PROJECT_DESCRIPTION.pdf
PDF 164 KB Posted
- Solicitation number
- 69056719R000017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MOJA_C6_RipReport.pdf | ||
| RFP.pdf | ||
| MANZ_C6_RipReport.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA NPS PP MANZ 2019(1), Pavement Preservation Manzanar, National Park Service – Manzanar National Historic Site and Mojave National Preserve, Inyo and San Bernadino Counties, California
The work consists of crack sealing, patching, application of micro surface treatment and pavement markings and other small items of work.
Project length: 5.39 Miles
Tentative Fixed Completion Date: Spring 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1 million to $2 million
Location: Lone Pine, CA
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
DIVISION 150 – Project Requirements 151 Mobilization (yes/no) Yes 152 Construction Survey & Staking (yes/no) No 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
DIVISION 400 – Asphalt Pavements & Surface Treatments 406 Fog Seal 410 TON 407 Blotter 10 TON 409 Micro Surfacing, Type 2 66,000 SQYD 414 Asphalt Pavement Crack Sealing & Filling 500 LNFT 414 Asphalt Pavement Crack Sealing & Filling 2.3 MILE 418 Asphalt Concrete Pavement Patching, Type 2 120 SQYD
DIVISION 600 – Incidental Construction 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 633 Rumble Strip 30 SQYD 634 Permanent Pavement Markings, (Type B) 6,300,000 LNFT 634 Permanent Pavement Markings, Symbols (Type B) 30 EACH 635 Temporary Traffic Control – Cone 440 EACH 635 Temporary Traffic Control – Portable Changeable Message Sign 4 EACH
O ne
S ch ed ul e Sc h N am e
635 Temporary Traffic Control – Pavement Markings 6,400 LNFT 635 Temporary Traffic Control – Construction Sign 150 SQFT 635 Temporary Traffic Control – Traffic Control Supervisor 45 DAY 635 Temporary Traffic Control – Flagger 2,900 FXHR
File details come from the government source that posted it.