PROJECT_DESCRIPTION.pdf

PDF 190 KB Posted

Attached to
AZ NPS PP GRCA 2019(2), Pavement Preservation Grand Canyon
Solicitation number
69056719R000020
Issued by

About this file

Project Description

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AZ NPS PP GRCA 2019(2), Pavement Preservation Grand Canyon, Coconino, AZ.

This project consists of crack sealing, patching, application of chip seal and micro surface treatments, pavement marking and other small items of work.

Project length: Base: 50.45 Miles. Option 23.37 Miles

Tentative Fixed Completion Date: Summer 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $10 million to $15 million

Location: Approximately 5 miles North of Tusayan and 35 miles South of Jacob Lake, AZ

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Ba se

Op tio n X

DIVISION 150 – Project Requirements 151 Mobilization (yes/no) Yes Yes 152 Construction Survey & Staking (yes/no) Yes No 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes

DIVISION 400 – Asphalt Pavements & Surface Treatments

406 Fog Seal 440 TON 175 TON 407 Chip Seal, Type 1C 700,000 SQYD 275,000 SQYD 407 Emulsified Asphalt 1,200 TON 5000 TON 407 Blotter 40 TON 40 TON 409 Micro surfacing,Type 2 87,000 SQYD 34,000 SQYD 414 Cracks, Cleaning and Filling 760 LNFT 84 LNFT 414 Cracks, Cleaning and Sealing 35.00 MILE 21 MILE 418 Asphalt Concrete Pavement Patching, Type 1 2,300 SQYD 0 SQYD 418 Asphalt Concrete Pavement Patching, Type 2 5,300 SQYD 1,900 SQYD

DIVISION 500 – Rigid Pavements 502 Concrete Pavement Restoration, Pavement Patch 60 SQYD 0 SQYD

Ba se

Op tio n X

502 Sealing Joints and Cracks 7,500 LNFT 0 LNFT

DIVISION 600 – Incidental Construction 622 Rental Equipment (yes/no) Yes No 623 General Labor (yes/no) Yes No 633 Rumble Strip 300 SQYD 0 SQYD 634 Permanent Pavement Markings (traffic pavement marking, Type

B) 2,300,000 LNFT 1,000,000 LNFT

634 Permanent Pavement Markings (solid, Type H) 450 LNFT 0 LNFT 634 Permanent Pavement Markings (symbols, Type B) 330 EACH 0 EACH 635 Temporary Traffic Control (Cone) 220 EACH 0 EACH 635 Temporary Traffic Control (Pavement Markings) 215,000 LNFT 125,000 LNFT 635 Temporary Traffic Control (Construction Sign) 250 SQFT 0 SQFT 635 Temporary Traffic Control – Pilot Car 450 HOUR 150 HOUR 635 Temporary Traffic Control – Traffic Control Supervisor 55 DAY 15 DAY 635 Temporary Traffic Control – Flagger 1,500 FXHR 500 FXHR

Location: Approximately 5 miles North of Tusayan and 35 miles South of Jacob Lake, AZ
DIVISION 400 – Asphalt Pavements & Surface Treatments

File details come from the government source that posted it.