PROJECT DESCRIPTION OR FLAP CURRY 595(1).pdf

PDF 164 KB Posted

Attached to
OR FLAP CURRY 595(1) Jerry's Flat Road Preservation and Improvements & OR FS RRSIS610 33(1) Agness Road Pavement Preservation
Solicitation number
69056723B000014
Issued by

About this file

This project description outlines requirements for a federal highway preservation and improvements project. The work involves asphalt paving, chipseal, patching, grading, and bridge railing, guardrail, and terminal sections along 14.5 miles of Jerry's Flat Road and Agness Road near Gold Beach, Oregon. The project is estimated to cost between $5-10 million and has a tentative completion date of fall 2025. Specific line items include 1,100 linear feet of silt fence, 5,000 linear feet of fiber roll, 5 inlet protections, 580 linear feet of removal of bridge railing, 675 linear feet of removal of guardrail, 15,000 tons of roadway aggregate for shoulder finishing, and various quantities of asphalt concrete pavement. The related federal contract opportunity posting provides a presolicitation notice for this project, with an anticipated solicitation to be made available within 30 days, through the Department of Transportation Federal Highway Administration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR FLAP CURRY 595(1) Jerry's Flat Road Preservation and Improvements

& OR FS RRSIS610 33(1) Agness Road Pavement Preservation

This work consists of asphalt paving, chipseal, patching, grading, and bridge railing, guardrail, and terminal sections.

Project length: 14.5 Miles

Tentative Fixed Completion Date: Fall, 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $5 million to $10 million

Location: 1.5 miles E of Gold Beach, OR, Curry County.

DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14

O p ti o n N am e

B as e_

A d d it io n al S ch ti o n N am e

X

A d d it io n al ti o n N am e

Y

A d d it io n al ti o n N am e

_Z

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes

157 Soil Erosion & Sediment Control (erosion control devices)

SILT FENCE (LNFT)

FIBER ROLL (LNFT)

INLET PROTECTION (EACH)

5,000

DIVISION 200 – Earthwork

203 Removal of Structures & Obstructions (structures, demolition)

REMOVAL OF BRIDGE RAILING (LNFT)

REMOVAL OF GUARDRAIL (LNFT)

DIVISION 250 – Slope Reinforcement and Retaining Walls

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate

ROADWAY AGGREGATE, SHOULDER

FINISHING (MILE) 15,000

ti o n N as e_ d it io n al ti o n N am e

X

A d d it io n al ti o n N am e

Y

A d d it io n al ti o n N am e

_Z

DIVISION 400 – Asphalt Pavements & Surface Treatments

401 Asphalt Concrete Pavement By Gyratory Mix Design Method

ASPHALT CONCRETE PAVEMENT,

GYRATORY MIX, 1/2-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, 0.3 TO

<3MILLION ESAL (TON)

13,800

406 Fog Seal 53 50 50 30

407 Chip Seal

CHIP SEAL, TYPE 1C (SQYD)

EMULSIFIED ASPHALT (TON)

97,000

92,000

90,000

45,000

412 Asphalt Tack Coat (asphalt surface treatment)

TACK COAT (TON) 55 50

413 Asphalt Pavement Milling ASPHALT PAVEMENT MILLING (0 to 2-

INCH) (SQYD) 2,400

414 Asphalt Pavement Crack Sealing & Filling

CRACKS, CLEANING AND SEALING

(MILE)

6.5

418 Asphalt Concrete Pavement Patching

ASPHALT CONCRETE PAVEMENT PATCH,

TYPE 1 (SQYD)

ASPHALT CONCRETE PAVEMENT PATCH,

TYPE 2 (SQYD)

1,100

2,200

3,400

1,740

DIVISION 500 – Rigid Pavement

DIVISION 550 – Bridge Construction

556 Bridge Railing

BRIDGE RAILING, STEEL (LNFT) 580

DIVISION 600 – Incidental Construction

617 Guardrail

GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A WOOD POSTS (LNFT)

TERMINAL SECTION, TYPE MGS

TANGENT (TL-2) (EACH)

TERMINAL SECTION, TYPE MGS

TANGENT (TL-3) (EACH)

STRUCTURE TRANSITION RAILING, MGS

SYSTEM (LNFT)

621 Monuments & Markers (construction survey & staking) (yes/no) No No No No

622 Rental Equipment (yes/no) Yes Yes Yes Yes

623 General Labor (yes/no) Yes Yes Yes Yes ti o n N as e_ d it io n al ti o n N am e

X

A d d it io n al ti o n N am e

Y

A d d it io n al ti o n N am e

_Z

633 Permanent Traffic Control (traffic control devices)

REMOVE AND RESET SIGN (EACH)

REMOVE AND RESET DELINEATOR

(EACH)

REMOVE AND RESET OBJECT MARKER

(EACH)

634 Permanent Pavement Markings (traffic pavement markings)

PAVEMENT MARKINGS, TYPE B, SOLID

(YELLOW) (MILE)

PAVEMENT MARKINGS, TYPE B, SOLID

(WHITE) (MILE)

PAVEMENT MARKINGS, TYPE B, TURN

ARROW (RIGHT) (EACH)

PAVEMENT MARKINGS, TYPE B, TURN

ARROW (LEFT) (EACH)

PAVEMENT MARKINGS, TYPE B,

STRAIGHT ARROW (EACH)

PAVEMENT MARKINGS, TYPE B,

STRAIGHT/TURN ARROW COMBINATION

(EACH)

PAVEMENT MARKINGS, TYPE B, "ONLY"

WORD MESSAGE (EACH)

PAVEMENT MARKINGS, TYPE B, "STOP"

WORD MESSAGE (EACH)

635 Temporary Traffic Control – Flagger 1,200 400 400 400

635 Temporary Traffic Control – Pilot Car 600 200 200 200

635 Temporary Traffic Control – ???

TEMPORARY TRAFFIC CONTROL, CONE

(EACH)

TEMPORARY TRAFFIC CONTROL,

PORTABLE CHANGEABLE MESSAGE SIGN

(EACH)

TEMPORARY TRAFFIC CONTROL,

CONSTRUCTION SIGN (SQFT)

TEMPORARY TRAFFIC CONTROL,

TRAFFIC CONTROL SUPERVISOR (DAY)

2,600