PROJECT DESCRIPTION MT BIGHORN 46(1) 2022.pdf
PDF 136 KB Posted
- Attached to
- MT BIGHORN 46(1) WARMAN LOOP ROAD Federal contract opportunity
- Solicitation number
- 69056721B000003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Warman Loop Prelim Letter 2023.pdf | ||
| Warman Loop Prelim Letter 2022.pdf | ||
| mt-a0300461_WarmanLoopRoad_Prelim-Plans 2022.pdf | ||
| mt-a0300461_WarmanLoopRoad_Prelim-Plans.pdf | ||
| Warman Loop Road Prelim Letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT BIGHORN 46(1) Warman Loop Road
Bighorn, MT.
This work consists of pulverizing the existing roadway, recondition and compact the pulverized surface, and overlay with a three-inch asphalt surface. Additional work includes replacement of minor culverts, one major culvert, subexcavation, bridge deck repairs, signage improvements, and pavement markings
Project length: 4 Miles
Tentative Fixed Completion Date: Fall, 2024
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1 million to $2 million
Location: 45 miles SE of Billings, MT.
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14
O n e S ch ed u le
S ch
N am e
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
DIVISION 200 – Earthwork
204 Subexcavation 1800 CY
207 Earthwork Geosynthetics 4500 SQYD
DIVISION 300 – Aggregate and Base Courses
301 Aggregate Base Grading D 3000 TON
304 Full Depth Reclamation 48500 SQ YD
DIVISION 400 – Asphalt Pavements & Surface Treatments
401 Asphalt Concrete Pavement By Gyratory Mix Design Method 8000 TON
401 Antistrip Additive, Type 3 80 TON
DIVISION 600 – Incidental Construction
602 Culverts
12-inch pipe culvert 34 LN FT
24-inch pipe culvert 84 LN FT
60-inch arch or elliptical pipe culvert 5 LN FT
5-foot span, 9 foot rise concrete box culvert 54 LN FT
O n e S ch ed u le
S ch
N am e
607 Cleaning, Relaying, & Repairing Existing Drainage Structures 4 EA
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
634 Permanent Pavement Markings (traffic pavement markings) 174,000 LN FT
635 Temporary Traffic Control – Flagger 1360 HR
635 Temporary Traffic Control – Pilot Car 200 HR
635 Temporary Traffic Control
Tubular Markers 100 EA
Construction Sign 162 SQ FT