AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 11/17/2020 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056720R000008
9B. DATED (SEE ITEM 11)
11/03/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CA NPS PP LAVO 2019(2), Pavement Preservation Lassen
See Page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated 11-17-2020 CA NPS PP LAVO 2019(2) Solicitation No. 69056720R000008 Pavement Preservation Lassen
REVISIONS ARE AS FOLLOWS:
SOLICITATION
Page A-2. Notice to Offeror, Part II, Facsimile and email offers, modifications, and withdrawals. Revises email address.
BID SCHEDULE
Pages A-7 through A-13. Revises entire bid schedule to revise quantities for Option X
Pay Items 20303-1900; 40301-0100; and 41101-1000..
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page E-18, Subsection 107.02 Protection and Restoration of Property and Landscape.
Reformats first paragraph on Page E-18 so it is not bolded.
Page E-21, Subsection 108.01 Commencement, Prosecution, and Completion of Work.
Revises Subsection (g), and Adds Subsection (i).
PLANS
Plan Sheets B.1 through B.2 Revises Option X Quantities for Pay Item Numbers 20303-1900; 40301-0100; and 41101-1000.
Plan Sheet D.5 Revises Option X Quantities for Pay Item Numbers 20303-1900;
40301-0100; and 41101-1000 associated with Route Numbers 0412Z; 0413Z; and 0414Z.
Plan Sheet D.7 Revises Option X Work shown on Area Map 1.
ENCLOSURES
Pages:
A-2/A-7 through A-13 E-18/E-21
Plan Sheets:
B.1 through B.2 D.5/D.7
Notice to Bidders: Please submit revised pages A-7 through A-13 with your bid.
A-2
Notice to Offeror Project: CA NPS PP LAVO 2019(2), Pavement Preservation Lassen
102.05A. The successful offeror will be determined by the lowest offer for the combined total of the Base and Option schedules.
Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://beta.sam.gov/opp/cc39198dcca44245882e3d20e7f69209/view. A paper copy of the plan sheets is available by submitting the form posted with this solicitation.
Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical Data.
Representations & Certifications. Submit or update Representations and Certifications online at https://beta.sam.gov/ before bid submittal. For more details go to FAR Provision 52.204-8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.
Requests for Information. Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).
SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.
Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.
Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov WFL.Comtracts@dot.gov. To confirm receipt, call 360.619.7520.
Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.
Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/content/contractors or call 1-800-U-ASK-SBA.
Revised by Amendment A003
A-7
BID SCHEDULE
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CA NPS PP LAVO 2019(2)
Project Name:Pavement Preservation Lassen Revised by Amendment A003
A-8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0100 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
76.0 TON $____________ $____________
A0120 40601-0000 FOG SEAL
280 TON $____________ $____________
A0160 40702-0300 CHIP SEAL, TYPE 1C
425,000 SQYD $____________ $____________
A0180 40711-0000 EMULSIFIED ASPHALT
800.0 TON $____________ $____________
A0200 40712-0000 BLOTTER
40 TON $____________ $____________
A0220 40901-2000 MICRO SURFACING, TYPE 2
130,000 SQYD $____________ $____________
A0240 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
700 SQYD $____________ $____________
A0260 41401-3000 CRACKS, CLEANING AND FILLING
250 LNFT $____________ $____________
A0280 41402-2000 CRACKS, CLEANING AND SEALING
2.10 MILE $____________ $____________
A0300 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
90 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-9
A0320 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
1,700 SQYD $____________ $____________
A0340 50202-0000 SEALING JOINTS AND CRACKS
220 LNFT $____________ $____________
A0360 55901-0000 MEMBRANE WATERPROOFING (PREFORMED MEMBRANE SYSTEM)
607 SQYD $____________ $____________
A0380 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0400 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
40 HOUR $____________ $____________
A0420 62201-2360 VACUUM SWEEPER
40 HOUR $____________ $____________
A0440 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A0460 63315-0000 RUMBLE STRIP
25 SQYD $____________ $____________
A0480 63401-0000 PAVEMENT MARKINGS (TYPE B)
1,820,000 LNFT $____________ $____________
A0500 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)
125 EACH $____________ $____________
A0520 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
220 EACH $____________ $____________
A0540 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
4 EACH $____________ $____________
A0560 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-10
A0580 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
170,000 LNFT $____________ $____________
A0600 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
250 SQFT $____________ $____________
A0620 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
2,300 HOUR $____________ $____________
A0640 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
250 HOUR $____________ $____________
A0660 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
72 DAY $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
A-11
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
X0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A003 X0100 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
25,000 SQYD $____________ $____________
A003 X0120 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
4,100.0 TON $____________ $____________
X0140 40712-0000 BLOTTER
20 TON $____________ $____________
X0160 40901-2000 MICRO SURFACING, TYPE 2
5,700 SQYD $____________ $____________
A003 X0180 41101-1000 PRIME COAT, METHOD 1
35.0 TON $____________ $____________
X0200 41402-2000 CRACKS, CLEANING AND SEALING
0.60 MILE $____________ $____________
X0220 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
50 SQYD $____________ $____________
X0240 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
X0260 63315-0000 RUMBLE STRIP
25 SQYD $____________ $____________
X0280 63401-0000 PAVEMENT MARKINGS (TYPE B)
1,500 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project Name:Pavement Preservation Lassen A003 Revised by Amendment A003
A-12
X0300 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)
5 EACH $____________ $____________
X0320 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
400 HOUR $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
A-13
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base (Pages A-8 through A-10)
Schedule X - Option(Pages A-11 through A-12)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
E-18 DIVISION 100
Special Contract Requirements Project: CA NPS PP LAVO 2019(2), Pavement Preservation Lassen
Add the following after the fourth paragraph:
Before starting surface treatment work, follow the requirements of Subsection 152.05(l) to survey and stake locations of manholes; and other utility and drainage covers within the work limits.
107.03A Public Notice. (Added Subsection).
Provide notices of the road work to the CO who will forward to the Park Public Information Office and will handle all notifications to local newspapers and on local radio stations. Provide notices at least 21 days before beginning work on the project, at least 10 days before closures, and at least two more times during the normal tourist season.
Prior to beginning any roadway work each week, send an email with the following information:
(a) Description of work and general operations planned;
(b) Location of work referenced to local landmarks and roadway stationing;
(c) Construction operations that will affect traffic;
(d) Expected delays including delay periods, durations and locations, and
(e) Periods when the road is open to traffic without delay, etc.
107.08 Sanitation, Health, and Safety. Add the following after the first paragraph:
Submit an accident prevention plan for implementing safety and health standards at the Preconstruction Conference. Use the Government furnished Form WFLHD-28, Guide Outline of Contractor's Accident Prevention Plan.
107.10 Environmental Protection. Amend as follows:
(c) Dirt, plant, and foreign material. Delete the text of the first paragraph and substitute the following:
Remove dirt, plant, and foreign material from vehicles and equipment before entry into Park.
Prevent introduction of noxious weeds and non-native plant species into the work site. Follow applicable Federal land management agency requirements and state requirements. Maintain cleaning and inspection records. Clean hauling vehicles before their initial entry; subsequent entries will not require cleaning unless requested. Notify the CO a minimum of 48 hours before entry to allow for inspection.
(d) Clearances for Contractor-selected, noncommercial areas. Delete this Subsection.
E-21 DIVISION 100
Special Contract Requirements Project: CA NPS PP LAVO 2019(2), Pavement Preservation Lassen
Section 108. — PROSECUTION AND PROGRESS
04/03/20– FP-14
108.01 Commencement, Prosecution, and Completion of Work. Amend as follows:
Delete the text of the second paragraph and substitute the following:
A preconstruction conference will be held after the task order is awarded and before beginning work. Seven days before the preconstruction conference, submit copies of the preliminary construction schedule according to Section 155.
Add the following:
Furnish at least a 48-hour advanced notice before changing the current work schedule. Work schedule changes that include additional shifts require a 14-day advanced notice.
Perform work under this contract according to the following:
(a) Limit work as provided for in Sections 104, 105, 107, 156, and 157.
(b) Limit application of surface treatments or fog seal according to Subsections 406.05 and 409.07.
(d) Before applying pavement markings according to Section 634, submit Pavement Marking Plan (PMP) according to Subsection 634.03.
(e) Perform work from 7:00 a.m. to 8:00 p.m., unless otherwise restricted by Subsection 108.01, or allowed under Subsection 156.08.
(f) When working within ¼ mile of campgrounds, cabins, and residential areas, do not start work before 8:00 a.m. unless approved.
(g) Perform Section 406 and 409 work in Campgrounds work is only allowed Monday through Thursday, from July 12, 2021 through July 22 2021., Section 406 and 409 work in and campgrounds work is not allowed outside these dates.
(h) Do not apply surface treatments over manholes; or other utility and drainage covers.
(i) Perform work on all Option X routes north of State Highway 36, after July 31.
108.01A Labor. (Added Subsection).
Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.
Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements (Davis- Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.
Sheet and Description
SECTION C SECTION D SECTION E SECTION F -
TYPICAL
SECTIONS PLANS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 72.3 3.7 76.0 See sheet C.1
A0120 40601-0000 FOG SEAL TON 267 13 280
A0160 40702-0300 CHIP SEAL, TYPE 1C SQYD 414,604 10,396 425,000
A0180 40711-0000 EMULSIFIED ASPHALT TON 742.9 57.1 800.0
A0200 40712-0000 BLOTTER TON 40 As directed by CO
A0220 40901-2000 MICRO SURFACING, TYPE 2 SQYD 124,095 5,905 130,000
A0240 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 665 35 700 See sheet C.2
A0260 41401-3000 CRACKS, CLEANING AND FILLING LNFT 200 50 250
A0280 41402-2000 CRACKS, CLEANING AND SEALING Parking area crack sealing converted to
MILE 1.97 0.13 2.10 units of miles (22'width)
A0300 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 75 15 90 As directed by CO
A0320 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 1,552 148 1,700 As directed by CO
A0340 50202-0000 SEALING JOINTS AND CRACKS LNFT 200 20 220
A0360 55901-0000 MEMBRANE WATERPROOFING (PREFORMED MEMBRANE SYSTEM) SQYD 607 607 See sheet C.2
A0380 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0400 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH HOUR 40
A0420 62201-2360 VACUUM SWEEPER HOUR 40
A0440 62301-0000 GENERAL LABOR HOUR 40
A0460 63315-0000 RUMBLE STRIP SQYD 23 2 25
A0480 63401-0000 PAVEMENT MARKINGS (TYPE B) LNFT 1,772,797 47,203 1,820,000
A0500 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B) EACH 122 3 125
A0520 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 220 220
A0540 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 4 4
A0560 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 1 1
A0580 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 161,727 8,273 170,000
A0600 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 250 250
A0620 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 2,300 2,300
A0640 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 250 250
A0660 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 72 72
Amendment A003 Amendment Review Date: 11/16/20 Report Date: 11/16/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES -
-N ov -2
7:
A M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities
C
U se rs \C lin to n.
C ho y\ D es kt op \P
S
E R ev ie w
E ng in ee r\ R ev ie w s\ C A N
PS
P
P
LA
V O
9( 2)
PP
L as se n\
A m en dm en t\
EE
B A C S F ile s\
[S he et s
B .1 t hr ou gh
B .2
.x ls m ]S he et
STATE PROJECT
B.1NPS PP LAVO 2019(2)CA
SHEET
NUMBER
James Mills Digitally signed by James Mills DN: CN=James Mills, OU=A01410D0000017069CDBEED00003F24, O=Unaffiliated, C=US Date: 2020.11.17 09:11:34-07'00'
Sheet and Description
SECTION C SECTION D SECTION E SECTION F -
TYPICAL
SECTIONS PLANS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0060 15401-0000 CONTRACTOR TESTING LPSM ALL
X0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A003 X0100 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH SQYD 24,653 347 25,000
A003 X0120 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 4,027.0 73.0 4,100.0
X0140 40712-0000 BLOTTER TON 20 As directed by CO
X0160 40901-2000 MICRO SURFACING, TYPE 2 SQYD 5,333 367 5,700
A003 X0180 41101-1000 PRIME COAT, METHOD 1 TON 34.7 0.3 35.0
X0200 41402-2000 CRACKS, CLEANING AND SEALING Parking area crack sealing converted to
MILE 0.42 0.18 0.60 units of miles (22'width)
X0220 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 48 2 50 As directed by CO
X0240 62301-0000 GENERAL LABOR HOUR 40
X0260 63315-0000 RUMBLE STRIP SQYD 23 2 25
X0280 63401-0000 PAVEMENT MARKINGS (TYPE B) LNFT 1,400 100 1,500
X0300 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B) EACH 4 1 5
X0320 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 400 400
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number
C
U se rs \C lin to n.
C ho y\ D es kt op \P
S
E R ev ie w
E ng in ee r\ R ev ie w s\ C A N
PS
P
P
LA
V O
9( 2)
PP
L as se n\
A m en dm en t\
EE
B A C S F ile s\
[S he et s
B .1 t hr ou gh
B .2
.x ls m ]S he et
2)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
-N ov -2
7:
A M
A003 Amendment Review Date: 11/16/20 Report Date: 11/16/20
STATE PROJECT
B.2NPS PP LAVO 2019(2)CA
SHEET
NUMBER
James Mills Digitally signed by James Mills DN: CN=James Mills, OU=A01410D0000017069CDBEED00003F24, Date: 2020.11.17 09:11:06-07'00'
3 Revised by Amendment 003
0.35
0.35
1,848 3,696 603.7 5.2
5.2
1,848
3,696 603.7
24,653 4,027.0 34.7
James Mills Digitally signed by James Mills DN: CN=James Mills, OU=A01410D0000017069CDBEED00003F24, Date: 2020.11.16 08:09:31-07'00'
ROUTE 0902EZ
PARK HEADQUARTERS/INTERPRETATION
AND EDUCATION BUILDING PARKING
ROUTE 0931
MAINTENANCE SERVICE
RV PARKING
ROUTE 0900
LASSEN HEADQUARTERS PARKING
ROUTE 0901
NATURALIST DIVISION
ANNEX PARKING
ROUTE 0902BZ
PARK HEADQUARTERS /
FIRE STATION PARKING B
ROUTE 0902CZ
PARK HEADQUARTERS /
FIRE STATION PARKING C
ROUTE 0902AZ
PARK HEADQUARTERS / RANGER
AND MAINTENANCE PARKING A
ROUTE 0902DZ
PARK HEADQUARTERS /
RANGER OPERATIONS PARKING
ROUTE 0419Z
LASSEN FIRE ROAD
ROUTE 0413Z
LASSEN HEADQUARTERS
/ RESIDENCE LOOP
ROAD CUL DE SAC
ROUTE 0415Z
MAINTENANCE ACCESS
ROAD (OLD VIOLA ROAD)
ROUTE 0416Z
MAINTENANCE
SERVICE ROAD
ROUTE 0412Z
LASSEN HEADQUARTERS /
RESIDENCE LOOP ROAD EAST
ROUTE 0414Z
LASSEN HEADQUARTERS /
RESIDENCE LOOP ROAD WEST
ROUTE 0414Z
LASSEN HEADQUARTERS /
RESIDENCE LOOP ROAD WEST
(NO WORK)
ROUTE 0412Z
LASSEN HEADQUARTERS /
RESIDENCE LOOP ROAD EAST
(NO WORK)
ROUTE 0412Z
LASSEN HEADQUARTERS/
RESIDENCE LOOP
ROAD EAST
(NO WORK)
NOTE:
1. See Road Inventory Program (RIP) data for Lassen Volcanic National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
J
Tr a ns p o rt a tio n\
W
X
W F
L
P P
_L A
V O
\7
F
H W
A \T
\R o a d w a y\
C A
D D
S h e e ts
\D \L
A V
O _A
R E
A M
A P
S
A R
E A
M A
P
(d am e n d m e n t.
m xd
1/
/2
:2
:3
A
M
NPS PMIS NO.: 261171
0 500 1,000 Feet
STATE
NPS PP LAVO 2019(2)
SHEET
NUMBER
CA
PROJECT
Chip Seal
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
LEGEND:
Micro Surfacing Type 2
LASSEN VOLCANIC
NATIONAL PARK
AREA MAP 1
OPTION X
D.7
Asphalt Concrete Pavement (3 " overlay)
No Work Unless Noted Otherwise
3 Revised by Amendment 003
James Mills Digitally signed by James Mills DN: CN=James Mills, OU=A01410D0000017069CDBEED00003F24, O=Unaffiliated, C=US Date: 2020.11.16 08:11:31-07'00'
Clinton.Choy Polygon
Clinton.Choy Polygon
Clinton.Choy Polygon
File details come from the government source that posted it. Updated .