Sources Sought PLA_OR NPS CRLA 2018(1).pdf
PDF 147 KB Posted
- Solicitation number
- 690567-23-SS-0002
About this file
This document is a Sources Sought announcement for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements project located in Crater Lake National Park, Oregon. The primary objectives of the proposed project are to rehabilitate the 1.1-mile Cleetwood Trail, perform rockfall scaling and mitigation, remove and replace the bulkhead/dock with a structurally stable marina, and replace composting toilets near the marina. The Federal Highway Administration, Western Federal Lands Highway Division, anticipates awarding a firm-fixed-price contract in Winter/Spring 2025 with construction from Summer 2025 through Fall 2027. The estimated project magnitude is between $30,000,000 and $40,000,000. Prime contractors are instructed to submit information such as their intent to propose, business details, size status, bonding capability, and willingness to enter a Project Labor Agreement. The government considers this a specialized construction project that may only be completed by a limited pool of contractors or subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought_OR NPS CRLA 2018(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Western Federal Lands Highway Division
UPDATED Sources Sought Announcement No. 690567-23-SS-0002
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
SUBMITTAL INFORMATION
ISSUE DATE: 06/25/2024
DUE DATE FOR RESPONSES: 07/25/2024
SUBMIT RESPONSES TO: wfl.contracts@dot.gov
SUBMITTALS SHOULD BE MADE IN ELECTRONIC FORMAT
Please reference “Sources Sought Announcement No. 690567-23-SS-0002 for OR NPS
CRLA 2018(1), Cleetwood Trail and Marina Improvements” in the subject line of your email.
Synopsis:
This is an updated Sources Sought announcement and is for information purposes only. The original Sources Sought announcement was posted to SAM.gov on December 13, 2022. THIS IS
NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. NO SOLICITATION IS
CURRENTLY AVAILABLE. This project is located in Crater Lake National Park, Oregon. The primary objectives of the proposed project are to:
(1) Rehabilitation of the entire 1.1-mile Cleetwood Trail including improvements to trail tread and retaining walls.
(2) Rockfall scaling and mitigation along identified high risk zones.
(3) Removal and replacement of the bulkhead/dock with a structurally stable marina.
(4) Replace composting toilets located near the marina.
The Federal Highway Administration (FHWA), Western Federal Lands Highway Division
(WFLHD), anticipates awarding a firm-fixed-price contract in Winter/Spring 2025 with construction in Summer 2025 through Fall 2027. The estimated magnitude is between
$30,000,000 and $40,000,000.
PRIME CONTRACTORS shall answer the following questions and submit the requested information, as applicable, by e-mail to wfl.contracts@dot.gov no later than 2:00pm PT on July
25, 2024.
1. Do you intend to submit a proposal as a Prime Contractor for the solicitation when it is issued?
2. Provide your full business name, address, point of contact, phone number, e-mail address, and website (if any). If a member of a joint venture (JV), include relevant information from both members of the JV.
mailto:wfl.contracts@dot.gov mailto:wfl.contracts@dot.gov
3. Provide your Unique Entity ID and Commercial and Government Entity (CAGE) Code;
if a member of a mentor-protégé agreement with the SBA, please provide information on both members.
4. Identify your firm’s size standard under NAICS code 237310; Highway, Street and
Bridge Construction ($45 Million). All firms shall be certified and registered under the
NAICS code 237310 in the System for Award Management (SAM) located at https://www.sam.gov/ at the time an offer is submitted in response to any solicitation.
5. Identify all applicable classifications for your firm such as: large business, small business; woman-owned small business; 8(a) small business; small-disadvantaged business; HUBZone small business; service-disabled veteran-owned small business; etc.
Please note that the size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. If a member of a joint venture (JV), include relevant information from both members of the JV.
6. Please provide a letter from your bonding agent stating your firm’s capability to bond for a single project of $40 million, and your firm’s aggregate bonding capacity.
7. Are you willing to enter into and submit a Project Labor Agreement prior to any potential contract award if your firm is determined to be the apparent successful offeror? Please explain.
The project labor agreement must meet the requirements of Executive Order 14063 and the policies and procedures of FAR Subpart 22.5 – Use of Project Labor Agreements for
Federal Construction Projects: When awarding large scale construction projects (>$35 million), federal agencies shall require the use of project labor agreements for contractors and subcontractors engaged in construction on the project unless an exception at FAR
Part 22.504(d) applies as determined by the agency’s Senior Procurement Executive.
8. The government considers this project to be specialized construction. Do you believe the project can only be completed by a limited pool of contractors or subcontractors? Please explain.
9. Please provide any information about availability of relevant unions, unionized and non-unionized contractors in the project area.
10. Would a project labor agreement affect the price of this project? If so, how?
11. Is there any other information you would like the government to consider regarding a
Project Labor Agreement for this solicitation?
https://www.sam.gov/ https://www.ecfr.gov/current/title-13/chapter-I/part-121 https://www.ecfr.gov/current/title-13/chapter-I/part-121/subpart-A/subject-group-ECFRd133f03f6d8398b/section-121.108 https://www.dol.gov/general/good-jobs/project-labor-agreement-resource-guide https://www.whitehouse.gov/briefing-room/presidential-actions/2022/02/04/executive-order-on-use-of-project-labor-agreements-for-federal-construction-projects/ https://www.acquisition.gov/far/subpart-22.5 https://www.acquisition.gov/far/subpart-22.5 https://www.acquisition.gov/far/subpart-22.5#FAR_22_504__d1369e68 https://www.acquisition.gov/far/subpart-22.5#FAR_22_504__d1369e68
File details come from the government source that posted it. Updated .