PROJECT DESCRIPTION.pdf

PDF 160 KB Posted

Attached to
WA PACIFIC 2015(1), PUBLIC ACCESS ENHANCEMENT TO WILLAPA NATIONAL WILDLIFE REFUGE
Solicitation number
69056720B000009
Issued by

About this file

This document describes a federal contract opportunity for reconstruction work on a public access road within Willapa National Wildlife Refuge. The project involves excavation, sub-excavation, base rock, paving, signage, stripping, installation of an electric gate, drainage improvements, and development of parking areas along 0.5 miles of roadway. Estimated pricing for the work is between $1 million to $2 million. The completion date is fall 2020. The solicitation is a small business set-aside offered by the Department of Transportation Federal Highway Administration located near Long Beach, Washington.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA PACIFIC 2015(1), PUBLIC ACCESS ENHANCEMENT TO WILLAPA

NATIONAL WILDLIFE REFUGE

This project will enhance safety and public access to Willapa National Wildlife Refuge (Refuge) through reconstruction of the existing roadway. Work includes, excavation, sub-excavation, base rock, paving, signage, stripping, electric gate, drainage, and parking areas.

Project length: 0.5 Miles

Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: within 4 miles of Long Beach, Washington

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Sc he du le

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (silt fence) 200 lnft 157 Soil Erosion & Sediment Control (fiber roll) 5755 lnft du le

A

157 Soil Erosion & Sediment Control (check dam) 30 each

DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (removal of gate) 2 each 203 Removal of Structures & Obstructions (removal of fence) 1422 lnft 203 Removal of Structures & Obstructions (removal of pavement) 970 sqyd 204 Roadway Excavation 2205 cuyd 204 Subexcavation 3275 cuyd 204 Select Borrow 3300 cuyd 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics 4400 sqyd 207 Earthwork Geosynthetics 6005 sqyd

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 8100 ton

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1000 ton 412 Asphalt Tack Coat (asphalt surface treatment) 6 ton

DIVISION 600 – Incidental Construction 609 Curb & Gutter (concrete – minor structures) (indicate which) 195 lnft 609 Curb & Gutter (concrete – minor structures) (indicate which) 15 each 615 Sidewalks, Pads & Paved Medians (concrete – minor structures) 547 sqyd 619 Fences, Gates, Cattle Guards & Bollard Posts 1422 lnft du le

A

619 Fences, Gates, Cattle Guards & Bollard Posts 1 each 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 625 Turf Establishment (indicate seeding or mulching separately) 1 acre 634 Permanent Pavement Markings (traffic pavement markings) 11000 lnft 634 Permanent Pavement Markings (traffic pavement markings) 10400 lnft 635 Temporary Traffic Control – Barricade Type 3 4 each 635 Temporary Traffic Control – Construction Sign 63 sqft 645 Locating Utilities 646 Roadside Development (fixture, bench) 2 each 646 Roadside Development (fixture, kiosk) 1 each

File details come from the government source that posted it. Updated .