Carbon_River_Bridge_Inspection_Report.pdf

PDF 830 KB Posted

Attached to
WA FS ERFO 2016(1)-20(6), Snoqualmie Repairs 2016, Phase II
Solicitation number
69056719Q000025
Issued by

About this file

Physical Data

View the file

Other files

File Type Posted
RFQ_Snoqualmie_Repairs_Phase_2.pdf PDF
Plans_WA_FS_ERFO_2016(1)-20(6).pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspection Date: 9/27/2018

Route: 7810000 Milepost: 0.1000 Structure No:

OVER

County, (Signature)

BRIDGE INSPECTION AND MANAGEMENT PROGRAM

Insert Cover photo here.

CARBON RIVER BRIDGE-FLTPP

MT BAKER-SNOQUALMIE NATIONAL FOREST

USDA FOREST SERVICE, REGION 6

060507000003032

ROAD BRIDGE INSPECTION REPORT

ROUTINEINSPECTION TYPE:

Pierce Washington

CARBON RIVER BRIDGE-FLTPP CARBON RIVER

INSPECTION TEAM LEADER: Luke Silvis

U.S. DEPARTMENT OF AGRICULTURE

Structure Name: (8)Structure No:

(5D)Route:

Forest:

702.0 14.0 99.9

(45)No. Main Spans: 6

(46)No. Appr Spans: 0

No. Substrs: 7

(in Tons) Inventory Safe Load Capacity

HL-93 (RF) -

HS-20 32

Type 3 32 Type 3S2 34 Yes/No Type 3-3 36 N 0 Months NRL (RF) N 0 Months Rating Date: N 0 Months

(41) Posting Status:

(70) Posting Capacity:

(31)Design Load:

(63,65)Method of Load Rating:

Yes No X

Date:

Inspection Team: Leader: Jurisdiction:

Weather: Latitude:

Township: 33 Meridian:

(9)Location:

Narrative Report: (Add additional sheets if necessary)

WASHING TRUE 95

PIERCE FALSE

CARBON RIVER BRIDGE-FLTPP

The Carbon River Bridge is a six span bridge with spans consisting of three prestressed bulb-tee superstructure and pier shaft substructure. U/S = Rt. Nomenclature is Abutment 1, Piers 1-5, Abutment 2. The bridge is generally in good condition. There is evidence of cracking in the flanges of the tees near the pier caps and cracking below the bottom of the bulb tees in the pier cap concrete. This condition is found throughout the bridge. There is evidence at the bridge of recent significant erosion of both upstream banks. During the winter of 2015, floods eroded the BOB embankment on the upstream side and washed away most of the riprap.

Armoring of both abutments is planned to be accomplished in the next year through ERFO and Forest funds.

Recommended Inspection Frequency:

Luke Silvis 46.9958

10:45 AM

sunny 45 °F

.1 MI N OF 78 / 7810 JCT.

Months

18N Range: 7E Section:

Operating

(49)Overall Br Length:

Description:

Other

Posting

692.0

Paved

Stringer/Multi-Beam Or Girder

NBIS Bridge Opening:

99.99 0

BRIDGE RATING SUMMARY:

(47)Horizontal (53)Vertical (34)Skew:

(107)Deck StructureType: Integral W/Prestress Unit (108A)Wearing Surface:

USDA FOREST SERVICE, REGION 6

CARBON RIVER(11)Milepost: 0.1000

BRIDGE IDENTIFICATION AND LOCATION

060507000003032

MT BAKER-SNOQUALMIE NATIONAL FOREST

(32)Approach Roadway Width:

(48)Max Span:

(52)Deck Width out-out: 16.8

6-span prestressed conc. bulb-t on drilled shafts

(51)Roadway Width (Curb to Curb):

Security ID 0605NORTH BEND

7810000 (6)Feature Crosse

16.0

BRIDGE DESCRIPTION and MEASUREMENTS MT BAKER-SNOQUALMIE District:

116.5 (27)Year Built:

12/7/2005 Open, No Restriction At Or Above Legal Loads

Critical Findings:

SPECIALIZED INSPECTIONS:

(43B)Superstr Type:

Specialized Inspections Required

(23 CFR 650.303)

Based on this inspection, is additional inspection work needed in these specialized inspection areas?

If Yes How Soon Neede

Solid Shaft Pier

(43A)Superstr Material:

(44A)Superstr Material: Other

Concrete, Prestressed

Concrete, ReinforcedSubstr Material:

(44B)Superstr Type:

Longitude: -121.9192

Re-rating required based on this inspection?

Substr Type:

FS

Inspection Template Revision Date: 05/31/2017

Infra data used for this report was pulled on: 04/23/2017

1/4 Sect:

8:30 AM

(92A) Fracture Critical (92B) Underwater (92C) Special

HS25+ BU99/BU101

1 - LOAD FACTOR REPORTED AS TONS

Time Completed:

9/27/2018 Time Started:

INSPECTION INFORMATION

Special Equipment Need

9/27/2018

Milepost: 0.1000 060507000003032

CODE

* 1. G C1. G C2. - C3. - C4. F C5. G C6. G C7. No

* 1. F

G

* 2. -

* 3. -

* 4. -

C1. G C2. -

C3. NOB

C4. NOB

*1. G *2. F *3. G

*4. - *5. - *6. - *7. - *8. -

*9. G *10. - *11. - *12. - *13. G *14. G *15. G *16. G *17. F *18. G *19. - *20. - *21. -

AB

U

TM

EN

TS

PI

ER

S

Timber Abutments (incl. WW)

Other Abutments

Columns or Walls See narrative page 5

7810000

Structure Name:

Route:

Walls Piles

b. Portals

c. Verticals/Diagonals

Bearing Devices Paint

d. Bracing

Deflection Under Load Vibration Under Load

Alignment (tilting, rotating, etc.)

CARBON RIVER BRIDGE-FLTPP

See narrative page 5

Erosion or Scour Settlement

Alignment (tipping, tilting, etc.)

Crib Walls/Tie Backs

Caps Footings

Wingwalls

Caps are on drilled shafts in good condition

See narrative page 5

* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.

1 Also includes wingwalls connected to the superstructure above the beam seat.

2 Includes wingwalls integral with the abutment or the portion of the wingwall below the bearing seat.

59. SUPERSTRUCTURE:

Sidewalks Drains and Drainage No rain for several days and water is still leaking between girder flanges

Expansion Joints Curbs

Rideability Cleanliness Utilities

Floor Beams

60. SUBSTRUCTURE:

Caps

Structure No:

Date:

Footings Piles

Scour is undermining caps threatening approach embankment

Caps

Backing Planks Sills/Footings

Settlement

Not observed during this inspection Not observed during this inspection

See narrative page 5

Stringers

Erosion or Scour

Bracing

CONDITION CODES and REMARKS

AC wearing surface with monir wear

Shear cracks on girders extend up into top flange/integral deck

Wearing Surface

Deck Slab/Panels/Joists

REMARKS(Overall Code for item, to be reported to FHWA, in bold box)

58. DECK:

Posts/Piles/Tie Backs

Girders 3 ea.

a. Diaphragms

b. Bracing

a. Chords Trusses

Milepost: 0.1000

CODE

1. G

2. F

3. G

4. G

5. F

6. 15.2

N *1. - *2. - *3. - *4. -

5. -

F

1. F

2. F

3. F

4. G

36A 0 36B 0 36C 0 36D 0 A. G B. - C. - D. -

1. -

2. P

1. P

2. G

N

CONDITION RATING OF EACH MEMBER OR ELEMENT

-NOT APPLICABLE

-APPLICABLE, BUT NO OBSERVED. (Give reason unless obvious)

-ELEMENT IN NEW OR GOOD CONDITION WITH NO REPAIRS NECESSARY.

-ELEMENT IS STILL PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED BUT MAY NEED MAINTENANCE.

-ELEMENT IS PERFORMING AT REDUCED CAPACITY.

-ELEMENT IS NOT PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED

Approach Rail Ends Approach Guardrails

Approach Settlement APPRAISAL CODES and REMARKS

Bridge Railing

C O

N D

IT

IO

N of e le m en ts

36. TRAFFIC SAFETY FEATURES:

Rail Transitions

Loss of riprap at both approaches has left embankments vulnerable

AC at BOB was undermined and broken up

Channel Protection

Observed Lateral Movement

Surfacing (Not needed for reporting to FHWA)

Vegetation Waterway Obstructions/Drift

Braided stream that shifts from side to side in valley bottom

Shape Seams or Joints Material Condition

61. CHANNEL and CHANNEL PROTECTION:

(Overall Code for item, to be reported to FHWA, in bold box) REMARKS

Channel Scour/Erosion

Foundations

Steep at BOB right due to loss of embankment Some loss of embankement at BOB

Shoulder Embankment Roadway Embankment

APPROACH CONDITION:

Headwall/Wingwall

G = GOOD

C = CRITICAL

72. APPROACH ROADWAY ALIGNMENT:

67. STRUCTURAL EVALUATION

NOB

F = FAIR

P = POOR

69. UNDERCLEARANCE:

7810000

Structure Name:

Route:

CARBON RIVER BRIDGE-FLTPP

Signing

Clear Height Height (feet) from thalwag to bottom of lowest superstructure member

62. CULVERTS

CONDITION CODES and REMARKS (continued) Structure No.:

Date:

060507000003032

9/27/2018

Missing 3 of 4Object Markers

68. DECK GEOMETRY:

Road intersection 80' from BOB Horizontal Vertical

29. ROAD ADT

* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.

71. WATERWAY ADEQUACY:

113. SCOUR CRITICAL BRIDGES: Bridge founded on deep drilled shafts at all locations

Milepost: 0.1000 Structure No.:

Work Item Category Detailed Work Item Description

Inspection Routine bridge inspection every 2 years

Approach Condition Repair approach fill at BOB, 20 CY

Channel Install riprap at both abutments

(600 CY)

Inspection Monitor crackign of caps and girder ends

Traffic Safety Features

Traffic Safety Features

Traffic Safety Features

Substructure Repair pier caps xxx xxx xxx xxx xxx

#N/A

#N/A

#N/A

#N/A

#N/A xxx

- xxx

Concrete Abutments/Piers - Repair/Patch 500

- xxx

EA

SF

#N/A

#N/A

#N/A

Signing - Repair/Replace Object Markers

Bridge Railing - Upgrade Bridge Railing 1402

Approach Railing - Upgrade Bridge Approach Railing 200LF

LS

LF

Monitor

Embankment - Repair Approach Fill 20

Channel Protection - Add/Repair Riprap 600

LS/B

CY

LSRoutine Bridge Inspection - Simple

#N/A

#N/A

#N/A

8002001

8003001

5003001

#N/A

#N/A

#N/A

#N/A

#N/A

6001003

9003003

8001002

Work Item Code

7003002

9001001

Unit

RECOMMENDED WORK ITEMS

Work Item Quantity

0605070000030327810000

9/27/2018Date:CARBON RIVER BRIDGE-FLTPP

Route:

Structure Name:

Date:

7810000 Milepost: 0.1000 Structure No:

Item Reference

60.15

60.17

60.18

Remarks

CARBON RIVER BRIDGE-FLTPPStructure Name:

Route:

9/27/2018

060507000003032

PIER CAPS: Pier 1-spalls in cap at girder bearings all 6 locations; Pier 2-spalls at 3 span 2 bearings and only small cracks in span 3 bearings; Pier 3-cracks only at all 6 bearing locations; Pier 4-on span 4 side has cracks at all 3 bearing locations, u/s and d/s are more significant, span 5 side all 3 bearing locations are spalled; Pier 5-is spalled at all 6 bearing locations

PIER EROSION: Pier 1 D/S face - 9.8'; Pier 2 D/S face - 12'; Pier 3 has 3.7ft of steel casing exposed, 18.2 ft total exposed; Pier 4 D/S face - 9.6'; Pier D/S face - 11'

All piers have map cracking. Pier 3 has 9 bullet spalls on span 2 face and 1 bullet spall on D/S face;

ITEM REFERENCE AND REMARKS ~ NARRATIVE REPORT

Route: Milepost: 0.1000

9/27/2018

060507000003032Structure No:

CARBON RIVER BRIDGE-FLTPPStructure Name:

7810000

Insert photo here.

Approach Ahead on Station

BRIDGE PHOTOS

Approach Back on Station

Insert photo here.

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Looking Upstream from the Bridge Deck

Looking Downstream from the Bridge Deck

Route: Milepost: 0.1000

Insert photo here.

Looking Downstream - Elevation Profile

Looking Upstream - Elevation Profile

9/27/2018

Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Structure Name:

7810000

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Insert photo here.

Looking Upstream Elevation Profile of Span 6

Looking Downstream Elevation Profile of Span 6

Route: Milepost: 0.1000

Abutment 2 Elevation

9/27/2018

Structure No: 060507000003032

Insert photo here.

Insert photo here.

Abutment 1 Elevation

BRIDGE PHOTOS - cont.

Structure Name:

Route: Milepost: 0.1000

Pier 2 Looking from BOB to EOB

9/27/2018

Structure No: 060507000003032

Insert photo here.

Insert photo here.

Pier 1 Looking from BOB to EOB

BRIDGE PHOTOS - cont.

Structure Name:

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Insert photo here.

Pier 3 Looking from BOB to EOB

Pier 4 Looking from BOB to EOB

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Insert photo here.

Pier 5 Looking from EOB to BOB

Typical Underside of Bridge

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Insert photo here.

Typical Joint at BOB

Approach erosion at BOB

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Insert photo here.

Spalled concrete at Pier Cap and girder tie-in

Cracks in girder ends that start in the web and extend to the top flange

Route: Milepost: 0.1000

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

7810000 Structure No: 060507000003032

BRIDGE PHOTOS - cont.

Insert photo here.

Typically spalling in pier caps

Typical Bearing Conditions

Structure Name: Date:

Route: 7810000 Milepost: 0.1000

15.2 .-3.5'

2016 2018 2021 2023 2025 2027 2029 Post No.

5 12.5 12.2 0 0 0 0 0 2 13 13 13.2 0 0 0 0 0 3 36 11.5 11.2 0 0 0 0 0 6 59 10 9.9 0 0 0 0 0 9 82 10 9.5 0 0 0 0 0 12 105 11.5 10.4 0 0 0 0 0 15 121 13 12.6 0 0 0 0 0 17 128 13 15.4 0 0 0 0 0 18 144 13.1 18.7 0 0 0 0 0 20 151 13.2 16.6 0 0 0 0 0 21 174 16 17 0 0 0 0 0 24 197 17 16.1 0 0 0 0 0 27 220 17.5 14.6 0 0 0 0 0 30 243 16 14.1 0 0 0 0 0 33 266 18.3 18.4 0 0 0 0 0 36 289 17.6 17.8 0 0 0 0 0 39 313 16.5 16.9 0 0 0 0 0 42 336 17.5 20.8 0 0 0 0 0 45 359 15.8 20.2 0 0 0 0 0 48 374 15 18.8 0 0 0 0 0 50 382 14.3 14.1 0 0 0 0 0 51 405 14 13.7 0 0 0 0 0 54 428 13.6 13.2 0 0 0 0 0 57 443 13.5 13 0 0 0 0 0 59 466 12.8 12.8 0 0 0 0 0 62 489 13.5 13 0 0 0 0 0 65 512 13.6 13.6 0 0 0 0 0 68 535 13.3 13.6 0 0 0 0 0 71 558 15.5 15 0 0 0 0 0 74 581 15 15.2 0 0 0 0 0 77 604 13.6 13.5 0 0 0 0 0 80 627 15 15 0 0 0 0 0 83 635 17.8 18 0 0 0 0 0 84 650 17.7 17.2 0 0 0 0 0 86 673 14.2 16.9 0 0 0 0 0 89 697 10.2 10 0 0 0 0 0 92

Water Surface

Horizontal Dist Measured from A-1 Distance Measured from Top of Curb U.S Side @ Each Rail Post

9/27/2018 Structure No: 060507000003032

CARBON RIVER BRIDGE-FLTPP

Input Cross-Section Data:

Height (feet) from thalwag to bottom of lowest superstructure member

Structure Name: Date:

Route: 7810000 Milepost: 0.1000

Channel Cross Section

CARBON RIVER BRIDGE-FLTPP 9/27/2018

Structure No: =H2

0 100 200 300 400 500 600 700 800

Top of Curb

(Substructure elements can be inserted in the cross-section using Insert, Shapes )

Milepost:

ID

Description

Needed for Real Property Verification

Y Re-rating required? (Enter Y/N) N Specialized Equipment Required? (Enter Y/N)

Infra Summary Data

Structure Name: CARBON RIVER BRIDGE-FLTPP 9/27/2018

Route: 7810000 0.1000 Structure No: 060507000003032

Main Data Appraisal Data

Insp Team Leader

Inspection_Type (System Generated) (System Generated) Inspection Date 9/27/2018 ROUTINE Inspection Freq 24

Wear Srfc Cond 7 Deck Cond (58) 6

Inspection Cost Aprch Cond F

Culvert Cond (62) N Channel Cond (61) 7

Supstr Cond (59) 6 Substr Cond (60) 5

Inspected By* Luke Silvis Done By (Org) FS - FOREST SERVICE

Scour Crit Br (113) 8 Insp Resp Name FS - FOREST SERVICE

Main Data Appraisal Data

Done By Name (Unit) REGIONAL OFFICE

Str Eval (67) 5 Deck Geom (68) 6

Approach Align (72) 4

Underclr (69) N Waterway Adq (71) 8

Insp Remarks

The Carbon River Bridge is a six span bridge with spans consisting of three prestressed bulb-tee superstructure and pier shaft substructure. U/S = Rt.

Nomenclature is Abutment 1, Piers 1-5, Abutment 2.

The bridge is generally in good condition. There is id f ki i th fl f th t th

Approach Rail Ends (36D) 0

Luke Silvis

Insp Team

Transition (36B) 0 Approach Guardrail (36C) 0

Traffic Rail Safety Features Appraisal Bridge Rail (36A)

Cover
1-Title
2-Condition
3-Condition(cont) & Appraisal
4 Work Items
5-Narrative
6a-Photos
6b-Photos
6c-Photos
6d-Photos
6e-Photos
6f-Photos
6g-Photos
6h-Photos
6i-Photos
6j-Photos
6k-Photos
8-Cross -Section
Infra Summary

File details come from the government source that posted it.