MT Musselshell 192(1), Old Divide & Fattig Creek Road
This project consists of Crack filling/sealing & deep patching paving, striping of routes of 6.3 miles of Old Divide Road and 2 miles of crack seal and chip seal on Fattig Creek Road and other small items of work.
Project length: 8.3 Miles
Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1 million to $2 million
Location: 32 miles North of Billings, Montana.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes DIVISION 200 – Earthwork 204 Subexcavation 1600 CY YD
207 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C (NONWOVEN)
207 GEOGRID, STABILIZATION
2000 SQ YD
3600 SQ YD
DIVISION 300 – Aggregate and Base Courses
301 AGGREGATE BASE GRADING C 2900 TON
302 ROADWAY AGGREGATE, METHOD 2
302 ROADWAY AGGREGATE, SHOULDER FINISHING
230 TON
12.75 mi
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 ASPHALT CONCRETE PAVEMENT, TYPE 1 (LEVELING COURSE)
403 ASPHALT CONCRETE PAVEMENT, TYPE 1
4650 TON
9300 TON
407 Chip Seal 407 Emulsified Asphalt
33,850 SQYD
37 TON
412 Tack Coat 70 TON 414 Asphalt Pavement Crack Sealing & Filling 13000 LNFT
On e S ch ed ul e
Sc h
Na m e
622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 634 Permanent Pavement Markings 355,000 635 Temporary Traffic Control – Flagger 1140 HOUR 635 Temporary Traffic Control – Pilot Car 200 HOUR 635 Temporary Traffic Control – Construction Sign 162 SQ FT 635 Temporary Traffic Control – Tubular Marker 100 EACH
| DIVISION 200 – Earthwork |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |