00 Construction Solutions Group, LLC Lump Sum $29,000.00

Engineer's Estimate ALL LPSM Lump Sum $5,000.00

13 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

JAL CONSTRUCTION, INC. $5.00 $3,300.00

Marcum & Son LLC $6.00 $3,960.00 Moreno and Nelson Construction Corp $2.00 $1,320.00 Construction Solutions Group, LLC $5.40 $3,564.00 Stimpel Webelhaus Associates, INC $12.00 $7,920.00 Engineer's Estimate 660 LNFT $20.00 $13,200.00

B0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

JAL CONSTRUCTION, INC. $6.00 $480.00

Marcum & Son LLC $8.00 $640.00 Moreno and Nelson Construction Corp $3.75 $300.00 Construction Solutions Group, LLC $4.20 $336.00 Stimpel Webelhaus Associates, INC $10.00 $800.00 Engineer's Estimate 80 LNFT $9.25 $740.00

B0160 20101-0000 CLEARING AND GRUBBING

JAL CONSTRUCTION, INC. $15,000.00 $4,500.00

Marcum & Son LLC $8,500.00 $2,550.00 Moreno and Nelson Construction Corp $63,410.00 $19,023.00 Construction Solutions Group, LLC $18,000.00 $5,400.00 Stimpel Webelhaus Associates, INC $50,000.00 $15,000.00 Engineer's Estimate 0.30 ACRE $50,000.00 $15,000.00

B0180 20301-2400 REMOVAL OF SIGN

JAL CONSTRUCTION, INC. $250.00 $500.00

Marcum & Son LLC $250.00 $500.00 Moreno and Nelson Construction Corp $550.00 $1,100.00 Construction Solutions Group, LLC $300.00 $600.00 Stimpel Webelhaus Associates, INC $260.00 $520.00 Engineer's Estimate 2 EACH $280.00 $560.00

B0200 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (8-INCH DEPTH)

JAL CONSTRUCTION, INC. $5.00 $16,500.00

Marcum & Son LLC $10.85 $35,805.00 Moreno and Nelson Construction Corp $45.00 $148,500.00 Construction Solutions Group, LLC $3.60 $11,880.00

14 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0220 20401-0000 ROADWAY EXCAVATION

JAL CONSTRUCTION, INC. $110.00 $2,750.00

Marcum & Son LLC $97.00 $2,425.00 Moreno and Nelson Construction Corp $330.00 $8,250.00 Construction Solutions Group, LLC $48.00 $1,200.00 Stimpel Webelhaus Associates, INC $810.00 $20,250.00 Engineer's Estimate 25 CUYD $230.00 $5,750.00

B0240 20402-0000 SUBEXCAVATION

JAL CONSTRUCTION, INC. $70.00 $7,000.00

Marcum & Son LLC $97.00 $9,700.00 Moreno and Nelson Construction Corp $196.00 $19,600.00 Construction Solutions Group, LLC $60.00 $6,000.00 Stimpel Webelhaus Associates, INC $190.00 $19,000.00 Engineer's Estimate 100 CUYD $130.00 $13,000.00

B0260 20435-1000 BACKFILL, SELECT GRANULAR

JAL CONSTRUCTION, INC. $135.00 $13,500.00

Marcum & Son LLC $132.00 $13,200.00 Moreno and Nelson Construction Corp $157.00 $15,700.00 Construction Solutions Group, LLC $78.00 $7,800.00 Stimpel Webelhaus Associates, INC $430.00 $43,000.00 Engineer's Estimate 100 CUYD $220.00 $22,000.00

B0280 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D (WOVEN)

JAL CONSTRUCTION, INC. $5.00 $27,500.00

Marcum & Son LLC $2.75 $15,125.00 Moreno and Nelson Construction Corp $4.75 $26,125.00 Construction Solutions Group, LLC $1.80 $9,900.00 Stimpel Webelhaus Associates, INC $17.00 $93,500.00 Engineer's Estimate 5,500 SQYD $7.50 $41,250.00

B0300 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

JAL CONSTRUCTION, INC. $135.00 $60,750.00

Marcum & Son LLC $193.00 $86,850.00 Moreno and Nelson Construction Corp $220.00 $99,000.00 Construction Solutions Group, LLC $90.00 $40,500.00 Stimpel Webelhaus Associates, INC $260.00 $117,000.00 Engineer's Estimate 450 CUYD $300.00 $135,000.00

15 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0320 30201-2000 ROADWAY AGGREGATE, METHOD 2

JAL CONSTRUCTION, INC. $125.00 $43,750.00

Marcum & Son LLC $127.00 $44,450.00 Moreno and Nelson Construction Corp $158.00 $55,300.00 Construction Solutions Group, LLC $68.40 $23,940.00 Stimpel Webelhaus Associates, INC $435.00 $152,250.00 Engineer's Estimate 350 CUYD $130.00 $45,500.00

B0340 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

JAL CONSTRUCTION, INC. $120.00 $162,000.00

Marcum & Son LLC $155.00 $209,250.00 Moreno and Nelson Construction Corp $210.00 $283,500.00 Construction Solutions Group, LLC $192.00 $259,200.00 Stimpel Webelhaus Associates, INC $280.00 $378,000.00 Engineer's Estimate 1,350 TON $320.00 $432,000.00

B0360 41201-0000 TACK COAT

JAL CONSTRUCTION, INC. $600.00 $1,800.00

Marcum & Son LLC $850.00 $2,550.00 Moreno and Nelson Construction Corp $1,700.00 $5,100.00 Construction Solutions Group, LLC $1,560.00 $4,680.00 Stimpel Webelhaus Associates, INC $2,000.00 $6,000.00 Engineer's Estimate 3.00 TON $1,500.00 $4,500.00

B0380 41301-0800 ASPHALT PAVEMENT MILLING, 3-INCH DEPTH

JAL CONSTRUCTION, INC. $5.00 $12,550.00

Marcum & Son LLC $6.00 $15,060.00 Moreno and Nelson Construction Corp $7.00 $17,570.00 Construction Solutions Group, LLC $21.60 $54,216.00 Stimpel Webelhaus Associates, INC $8.50 $21,335.00 Engineer's Estimate 2,510 SQYD $6.25 $15,687.50

B0400 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $125.00 $1,250.00 Moreno and Nelson Construction Corp $250.00 $2,500.00 Construction Solutions Group, LLC $138.00 $1,380.00 Stimpel Webelhaus Associates, INC $230.00 $2,300.00 Engineer's Estimate 10 HOUR $190.00 $1,900.00

16 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0420 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $150.00 $1,500.00 Moreno and Nelson Construction Corp $250.00 $2,500.00 Construction Solutions Group, LLC $102.00 $1,020.00 Stimpel Webelhaus Associates, INC $165.00 $1,650.00 Engineer's Estimate 10 HOUR $250.00 $2,500.00

B0440 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $190.00 $1,900.00 Moreno and Nelson Construction Corp $380.00 $3,800.00 Construction Solutions Group, LLC $102.00 $1,020.00 Stimpel Webelhaus Associates, INC $235.00 $2,350.00 Engineer's Estimate 10 HOUR $240.00 $2,400.00

B0460 62301-0000 GENERAL LABOR

JAL CONSTRUCTION, INC. $100.00 $1,000.00

Marcum & Son LLC $105.00 $1,050.00 Moreno and Nelson Construction Corp $152.00 $1,520.00 Construction Solutions Group, LLC $73.56 $735.60 Stimpel Webelhaus Associates, INC $90.00 $900.00 Engineer's Estimate 10 HOUR $110.00 $1,100.00

B0480 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

JAL CONSTRUCTION, INC. $25.00 $1,125.00

Marcum & Son LLC $45.00 $2,025.00 Moreno and Nelson Construction Corp $14.00 $630.00 Construction Solutions Group, LLC $120.00 $5,400.00 Stimpel Webelhaus Associates, INC $225.00 $10,125.00 Engineer's Estimate 45 SQYD $75.00 $3,375.00

B0500 62502-0000 TURF ESTABLISHMENT

JAL CONSTRUCTION, INC. $90.00 $4,050.00

Marcum & Son LLC $8.00 $360.00 Moreno and Nelson Construction Corp $4.25 $191.25 Construction Solutions Group, LLC $54.00 $2,430.00 Stimpel Webelhaus Associates, INC $225.00 $10,125.00 Engineer's Estimate 45 SQYD $85.00 $3,825.00

17 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0520 63302-0000 SIGN SYSTEM

JAL CONSTRUCTION, INC. $105.00 $22,470.00

Marcum & Son LLC $103.00 $22,042.00 Moreno and Nelson Construction Corp $142.00 $30,388.00 Construction Solutions Group, LLC $123.60 $26,450.40 Stimpel Webelhaus Associates, INC $225.00 $48,150.00 Engineer's Estimate 214 SQFT $250.00 $53,500.00

B0540 63308-3000 OBJECT MARKER, TYPE 3

JAL CONSTRUCTION, INC. $450.00 $900.00

Marcum & Son LLC $450.00 $900.00 Moreno and Nelson Construction Corp $260.00 $520.00 Construction Solutions Group, LLC $108.00 $216.00 Stimpel Webelhaus Associates, INC $600.00 $1,200.00 Engineer's Estimate 2 EACH $490.00 $980.00

B0560 63309-0200 DELINEATOR, TYPE 2 (WHITE)

JAL CONSTRUCTION, INC. $100.00 $6,900.00

Marcum & Son LLC $90.00 $6,210.00 Moreno and Nelson Construction Corp $260.00 $17,940.00 Construction Solutions Group, LLC $108.00 $7,452.00 Stimpel Webelhaus Associates, INC $240.00 $16,560.00 Engineer's Estimate 69 EACH $100.00 $6,900.00

B0580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)

JAL CONSTRUCTION, INC. $0.35 $57,008.00

Marcum & Son LLC $0.25 $40,720.00 Moreno and Nelson Construction Corp $0.17 $27,689.60 Construction Solutions Group, LLC $0.30 $48,864.00 Stimpel Webelhaus Associates, INC $0.15 $24,432.00 Engineer's Estimate 162,880 LNFT $0.24 $39,091.20

B0600 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW)

JAL CONSTRUCTION, INC. $0.30 $3,714.00

Marcum & Son LLC $0.22 $2,723.60 Moreno and Nelson Construction Corp $0.26 $3,218.80 Construction Solutions Group, LLC $0.26 $3,218.80 Stimpel Webelhaus Associates, INC $0.20 $2,476.00 Engineer's Estimate 12,380 LNFT $0.18 $2,228.40

18 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0620 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

JAL CONSTRUCTION, INC. $125.00 $750.00

Marcum & Son LLC $185.00 $1,110.00 Moreno and Nelson Construction Corp $280.00 $1,680.00 Construction Solutions Group, LLC $240.00 $1,440.00 Stimpel Webelhaus Associates, INC $275.00 $1,650.00 Engineer's Estimate 6 EACH $220.00 $1,320.00

B0640 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

JAL CONSTRUCTION, INC. $30.00 $690.00

Marcum & Son LLC $20.00 $460.00 Moreno and Nelson Construction Corp $21.00 $483.00 Construction Solutions Group, LLC $42.00 $966.00 Stimpel Webelhaus Associates, INC $65.00 $1,495.00 Engineer's Estimate 23 EACH $29.00 $667.00

B0660 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

JAL CONSTRUCTION, INC. $2,500.00 $5,000.00

Marcum & Son LLC $2,500.00 $5,000.00 Moreno and Nelson Construction Corp $1,810.00 $3,620.00 Construction Solutions Group, LLC $2,880.00 $5,760.00 Stimpel Webelhaus Associates, INC $3,750.00 $7,500.00 Engineer's Estimate 2 EACH $11,000.00 $22,000.00

B0680 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

JAL CONSTRUCTION, INC. $40.00 $9,800.00

Marcum & Son LLC $40.00 $9,800.00 Moreno and Nelson Construction Corp $36.00 $8,820.00 Construction Solutions Group, LLC $48.00 $11,760.00 Stimpel Webelhaus Associates, INC $220.00 $53,900.00 Engineer's Estimate 245 SQFT $62.00 $15,190.00

B0700 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

JAL CONSTRUCTION, INC. $100.00 $1,000.00

Marcum & Son LLC $85.00 $850.00 Moreno and Nelson Construction Corp $141.00 $1,410.00 Construction Solutions Group, LLC $87.60 $876.00 Stimpel Webelhaus Associates, INC $130.00 $1,300.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00

19 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0720 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

JAL CONSTRUCTION, INC. $250.00 $10,750.00

Marcum & Son LLC $150.00 $6,450.00 Moreno and Nelson Construction Corp $1,430.00 $61,490.00 Construction Solutions Group, LLC $1,080.00 $46,440.00 Stimpel Webelhaus Associates, INC $1,500.00 $64,500.00 Engineer's Estimate 43 DAY $2,000.00 $86,000.00

Total Schedule - All Items

JAL CONSTRUCTION, INC. $588,037.00

Marcum & Son LLC $615,915.60 Moreno and Nelson Construction Corp $943,418.65 Construction Solutions Group, LLC $1,164,244.80 Stimpel Webelhaus Associates, INC $1,447,288.00 Engineer's Estimate $1,324,445.00

20 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Solcitation No: 69056724B000003

Division: Western Federal Lands

State: OR County: Crook

Federal Land: Ochoco National Forest Opened at: Vancouver, WA

Opened by: Marino Chea

Date: 05/13/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

JAL CONSTRUCTION, INC. $720,072.00

PO Box 6269 Bend, OR 97708

Marcum & Son LLC $748,175.60 336 SW Black Butte Blvd Redmond, OR 97756

Moreno and Nelson Construction Corp $1,059,215.40

665 STINSEN AVE

Walla Walla, WA 99362

Construction Solutions Group, LLC $1,408,708.80 425 Highland Ave St. Louis, MO 63122

Stimpel Webelhaus Associates, INC $1,814,588.00

PO BOX 492335

Engineer's Estimate $1,623,445.00

21 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0020 15101-0000 MOBILIZATION

JAL CONSTRUCTION, INC. Lump Sum $70,000.00 Marcum & Son LLC Lump Sum $31,500.00 Moreno and Nelson Construction Corp Lump Sum $16,500.00 Construction Solutions Group, LLC Lump Sum $443,600.00 Stimpel Webelhaus Associates, INC Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $159,458.40

C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

JAL CONSTRUCTION, INC. Lump Sum $15,000.00 Marcum & Son LLC Lump Sum $13,000.00 Moreno and Nelson Construction Corp Lump Sum $16,000.00 Construction Solutions Group, LLC Lump Sum $18,000.00 Stimpel Webelhaus Associates, INC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

C0060 15301-0000 CONTRACTOR QUALITY CONTROL

JAL CONSTRUCTION, INC. Lump Sum $12,500.00 Marcum & Son LLC Lump Sum $11,000.00 Moreno and Nelson Construction Corp Lump Sum $16,000.00 Construction Solutions Group, LLC Lump Sum $147,000.00 Stimpel Webelhaus Associates, INC Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

C0080 15401-0000 CONTRACTOR TESTING

JAL CONSTRUCTION, INC. Lump Sum $17,500.00 Marcum & Son LLC Lump Sum $12,000.00 Moreno and Nelson Construction Corp Lump Sum $16,000.00 Construction Solutions Group, LLC Lump Sum $19,000.00 Stimpel Webelhaus Associates, INC Lump Sum $12,500.00 Engineer's Estimate ALL LPSM Lump Sum $27,000.00

C0100 15501-0000 CONSTRUCTION SCHEDULE

JAL CONSTRUCTION, INC. Lump Sum $1,500.00 Marcum & Son LLC Lump Sum $5,500.00 Moreno and Nelson Construction Corp Lump Sum $2,260.00 Construction Solutions Group, LLC Lump Sum $29,000.00

Engineer's Estimate ALL LPSM Lump Sum $7,000.00

22 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

JAL CONSTRUCTION, INC. $5.00 $3,300.00

Marcum & Son LLC $6.00 $3,960.00 Moreno and Nelson Construction Corp $2.00 $1,320.00 Construction Solutions Group, LLC $5.40 $3,564.00 Stimpel Webelhaus Associates, INC $12.00 $7,920.00 Engineer's Estimate 660 LNFT $20.00 $13,200.00

C0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

JAL CONSTRUCTION, INC. $6.00 $6,300.00

Marcum & Son LLC $8.00 $8,400.00 Moreno and Nelson Construction Corp $3.50 $3,675.00 Construction Solutions Group, LLC $4.20 $4,410.00 Stimpel Webelhaus Associates, INC $7.00 $7,350.00 Engineer's Estimate 1,050 LNFT $9.25 $9,712.50

C0160 20101-0000 CLEARING AND GRUBBING

JAL CONSTRUCTION, INC. $15,000.00 $6,000.00

Marcum & Son LLC $8,500.00 $3,400.00 Moreno and Nelson Construction Corp $56,820.00 $22,728.00 Construction Solutions Group, LLC $18,000.00 $7,200.00 Stimpel Webelhaus Associates, INC $50,000.00 $20,000.00 Engineer's Estimate 0.40 ACRE $55,000.00 $22,000.00

C0180 20301-2400 REMOVAL OF SIGN

JAL CONSTRUCTION, INC. $250.00 $500.00

Marcum & Son LLC $250.00 $500.00 Moreno and Nelson Construction Corp $540.00 $1,080.00 Construction Solutions Group, LLC $300.00 $600.00 Stimpel Webelhaus Associates, INC $260.00 $520.00 Engineer's Estimate 2 EACH $280.00 $560.00

C0200 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (8-INCH DEPTH)

JAL CONSTRUCTION, INC. $5.00 $16,500.00

Marcum & Son LLC $10.85 $35,805.00 Moreno and Nelson Construction Corp $45.00 $148,500.00 Construction Solutions Group, LLC $3.60 $11,880.00

23 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0220 20401-0000 ROADWAY EXCAVATION

JAL CONSTRUCTION, INC. $110.00 $11,000.00

Marcum & Son LLC $97.00 $9,700.00 Moreno and Nelson Construction Corp $144.00 $14,400.00 Construction Solutions Group, LLC $48.00 $4,800.00 Stimpel Webelhaus Associates, INC $570.00 $57,000.00 Engineer's Estimate 100 CUYD $230.00 $23,000.00

C0240 20402-0000 SUBEXCAVATION

JAL CONSTRUCTION, INC. $70.00 $7,000.00

Marcum & Son LLC $97.00 $9,700.00 Moreno and Nelson Construction Corp $194.00 $19,400.00 Construction Solutions Group, LLC $60.00 $6,000.00 Stimpel Webelhaus Associates, INC $190.00 $19,000.00 Engineer's Estimate 100 CUYD $130.00 $13,000.00

C0260 20403-0000 UNCLASSIFIED BORROW

JAL CONSTRUCTION, INC. $110.00 $22,000.00

Marcum & Son LLC $132.00 $26,400.00 Moreno and Nelson Construction Corp $86.00 $17,200.00 Construction Solutions Group, LLC $78.00 $15,600.00 Stimpel Webelhaus Associates, INC $430.00 $86,000.00 Engineer's Estimate 200 CUYD $80.00 $16,000.00

C0280 20435-1000 BACKFILL, SELECT GRANULAR

JAL CONSTRUCTION, INC. $135.00 $13,500.00

Marcum & Son LLC $132.00 $13,200.00 Moreno and Nelson Construction Corp $154.00 $15,400.00 Construction Solutions Group, LLC $78.00 $7,800.00 Stimpel Webelhaus Associates, INC $430.00 $43,000.00 Engineer's Estimate 100 CUYD $220.00 $22,000.00

C0300 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D (WOVEN)

JAL CONSTRUCTION, INC. $5.00 $32,500.00

Marcum & Son LLC $2.75 $17,875.00 Moreno and Nelson Construction Corp $4.75 $30,875.00 Construction Solutions Group, LLC $1.80 $11,700.00 Stimpel Webelhaus Associates, INC $17.00 $110,500.00 Engineer's Estimate 6,500 SQYD $7.50 $48,750.00

24 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0320 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

JAL CONSTRUCTION, INC. $135.00 $60,750.00

Marcum & Son LLC $193.00 $86,850.00 Moreno and Nelson Construction Corp $210.00 $94,500.00 Construction Solutions Group, LLC $90.00 $40,500.00 Stimpel Webelhaus Associates, INC $260.00 $117,000.00 Engineer's Estimate 450 CUYD $300.00 $135,000.00

C0340 30201-2000 ROADWAY AGGREGATE, METHOD 2

JAL CONSTRUCTION, INC. $125.00 $75,000.00

Marcum & Son LLC $127.00 $76,200.00 Moreno and Nelson Construction Corp $123.00 $73,800.00 Construction Solutions Group, LLC $68.40 $41,040.00 Stimpel Webelhaus Associates, INC $350.00 $210,000.00 Engineer's Estimate 600 CUYD $130.00 $78,000.00

C0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

JAL CONSTRUCTION, INC. $120.00 $198,000.00

Marcum & Son LLC $155.00 $255,750.00 Moreno and Nelson Construction Corp $210.00 $346,500.00 Construction Solutions Group, LLC $192.00 $316,800.00 Stimpel Webelhaus Associates, INC $270.00 $445,500.00 Engineer's Estimate 1,650 TON $320.00 $528,000.00

C0380 41201-0000 TACK COAT

JAL CONSTRUCTION, INC. $600.00 $1,800.00

Marcum & Son LLC $850.00 $2,550.00 Moreno and Nelson Construction Corp $1,670.00 $5,010.00 Construction Solutions Group, LLC $1,560.00 $4,680.00 Stimpel Webelhaus Associates, INC $2,000.00 $6,000.00 Engineer's Estimate 3.00 TON $1,500.00 $4,500.00

C0400 41301-0800 ASPHALT PAVEMENT MILLING, 3-INCH DEPTH

JAL CONSTRUCTION, INC. $5.00 $12,550.00

Marcum & Son LLC $5.00 $12,550.00 Moreno and Nelson Construction Corp $7.00 $17,570.00 Construction Solutions Group, LLC $21.60 $54,216.00 Stimpel Webelhaus Associates, INC $8.50 $21,335.00 Engineer's Estimate 2,510 SQYD $6.25 $15,687.50

25 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $125.00 $1,250.00 Moreno and Nelson Construction Corp $250.00 $2,500.00 Construction Solutions Group, LLC $138.00 $1,380.00 Stimpel Webelhaus Associates, INC $230.00 $2,300.00 Engineer's Estimate 10 HOUR $190.00 $1,900.00

C0440 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $150.00 $1,500.00 Moreno and Nelson Construction Corp $250.00 $2,500.00 Construction Solutions Group, LLC $102.00 $1,020.00 Stimpel Webelhaus Associates, INC $165.00 $1,650.00 Engineer's Estimate 10 HOUR $250.00 $2,500.00

C0460 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

JAL CONSTRUCTION, INC. $150.00 $1,500.00

Marcum & Son LLC $190.00 $1,900.00 Moreno and Nelson Construction Corp $370.00 $3,700.00 Construction Solutions Group, LLC $102.00 $1,020.00 Stimpel Webelhaus Associates, INC $235.00 $2,350.00 Engineer's Estimate 10 HOUR $240.00 $2,400.00

C0480 62301-0000 GENERAL LABOR

JAL CONSTRUCTION, INC. $100.00 $1,000.00

Marcum & Son LLC $105.00 $1,050.00 Moreno and Nelson Construction Corp $150.00 $1,500.00 Construction Solutions Group, LLC $73.56 $735.60 Stimpel Webelhaus Associates, INC $90.00 $900.00 Engineer's Estimate 10 HOUR $110.00 $1,100.00

C0500 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

JAL CONSTRUCTION, INC. $8.00 $3,600.00

Marcum & Son LLC $15.00 $6,750.00 Moreno and Nelson Construction Corp $14.00 $6,300.00 Construction Solutions Group, LLC $120.00 $54,000.00 Stimpel Webelhaus Associates, INC $115.00 $51,750.00 Engineer's Estimate 450 SQYD $25.00 $11,250.00

26 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0520 62502-0000 TURF ESTABLISHMENT

JAL CONSTRUCTION, INC. $12.00 $5,400.00

Marcum & Son LLC $8.00 $3,600.00 Moreno and Nelson Construction Corp $3.50 $1,575.00 Construction Solutions Group, LLC $9.60 $4,320.00 Stimpel Webelhaus Associates, INC $115.00 $51,750.00 Engineer's Estimate 450 SQYD $35.00 $15,750.00

C0540 63302-0000 SIGN SYSTEM

JAL CONSTRUCTION, INC. $115.00 $24,610.00

Marcum & Son LLC $103.00 $22,042.00 Moreno and Nelson Construction Corp $139.00 $29,746.00 Construction Solutions Group, LLC $123.60 $26,450.40 Stimpel Webelhaus Associates, INC $225.00 $48,150.00 Engineer's Estimate 214 SQFT $250.00 $53,500.00

C0560 63308-3000 OBJECT MARKER, TYPE 3

JAL CONSTRUCTION, INC. $450.00 $900.00

Marcum & Son LLC $85.00 $170.00 Moreno and Nelson Construction Corp $260.00 $520.00 Construction Solutions Group, LLC $108.00 $216.00 Stimpel Webelhaus Associates, INC $600.00 $1,200.00 Engineer's Estimate 2 EACH $490.00 $980.00

C0580 63309-0200 DELINEATOR, TYPE 2 (WHITE)

JAL CONSTRUCTION, INC. $100.00 $6,900.00

Marcum & Son LLC $90.00 $6,210.00 Moreno and Nelson Construction Corp $260.00 $17,940.00 Construction Solutions Group, LLC $108.00 $7,452.00 Stimpel Webelhaus Associates, INC $240.00 $16,560.00 Engineer's Estimate 69 EACH $100.00 $6,900.00

C0600 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)

JAL CONSTRUCTION, INC. $0.35 $57,008.00

Marcum & Son LLC $0.25 $40,720.00 Moreno and Nelson Construction Corp $0.17 $27,689.60 Construction Solutions Group, LLC $0.30 $48,864.00 Stimpel Webelhaus Associates, INC $0.15 $24,432.00 Engineer's Estimate 162,880 LNFT $0.24 $39,091.20

27 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0620 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW)

JAL CONSTRUCTION, INC. $0.30 $3,714.00

Marcum & Son LLC $0.22 $2,723.60 Moreno and Nelson Construction Corp $0.26 $3,218.80 Construction Solutions Group, LLC $0.26 $3,218.80 Stimpel Webelhaus Associates, INC $0.20 $2,476.00 Engineer's Estimate 12,380 LNFT $0.18 $2,228.40

C0640 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

JAL CONSTRUCTION, INC. $125.00 $750.00

Marcum & Son LLC $185.00 $1,110.00 Moreno and Nelson Construction Corp $270.00 $1,620.00 Construction Solutions Group, LLC $240.00 $1,440.00 Stimpel Webelhaus Associates, INC $275.00 $1,650.00 Engineer's Estimate 6 EACH $220.00 $1,320.00

C0660 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

JAL CONSTRUCTION, INC. $30.00 $690.00

Marcum & Son LLC $20.00 $460.00 Moreno and Nelson Construction Corp $21.00 $483.00 Construction Solutions Group, LLC $42.00 $966.00 Stimpel Webelhaus Associates, INC $65.00 $1,495.00 Engineer's Estimate 23 EACH $29.00 $667.00

C0680 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

JAL CONSTRUCTION, INC. $2,500.00 $5,000.00

Marcum & Son LLC $2,500.00 $5,000.00 Moreno and Nelson Construction Corp $1,780.00 $3,560.00 Construction Solutions Group, LLC $2,880.00 $5,760.00 Stimpel Webelhaus Associates, INC $3,750.00 $7,500.00 Engineer's Estimate 2 EACH $11,000.00 $22,000.00

C0700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

JAL CONSTRUCTION, INC. $40.00 $9,800.00

Marcum & Son LLC $40.00 $9,800.00 Moreno and Nelson Construction Corp $35.00 $8,575.00 Construction Solutions Group, LLC $48.00 $11,760.00 Stimpel Webelhaus Associates, INC $220.00 $53,900.00 Engineer's Estimate 245 SQFT $62.00 $15,190.00

28 out of 28

Project No: OR FS OCHOC607 22(1)

Project Name: ROAD 22 REPAIRS MP 0.0 TO 8.0

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0720 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

JAL CONSTRUCTION, INC. $100.00 $1,000.00

Marcum & Son LLC $85.00 $850.00 Moreno and Nelson Construction Corp $139.00 $1,390.00 Construction Solutions Group, LLC $87.60 $876.00 Stimpel Webelhaus Associates, INC $130.00 $1,300.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00

C0740 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

JAL CONSTRUCTION, INC. $250.00 $12,000.00

Marcum & Son LLC $150.00 $7,200.00 Moreno and Nelson Construction Corp $1,410.00 $67,680.00 Construction Solutions Group, LLC $1,080.00 $51,840.00 Stimpel Webelhaus Associates, INC $1,500.00 $72,000.00 Engineer's Estimate 48 DAY $2,700.00 $129,600.00

Total Schedule - All Items

JAL CONSTRUCTION, INC. $720,072.00

Marcum & Son LLC $748,175.60 Moreno and Nelson Construction Corp $1,059,215.40 Construction Solutions Group, LLC $1,408,708.80 Stimpel Webelhaus Associates, INC $1,814,588.00 Engineer's Estimate $1,623,445.00